{"id":19638,"date":"2025-12-02T09:06:33","date_gmt":"2025-12-02T08:06:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19638"},"modified":"2026-05-11T07:50:04","modified_gmt":"2026-05-11T05:50:04","slug":"annulus-grouting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting","title":{"rendered":"Annulus grouting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Annulus grouting is a central procedure in construction and geotechnical engineering in which the <em>annular space<\/em> between an installed component and the surrounding soil or rock is deliberately filled with a flowable slurry or mortar. This establishes water-tightness, load-bearing capacity, and interlock, reduces settlements, and reliably closes voids. In applications such as tunneling, pipe jacking, bored piles, and anchoring technology, annulus grouting connects the disciplines of subsoil, concrete, and steel construction. Often referred to as annular gap backfilling or backfill grouting, the method enables controlled <em>load transfer<\/em>, hydraulic sealing, and durable bonding of lining elements or pipes to the ground. For projects that will later require <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete Demolition<\/a> and special demolition<\/strong>, it creates safe starting conditions, for example for low-vibration opening and selective separation using <strong>concrete demolition shears<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">low-vibration rock and concrete splitters<\/a> from Darda GmbH.<\/p>\n<h2>Definition: What is meant by annulus grouting?<\/h2>\n<p>Annulus grouting refers to the backfilling and densification of the <em>annular gap<\/em> between components (e.g., segmental lining, pipes, casings, bored piles, sleeve pipes) and the adjacent surroundings with a suitable injection material. The objective is the <strong>load transfer and interlocking<\/strong> connection of the component, <strong>sealing<\/strong> against groundwater and soil air, minimization of deformations, and permanent safeguarding of the structure. Grouting is carried out with controlled pressures and flow rates, often in multiple stages (primary and secondary grouting), via injection ports, grouting hoses, or sleeve pipes\/manchette tubes. Unlike crack or void grouting in massive concrete, annulus grouting refers to the circumferential gap between two \u201cshells.\u201d It follows recognized rules of practice, including coordinated material mix designs, pressure stages, and documentation, aligned with project specifications and accepted industry standards.<\/p>\n<h3>Regulatory guidance and standards<\/h3>\n<p>Execution must comply with applicable standards, client specifications, and permitting conditions. This typically includes requirements for material conformity, environmental compatibility, pressure control, monitoring, and documentation. Where national or project-specific tunneling and grouting guidelines exist, their provisions for design, testing, and verification are to be integrated into the method statement.<\/p>\n<h2>Areas of application and typical use cases<\/h2>\n<p>Annulus grouting is used wherever a component is installed in soil or rock and must be circumferentially backfilled:<\/p>\n<ul>\n<li><strong>Tunneling and pipe jacking<\/strong>: Backfilling\/grouting in shield tunneling (TBM) to fill between the segmental lining and the ground; annulus grouting in microtunneling and pipe jacking to reduce friction, limit settlements, and provide sealing. Synchronous injection at the tail skin and immediate backfill after ring erection are established practices.<\/li>\n<li><strong>Bored piles, micropiles, anchors<\/strong>: Grouting the annulus between casing\/anchor bar and borehole wall for load transfer and corrosion protection.<\/li>\n<li><strong>Utility line construction and wells<\/strong>: Annular backfill of protective and production casings as well as well screens, including sealing layers (e.g., clay\/bentonite contents).<\/li>\n<li><strong>Geothermal and ground-source probes<\/strong>: Thermally conductive grouting mortars for filling and sealing the probe borehole to ensure heat transfer and long-term tightness.<\/li>\n<li><strong>Existing structures and rehabilitation<\/strong>: Backfilling of manhole rings, lock chambers, carrier pipes and thrust bores; sealing of annular joints.<\/li>\n<li><strong>Rock demolition and tunneling<\/strong>: Temporary stabilization of loosened zones or fissures near the excavation and subsequent annulus backfilling behind lining elements.<\/li>\n<\/ul>\n<h2>Construction materials and mixes for annulus grouting<\/h2>\n<p>The choice of injection material depends on function, installation conditions, and environmental influences. Common are:<\/p>\n<ul>\n<li><strong>Cement and cement-bentonite slurries<\/strong> with adjustable viscosity, sedimentation stability, and filter stability; water-cement ratio and bentonite content control flowability and tightness. Thixotropic behavior supports suspension during standstill.<\/li>\n<li><strong>Two-component backfill mortars<\/strong> for TBM drives with defined gel time; component A (cement grout) and component B (e.g., accelerator) react only in the mixing cross near the discharge nozzle to secure rapid setting with controlled pumpability.<\/li>\n<li><strong>Grouting mortars<\/strong> with fine sands and, if necessary, expansive additives for shrinkage compensation as well as additives for frost and sulfate resistance. Anti-washout agents can be beneficial in water-bearing horizons.<\/li>\n<li><strong>Microfine and ultrafine cement systems<\/strong> for dense or fine-grained soils where improved penetration and filter stability are required.<\/li>\n<li><strong>Special systems<\/strong> for sensitive areas (e.g., drinking water protection), matched to leaching behavior and environmental compatibility; where needed, low-pH concepts and verified eluate characteristics are used.<\/li>\n<\/ul>\n<p>Decisive factors are <em>rheology<\/em> (pumpability, yield stress), <em>setting behavior<\/em> (gel time, final strength), <em>filter stability<\/em> (no water separation), and <em>shrinkage or expansion behavior<\/em>. Test criteria can include density, flow time, sieve residue, compressive strength, bleeding tendency, and volume stability. Compatibility with adjacent materials and exposure classes must be verified.<\/p>\n<h2>Procedure and execution steps<\/h2>\n<ol>\n<li><strong>Planning and design<\/strong>: Determination of annulus volume (geometry, ovalization, over-drilling), allowance for losses and settlements, specification of pressure stages, gel time, and regrouting. Define acceptance criteria, alarm thresholds, and fallback strategies.<\/li>\n<li><strong>Setup<\/strong>: Positioning of injection lines\/ports; tightness check; provision of mixing and pumping technology; calibration of measuring and logging equipment. Ensure adequate venting points and safe access routes.<\/li>\n<li><strong>Mixing<\/strong>: Homogeneous preparation of slurry\/mortar; control of density, temperature, and flow time; continuous supply without standstills. Maintain clean water management and verify batch traceability.<\/li>\n<li><strong>Grouting<\/strong>: Injection \u201cfrom bottom to top\u201d or in sections against venting; control of pressure and flow rate; avoidance of short-circuits and material segregation. Adjust to real-time feedback from pressure and volume trends.<\/li>\n<li><strong>Venting and regrouting<\/strong>: Systematic purging of residual air; targeted secondary grouting in case of volume losses or settlements. Keep ports serviceable until stabilization is demonstrated.<\/li>\n<li><strong>Control and documentation<\/strong>: Continuous recording of pressure, quantity, time; spot material testing; visual checks at vents and joints. Archive data in a structured manner for later verification.<\/li>\n<\/ol>\n<h3>Start and end criteria<\/h3>\n<p>Typical termination criteria are a stable final pressure within the target corridor, discharge at defined vents with homogeneous consistency, and achievement of the calculated volume plus safety allowances. In TBM backfilling, timely grouting after ring installation is essential to minimize settlements.<\/p>\n<ul>\n<li><strong>Start prerequisites<\/strong>: Verified equipment calibration, validated mix properties, clear grouting sequence, and active venting concept.<\/li>\n<li><strong>End confirmation<\/strong>: Stabilized pressures without uncontrolled loss, uniform outflow at vents, no further intake during hold period, and documented volumes in line with design envelopes.<\/li>\n<\/ul>\n<h2>Design of volumes, pressures, and times<\/h2>\n<p>Dimensioning is based on geometry, subsoil, construction stage, and function. Influencing factors are:<\/p>\n<ul>\n<li><strong>Annulus geometry<\/strong> (segment thickness, pipe diameter, over-drilling, eccentricities) and expected <em>ovalization<\/em>.<\/li>\n<li><strong>Subsoil<\/strong> (permeability, grain size distribution, pore water pressure, loose rock vs. rock).<\/li>\n<li><strong>Installation conditions<\/strong> (advance rate, temperature, grouting paths, line lengths).<\/li>\n<li><strong>Material parameters<\/strong> (gel time, sedimentation, shrinkage, early strength).<\/li>\n<\/ul>\n<p>Grouting pressures are chosen to ensure reliable encapsulation and sealing without damaging the surroundings (e.g., hydraulic fracturing of the soil). The gel time must match the process: short enough to counter settlements, long enough for safe transport and placement. Sensitivity checks and staged pressure ramps reduce the risk of blow-outs and surface heave; model-based volume windows support plausibility checks during execution.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>An effective QA system links material, process, and outcome testing:<\/p>\n<ul>\n<li><strong>Fresh material tests<\/strong>: Density, flow time\/viscosity, temperature, tendency to sedimentation, sieve residue. Retain reference samples for later verification.<\/li>\n<li><strong>Process data<\/strong>: Continuous recording of pressure, delivery rate, volume, times; event logs (stops, recipe changes). Keep calibration records of sensors and pumps.<\/li>\n<li><strong>Outcome checks<\/strong>: Visual\/outflow control at vents, regrouting quantities, if necessary tightness tests; samples taken for compressive strength. Where feasible, integrate trial sections and photographic evidence at vents and joints.<\/li>\n<\/ul>\n<p>Clear assignment of mix design, section, and time simplifies later verification, e.g., prior to subsequent works such as gutting, cutting, or deconstruction. Structured data storage enables transparent review by site supervision and stakeholders.<\/p>\n<h2>Challenges, risks, and remedies<\/h2>\n<ul>\n<li><strong>Incomplete filling<\/strong> due to air pockets or short-circuits: plan vent points, adjust grouting sequence, allow for regrouting. Use low-permeability stoppers and verify outflow at remote vents.<\/li>\n<li><strong>Material segregation<\/strong> and filter cake formation: adapt mix to subsoil, control shear energy and mixing time, adjust yield stress. Employ anti-washout and stabilizing agents as needed.<\/li>\n<li><strong>Blow-outs\/uncontrolled discharges<\/strong>: limit pressure stages, set observation points, increase pressure stepwise, environment-dependent barriers. Prepare emergency stop procedures and isolation measures.<\/li>\n<li><strong>Settlements<\/strong> due to shrinkage: configure low-shrinkage or expansive behavior, secondary grouting. Ensure timely execution relative to structural loading.<\/li>\n<li><strong>Time window<\/strong>: align gel time with delivery distance and cycle; provide redundancy for mixing\/pumping equipment. Monitor temperature influences on set and viscosity.<\/li>\n<\/ul>\n<h2>Interfaces to deconstruction, gutting, and cutting operations<\/h2>\n<p>In projects where, after annulus grouting, selective opening, separation, or deconstruction is performed, the backfill acts as a <em>stabilizing medium<\/em> and as a <em>seal<\/em>. This reduces uncontrolled movements and facilitates safe sequencing of mechanical methods. For low-vibration approaches, the following Darda GmbH tools are particularly suitable:<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong> for targeted biting and opening of concrete cross-sections at shafts, segment edges, or lining elements, when the backfilled annulus stabilizes the component and minimizes water ingress.<\/li>\n<li><strong>Hydraulic splitters<\/strong> for controlled widening of separation joints or breaking out smaller segments without impact or blasting effects, which reduces risks to adjacent structures in a grout-filled environment.<\/li>\n<li><strong>Hydraulic power packs<\/strong> to supply the above tools, with finely adjustable output for precise steps in confined spaces; for example, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">precisely tuned hydraulic power units<\/a>.<\/li>\n<li><strong>Combination shears<\/strong> and <strong>multi cutters<\/strong> for releasing embedded parts, fasteners, and embedded steels; <strong>steel shears<\/strong> for reinforcement and sections during selective deconstruction.<\/li>\n<\/ul>\n<p>Coordinating injection logs, component break-down, and tool selection prevents damage to injection lines and increases occupational safety in <strong>concrete demolition and special demolition<\/strong> as well as during <strong>gutting and cutting<\/strong>. Clearly marked ports and protected routing of hoses reduce conflicts during subsequent works.<\/p>\n<h2>Annulus grouting in tunneling and pipe jacking<\/h2>\n<p>In shield tunneling, segment rings are backfilled immediately after installation. The backfill mortar must be promptly pumpable, low-shrinkage, and gain early strength to close voids and transfer overburden from the ground. In microtunneling, annulus grouting reduces friction forces, stabilizes the ground, and seals against water ingress. Consistent pressure control prevents upheaval at the ground surface. For subsequent works on the lining, such as modifications or connections, teams benefit from the backfilled, tight annulus when controlled interventions with concrete demolition shears are planned. Reliable gasket seating and tail void closure are decisive for long-term performance.<\/p>\n<h2>Annulus backfilling for pile and anchor works<\/h2>\n<p>For bored piles, micropiles, and soil nails, annulus grouting establishes the load-bearing bond to the borehole wall. Crucial factors are sufficient penetration of the mortar into the soil structure and avoiding \u201cwashing out\u201d in water-bearing layers. Sleeve pipes allow sectional grouting; regrouting can compensate for volume losses. For later local openings, e.g., inspection windows in pile heads, precise tools such as hydraulic splitters are helpful to expose reinforcement without damaging the grouted matrix. Corrosion protection and durability classes must be addressed in the mix and cover design.<\/p>\n<h2>Occupational safety and environmental aspects<\/h2>\n<p>When handling cement grouts, bentonites, and accelerators, appropriate protective measures must be taken. Grouting pressures and quantities must be selected so that surrounding structures and utilities are not impaired. In sensitive areas (e.g., water protection), systems with verified environmental compatibility should be used. Measures for handling high-pH media, dust control, containment of spills, and noise minimization are to be planned. Legal requirements and permitting conditions must be checked on a project-specific basis; any guidance here is always general and non-binding.<\/p>\n<h2>Planning, logistics, and digitalization<\/h2>\n<p>A robust \u201ctakt logistics\u201d of mixing, pumping, line maintenance, and data recording prevents process interruptions. Digital logs, sensors on pumps, and systematic data management facilitate evidence for site supervision and create transparency for subsequent trades. In construction sequences with <strong>special operations<\/strong> or confined spaces (shafts, tunnel tubes), close coordination between the grouting crew and teams for <strong>gutting and cutting<\/strong> &#8211; for example, working with concrete demolition shears &#8211; has proven effective. Integration with 4D scheduling and standardized IDs for ports, batches, and sections enhances traceability.<\/p>\n<h2>Practice-oriented tips for reliable annulus grouting<\/h2>\n<ul>\n<li><strong>Dimension early<\/strong>: Realistically estimate annulus volume (tolerances, ovalization, overbreak) and calculate allowances.<\/li>\n<li><strong>Test the mix<\/strong>: Pre-trials for rheology, filter stability, and gel time; adapt to subsoil as needed.<\/li>\n<li><strong>Think compatibility<\/strong>: Route injection lines so that later separation and deconstruction works are not impeded; define cutting planes early.<\/li>\n<li><strong>Take venting seriously<\/strong>: Air pockets prevent complete encapsulation; plan vent points and sight windows.<\/li>\n<li><strong>Use documentation<\/strong>: Actively employ logs for fine-planning the use of concrete demolition shears and splitters.<\/li>\n<li><strong>Manage temperature<\/strong>: Control mix and ambient temperatures to maintain gel time and viscosity within target corridors.<\/li>\n<li><strong>Verify instruments<\/strong>: Calibrate pressure and flow sensors regularly; check zero points before each shift.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Annulus grouting is a central procedure in construction and geotechnical engineering in which the annular space between an installed component and the surrounding soil or rock is deliberately filled with a flowable slurry or mortar. This establishes water-tightness, load-bearing capacity, and interlock, reduces settlements, and reliably closes voids. In applications <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19638","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Annulus Grouting in Geotechnical Engineering<\/title>\n<meta name=\"description\" content=\"Discover annulus grouting for tunneling, piles and anchors \u2713 sealing, load transfer &amp; minimized settlements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Annulus Grouting in Geotechnical Engineering\" \/>\n<meta property=\"og:description\" content=\"Discover annulus grouting for tunneling, piles and anchors \u2713 sealing, load transfer &amp; minimized settlements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-11T05:50:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/annulus-grouting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/annulus-grouting\",\"name\":\"Annulus Grouting in Geotechnical Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-02T08:06:33+00:00\",\"dateModified\":\"2026-05-11T05:50:04+00:00\",\"description\":\"Discover annulus grouting for tunneling, piles and anchors \u2713 sealing, load transfer & minimized settlements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/annulus-grouting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/annulus-grouting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/annulus-grouting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Annulus grouting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Annulus Grouting in Geotechnical Engineering","description":"Discover annulus grouting for tunneling, piles and anchors \u2713 sealing, load transfer & minimized settlements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting","og_locale":"en_US","og_type":"article","og_title":"Annulus Grouting in Geotechnical Engineering","og_description":"Discover annulus grouting for tunneling, piles and anchors \u2713 sealing, load transfer & minimized settlements.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-11T05:50:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting","url":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting","name":"Annulus Grouting in Geotechnical Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-02T08:06:33+00:00","dateModified":"2026-05-11T05:50:04+00:00","description":"Discover annulus grouting for tunneling, piles and anchors \u2713 sealing, load transfer & minimized settlements.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/annulus-grouting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Annulus grouting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19638"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19638\/revisions"}],"predecessor-version":[{"id":27234,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19638\/revisions\/27234"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}