{"id":19648,"date":"2025-12-03T10:51:23","date_gmt":"2025-12-03T09:51:23","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19648"},"modified":"2026-05-12T16:05:03","modified_gmt":"2026-05-12T14:05:03","slug":"pipe-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition","title":{"rendered":"Pipe demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pipe demolition refers to the orderly deconstruction of lines and pipe systems in buildings, industrial plants, and infrastructure. It includes cutting, segmenting, salvaging, and disposing of steel, cast iron, concrete, and plastic pipes, as well as removing supports, claddings, and foundations. In practice, pipe demolition is often interlinked with <strong>concrete demolition and special demolition<\/strong>, <strong>building gutting and cutting<\/strong>, as well as work in <strong>rock excavation and tunnel construction<\/strong>. Where lines run in concrete ducts or are embedded, <strong>concrete demolition shears<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic wedge splitters<\/a><\/strong> from Darda GmbH play a central role, because they can selectively release claddings, foundation blocks, and breakthrough areas before steel shears, hydraulic shears, multi cutters, or tank cutters segment the pipe runs themselves. The objective is controlled dismantling with minimal collateral impact, compliant with structural, environmental, and safety requirements.<\/p>\n<h2>Definition: What is meant by pipe demolition?<\/h2>\n<p>Pipe demolition means the professional dismantling of lines including attachments such as flanges, valves and fittings, brackets, supports, and beams. This includes <em>cold cutting<\/em> or shearing of pipe sections, exposing embedded sections, the controlled recovery of large segments, as well as source-separated preparation for recycling or disposal. The process starts after locating, draining, and depressurizing the lines, and is carried out using mechanical, hydraulic, or cutting methods depending on material, wall thickness, diameter, and installation situation. Typical preparatory measures include isolation and lockout tagout, permitting and clearance procedures, and documented verification that lines are gas free and media free.<\/p>\n<h2>Methods and tools in pipe demolition<\/h2>\n<p>The choice of method depends on pipe material, media history, accessibility, and environmental requirements. Hydraulic handheld tools powered by <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units for handheld tools<\/a><\/strong> from Darda GmbH enable <em>low-spark<\/em> work in sensitive areas. <strong>Concrete demolition shears<\/strong> open concrete ducts, shafts, and claddings, while <strong>hydraulic wedge splitters<\/strong> controllably break anchor and foundation blocks. For the metallic pipe body, <strong>steel shears<\/strong>, <strong>hydraulic shears<\/strong>, and <strong>multi cutters<\/strong> are used; large structures, nozzles, and shell plates are segmented with <strong>tank cutters<\/strong>. This allows lines to be dismantled in sections without extensive damage to the surroundings.<\/p>\n<ul>\n<li><strong>Method selection criteria<\/strong>: diameter and wall thickness, media and contamination history, access and shielding options, emissions control targets, and required cutting quality for recycling or reuse.<\/li>\n<li><strong>Operational context<\/strong>: work above ground versus trenches or shafts, overhead sections, and interfaces with live systems influence tool geometry and power supply.<\/li>\n<\/ul>\n<h2>Typical pipe types and installation situations<\/h2>\n<p>Pipe demolition encounters a wide range of constellations &#8211; from district heating lines to process piping in the chemical and food industries, to drainage systems. Relevant materials include in particular steel, ductile iron pipe, gray cast iron, prestressed concrete and reinforced concrete pipes, as well as PE\/PP plastics. Lines are often routed in concrete ducts, pass through slabs and walls, or are combined with protective pipes (casing pipes). In practice, internal linings and coatings such as cement mortar, epoxy, or bitumen, as well as insulation systems, can influence cutting behavior and disposal routes.<\/p>\n<ul>\n<li>Industrial plants: Media lines with valves and fittings, trace heating, and insulation, partly in ATEX zones.<\/li>\n<li>Building services: Heating, potable water, and wastewater lines in shafts, slab fields, and walls.<\/li>\n<li>Infrastructure: Pressure pipelines, district heating routes, bridge lines, tunnel pipes, suction and pressure headers.<\/li>\n<li>Special structural conditions: Embedded lines, supports on brackets, penetrations with sealing systems, foundation blocks at changes of direction.<\/li>\n<\/ul>\n<h2>Process principles: cutting, shearing, splitting<\/h2>\n<p>For efficient pipe demolition, methods are chosen to be combinable. <strong>Shearing<\/strong> and <strong>cold cutting<\/strong> minimize sparking and heat input. <strong>Splitting<\/strong> reduces concrete and rock cross-sections without high vibrations. This exposes the pipe cross-section before segmentation and recovery take place.<\/p>\n<ul>\n<li><strong>Shearing<\/strong>: fast sectioning of metallic components with compact kerf and low heat input, suitable for controlled segmentation.<\/li>\n<li><strong>Cold cutting<\/strong>: preferred in sensitive environments to reduce ignition sources and thermal distortion, while maintaining cut quality.<\/li>\n<li><strong>Splitting<\/strong>: targeted crack propagation in concrete and rock to free clamps, jackets, and foundation blocks with reduced vibration.<\/li>\n<\/ul>\n<h3>Cold cutting in sensitive areas<\/h3>\n<p>Where sparks and heat must be avoided &#8211; such as near residual flammable media or in areas with increased atmospheric monitoring &#8211; hydraulic shears, multi cutters, and tank cutters are preferred. Prerequisites are <em>gas-cleared<\/em>, depressurized, and drained lines, as well as clearances according to local requirements. Depending on the regime, hot work permits can be reduced or avoided by cold methods, yet local rules apply. These notes are general in nature and are not legally binding.<\/p>\n<h3>Selective deconstruction of embedded lines<\/h3>\n<p>For pipework that is jacketed or integrated into components, the concrete is released first. <strong>Concrete demolition shears<\/strong> open duct covers and breakthroughs; <strong>hydraulic wedge splitters<\/strong> controllably break anchor blocks, foundation feet, or concrete claddings. The exposed pipe run is then segmented in metal and recovered. Low-vibration exposure preserves adjacent structures and reduces follow-up repair work.<\/p>\n<h2>Planning, investigation, and clearance measurements<\/h2>\n<p>A structured preparation reduces risks and follow-up costs. Essential steps are media identification, draining, depressurizing, flushing, and clearance measurements; followed by structural assessment, access planning, and the definition of lifting and cut points. In buildings, interactions with load-bearing components must be checked; in tunnels and shafts, also ventilation and escape routes. Non-destructive testing methods such as cover meters and ground penetrating approaches help locate reinforcement, embedded services, and voids prior to cutting.<\/p>\n<ul>\n<li>Review documentation: Plans, isometrics, valve lists, media history.<\/li>\n<li>Hazard analysis: Pressure, residual media, ATEX zones, hazardous substances in insulation.<\/li>\n<li>Cutting and recovery plan: Section lengths, mass, lifting points, transport routes.<\/li>\n<li>Clearances: Work and safety clearances according to local regulations (general note, not legally binding).<\/li>\n<li>Structural scanning and locating: Rebar position, post tensioning, embedded parts to avoid unintended hits.<\/li>\n<li>Interface management: Coordination with operations, temporary supports, exclusion zones, and traffic routes.<\/li>\n<\/ul>\n<h2>Equipment deployment: selection criteria and combinations<\/h2>\n<p>Darda GmbH covers a broad spectrum with its equipment categories, ranging from concrete exposure to metal segmentation. Selection is based on diameter, wall thickness, material, location, and environmental requirements. Combinations are planned to minimize tool changes and to match available energy sources and logistics on site.<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: Opening ducts, shafts, slab and wall penetrations; exposing pipe clamps and embedments.<\/li>\n<li><strong>Hydraulic wedge splitters<\/strong> and <strong>rock wedge splitters<\/strong>: Releasing foundation and anchor blocks, breaking claddings, work in trenches and tunnels with reduced vibrations.<\/li>\n<li><strong>Steel shears<\/strong> and <strong>hydraulic shears<\/strong>: Cold cutting of steel pipes, beams, brackets, and supports.<\/li>\n<li><strong>Multi cutters<\/strong>: Versatile segmentation of mixed cross-sections, including thin-walled metal elements.<\/li>\n<li><strong>Tank cutters<\/strong>: Segmenting large pipe and vessel walls, nozzles, and shell plates.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: Power supply for mobile, handheld tools &#8211; especially in confined areas with limited infrastructure.<\/li>\n<\/ul>\n<h3>Concrete demolition shears for jacketed lines<\/h3>\n<p>Concrete or mortar jackets are selectively opened without excessively loading adjacent components. This creates defined access to pipe clamps, anchors, and transitions &#8211; an advantage in existing buildings where adjacent structures are to be preserved. Where reinforcement is present, staged opening with intermediate cleaning improves visibility and accuracy.<\/p>\n<h3>Hydraulic wedge splitters in trenches and tunnels<\/h3>\n<p>When deconstructing pressure pipelines in trenches, shafts, or tunnels, splitters reduce block and jacket cross-sections without requiring continuous separation cuts. This facilitates subsequent segmentation and the safe recovery of pipe sections. Sequencing from support points toward free spans reduces uncontrolled movements.<\/p>\n<h2>Workflow: from sectioning to disposal<\/h2>\n<p>A clear workflow ensures quality and schedule adherence. The following guide shows proven steps from the first cut to source-separated handover.<\/p>\n<ol>\n<li>Documentation and marking: Mark lines, flanges, supports, and interfaces.<\/li>\n<li>Ensure media-free condition: Draining, flushing, depressurizing, clearance measurements, approvals.<\/li>\n<li>Expose: Concrete demolition shears and splitters for claddings, supports, and anchor areas.<\/li>\n<li>Segment: Shearing and cold cutting at defined interfaces, set cutting direction.<\/li>\n<li>Recover: Sling, lift, intermediate storage; consider mass and balance.<\/li>\n<li>Downsize: Adjust section lengths for transport and disposal.<\/li>\n<li>Sort: Place metals, concrete, insulation, and gaskets separately.<\/li>\n<li>Haul-out and documentation: Weighing, records, handover to recycling\/disposal.<\/li>\n<li>Closeout: Final inspection of cut edges and interfaces, update of as-built documentation and permits.<\/li>\n<\/ol>\n<h3>Handling large pipe diameters<\/h3>\n<p>For large diameters, cut sequences and lifting points are chosen to avoid rotations. Additional separation cuts reduce self-weight before segments are lowered in a controlled manner. Cranes and lifting gear must be sized for the load case; notes are general. Use of tag lines, anti-rotation devices, and temporary lifting lugs increases control during lowering.<\/p>\n<h2>Special application areas and boundary conditions<\/h2>\n<p>In <strong>concrete demolition and special demolition<\/strong>, complex pipe networks meet massive embedments. Approaches with concrete demolition shears and splitters prove effective for opening ducts, shafts, and foundations. In <strong>building gutting and cutting<\/strong>, compact hydraulic handheld tools are advantageous due to confined space, controlled emissions, and precise cutting guidance. In <strong>rock excavation and tunnel construction<\/strong>, dismantled casing pipes, protective pipes, and inserts are encountered; splitting to release blockages is often efficient here. For <strong>special demolition<\/strong> &#8211; for example in sensitive areas with strict requirements &#8211; <em>cold cutting<\/em> is preferred and combined with additional protection and monitoring measures. Night work windows, noise limits, and restricted access conditions may further refine tool choice and sequencing.<\/p>\n<h2>Risks, occupational safety, and emissions<\/h2>\n<p>Hazards result from residual pressures, media, shear forces, falling loads, noise, and dust. Prevention starts with hazard analysis and continues with the selection of suitable methods. The following points are general notes and not legally binding:<\/p>\n<ul>\n<li>Ensure freedom from media and pressure; document gas-free measurements.<\/li>\n<li>Control loads: Slings, intermediate supports, controlled cut sequences.<\/li>\n<li>Minimize emissions: Dust suppression, dust extraction, prefer <em>cold<\/em> methods.<\/li>\n<li>Personal protective equipment, safe access, and adequate lighting.<\/li>\n<li>Handling insulation and potential hazardous substances in accordance with applicable requirements.<\/li>\n<li>Confined space entry procedures where applicable, including ventilation and continuous atmosphere monitoring.<\/li>\n<li>Exclusion zones, spotters, and clear signaling for crane and cutting operations.<\/li>\n<li>Hot work permits and fire watch if thermal processes are deployed; cold methods reduce but do not replace formal controls.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Quality includes clean cut edges, undamaged existing components, and seamless proof of compliance. Photo documentation before and after, logs of approvals and clearance measurements, weight tickets, and accompanying documents have proven effective. In conversion work, existing conditions remain protected when exposures with concrete demolition shears and splitting methods are carried out in a controlled and position-accurate manner. Method statements, inspection and test plans, and traceable waste transfer documentation support transparent execution and handover.<\/p>\n<h2>Practice-oriented examples<\/h2>\n<p>In a heating plant, district heating pipelines in a concrete duct are deconstructed: First, a concrete demolition shear opens the duct section, splitters release anchor blocks; afterward, steel shears segment the steel pipes. In an existing building with narrow shafts, riser pipes are dismantled: Shears expose the penetrations, multi cutters cut near valves, brackets are removed with hydraulic shears. In tunnel construction, casing pipes and inserts are exposed and recovered in short sections; where required, a <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">tank cutter for segmenting shell plates<\/a> is used. The combination of exposing, splitting, and shearing keeps vibrations low and enables an orderly approach under operational and space constraints. In a brownfield process unit, lines are first flushed and inerted, then selectively opened in cold cutting windows with controlled lifting, while jackets and supports are split prior to segmentation to limit emissions and protect adjacent equipment.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pipe demolition refers to the orderly deconstruction of lines and pipe systems in buildings, industrial plants, and infrastructure. It includes cutting, segmenting, salvaging, and disposing of steel, cast iron, concrete, and plastic pipes, as well as removing supports, claddings, and foundations. In practice, pipe demolition is often interlinked with concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19648","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pipe Demolition - Methods, Tools &amp; Safety<\/title>\n<meta name=\"description\" content=\"Deconstruction of building &amp; industrial pipe systems - pipe demolition with cold cutting, shearing, safety \u2713 and care.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pipe Demolition - Methods, Tools &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Deconstruction of building &amp; industrial pipe systems - pipe demolition with cold cutting, shearing, safety \u2713 and care.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T14:05:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-demolition\",\"name\":\"Pipe Demolition - Methods, Tools & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-03T09:51:23+00:00\",\"dateModified\":\"2026-05-12T14:05:03+00:00\",\"description\":\"Deconstruction of building & industrial pipe systems - pipe demolition with cold cutting, shearing, safety \u2713 and care.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipe-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pipe demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pipe Demolition - Methods, Tools & Safety","description":"Deconstruction of building & industrial pipe systems - pipe demolition with cold cutting, shearing, safety \u2713 and care.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition","og_locale":"en_US","og_type":"article","og_title":"Pipe Demolition - Methods, Tools & Safety","og_description":"Deconstruction of building & industrial pipe systems - pipe demolition with cold cutting, shearing, safety \u2713 and care.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-12T14:05:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition","name":"Pipe Demolition - Methods, Tools & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-03T09:51:23+00:00","dateModified":"2026-05-12T14:05:03+00:00","description":"Deconstruction of building & industrial pipe systems - pipe demolition with cold cutting, shearing, safety \u2713 and care.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pipe-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pipe demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19648"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19648\/revisions"}],"predecessor-version":[{"id":27355,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19648\/revisions\/27355"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}