{"id":19659,"date":"2025-12-04T12:26:16","date_gmt":"2025-12-04T11:26:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19659"},"modified":"2026-05-12T14:11:02","modified_gmt":"2026-05-12T12:11:02","slug":"coupling-pieces","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces","title":{"rendered":"Coupling pieces"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Coupling pieces<\/strong> are components that connect pipes and hoses securely, leak-tight, and with load-bearing capacity. In hydraulic and pneumatic systems for demolition, gutting works, and tunnel construction, they provide the basis for reliable media routing. In applications with tools from Darda GmbH &#8211; such as when using <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> &#8211; coupling pieces create the hydraulic connection from the <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power unit<\/a><\/em> through lines to the cylinder, the shear, or the cutter. Their quality determines performance, tightness, occupational safety, and downtime on the construction site. Consistent component selection, documented assembly, and preventive maintenance reduce unplanned stops and extend service life under harsh operating conditions.<\/p>\n<h2>Definition: What is meant by coupling pieces?<\/h2>\n<p>Coupling pieces are positive- and friction-locking connections for rigid pipes and flexible lines that transport media such as hydraulic oil, water, or air. They typically consist of a body, union nut, sealing elements, and optional support sleeves. Functions include joining, branching, reducing, shutting off, or quickly disconnecting a line. In high-pressure hydraulic systems, as encountered in <em>concrete demolition and special demolition<\/em> as well as in <em>rock excavation and tunnel construction<\/em>, coupling pieces must safely handle high pressure ratings, vibrations, and shock loads while being easy to install, corrosion resistant, and compatible with the media. In technical usage, terms such as <em>fitting<\/em>, <em>connector<\/em>, or <em>adaptor<\/em> are often used synonymously; decisive are the sealing principle, the permissible pressure range, and the assembly method specified by the manufacturer.<\/p>\n<h2>Design types and functional principles of coupling pieces<\/h2>\n<p>The design and sealing principle of a coupling piece define its application limits and installation effort. In practice, different designs are selected depending on medium, pressure, environment, and service concept. Correct pairing of body, ferrule\/support sleeve, and seal material is essential to achieve the intended performance window and prevent microleaks.<\/p>\n<h3>Cutting-ring and clamping fittings<\/h3>\n<p>Cutting-ring fittings for metallic pipes are widespread. When tightened, a cutting ring is pressed into the pipe, creating a positive lock and a metallic sealing edge. They are robust, vibration-resistant, and suitable for repeated disassembly. Clamp fittings with a support sleeve are used for thin-walled or soft pipe materials. Clean, burr-free pipe ends and correct pre-assembly of the ring are critical; over-tightening can cause microcracks, while under-tightening leads to creeping leakage under pulsation.<\/p>\n<h3>Threaded connections and fittings<\/h3>\n<p>Threaded fittings connect pipelines via tapered or parallel threads. Depending on standard and sealing system (e.g., soft seal, cone-on-cone, sealing edges), they are usable for hydraulics and media supply. Thread standard compatibility and proper sealing are crucial to avoid leaks. For tapered threads, compatible sealants are used sparingly; parallel, flat-sealing ports rely on defined elastomers and must not be contaminated with additional sealing agents.<\/p>\n<h3>Press fittings<\/h3>\n<p>Press fittings are cold-pressed. They reduce installation time and errors, especially in extensive piping networks, for example for water and dust suppression systems during <em>gutting works and concrete cutting<\/em>. Special systems are required for hydraulic high pressure; the specification must be matched to pressure, temperature, and medium. Press contours and marking rings should remain visible for inspection; unpressed connections are to be identified reliably during commissioning checks.<\/p>\n<h3>Plug-in and quick couplings<\/h3>\n<p>Quick couplings enable frequent tool-free disconnecting &#8211; important when switching tools between <strong>concrete demolition shears<\/strong>, <strong>attachment shear<\/strong>, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong>, <strong>steel shear<\/strong> or <strong>tank cutters<\/strong>. Flat-sealing variants reduce oil loss and air ingress. The coupling nominal size influences flow and pressure loss. For demanding duty cycles, double shut-off designs and versions with connect-under-pressure capability increase availability; protective caps and color coding improve cleanliness and error avoidance.<\/p>\n<h3>Flange connections<\/h3>\n<p>Flanges transmit high forces and are suitable for large nominal sizes. In stationary power units and at interfaces with high load cycles, they provide high repeatability during maintenance and disassembly. Defined tightening sequences and surface finishes on the sealing faces safeguard long-term tightness under pulsation.<\/p>\n<h3>Clamp collars for auxiliary structures<\/h3>\n<p>Clamp collars connect pipe frames and support systems, for example for temporary line routing, guardrails, or pipe attachments in <em>special applications<\/em>. They are not pressure-bearing, but must withstand vibrations, shock loads, and corrosion. Slip resistance, correct clamp geometry, and periodic torque checks are decisive for reliable auxiliary structures.<\/p>\n<h2>Requirements in concrete demolition, deconstruction, and tunnel construction<\/h2>\n<p>In practical use with tools from Darda GmbH, coupling pieces face extreme boundary conditions: abrasive dust, moisture, cold and heat, tight installation spaces, repeated coupling cycles, and pressure spikes during demolition. Hydraulic lines between the <em>hydraulic power pack<\/em> and the tool (e.g., <strong>rock splitting cylinders<\/strong>, <strong>concrete demolition shears<\/strong>) require leak-tight, pressure-surge-resistant connections that do not loosen under vibration. For water lines for dust suppression or cooling, corrosion-resistant materials, secure plug-in or press connections, and reliable locking are important. In tunnel headings, mud and limited visibility complicate installation &#8211; clear marking, protective caps for couplings, and a standardized procedure have proven their worth here.<\/p>\n<ul>\n<li><strong>Harsh environment measures:<\/strong> Use strain relief, abrasion protection, and bend restrictors; shield interfaces against impact; apply caps immediately after decoupling.<\/li>\n<li><strong>Operational consistency:<\/strong> Define uniform nominal sizes and coupling types across fleet and sites to reduce adapter chains and setup time.<\/li>\n<\/ul>\n<h2>Selection criteria for coupling pieces in high-pressure hydraulics<\/h2>\n<p>Selecting correctly minimizes downtime and increases process reliability.<\/p>\n<ul>\n<li><strong>Pressure rating and load spectrum:<\/strong> Define operating pressure, pressure spikes, pulsation, and vibrations. Allow for safety margins.<\/li>\n<li><strong>Medium and compatibility:<\/strong> Hydraulic oil, water, air, or emulsion; verify sealing materials for media and temperature compatibility.<\/li>\n<li><strong>Temperature range:<\/strong> Cold starts, solar radiation, winter conditions; consider material expansion and elastomer behavior.<\/li>\n<li><strong>Thread standard and port geometry:<\/strong> Combine only matching threads, sealing systems, and seats; use adapters purposefully.<\/li>\n<li><strong>Sealing principle:<\/strong> Flat-face, cutting ring, cone, O-ring &#8211; choose to suit pressure and vibration levels.<\/li>\n<li><strong>Corrosion protection:<\/strong> Zinc-plated, stainless steel, or coated &#8211; depending on humidity, salt, mud, and concrete contact.<\/li>\n<li><strong>Ease of assembly:<\/strong> Accessibility, repeatable torques, defined installation position; for frequent changes, quick couplings with protective caps.<\/li>\n<li><strong>Flow and pressure loss:<\/strong> Size nominal bores so that tool performance is not limited.<\/li>\n<li><strong>Service and cleaning:<\/strong> Disassembly without damage, simple seal replacement, good cleanability for contamination control.<\/li>\n<li><strong>Connect-under-pressure capability:<\/strong> Where residual pressure cannot be fully relieved, select appropriate quick couplings.<\/li>\n<li><strong>Documentation and traceability:<\/strong> Batch identification, material certificates, and clear part marking for safety-relevant assemblies.<\/li>\n<li><strong>Weight and ergonomics:<\/strong> Particularly for handheld tools or frequent tool changes, reduce mass at the interface.<\/li>\n<\/ul>\n<h2>Installation, leak-tightness, and test steps<\/h2>\n<p>Professional installation is crucial for leak-tightness and service life. Cleanliness, alignment, and correct tightening torque prevent consequential damage.<\/p>\n<h3>Preparation<\/h3>\n<p>Check components, inspect sealing surfaces, remove chips and particles. Clean ends; remove protective caps only immediately before joining. Use suitable support sleeves for cutting rings. Deburr and chamfer pipe ends; verify that hoses and ferrules are a matched pair and within shelf life.<\/p>\n<h3>Assembly<\/h3>\n<p>Route lines without stress, maintain bend radii, and ensure alignment. Use only approved lubricants or assembly pastes. Seal threads of tapered connections sparingly; do not apply additional sealants to flat-sealing systems. Use a counterhold with two wrenches to avoid introducing torsion; prevent hoses from twisting during tightening.<\/p>\n<h3>Tightening and documentation<\/h3>\n<p>Observe torque or angle tightening per manufacturer specifications. Then apply a mark and document installation (date, type, pressure rating). Count repeated disconnections for quick couplings to plan maintenance intervals. Record batch numbers of seals and critical fittings for traceability.<\/p>\n<h3>Leak test<\/h3>\n<p>Pre-check without pressure, then increase stepwise to operating pressure. Visual inspection for weeping, bubble formation, or creep. Recheck after the first hour; repeat after temperature changes. Include a hold time at maximum test pressure and a final check after several load cycles.<\/p>\n<h2>Typical failure modes and how to avoid them<\/h2>\n<ul>\n<li><strong>Over-tightening\/under-tightening:<\/strong> Incorrect torque causes leaks or cracks. Solution: calibrated tools, documented values.<\/li>\n<li><strong>Wrong thread standard:<\/strong> Similar threads seem to fit but do not seal. Solution: clearly identify the standard, use adapters with clear marking.<\/li>\n<li><strong>Ingress of contamination:<\/strong> Particles damage seats and valves. Solution: protective plugs, clean assembly areas, flush before commissioning.<\/li>\n<li><strong>Side loads and misalignment:<\/strong> Rigidly mounted lines without alignment create bending moments. Solution: appropriate lengths, supports, compensation elements.<\/li>\n<li><strong>Unsuitable sealing materials:<\/strong> Incompatibility with oil, water, or temperature. Solution: check material data, adhere to defined approvals.<\/li>\n<li><strong>Galvanic corrosion:<\/strong> Material mix in humid environments. Solution: matched materials, coatings, isolating elements.<\/li>\n<li><strong>Incorrect sealing of parallel threads:<\/strong> Tape on flat-sealing ports is unsuitable. Solution: use O-ring\/soft seal, no foreign agents.<\/li>\n<li><strong>Residual pressure during coupling:<\/strong> Connecting against trapped pressure damages valves and seals. Solution: integrate pressure relief and use connect-under-pressure variants.<\/li>\n<li><strong>Hose twist and pull-out:<\/strong> Torsion during assembly or operation reduces hose life. Solution: use swivels where necessary; avoid torque transfer into hoses.<\/li>\n<\/ul>\n<h2>Standards, designations, and compatibility<\/h2>\n<p>Coupling pieces follow international and European standards for threads, sealing systems, and pressure ratings. In practice, metric cutting-ring fittings, flat-face ports, tapered threads, as well as standardized flanges and quick couplings are common. Clear identification of nominal size, thread, sealing principle, and material is important. For safety-critical applications in <em>concrete demolition<\/em> or <em>tunnel construction<\/em>, consistent system design across power unit, line, and tool is essential. Compatibility should be documented and verified on site; mixed configurations are to be avoided. Avoid long adapter chains and prefer uniform interface concepts to keep flow losses and leak risks low.<\/p>\n<h2>Practical context: coupling pieces on concrete demolition shears and splitters<\/h2>\n<p>On <strong>concrete demolition shears<\/strong>, quick couplings connect the hydraulic hose lines to the tool. Flat-face couplings reduce oil leakage during tool changes and keep the ports clean. Between the <em>hydraulic power pack<\/em> and <strong>rock and concrete splitters<\/strong>, vibration-resistant fittings with defined line support ensure a stable pressure supply. In <em>natural stone extraction<\/em>, corrosion-resistant materials and covered couplings are advantageous, as moisture and fine particles stress the sealing surfaces. In <em>special applications<\/em>, such as under confined conditions, color-coded caps simplify error-free coupling. Where residual pressure is likely, quick couplings with pressure-release function and fitted dust caps further increase availability and cleanliness.<\/p>\n<h2>Material selection and environmental aspects<\/h2>\n<p>Materials such as zinc-plated steel, stainless steel, or coated alloys are selected based on corrosion risk, media compatibility, and temperature. Seals based on NBR, FKM, or EPDM cover typical hydraulic and water applications. The aim is to avoid leaks, minimize media losses, and reduce cleaning effort. For water systems used for dust suppression, tool-less maintenance is recommended to keep downtime short during <em>gutting works and concrete cutting<\/em>. In addition, consider chloride-induced stress corrosion in aggressive atmospheres, dezincification resistance for water service, and compatibility with biodegradable hydraulic fluids. Durable materials and easily replaceable seals contribute to lower lifecycle impact.<\/p>\n<h2>Safety notes for installation and operation<\/h2>\n<p>Coupling pieces on pressurized systems may only be installed by trained personnel. Depressurize lines before work, secure against re-energization, and wear appropriate protective clothing. Rework on pressurized connections should be avoided. Inspection and maintenance intervals should be adapted to operating conditions. These notes are general in nature and do not replace individual documents or instructions. Take into account stored hydraulic energy, hot surfaces, and pinch points; after impacts or drops, perform an immediate leak check before resuming operation.<\/p>\n<h2>Procurement, storage, and labeling<\/h2>\n<p>For efficient construction logistics, a standardized parts list with clear designations for threads, sealing principle, and nominal sizes is recommended. Store seals dry, dust-free, and protected from UV; elastomers age, so shelf lives must be observed. Keep protective caps and reinstall them after disassembly. Clear marking of supply and return (hydraulics) prevents mix-ups when switching tools between <strong>attachment shear<\/strong>, <strong>Multi Cutters<\/strong>, or <strong>steel shear<\/strong>. Implement first-in-first-out for elastomers, maintain batch and heat number records for traceability, and pre-assemble service kits for typical interfaces to accelerate on-site repairs.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Coupling pieces are components that connect pipes and hoses securely, leak-tight, and with load-bearing capacity. In hydraulic and pneumatic systems for demolition, gutting works, and tunnel construction, they provide the basis for reliable media routing. In applications with tools from Darda GmbH &#8211; such as when using concrete demolition shears <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19659","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Coupling Pieces for Hydraulic &amp; Pneumatic Systems<\/title>\n<meta name=\"description\" content=\"Learn how coupling pieces connect pipes and hoses in hydraulic &amp; pneumatic systems \u2713 types, sealing, selection &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Coupling Pieces for Hydraulic &amp; Pneumatic Systems\" \/>\n<meta property=\"og:description\" content=\"Learn how coupling pieces connect pipes and hoses in hydraulic &amp; pneumatic systems \u2713 types, sealing, selection &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T12:11:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coupling-pieces\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coupling-pieces\",\"name\":\"Coupling Pieces for Hydraulic & Pneumatic Systems\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-04T11:26:16+00:00\",\"dateModified\":\"2026-05-12T12:11:02+00:00\",\"description\":\"Learn how coupling pieces connect pipes and hoses in hydraulic & pneumatic systems \u2713 types, sealing, selection & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coupling-pieces#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coupling-pieces\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coupling-pieces#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Coupling pieces\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Coupling Pieces for Hydraulic & Pneumatic Systems","description":"Learn how coupling pieces connect pipes and hoses in hydraulic & pneumatic systems \u2713 types, sealing, selection & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces","og_locale":"en_US","og_type":"article","og_title":"Coupling Pieces for Hydraulic & Pneumatic Systems","og_description":"Learn how coupling pieces connect pipes and hoses in hydraulic & pneumatic systems \u2713 types, sealing, selection & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-12T12:11:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces","url":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces","name":"Coupling Pieces for Hydraulic & Pneumatic Systems","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-04T11:26:16+00:00","dateModified":"2026-05-12T12:11:02+00:00","description":"Learn how coupling pieces connect pipes and hoses in hydraulic & pneumatic systems \u2713 types, sealing, selection & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/coupling-pieces#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Coupling pieces"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19659"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19659\/revisions"}],"predecessor-version":[{"id":27351,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19659\/revisions\/27351"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}