{"id":19653,"date":"2025-12-04T14:33:08","date_gmt":"2025-12-04T13:33:08","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19653"},"modified":"2026-05-12T17:43:06","modified_gmt":"2026-05-12T15:43:06","slug":"pipe-jacking","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking","title":{"rendered":"Pipe jacking"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pipe jacking is a trenchless construction method in which pipelines are pushed from an <strong>entry shaft<\/strong> straight or with slight curvature through the ground. It is used to pass beneath traffic areas, cross watercourses, or intersect existing infrastructure without an open trench. The method combines geotechnical guidance, hydraulic jacking force, and precise construction workflows-and directly touches activities from <em>concrete demolition<\/em> and <em>special demolition<\/em> (see <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>), for example when constructing and removing entry and target shafts. Tools such as <strong>hydraulic demolition shears<\/strong> and <strong>hydraulic splitters<\/strong> from Darda GmbH are often used in adjacent work steps, for instance when opening reinforced concrete components or when exposing pipe segments in a controlled manner. Typical advantages include minimal surface disruption, low traffic impact, and precise, survey-controlled installation in sensitive environments.<\/p>\n<h2>Definition: What is meant by pipe jacking?<\/h2>\n<p>Pipe jacking (also jacking pipe drive or pipe jacking in the pressing method) refers to the hydraulic forward pushing of prefabricated <strong>thrust pipe<\/strong> from an entry shaft into the ground. The jacking forces are transferred to the drive pipe via a jacking station; in the target shaft, the pipe is received. Depending on the method, a steering head or a drive machine performs the soil excavation, while skin friction is reduced by support and lubricating agents (e.g., bentonite). Guidance is typically achieved by laser or gyro systems. Jacking is carried out section by section via the pipe joint, so that loads are introduced over the entire pipe column into the reaction ring of the entry shaft. Intermediate jacking stations can be installed to limit joint and pipe stresses over longer alignments. Typical applications include supply and wastewater pipelines, cable protection ducts, and drives in small-scale tunnel construction.<\/p>\n<h2>Mechanics and sequence of pipe jacking<\/h2>\n<p>Pipe jacking is based on transferring high hydraulic forces to a pipe column that is subjected to ground resistance, friction, and local obstructions. A counter-bearing in the entry shaft absorbs the reaction forces. The drive machine or a drilling\/steering head creates the cavity; support fluids stabilize the face and reduce skin friction. Section by section, another pipe is placed in the jack, and the jacking cycle repeats until the target shaft is reached. Precision in alignment, lubrication, and jacking cadence is crucial to avoid ovality, ring cracks, or binding at the joint. After breakthrough, annular space grouting and connection works ensure positional accuracy and tightness over the whole length.<\/p>\n<ol>\n<li>Site setup and surveying baseline in the entry shaft<\/li>\n<li>Launch of the steering head or drive machine with initial support medium<\/li>\n<li>Excavation and spoil transport with face stabilization as required<\/li>\n<li>Jacking stroke, insertion of the next pipe, and repetition of cycles<\/li>\n<li>Continuous guidance control and lubrication management<\/li>\n<li>Breakthrough in the target shaft, reception, sealing, and tie-in<\/li>\n<\/ol>\n<h2>Method variants and typical application limits<\/h2>\n<p>Pipe jacking is implemented in different technical variants, depending on soil type, diameter, and alignment length, as well as groundwater conditions and required tolerances.<\/p>\n<h3>Method overview<\/h3>\n<ul>\n<li>Microtunneling with guided drive machine and support fluid for fine-grained to heterogeneous soils<\/li>\n<li>Auger boring method with a screw auger in stable soils<\/li>\n<li>Steel pipe jacking with casing and subsequent carrier line<\/li>\n<li>Open face in cohesive, stable soils for short lengths<\/li>\n<li>Pilot pipe jacking with optical or gyro guidance for small to medium diameters<\/li>\n<\/ul>\n<h3>Limits and influences<\/h3>\n<ul>\n<li>Alignment lengths are limited by maximum permissible <em>jacking forces<\/em> and lubrication<\/li>\n<li>Curvature radii depend on socket geometry and sealing system<\/li>\n<li>Soil classes, groundwater, and obstructions determine support media and cutting technology<\/li>\n<li>Groundwater head and allowable support pressure constrain the chosen method<\/li>\n<li>Settlement criteria and permissible positional tolerances from the project specification set execution limits<\/li>\n<\/ul>\n<h2>Planning parameters and design of jacking forces<\/h2>\n<p>The dimensioning of the jacking system and the selection of pipes are based on a realistic estimate of resistances and safety reserves. Design should reflect the expected geology, groundwater regime, and client tolerances, including serviceability and watertightness requirements.<\/p>\n<h3>Essential parameters<\/h3>\n<ul>\n<li>Pipe diameter, wall thickness, material properties (concrete, GRP, steel)<\/li>\n<li>Drive length and number of intermediate jacking stations<\/li>\n<li>Route alignment (straight, curve, reverse curves)<\/li>\n<li>Skin friction depending on soil, support and lubricating agents<\/li>\n<li>Counter-bearing strength and reaction ring in the entry shaft<\/li>\n<li>Allowable joint stress, ovality limits, and socket pressure distribution<\/li>\n<li>Support medium properties, injection concept, and lubrication port spacing<\/li>\n<li>Survey control concept and positional tolerances for installation<\/li>\n<\/ul>\n<h3>Practical notes<\/h3>\n<ul>\n<li>Friction values are set conservatively and verified during construction via lubrication logs<\/li>\n<li>Intermediate jacking stations reduce peak forces and distribute loads more evenly<\/li>\n<li>Measurement systems continuously record jacking force, advance, axis position, and inclination<\/li>\n<li>Trial jacking and initial lubrication tests at launch help calibrate design assumptions<\/li>\n<li>Defined contingency measures for obstruction removal and, if necessary, recovery shafts reduce downtime<\/li>\n<\/ul>\n<h2>Pipes, sealing systems, and joining principles<\/h2>\n<p>Jacking pipes must reliably absorb jacking, bending, and contact stresses while ensuring sealing and centering. High-quality socket surfaces and clean, damage-free gaskets are prerequisites for long-term tightness.<\/p>\n<h3>Materials<\/h3>\n<ul>\n<li>Reinforced concrete jacking pipes with socket and rubber-ring gasket for high jacking forces<\/li>\n<li>Steel pipes for combined jacking and cutting applications and as casing pipes<\/li>\n<li>GRP\/GUP pipes with low weight and good corrosion resistance<\/li>\n<li>Vitrified clay jacking pipes for chemically aggressive wastewater applications<\/li>\n<li>Polymer concrete pipes with smooth surfaces and high compressive strength<\/li>\n<\/ul>\n<h3>Joining and sealing principles<\/h3>\n<ul>\n<li>Socket joints with profiled seal for axial load transfer<\/li>\n<li>Ball-and-socket joints to accommodate small radii<\/li>\n<li>Interlayers (e.g., thrust pads) for uniform force transmission<\/li>\n<li>Integrated lubrication channels near the socket to manage skin friction<\/li>\n<li>External collars or bandages for post-sealing in special cases<\/li>\n<\/ul>\n<h2>Shafts, counter-bearings, and site setup<\/h2>\n<p>Entry and target shafts are key components of pipe jacking. They serve as positioning and receiving structures and transfer high jacking and reaction forces into the ground. Temporary ground support, dewatering, and safe access must be planned to suit local conditions.<\/p>\n<h3>Entry shaft<\/h3>\n<ul>\n<li>Reaction ring\/counter-bearing with adequate load distribution<\/li>\n<li>Jacking station and insertion devices for jacking pipes<\/li>\n<li>Work platform with safe access, lifting gear, and media routing<\/li>\n<li>Stable surveying baseline and reference targets for guidance systems<\/li>\n<li>Ventilation and gas measurement equipment prepared for confined space work<\/li>\n<\/ul>\n<h3>Target shaft<\/h3>\n<ul>\n<li>Unobstructed reception and precise elevation\/position control<\/li>\n<li>Optional cutting\/separation works for tying into existing structures<\/li>\n<li>Compliant dewatering and ventilation<\/li>\n<li>Thrust relief and a reception cradle to protect the last pipe during breakthrough<\/li>\n<\/ul>\n<h3>Access and deconstruction in existing structures<\/h3>\n<p>When creating shaft openings, cutting tie-ins, or removing temporary components, <strong>hydraulic demolition shears<\/strong> as well as <strong>hydraulic splitters<\/strong> from Darda GmbH are frequently used. They enable controlled opening of reinforced concrete walls, exposing pipe connections, and pinpoint removal of bracing without transmitting vibrations over large areas. Low-dust, low-vibration techniques are especially suitable near sensitive assets and in confined spaces.<\/p>\n<h2>Interfaces with concrete demolition and special demolition<\/h2>\n<p>Pipe jacking creates and requires workspaces in which components are constructed, adjusted, or dismantled. At these interfaces, precise cutting and splitting work is crucial to maintain geometry, gasket seating, and tightness.<\/p>\n<h3>Typical tasks<\/h3>\n<ul>\n<li>Opening entry\/target shafts in reinforced concrete: selective partial demolition with hydraulic demolition shears<\/li>\n<li>Separating mis-jacked or damaged pipe segments: controlled splitting of mineral components<\/li>\n<li>Adjusting wall openings and culverts: clean edges, defined removal profile<\/li>\n<li>Cutting free steel components (sheet piles, sections): steel shear or cutting torch in special operations<\/li>\n<li>Dismantling temporary fittings in confined spaces: handy multi cutters for mixed materials<\/li>\n<li>Edge finishing and surface preparation at sockets and tie-ins to ensure sealing<\/li>\n<li>Core drilling for pilot holes, survey points, and service penetrations where required<\/li>\n<\/ul>\n<p>In <em>concrete demolition and special demolition<\/em>, in <em>strip-out and cutting<\/em>, as well as in <em>rock excavation and tunnel construction<\/em>, these methods support the safe completion of jacking works and the tie-in to existing structures. Clean sequencing prevents contamination of lubrication circuits and maintains safety zones around active jacking equipment.<\/p>\n<h2>Quality assurance, geometry control, and documentation<\/h2>\n<p>Comprehensive control ensures positional accuracy and tightness over the entire jacking length. Acceptance criteria include alignment tolerance, joint integrity, and watertightness in accordance with the specification.<\/p>\n<h3>Control priorities<\/h3>\n<ul>\n<li>Jacking force and stroke recording per cycle<\/li>\n<li>Axis and inclination measurement, curve keeping<\/li>\n<li>Logs for lubrication, support media, and soil changes<\/li>\n<li>Joint inspection (tightness, offset, socket seating)<\/li>\n<li>Support or face pressure, slurry density and viscosity where applicable<\/li>\n<li>Annular space backfill volumes and pressures<\/li>\n<li>Regular guidance checks and independent survey control shots<\/li>\n<\/ul>\n<h3>Documentation<\/h3>\n<ul>\n<li>Shift reports with parameters, events, and measures<\/li>\n<li>Photo documentation of critical work steps<\/li>\n<li>Acceptance tests of the pipeline and the shafts<\/li>\n<li>As-built survey and deviation plots versus design alignment<\/li>\n<li>Pressure or leak tests and, if applicable, CCTV inspection protocols<\/li>\n<\/ul>\n<h2>Risks, damage, and countermeasures<\/h2>\n<p>Typical risks arise from insufficient ground knowledge, unsuitable lubrication, or high skin friction. Early detection and targeted intervention reduce secondary damage. A clearly defined geotechnical baseline and response plan supports timely decisions.<\/p>\n<ul>\n<li>Ovality and ring cracks: jacking force management, intermediate jacking stations, adjustment of the lubrication strategy<\/li>\n<li>Binding at the socket joint: precise axis control, controlled stroke sequences<\/li>\n<li>Surface settlements: sufficient face support and pressure monitoring<\/li>\n<li>Collisions with obstructions: probing, locating, if necessary exposing and selective separation with hydraulic demolition shears<\/li>\n<li>Lubricant loss or inadvertent returns: adapt injection points, reduce pressure, implement containment<\/li>\n<li>Groundwater inflow or face instability: adjust support system, temporary dewatering, or targeted grouting<\/li>\n<li>Tool wear and drive stoppage: planned cutter changes, maintenance windows, and spare parts readiness<\/li>\n<\/ul>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>Occupational safety has top priority in pipe jacking. Safety concepts account for confined workspaces, pressure systems, and media routing. Generally advisable are access and rescue concepts, instruction on hydraulic systems, gas and air measurements in shafts, and low-dust and low-noise cutting methods. When handling support and lubricating agents, follow the respective manufacturer instructions and the relevant regulations; <em>disposal<\/em> and <em>water protection<\/em> must be planned at an early stage. These notes are general and not case-specific.<\/p>\n<ul>\n<li>Confined space entry procedures with rescue equipment and standby personnel<\/li>\n<li>Lockout-tagout for electrical and hydraulic energy sources<\/li>\n<li>Lifting plans with rated accessories and clear exclusion zones<\/li>\n<li>Dust and noise control measures including wet cutting and extraction<\/li>\n<\/ul>\n<h2>Fields of application and practice-oriented use cases<\/h2>\n<p>Pipe jacking is linked in practice with several fields of application:<\/p>\n<ul>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Constructing entry shafts in loose rock or bedrock; pinpoint splitting of rock noses when the face or shaft contour must be adjusted. These works align with <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>.<\/li>\n<li><strong>Concrete demolition and special demolition:<\/strong> Opening thick reinforced concrete components, adjusting openings, dismantling temporary counter-bearings<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Tie-ins in existing structures, cutting reinforcement and embedded items, exposing lines<\/li>\n<li><strong>Natural stone extraction:<\/strong> Less common, but relevant for shaft works in natural rock where controlled fractures are required<\/li>\n<li><strong>Special operations:<\/strong> Inner-city locations with limited space, working under live traffic, sensitive protection of existing assets<\/li>\n<li><strong>Rail and highway crossings:<\/strong> Settlement-controlled drives beneath critical corridors with tight tolerances<\/li>\n<li><strong>Watercourse and floodplain crossings:<\/strong> Drives under rivers and wetlands with enhanced environmental safeguards<\/li>\n<\/ul>\n<h2>Tool selection in the environment of pipe jacking<\/h2>\n<p>For adjacent works, different tools are used depending on material and space constraints. <strong>Hydraulic demolition shears<\/strong> are predestined for the precise opening and reduction of reinforced concrete components at shafts and excavations. <strong>Hydraulic splitters<\/strong> allow low-vibration release of mineral materials, for example when widening openings or removing damaged pipe sections. <strong>Steel shear<\/strong> and <strong>cutting torch<\/strong> are used for separating steel pipes, sections, or cladding, while <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> efficiently cut mixed construction materials in confined spaces. Darda GmbH covers this family of tools, enabling technically coordinated works around pipe jacking. Selection criteria include accessibility and working room, required cutting or splitting capacity, and the available power supply in the shaft environment.<\/p>\n<ul>\n<li>Geometry and reach: tool size, opening width, and cut length versus available space<\/li>\n<li>Material mix and thickness: reinforcement content, steel grades, and concrete strength<\/li>\n<li>Operational constraints: emissions, noise, vibration, and ease of handling in confined areas<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pipe jacking is a trenchless construction method in which pipelines are pushed from an entry shaft straight or with slight curvature through the ground. It is used to pass beneath traffic areas, cross watercourses, or intersect existing infrastructure without an open trench. The method combines geotechnical guidance, hydraulic jacking force, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19653","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pipe Jacking - Trenchless Pipeline Installation<\/title>\n<meta name=\"description\" content=\"Trenchless pipeline installation \u2713 Pipe jacking with hydraulic drive, precise guidance &amp; low impact.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pipe Jacking - Trenchless Pipeline Installation\" \/>\n<meta property=\"og:description\" content=\"Trenchless pipeline installation \u2713 Pipe jacking with hydraulic drive, precise guidance &amp; low impact.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T15:43:06+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-jacking\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-jacking\",\"name\":\"Pipe Jacking - Trenchless Pipeline Installation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-04T13:33:08+00:00\",\"dateModified\":\"2026-05-12T15:43:06+00:00\",\"description\":\"Trenchless pipeline installation \u2713 Pipe jacking with hydraulic drive, precise guidance & low impact.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-jacking#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-jacking\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-jacking#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pipe jacking\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pipe Jacking - Trenchless Pipeline Installation","description":"Trenchless pipeline installation \u2713 Pipe jacking with hydraulic drive, precise guidance & low impact.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking","og_locale":"en_US","og_type":"article","og_title":"Pipe Jacking - Trenchless Pipeline Installation","og_description":"Trenchless pipeline installation \u2713 Pipe jacking with hydraulic drive, precise guidance & low impact.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-12T15:43:06+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking","url":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking","name":"Pipe Jacking - Trenchless Pipeline Installation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-04T13:33:08+00:00","dateModified":"2026-05-12T15:43:06+00:00","description":"Trenchless pipeline installation \u2713 Pipe jacking with hydraulic drive, precise guidance & low impact.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pipe-jacking#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pipe jacking"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19653","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19653"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19653\/revisions"}],"predecessor-version":[{"id":27359,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19653\/revisions\/27359"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}