{"id":19645,"date":"2025-12-03T13:16:18","date_gmt":"2025-12-03T12:16:18","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19645"},"modified":"2026-05-12T08:56:03","modified_gmt":"2026-05-12T06:56:03","slug":"shell-opening","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening","title":{"rendered":"Shell opening"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A shell opening is the passage created in the load-bearing structure or masonry that will later accommodate windows, doors, shafts, service runs, or larger penetrations for technical installations. It forms the basis for precise fit-outs and thus affects function, safety, and the construction workflow. Whether in new construction or existing buildings: precision in the opening size, an appropriate execution of the jambs, and a correctly sized lintel are crucial. In practice, shell openings in concrete and masonry are either planned during construction (blockouts) or created or enlarged later &#8211; for example during repurposing, building gutting, or selective deconstruction. Depending on the task, tools such as concrete pulverizers, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, hydraulic demolition shear, or steel shear from Darda GmbH are used when working in a controlled and material-appropriate manner.<\/p>\n<h2>Definition: What is meant by a shell opening?<\/h2>\n<p>A shell opening is the opening dimension in a load-bearing or non-load-bearing component before finishing trades install their elements. In professional usage it is also described as a structural or rough opening, emphasizing its role before lining, frames, or casings are fitted. This particularly concerns door and window openings in walls, ceiling openings for stair flights, elevator shafts, service and ventilation shafts, as well as openings for installations. The shell dimension differs from the later clear opening because installation joints, sealing systems, jamb configurations, or frame widths must be taken into account. Structurally relevant elements such as the lintel and the side bearings are functionally part of the shell opening. In concrete components, shell openings often arise from blockout bodies in the formwork; in masonry, they are formed by leaving out units and placing a lintel. For openings created later, the formation is achieved by controlled cutting or splitting of the material, including proper treatment of the reinforcement and edge zones to preserve load transfer and durability.<\/p>\n<h2>Planning, dimensions, and tolerances of the shell opening<\/h2>\n<p>The opening size is derived from the insert element and the necessary gaps and seals. From a planning standpoint, it must be specified how jambs, lintel, sill or curb are constructed and which <em>installation tolerances<\/em> must be observed. This includes permissible deviations in width and height, diagonals, plumb, flatness, and edge straightness measured against defined reference lines. Especially with prefabricated elements, a shell dimension that is too small or too large leads to extra work, delays, or compromises in sealing. In concrete construction, the position of the reinforcement must also be considered to ensure load transfer at the edges of the opening. Where relevant, allowances for fire stopping, thermal separation, moisture management, and facade interfaces are to be integrated into the dimensioning.<\/p>\n<ul>\n<li><strong>Shell opening size<\/strong>: Dimension of the opening in its raw state, including jambs and lintel.<\/li>\n<li><strong>Clear opening<\/strong>: Free passage after installation of the elements (door leaf, frame, window frame).<\/li>\n<li><strong>Installation joint<\/strong>: Space for tolerance compensation, insulation, and sealing.<\/li>\n<li><strong>Jamb<\/strong>: Side surfaces of the opening; to be constructed suitable for the material and function.<\/li>\n<li><strong>Lintel<\/strong>: Load-transferring element above the opening, to be structurally sized.<\/li>\n<\/ul>\n<p>For large openings, the construction sequence is decisive: first provide temporary shoring, then cut, split, or break down, and finally form the edges and strengthen the bearings. For precise results in existing structures, controlled methods such as splitting concrete or the pulverizer method are sensible to limit vibrations and protect adjacent components. Coordination with building envelope trades and building services early in the design prevents clashes and ensures installation-ready edge geometries.<\/p>\n<h2>Shell opening in concrete and masonry: differences<\/h2>\n<p>The inherent material properties determine the approach to planning and execution. While masonry is compressive-strong but tension-sensitive, reinforced concrete combines compressive and tensile capacity via reinforcement. This affects lintel formation, blockouts, and later creation. In addition, the repair concept for edges and the bonding to existing material differs: concrete demands attention to cover, bond and corrosion protection, whereas masonry requires interlocking bed and head joints with suitable mortar or grout.<\/p>\n<h3>Concrete walls and slabs<\/h3>\n<p>In concrete components, shell openings are ideally provided for in the formwork planning. Blockout bodies ensure precise edges, and the reinforcement is supplemented accordingly (edge reinforcement, bar diversion). If openings must be created or enlarged later, handling the reinforcement is crucial. Methods with <strong>concrete pulverizers<\/strong> or <strong>hydraulic splitter<\/strong> units enable targeted cutting or splitting of the concrete cross-section. Reinforcing bars are then neatly cut with <em>steel shear<\/em> or <em>Multi Cutters<\/em>. This allows openings for doors, service shafts, or bearing exposures to be created without unintentionally disturbing load transfer. Hydraulic power packs from Darda GmbH supply the tools consistently with the required output &#8211; important for repeatability and cycle times.<\/p>\n<ul>\n<li><strong>Recommended sequence<\/strong>: mark and reference, scan for reinforcement and embedded parts, core-drill for splitters if needed, split or pulverize the concrete in stages, cut exposed bars, shape the jamb, protect reinforcement ends, and finish edges.<\/li>\n<li><strong>Edge durability<\/strong>: chamfer or round vulnerable edges where specified, and repair surface defects with compatible repair systems to ensure adhesion and long-term performance.<\/li>\n<\/ul>\n<h3>Masonry walls<\/h3>\n<p>In masonry, the formation of the lintel above the shell opening is decisive. For later openings, work is usually carried out in sections: temporary shoring, careful opening of joints, removal of individual units, construction of the lintel, then excavation to the target size. With dense, high-strength fired units or with natural stone masonry, <em>stone splitting cylinders<\/em> and compact <em>hydraulic splitter<\/em> units can help initiate cracks and guide them in a controlled manner before the jambs are finished. The lower vibration compared to percussive methods protects adjacent masonry. Lintel solutions range from precast concrete elements to steel profiles or reinforced masonry, each with defined bearing lengths and properly filled bed joints to achieve reliable load transfer.<\/p>\n<h2>Creation and enlargement in existing buildings<\/h2>\n<p>In existing buildings, shell openings often arise in the course of conversions, energy upgrades, changes of use, or selective deconstruction. Careful planning minimizes risks to the structure, neighboring surfaces, and technical systems. Before starting, locate utilities, clarify load paths, and define dust, noise, and vibration protection. As-built verification, structural assessment, and an agreed method statement with acceptance points provide clarity on responsibilities and quality targets.<\/p>\n<h3>Structural precautions and construction sequence<\/h3>\n<p>As a rule, the load-bearing capacity of surrounding components must be checked. Temporary shoring, step-by-step opening, and the immediate strengthening of the bearings are proven measures. Specifications for lintel dimensions or reinforcement verification are project-specific and must be observed. Construction code and occupational safety requirements must be taken into account.<\/p>\n<ol>\n<li>Establish exclusion zones, containment, and shoring.<\/li>\n<li>Mark and measure from fixed reference points; document initial condition.<\/li>\n<li>Open in stages with low-vibration methods; integrate immediate edge protection.<\/li>\n<li>Install lintel or edge reinforcement; verify bearing lengths.<\/li>\n<li>Finish jambs and interfaces; perform interim and final dimensional checks.<\/li>\n<\/ol>\n<h3>Methods and tools for precise shell openings<\/h3>\n<p>The choice of method depends on material, component thickness, reinforcement ratio, and boundary conditions such as sensitivity to vibration. The following hydraulic methods are common in practice:<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: Gripping, crushing, and reducing concrete components and jamb areas; edges can be formed in stages and rework minimized.<\/li>\n<li><strong>Hydraulic splitter<\/strong> units: Introducing defined splitting forces into drillholes or joints; suitable for low-vibration openings in concrete, natural stone, and masonry.<\/li>\n<li><strong>Steel shear<\/strong> and <strong>Multi Cutters<\/strong>: Cutting reinforcing steel, sections, and embedded parts in the opening area; important for clean exposure of the jamb.<\/li>\n<li><strong>Hydraulic demolition shear<\/strong> and <strong>concrete pulverizers<\/strong>: For mixed components with concrete and steel content, e.g., in composite structures or stiffened opening edges.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: Supplying the tools with constant pressure and flow; the basis for reproducible cuts, splitting operations, and cycle time.<\/li>\n<\/ul>\n<p>Compared to percussive methods, hydraulic splitting and pulverizer work often allow better control of fracture lines and a reduction of secondary damage. This is particularly relevant during building gutting, on sensitive existing structures, or in occupied buildings. If required, wire sawing or core drilling can complement the hydraulic process to create guide cuts, feed-throughs, or precise corners.<\/p>\n<h2>Finishing of jambs, lintel, and bearings<\/h2>\n<p>The quality of a shell opening is evident in the jambs and bearings. Straight edges, sufficient compressive strength, and a defined bond with the existing structure are crucial for subsequent installation. For concrete openings, concrete cover and reinforcement ends may need protection or rework; masonry requires a clean interlock and void-free filling. The lintel is to be sized according to structural requirements; bearing lengths and bed joints must reliably transfer loads. Edge chamfers reduce spalling risk, and compatible bonding bridges and repair mortars help achieve durable, adherent surfaces suitable for sealing and fastening.<\/p>\n<h3>Built-in components and attachment points<\/h3>\n<p>Depending on the fit-out, provisions must be made for frame anchors, anchor channels, brackets, or penetrations. In concrete, built-in components can be integrated or anchored later; in masonry, suitable fastening systems must be selected. Planned provision of these points avoids later interventions in freshly finished jambs.<\/p>\n<ul>\n<li>Define location, embedment depth, and edge distances for anchors and channels in advance.<\/li>\n<li>Coordinate with fire, acoustic, and moisture requirements to avoid subsequent remedial work.<\/li>\n<li>Protect embedded steel against corrosion where exposure cannot be avoided.<\/li>\n<\/ul>\n<h2>Shell openings in slabs and shafts<\/h2>\n<p>Ceiling openings for stairs, lifts, or building services require special care. Load redistribution, fire protection, and sound insulation must be considered. Openings are often enlarged in sections: first relief and securing, then controlled cutting or splitting of the slab, and finally edge finishing and fire protection measures. <strong>Concrete pulverizers<\/strong> can reduce slab edges, while <em>hydraulic splitter<\/em> units separate the component beforehand to obtain defined fracture surfaces. Exposed reinforcement is treated with <em>steel shear<\/em> before jambs and bearings are strengthened. Punching and shear checks at residual supports, temporary edge protection, and coordinated routing of shafts and sleeves are integral to the work sequence.<\/p>\n<h2>Site protection, environment, and occupational safety<\/h2>\n<p>When creating shell openings, low-dust work methods, suitable dust extraction, containment, and personal protective equipment must be used. Vibrations and noise are to be minimized, especially in sensitive areas such as hospitals or existing buildings in use. Hydraulic methods with pulverizer and splitting technology enable a controlled approach. Construction waste separation must be ensured; reinforcing steel can be cut to transportable lengths with <em>steel shear<\/em> or <em>Multi Cutters<\/em>, facilitating disposal and recycling. Legal requirements regarding emissions, waste, and occupational safety must be observed. Water management for wet processes, negative-pressure containment where required, and clear logistics routes reduce disruption and improve site safety.<\/p>\n<h2>Quality assurance and dimensional control<\/h2>\n<p>A shell opening is only \u201cfinished\u201d when dimensional accuracy is documented, the edges are load-capable, and the bearings are constructed according to the design. Suitable measuring tools, an unambiguous reference level, and documentation of dimensions (shell opening size, clear opening, diagonals, plumb and flatness) ensure the installation of subsequent components. For later openings, reinforcement exposure, temporary safety measures, and the removal of offsets must also be recorded. Small inaccuracies can usually be compensated via the installation joint; systematic deviations must be avoided.<\/p>\n<ul>\n<li><strong>Documentation<\/strong>: initial and as-built measurements, photo evidence, and acceptance records for concealed work.<\/li>\n<li><strong>Verification<\/strong>: check contact surfaces, bearing lengths, and compatibility of repair materials with the substrate.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<p>Mistakes often arise from unclear dimensional specifications, missing shoring, or an unsuitable choice of method. Bearings that are too narrow, insufficient lintel dimensions, or damaged jambs lead to rework and operational risks. A coordinated construction sequence, suitable tools, and early verification of built-in components prevent most problems.<\/p>\n<ul>\n<li>Unclear difference between shell opening size and clear opening \u2192 define installation joints early.<\/li>\n<li>Overly aggressive work near sensitive components \u2192 consider controlled pulverizer or splitting techniques.<\/li>\n<li>Reinforcement cut unintentionally \u2192 locate beforehand, free cut with <strong>concrete pulverizers<\/strong>, separation with <em>steel shear<\/em>.<\/li>\n<li>Edge spalling at jambs \u2192 reduce step-by-step instead of large-area percussive work.<\/li>\n<li>Missing temporary shoring \u2192 check load paths, provide supporting systems in good time.<\/li>\n<li>Overlooking utilities and embedded services \u2192 survey and isolate before opening to avoid hazards and delays.<\/li>\n<li>Insufficient planning for fire stopping and moisture sealing \u2192 reserve space and compatible substrates at the shell stage.<\/li>\n<\/ul>\n<h2>Application areas and practical relevance<\/h2>\n<p>Shell openings occur for professionals in numerous application areas of Darda GmbH: In <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, openings are created selectively to relieve components or prepare demolition sections. For <em>building gutting and cutting<\/em>, precise door and window openings are required without impairing the remaining structure. In <em>rock breakout and tunnel construction<\/em>, openings are created as connections, niches, or installation spaces in concrete and rock support structures; here, <strong>hydraulic splitter<\/strong> units provide valuable service. In <em>natural stone extraction<\/em>, controlled splitting methods facilitate dimensional accuracy for passages or technical recesses. For <em>special operations<\/em> &#8211; for example in facilities with high requirements for low vibration &#8211; hydraulic tools enable a predictable approach. <strong>Concrete pulverizers<\/strong> are particularly often in focus when openings must be created in reinforced concrete, while <strong>hydraulic splitter<\/strong> units are appreciated for controlled separation in massive components without large-scale secondary damage.<\/p>\n<h2>Material-appropriate selection of methods<\/h2>\n<p>The choice between cutting, splitting, and reducing depends on component thickness, reinforcement content, edge distances, and environmental requirements. Hydraulic <strong>concrete pulverizers<\/strong> excel on reinforced concrete through controlled material removal along the jamb, <em>hydraulic splitter<\/em> units work to advantage when defined fracture surfaces and low vibration are required. <em>Hydraulic demolition shear<\/em> and <em>Multi Cutters<\/em> complement processing of mixed materials, while <em>steel shear<\/em> ensures clean separation of reinforcing steel. The hydraulic power pack as the energy source remains the central element for operating the tools reliably and efficiently. Clear decision criteria and a staged approach &#8211; from preparation to controlled material separation and clean finishing &#8211; ensure structural integrity, dimensional accuracy, and efficient workflows for shell openings.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A shell opening is the passage created in the load-bearing structure or masonry that will later accommodate windows, doors, shafts, service runs, or larger penetrations for technical installations. It forms the basis for precise fit-outs and thus affects function, safety, and the construction workflow. Whether in new construction or existing <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shell-opening\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19645","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shell Opening in Construction - Definition &amp; Guide<\/title>\n<meta name=\"description\" content=\"Construction guide to shell openings in concrete &amp; masonry \u2713 sizing, lintels, jambs, and low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shell-opening\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shell Opening in Construction - Definition &amp; Guide\" \/>\n<meta property=\"og:description\" content=\"Construction guide to shell openings in concrete &amp; masonry \u2713 sizing, lintels, jambs, and low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/shell-opening\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T06:56:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shell-opening\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shell-opening\",\"name\":\"Shell Opening in Construction - Definition & Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-03T12:16:18+00:00\",\"dateModified\":\"2026-05-12T06:56:03+00:00\",\"description\":\"Construction guide to shell openings in concrete & masonry \u2713 sizing, lintels, jambs, and low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shell-opening#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shell-opening\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shell-opening#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Shell opening\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shell Opening in Construction - Definition & Guide","description":"Construction guide to shell openings in concrete & masonry \u2713 sizing, lintels, jambs, and low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening","og_locale":"en_US","og_type":"article","og_title":"Shell Opening in Construction - Definition & Guide","og_description":"Construction guide to shell openings in concrete & masonry \u2713 sizing, lintels, jambs, and low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-12T06:56:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening","url":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening","name":"Shell Opening in Construction - Definition & Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-03T12:16:18+00:00","dateModified":"2026-05-12T06:56:03+00:00","description":"Construction guide to shell openings in concrete & masonry \u2713 sizing, lintels, jambs, and low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/shell-opening"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/shell-opening#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Shell opening"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19645"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19645\/revisions"}],"predecessor-version":[{"id":27333,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19645\/revisions\/27333"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}