{"id":19627,"date":"2025-12-02T11:49:21","date_gmt":"2025-12-02T10:49:21","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19627"},"modified":"2026-05-09T11:45:03","modified_gmt":"2026-05-09T09:45:03","slug":"remaining-wall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall","title":{"rendered":"Remaining wall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The <strong>remaining wall<\/strong> is a central topic in selective deconstruction: it denotes the portion of a wall that intentionally remains after a partial demolition to preserve functions such as structural stability, weather protection, separation, or protected heritage substance. In the context of concrete demolition and special deconstruction, gutting and cutting, as well as work within existing structures, the professional creation of a remaining wall determines project flow, safety, quality, and downstream costs. Tools such as <em>concrete demolition shears<\/em> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a> and the associated <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a> from Darda GmbH enable controlled, low-vibration work &#8211; especially where neighboring buildings, sensitive facilities, or existing load-bearing structures must be protected. Properly designed remaining walls minimize rework, safeguard interfaces for subsequent trades, and help maintain program reliability.<\/p>\n<h2>Definition: What is meant by a remaining wall?<\/h2>\n<p>A <strong>planned remaining wall<\/strong> after a partial demolition is referred to as the remaining wall. It is retained in the existing structure for structural, functional, or building physics reasons. Typical objectives include securing load transfer, complying with property boundaries, preserving connection faces for new construction, or maintaining components with protected status. In concrete and masonry structures, the remaining wall generally includes the wall base, partial heights, or wall fields as <em>shear walls<\/em>, which are deliberately dimensioned and their surface defined (demolition edge, relief cut, connection level).<\/p>\n<ul>\n<li>Typical configurations: plinth zones for bracing, partial-height panels for separation, or end walls for connection to extensions.<\/li>\n<li>Defined interfaces: intentionally roughened or cut surfaces for bonded joints, mechanical fixings, or waterproofing tie-ins.<\/li>\n<li>Temporary function: interim support or enclosure until the subsequent construction phase establishes new load paths.<\/li>\n<\/ul>\n<h2>Tasks and fields of application of the remaining wall in deconstruction<\/h2>\n<p>Remaining walls appear in numerous project scenarios. The spectrum ranges from interior walls during gutting to massive exterior walls made of reinforced concrete. Common fields of application:<\/p>\n<ul>\n<li>Concrete demolition and special deconstruction: Partial deconstruction of wall areas during ongoing operations, retaining partition walls or bracing elements.<\/li>\n<li>Gutting and cutting: Selective removal of service runs, shafts, and openings while defined remaining wall areas remain in place as dust and noise protection.<\/li>\n<li>Rock excavation and tunnel construction: Retention of wall or support elements (e.g., excavation edges, temporary supports) as a &#8220;remaining wall&#8221; for subsequent construction phases.<\/li>\n<li>Natural stone extraction: Precise separation at fracture edges to preserve a wall remainder as a later reference or protective surface.<\/li>\n<li>Special applications: Work in sensitive zones (hospitals, laboratories, heritage protection) where low-vibration methods are required for clean remaining walls.<\/li>\n<\/ul>\n<p>Across these applications, the remaining wall secures stability, separates construction stages, and establishes precise connection zones for refurbishment or extensions.<\/p>\n<h2>Planning, structural analysis, and boundary conditions<\/h2>\n<p>Creating a remaining wall begins with planning and assessment of boundary conditions. Key points:<\/p>\n<ul>\n<li>Structural stability: Preliminary investigation of load transfer, cracks, concrete quality, and reinforcement layout. If necessary, temporary shoring or bracing.<\/li>\n<li>Demolition objective and tolerances: Definition of height, thickness, edge alignment, flatness, and surface quality of the future remaining wall.<\/li>\n<li>Separation and cutting concept: Definition of saw cuts, core drillings, splitting lines, and nibbling steps (e.g., with concrete demolition shears) for controlled demolition.<\/li>\n<li>Vibration, noise, dust: Selection of low-vibration methods, extraction and wetting, suitable cutting and splitting techniques.<\/li>\n<li>Neighborhood and existing structure: Protective measures for adjacent components (crack monitoring, ground vibration monitoring), controlled load redistribution.<\/li>\n<li>Permits and documentation: Project and safety planning according to applicable rules; these notes are general and do not replace project-specific assessments.<\/li>\n<li>Surveying and digital capture: Precise as-built measurement, if applicable scan-to-model workflows for reliable interface definition and clash prevention.<\/li>\n<li>Services and materials: Location of active services, assessment of embedded items, and identification of hazardous substances before intervention.<\/li>\n<li>Temporary conditions: Verification of load paths and serviceability in interim states; coordination of props, tie-backs, and access logistics.<\/li>\n<li>Waste, water, and slurry management: Concepts for collection, separation, and lawful disposal without contaminating adjacent areas.<\/li>\n<\/ul>\n<h2>Methods for creating a defined remaining wall<\/h2>\n<p>Clean remaining walls result from the combination of precise separation cuts and controlled material removal. Depending on material, reinforcement, and surroundings, different methods are used:<\/p>\n<h3>Sawing and drilling as preliminary work<\/h3>\n<p>Wall saws, joint cutters, and core drillings define the exact demolition edge. This pre-separation reduces locked-in stresses and minimizes damage to the remaining wall surface.<\/p>\n<h3>Concrete demolition shears for controlled material removal<\/h3>\n<p><strong>Concrete demolition shears<\/strong> operate hydraulically by cutting\/nibbling and are ideal for removing concrete layer by layer back to the separation joint. Advantages include excellent edge control, exposing reinforcement, and low vibration levels &#8211; particularly suitable for partial demolition near sensitive components.<\/p>\n<h3>Stone and concrete splitters for low-vibration separation<\/h3>\n<p><strong>Stone and concrete splitters<\/strong> generate splitting forces in the drilled hole. This allows massive wall areas and foundation zones to be opened along the intended line without introducing percussive or impact energy. This is advantageous for thick wall remnants, in basements, shafts, or close to neighboring buildings.<\/p>\n<h3>Combination shears, multi cutters, and steel shears<\/h3>\n<p>Combination shears and multi cutters are helpful when, in addition to concrete, masonry, sections, built-ins, or services are also being deconstructed. <em>Steel shears<\/em> cut exposed reinforcement in a targeted manner so the remaining wall is left without protruding steel ends.<\/p>\n<h3>Hydraulic power packs and system thinking<\/h3>\n<p>Hydraulic power packs from Darda GmbH supply shears and splitters with the required pressure and flow rate. A coordinated system of power pack, tool, and accessories ensures performance, controllability, and repeatability &#8211; critical for uniform demolition edges.<\/p>\n<h3>Diamond wire sawing for thick and reinforced sections<\/h3>\n<p>Where wall thicknesses or reinforcement density exceed the efficient range of conventional wall saws, diamond wire systems create precise, low-vibration cuts with minimal kerf. They are suitable for complex geometries and help maintain perpendicularity and edge integrity at the remaining wall.<\/p>\n<h3>Dust, water, and slurry management<\/h3>\n<p>Cutting and drilling generate dust and slurry that can impair adhesion at connection surfaces. Targeted extraction, wet cutting with controlled water supply, and immediate slurry collection maintain cleanliness and support subsequent bonding performance.<\/p>\n<h2>Sequence of steps: From separation cut to finished remaining wall<\/h2>\n<ol>\n<li>Surveying and marking: Define the demolition edge, elevation marks, and protection zones; check for services and built-ins.<\/li>\n<li>Pre-separation: Saw cuts\/core drillings at the intended line, drilling of splitting holes, installation of dust and splash protection.<\/li>\n<li>Controlled removal: Work section by section with concrete demolition shears or stone and concrete splitters; secure against tipping and uncontrolled breaking.<\/li>\n<li>Reinforcement management: Expose, shorten, or thread out reinforcement; cut with steel shears if required.<\/li>\n<li>Edge finishing: Smooth steps, remove loose parts, create a defined demolition edge.<\/li>\n<li>Quality check: Dimensional control, flatness, visual inspection for cracks and edge integrity; documentation of results.<\/li>\n<li>Temporary protection: Shield exposed interfaces against moisture and contamination; install edge guards where required.<\/li>\n<li>Handover: Record as-built dimensions, tolerance compliance, and surface condition for subsequent trades.<\/li>\n<\/ol>\n<h2>Quality criteria, tolerances, and connectivity<\/h2>\n<p>A professionally executed remaining wall is characterized by the following:<\/p>\n<ul>\n<li>Dimensional accuracy: Height, thickness, and alignment within the agreed tolerance range; clean connection edges.<\/li>\n<li>Surface: Free of loose constituents, formwork residues, and honeycomb structure in concrete; defined roughness for subsequent connections.<\/li>\n<li>Reinforcement: Properly exposed or cut flush; consider corrosion protection at exposed ends.<\/li>\n<li>Documentation: Photo records, measurement logs, if applicable ground vibration monitoring and crack monitoring.<\/li>\n<li>Edge geometry: Perpendicular, chip-free arrises; no undercuts that compromise load transfer or sealing details.<\/li>\n<li>Interface readiness: Dry, dust-free, and pretreated as specified for bonding agents, anchors, or waterproofing systems.<\/li>\n<li>Consistency: Uniform finish across the entire length and height to ensure predictable performance in subsequent works.<\/li>\n<\/ul>\n<h2>Safety and environmental protection aspects<\/h2>\n<p>Work on remaining walls requires special care, as uncontrolled fractures pose increased risk. Proven measures:<\/p>\n<ul>\n<li>Temporary props, tie-back anchoring, or shoring for slender wall remnants.<\/li>\n<li>Low-vibration methods (splitting, shear work) instead of percussive methods in sensitive environments.<\/li>\n<li>Dust and noise reduction: Wetting, localized extraction, acoustic shielding.<\/li>\n<li>Hazard analysis and instruction; cordoned hazard zones on both sides of the remaining wall.<\/li>\n<li>Silica exposure control: Water suppression or HEPA extraction; compliance with occupational exposure limits.<\/li>\n<li>Waste and slurry handling: Segregated collection, leak-proof transport, and compliant disposal to prevent contamination.<\/li>\n<li>Monitoring: Real-time observation of crack gauges and vibration thresholds with action levels defined in advance.<\/li>\n<\/ul>\n<p>Legal requirements vary by country; the information provided is general and does not replace a project-specific assessment.<\/p>\n<h2>Special situations and boundary conditions<\/h2>\n<h3>Remaining wall at neighboring buildings<\/h3>\n<p>For directly adjacent structures, crack monitoring, ground vibration measurements, and detailed cutting\/splitting concepts are important. Concrete demolition shears allow precise, material-conserving removal back to the demolition edge.<\/p>\n<h3>Remaining wall in basements and shafts<\/h3>\n<p>Tight spaces and low reserve capacity argue for compact hydraulic tools. Stone and concrete splitters work in the drilled hole with virtually no vibration and are therefore ideal.<\/p>\n<h3>Remaining wall in tunnel and rock environments<\/h3>\n<p>In linings or at rock excavations, a &#8220;remaining wall&#8221; can temporarily take loads. Split cylinders and concrete demolition shears create defined edges without impact energy &#8211; beneficial for surrounding supports.<\/p>\n<h3>Remaining wall with natural stone<\/h3>\n<p>In natural stone masonry, the fabric determines the separation strategy. Splitting along drill lines produces smooth fracture surfaces that are well-suited for subsequent connections.<\/p>\n<h3>Interfaces to new construction<\/h3>\n<p>When the remaining wall serves as a future bond or bearing surface, early agreement on geometry, roughness, and permissible tolerances ensures that subsequent components can be installed without adaptation work.<\/p>\n<h2>Equipment and product reference of Darda GmbH in the context of remaining wall<\/h2>\n<ul>\n<li>Concrete demolition shears: Layer-by-layer removal to the intended line, exposing and cleanly finishing edges and openings.<\/li>\n<li>Stone and concrete splitters: Suitable for massive wall remnants and foundations when vibrations must be strictly limited.<\/li>\n<li>Hydraulic power packs: Supply the tools with constant pressure; important for reproducible cutting and splitting results.<\/li>\n<li>Combination shears and multi cutters: For mixed tasks where concrete, masonry, and built-ins are processed in combination.<\/li>\n<li>Steel shears: Cut exposed reinforcement and steel sections at the remaining wall to achieve flush, safe finishing edges.<\/li>\n<li>Rock wedge splitter: Specific for natural stone and rock when defined edges without impact energy are required.<\/li>\n<li>System accessories: Hoses, control units, and protective shields to optimize handling and on-site safety.<\/li>\n<\/ul>\n<h2>Common errors and how to avoid them<\/h2>\n<ul>\n<li>Insufficient pre-separation: Without continuous saw cuts, the risk of spalling at the remaining wall increases.<\/li>\n<li>Excessive vibrations: Percussive methods can cause cracks in the wall remainder; choose alternative splitting and shear methods.<\/li>\n<li>Unplanned reinforcement displacement: Locate reinforcement early; align cutting and splitting strategy accordingly.<\/li>\n<li>Missing edge protection: Protect edges during removal; plan finishing work.<\/li>\n<li>Unclear tolerances: Define in advance and measure continuously; correct deviations immediately.<\/li>\n<li>Inadequate slurry and debris control: Prevent contamination of interfaces and clogging of drainage systems.<\/li>\n<li>Missing monitoring: Establish trigger values for vibration and cracking; act immediately on exceedances.<\/li>\n<\/ul>\n<h2>Practice-oriented checklist for execution<\/h2>\n<ul>\n<li>Structural analysis and protection concept for the existing structure<\/li>\n<li>Surveying, marking, definition of edges and tolerances<\/li>\n<li>Selection: Concrete demolition shears for controlled removal, stone and concrete splitters for massive areas<\/li>\n<li>Dimension hydraulic power packs, coordinate tool combinations<\/li>\n<li>Plan dust, noise, and vibration management<\/li>\n<li>Quality control: Dimensional accuracy, surface, reinforcement, documentation<\/li>\n<li>Service detection and permits, including hazardous materials management<\/li>\n<li>Slurry, water, and waste logistics with compliant disposal routes<\/li>\n<li>Monitoring plan: Crack gauges, vibration thresholds, and defined response actions<\/li>\n<\/ul>\n<p>This is how a <strong>remaining wall<\/strong> is created that is functional, dimensionally accurate, and ready for connection &#8211; with controlled methods that respect the existing structure and support the subsequent construction process. Documented, low-vibration techniques foster predictable outcomes and acceptance among stakeholders.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The remaining wall is a central topic in selective deconstruction: it denotes the portion of a wall that intentionally remains after a partial demolition to preserve functions such as structural stability, weather protection, separation, or protected heritage substance. In the context of concrete demolition and special deconstruction, gutting and cutting, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19627","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Remaining Wall - Selective Demolition Guide<\/title>\n<meta name=\"description\" content=\"Master \u2713 the remaining wall in partial demolition with low vibration methods to protect structure &amp; deliver clean edges.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Remaining Wall - Selective Demolition Guide\" \/>\n<meta property=\"og:description\" content=\"Master \u2713 the remaining wall in partial demolition with low vibration methods to protect structure &amp; deliver clean edges.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-09T09:45:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-wall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-wall\",\"name\":\"Remaining Wall - Selective Demolition Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-02T10:49:21+00:00\",\"dateModified\":\"2026-05-09T09:45:03+00:00\",\"description\":\"Master \u2713 the remaining wall in partial demolition with low vibration methods to protect structure & deliver clean edges.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-wall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-wall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remaining-wall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Remaining wall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Remaining Wall - Selective Demolition Guide","description":"Master \u2713 the remaining wall in partial demolition with low vibration methods to protect structure & deliver clean edges.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall","og_locale":"en_US","og_type":"article","og_title":"Remaining Wall - Selective Demolition Guide","og_description":"Master \u2713 the remaining wall in partial demolition with low vibration methods to protect structure & deliver clean edges.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-09T09:45:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall","url":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall","name":"Remaining Wall - Selective Demolition Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-02T10:49:21+00:00","dateModified":"2026-05-09T09:45:03+00:00","description":"Master \u2713 the remaining wall in partial demolition with low vibration methods to protect structure & deliver clean edges.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/remaining-wall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/remaining-wall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Remaining wall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19627"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19627\/revisions"}],"predecessor-version":[{"id":27218,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19627\/revisions\/27218"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}