{"id":19628,"date":"2025-12-02T12:23:07","date_gmt":"2025-12-02T11:23:07","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19628"},"modified":"2026-05-11T15:58:03","modified_gmt":"2026-05-11T13:58:03","slug":"remaining-service-life-of-structure","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure","title":{"rendered":"Remaining service life of structure"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The remaining service life of a structure is central to maintenance operations, partial deconstruction, and replacement new build. It determines whether a building or civil engineering structure is kept in operation, upgraded, or deconstructed in an orderly manner. For planning, estimating, <em>selective deconstruction<\/em>, and safe construction workflows, a reliable view of the remaining service life of a structure is essential. In practice, this directly affects methods, sequencing, and tool selection in <strong>concrete demolition and special demolition<\/strong>-for example, whether concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, or other hydraulic tools from Darda GmbH are used. Clear, evidence-based assessments support approvals, budget certainty, and risk management in late life-cycle projects.<\/p>\n<h2>Definition: What is meant by the remaining service life of a structure?<\/h2>\n<p>By the remaining service life of a structure is meant the period in which the structural asset is expected, under the given boundary conditions, to continue to fulfill the required functions (structural stability, serviceability, durability). It results from the interaction of the structure\u2019s condition, imposed usage, environmental and surrounding conditions, maintenance level, as well as economic and organizational aspects. Professionally, a distinction is made between <strong>technical remaining life<\/strong> (load-bearing-capacity- and damage-related) and <strong>economic remaining service life<\/strong> (usage- and cost-related); both perspectives influence decisions on repair, partial demolition, or complete deconstruction. In practice, the term is also used synonymously with <em>residual service life<\/em> or <em>remaining useful life<\/em> when describing decision windows for interventions.<\/p>\n<h2>Influencing factors on the remaining service life of structures<\/h2>\n<p>The remaining service life is not a fixed value but the result of several, partly interacting factors. A transparent derivation improves planning reliability and reduces risks in deconstruction.<\/p>\n<ul>\n<li>Material and construction method: concrete mix design, concrete cover, reinforcement ratio, execution quality, joints and details.<\/li>\n<li>Environmental effects: concrete carbonation, chloride-induced corrosion, moisture cycles, freeze\/thaw and de-icing salt attack, sulfates, chemical exposure.<\/li>\n<li>Mechanical loading: load level, fatigue (e.g., in bridges), vibrations, settlements, dynamic actions.<\/li>\n<li>Damage patterns: cracks, spalling, cross-section losses of reinforcement, delaminations, ASR indicators, concrete damage due to fire.<\/li>\n<li>Usage and changes: intensity of use, change of use, extensions, breakthroughs, installation loads.<\/li>\n<li>Maintenance history: maintenance, inspection, refurbishment, coatings, waterproofing.<\/li>\n<li>Boundary conditions in the existing structure: accessibility, heritage protection, neighboring buildings, utility lines, operational safety.<\/li>\n<li>Substances of concern: hazardous substances in the strip-out (e.g., during building gutting) and the resulting requirements for selective deconstruction.<\/li>\n<li>Design life and standards: originally intended design working life, safety levels, and changes in regulatory requirements over time.<\/li>\n<li>Drainage and detailing: performance of joints, edge seals, and water management that influence exposure classes and degradation rates.<\/li>\n<\/ul>\n<h2>Methods of condition assessment and forecasting<\/h2>\n<p>A sound assessment of the remaining service life is based on structured structural inspections, laboratory analyses, and prediction models. It provides robust foundations for repair concepts, partial deconstruction, and dismantling sequences in <em>building gutting and concrete cutting<\/em> as well as in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>. Data quality, representativeness, and traceable documentation are decisive for reliable conclusions and later verification.<\/p>\n<h3>Non-destructive testing (NDT)<\/h3>\n<ul>\n<li>Surface tests: rebound hammer, visual inspection, crack monitoring.<\/li>\n<li>Ultrasonic\/impact methods: homogeneity, delaminations, member thickness.<\/li>\n<li>Rebar locating: cover, position, and diameter using locating devices.<\/li>\n<li>Corrosion diagnostics: potential measurements, moisture measurements as indicators.<\/li>\n<li>Ground penetrating radar: reinforcement mapping, tendon ducts, embedded objects.<\/li>\n<li>Infrared thermography and acoustic emission: detection of near-surface voids and active cracking.<\/li>\n<\/ul>\n<h3>Destructive tests (DT)<\/h3>\n<ul>\n<li>Concrete cores (specimens): compressive strength, matrix, chloride profile, carbonation depth.<\/li>\n<li>Laboratory analyses: capillary porosity, ASR indicators, chemical impacts.<\/li>\n<li>Exposures: reinforcement cross-section losses, condition of joints and bearings.<\/li>\n<li>Petrographic analysis and microstructure: identification of deleterious reactions and damage mechanisms.<\/li>\n<li>Pull-out and bond tests: verification of reinforcement bond where relevant for residual capacity.<\/li>\n<\/ul>\n<h3>Prediction models and scenarios<\/h3>\n<p>Measurement data are used to derive scenarios for the remaining service life of a structure: deterministic (limit values) or probabilistic (failure probability over time). Typical approaches combine degradation (e.g., carbonation front) with limit states of load-bearing capacity. Scenarios consider repair, continued operation, partial deconstruction or complete deconstruction and help plan workflows and tool sequences-for example, the targeted use of concrete demolition shears before the final removal of a structural member. Continuous updating with monitoring data increases forecasting robustness during execution.<\/p>\n<ul>\n<li>Model categories: degradation models, reliability-based assessments, and scenario trees with trigger values for action.<\/li>\n<li>Uncertainty management: sensitivity analyses and conservative partial factors for critical assumptions.<\/li>\n<li>Decision windows: definition of thresholds for switching from repair to deconstruction, including contingency plans.<\/li>\n<\/ul>\n<h2>Threshold values and decision logic in deconstruction<\/h2>\n<p>The decision between repair, partial deconstruction, or demolition often follows a threshold logic that brings together technical and economic criteria. The shorter the remaining service life of a structure and the higher the risks, the more the focus shifts to dismantling and deconstruction.<\/p>\n<ul>\n<li>Technical criteria: structural stability, serviceability, durability, redundancy in construction.<\/li>\n<li>Economic criteria: life-cycle costs, downtimes, availability of replacement.<\/li>\n<li>Operational criteria: accessibility, construction time windows, safety level during operation.<\/li>\n<li>Environmental and neighborhood protection: vibrations, noise, dust, sensitivity to vibration.<\/li>\n<li>Regulatory framework conditions: inspection intervals, documentation duties, verifications (understood generally, not case-specific).<\/li>\n<li>Resource and circularity criteria: recoverable material value, recycling routes, and embodied carbon considerations.<\/li>\n<li>Permitting and stakeholder acceptance: constraints from operations, neighbors, and authorities that influence feasible options.<\/li>\n<\/ul>\n<h2>Effects of the remaining service life on planning and procedures in deconstruction<\/h2>\n<p>The remaining service life governs how selective, low-vibration, and material-appropriate the approach must be. With short remaining service life and limited load-bearing capacity, components are often removed in small sections to minimize load redistribution. Here, <strong>concrete demolition shears<\/strong> prove their worth for separating and nipping off reinforced concrete sections, as do <strong>stone splitter and concrete splitter<\/strong> for controlled, pressure-based separation without impact and with very low vibration. Sequencing, temporary states, and the protection of retained elements are coordinated with the verified residual capacity and the expected degradation during the works.<\/p>\n<h3>Tool selection in the context of remaining service life<\/h3>\n<ul>\n<li>Concrete demolition shears: cutting and reducing member thicknesses, opening edges, nipping off brackets and beam ends; suitable when reinforcement is to be selectively exposed or carried along.<\/li>\n<li>Stone splitter and concrete splitter: splitting massive members, piers, or foundations when low vibration and crack control in the existing structure are prioritized.<\/li>\n<li>Combination shears and multi cutters: universal separation tasks in <em>building gutting and concrete cutting<\/em>, especially in masonry-concrete transition zones.<\/li>\n<li>Steel shear: deconstruction of steel beams, rebar bundles, and steelwork connections.<\/li>\n<li>Rock wedge splitter: rock removal in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, e.g., when opening shafts next to sensitive existing structures.<\/li>\n<li>Tank cutters: dismantling of vessels and apparatus in industrial buildings when their remaining service life has expired and orderly segmentation is required.<\/li>\n<li>Hydraulic power pack: energy supply and pacing of multiple hydraulic tools; relevant for cycle planning, emissions, and energy management on confined construction sites.<\/li>\n<li>Diamond wire and wall saws: precise cuts where geometry control, cold cutting, and very low vibration are critical to protect adjacent structures.<\/li>\n<\/ul>\n<h2>Remaining service life of structures for bridges, parking structures, and tunnels<\/h2>\n<p>Engineering structures exhibit specific aging mechanisms. In bridges, fatigue, chlorides, and joint problems dominate; in parking structures, moisture and de-icing salt attack; in tunnels and massive basements, moisture and chemical impacts. Protective systems such as surfacings, membranes, and drainage significantly influence exposure and thus residual life, particularly at transitions and joints.<\/p>\n<h3>Fatigue and usage intensity<\/h3>\n<p>Repeated loads shorten the remaining service life of a structure even when visual inspections initially appear unremarkable. Deconstruction concepts consider temporary shoring, load redistribution, and a sequence of separating (e.g., concrete demolition shears) and splitting methods (e.g., stone splitter and concrete splitter) to avoid local overstressing. Where usage remains high during works, monitoring of deflections and vibrations with thresholds for intervention enhances operational safety.<\/p>\n<h2>Sustainability, resource conservation, and circular economy<\/h2>\n<p>Assessing the remaining service life of a structure is a lever for circular construction: components that still fulfill their function are retained; members at the end of the life cycle are separated with minimal damage. <em>Low-vibration<\/em> separation methods improve the quality of the arising material, increase purity of fractions, and support high-value recycling. At the same time, noise and dust emissions can be reduced-an advantage in densely built environments and in <em>special operations<\/em> with sensitive neighbors.<\/p>\n<ol>\n<li>Investigation and material flow planning: identification of reusable components, separation of reinforcement and concrete.<\/li>\n<li>Selective deconstruction: sequence from non-load-bearing fit-out to the load-bearing structure, planned to suit the tools.<\/li>\n<li>Material separation: concrete demolition shears for exposing reinforcement, splitters for massive concrete; steel shear for profiles and rebar bundles.<\/li>\n<li>Quality assurance: documentation of origin, exposures, and material qualities.<\/li>\n<li>Reporting: determination of recovery and recycling rates and, where applicable, balance of avoided emissions through reuse.<\/li>\n<\/ol>\n<h2>Occupational safety and emission reduction in the late life cycle<\/h2>\n<p>Safety takes priority, especially with short remaining service life of a structure and limited load-bearing capacity. Load relief, temporary safeguards, and <strong>controlled demolition<\/strong> minimize risks. Methods with low vibration and low sparking support the protection of people and neighboring structures. Dust and noise reduction measures, utility isolation, and a coordinated pacing of the hydraulic power pack are standard measures. Legal requirements are location- and project-dependent; they should be reviewed early and considered on a project-specific basis.<\/p>\n<ul>\n<li>Exposure control: silica dust management, water treatment, and noise control plans for sensitive surroundings.<\/li>\n<li>Emergency preparedness: access routes, rescue concepts, and fallback measures for unexpected target-actual deviations.<\/li>\n<li>Interface management: coordination with operations, utilities, and neighboring projects to avoid cascading risks.<\/li>\n<\/ul>\n<h2>Planning sequence: from investigation to execution<\/h2>\n<ol>\n<li>Preliminary investigation: documents, usage history, damage screening.<\/li>\n<li>Testing concept: NDT\/DT, sampling, monitoring, structural analysis.<\/li>\n<li>Assessment of the remaining service life of a structure: scenarios, risks, hierarchy of measures.<\/li>\n<li>Deconstruction concept: demolition sequence, intermediate states, safeguards, emergency plans.<\/li>\n<li>Tool and pacing planning: concrete demolition shears, stone splitter and concrete splitter, shears; hydraulic power pack and logistics.<\/li>\n<li>Pretests: trial areas, parameter optimization, emission measurements.<\/li>\n<li>Execution: supervision, adaptation to target-actual deviations, verifications.<\/li>\n<li>Documentation: material flows, proofs, as-built records for remaining components.<\/li>\n<li>Handover and evaluation: acceptance of residual structures, lessons learned for future late life-cycle projects.<\/li>\n<\/ol>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Underestimating intermediate states with reduced load-bearing capacity; countermeasure: temporary shoring and tightly paced sequences.<\/li>\n<li>Unsuitable tool selection; countermeasure: combination of separating and splitting methods depending on member thickness, reinforcement, and surroundings.<\/li>\n<li>Lack of an emission strategy; countermeasure: dust and noise reduction measures, water management, ground vibration monitoring.<\/li>\n<li>Incomplete investigation; countermeasure: tiered testing concept with follow-up investigations at critical locations.<\/li>\n<li>Unclear material flow management; countermeasure: early sorting and recycling planning.<\/li>\n<li>Poor coordination of interfaces; countermeasure: integrated schedules and responsibilities for operations, logistics, and utilities.<\/li>\n<\/ul>\n<h2>Documentation and legal notes<\/h2>\n<p>The assessment of the remaining service life of a structure and the resulting deconstruction must be documented: examination methods, measurement results, assumptions, safety concepts, and the actual construction process. Proofs of disposal, recycling, and the whereabouts of materials are to be kept on a project-specific basis. Normative and authority requirements may vary by region; these notes are general and do not replace a project-specific review. Early coordination with the stakeholders supports safe, material-efficient, and low-emission deconstruction. Digital records and structured data models facilitate traceability, verification, and reuse potential assessments.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The remaining service life of a structure is central to maintenance operations, partial deconstruction, and replacement new build. It determines whether a building or civil engineering structure is kept in operation, upgraded, or deconstructed in an orderly manner. For planning, estimating, selective deconstruction, and safe construction workflows, a reliable view <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19628","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Remaining Service Life of Structure Assessment<\/title>\n<meta name=\"description\" content=\"Understand remaining service life of structure for buildings &amp; civil assets \u2713 assessment to plan repair or demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Remaining Service Life of Structure Assessment\" \/>\n<meta property=\"og:description\" content=\"Understand remaining service life of structure for buildings &amp; civil assets \u2713 assessment to plan repair or demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-11T13:58:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-service-life-of-structure\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-service-life-of-structure\",\"name\":\"Remaining Service Life of Structure Assessment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-02T11:23:07+00:00\",\"dateModified\":\"2026-05-11T13:58:03+00:00\",\"description\":\"Understand remaining service life of structure for buildings & civil assets \u2713 assessment to plan repair or demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-service-life-of-structure#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-service-life-of-structure\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-service-life-of-structure#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Remaining service life of structure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Remaining Service Life of Structure Assessment","description":"Understand remaining service life of structure for buildings & civil assets \u2713 assessment to plan repair or demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure","og_locale":"en_US","og_type":"article","og_title":"Remaining Service Life of Structure Assessment","og_description":"Understand remaining service life of structure for buildings & civil assets \u2713 assessment to plan repair or demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-11T13:58:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure","url":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure","name":"Remaining Service Life of Structure Assessment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-02T11:23:07+00:00","dateModified":"2026-05-11T13:58:03+00:00","description":"Understand remaining service life of structure for buildings & civil assets \u2713 assessment to plan repair or demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/remaining-service-life-of-structure#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Remaining service life of structure"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19628"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19628\/revisions"}],"predecessor-version":[{"id":27317,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19628\/revisions\/27317"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}