{"id":19623,"date":"2025-12-01T08:54:16","date_gmt":"2025-12-01T07:54:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19623"},"modified":"2026-09-12T19:53:22","modified_gmt":"2026-09-12T17:53:22","slug":"ripper-tooth","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth","title":{"rendered":"Ripper tooth"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The ripper tooth is a specialized excavator attachment for hydraulic excavators that purposefully tears open hard and brittle materials such as rock, frozen ground, asphalt, or concrete. In demolition and earthworks, it enables controlled pre-breaking, ripping, and exposure &#8211; often as a preparatory step before material is crushed with concrete pulverizers or split with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> with low vibration. Thanks to its concentrated attack force, the ripper tooth works selectively, often more quietly and with less vibration than percussive tools, which makes it particularly suitable for concrete demolition and special demolition as well as rock excavation and tunnel construction. When correctly sized and applied, it reduces collateral damage and helps meet stringent vibration and noise limits in sensitive surroundings.<\/p>\n<h2>Definition: What is meant by a ripper tooth?<\/h2>\n<p>A ripper tooth (also called a frost ripper tooth) is a single, heavy-duty tooth with a curved, pointed geometry that is driven via the excavator stick. It uses the breakout and ripping force of the carrier machine to cut along existing planes of weakness or initiate cracks. Unlike percussive devices, the ripper tooth operates without impact; it generates cracking through static-dynamic peak forces at a small contact area. As a single-point tool, it concentrates load where cracking is most effective. The result is ripped joints, loosened blocks, or exposed edges that can then be further processed with tools such as concrete pulverizers or specifically split with rock and concrete splitters. The ripper tooth is used in various sizes on excavators from compact to large machines and is an established solution especially in selective deconstruction.<\/p>\n<h2>Design and operating principle of a ripper tooth<\/h2>\n<p>The ripper tooth consists of a robust shank with pronounced curvature and a replaceable tip made of wear-resistant material. This geometry concentrates forces, improves penetration, and enables controlled levering. The tooth engages at an edge, cuts into the material, and uses excavator movement to enlarge cracks. Critical factors are the attack angle, the shank\u2019s ground clearance, and the stability of the mounting. Through <em>targeted positioning<\/em>, microcracks are created that weaken the material. This way, foundations, slabs, and rock masses can be opened in preparation so that concrete pulverizers can expose and size reinforcement. For large cross-sections, it is common to follow ripping with rock and concrete splitters to create a defined separation joint. Tip designs vary from very pointed for maximum penetration to slightly broader, chisel-shaped variants that guide crack propagation more evenly; wear strips and hardfacing on the shank extend service life in abrasive media.<\/p>\n<h2>Typical applications in demolition and earthworks<\/h2>\n<p>The ripper tooth covers a broad range where controlled ripping and pre-breaking are required. It is particularly relevant wherever vibration and noise must be minimized or selective work is needed.<\/p>\n<ul>\n<li>Concrete demolition and special demolition: ripping concrete slabs, opening cracks along foundation edges, exposing reinforcement as preparation for using concrete pulverizers.<\/li>\n<li>Strip-out and cutting: locally initiating separation cuts, releasing bonded interfaces before load-bearing parts are processed with cutting or pressing tools.<\/li>\n<li>Rock excavation and tunnel construction: loosening weathered or jointed rock, opening bedding planes; follow-up with rock and concrete splitters for controlled block formation.<\/li>\n<li>Natural stone extraction: working along natural beds and joints; after ripping, split cylinders create defined separation surfaces to separate blocks to size.<\/li>\n<li>Special applications: breaking frozen ground (frost ripper tooth), removing asphalt layers, loosening root stumps, and exposing utilities or jacketed components that are then processed with suitable tools.<\/li>\n<li>Bridge and infrastructure works: pre-cracking abutments, parapets, and pile caps to reduce impact on adjacent structures before secondary processing with concrete pulverizers.<\/li>\n<li>Trenching in frost and permafrost: initiating narrow slots to lower breakout forces while protecting nearby utilities and coatings.<\/li>\n<\/ul>\n<h2>Advantages and limitations of the ripper tooth<\/h2>\n<ul>\n<li><strong>Advantages<\/strong>: high penetration capability, selective work, often lower vibration and lower noise than percussive methods; good edge control; low energy input; ideal as preparation for concrete pulverizers or rock and concrete splitters.<\/li>\n<li><strong>Additional benefits<\/strong>: reduced dust generation compared to impact tools; potential fuel savings per ton loosened through efficient single-point loading; minimized influence on sensitive edges and adjacent components.<\/li>\n<li><strong>Limitations<\/strong>: limited efficiency in very homogeneous, high-strength matrices without planes of weakness; in heavily reinforced concrete the ripper tooth reaches structural limits and requires subsequent processing with concrete pulverizers; in very hard, tough rock, milling, drilling, or splitting may be more economical.<\/li>\n<li><strong>Additional constraints<\/strong>: effectiveness depends on operator skill and precise positioning; increased tip wear in highly abrasive aggregates may raise operating costs.<\/li>\n<\/ul>\n<h2>Work methodology: process chain with ripper tooth, concrete pulverizers, and rock and concrete splitters<\/h2>\n<p>In practice, a coordinated process chain that leverages each tool\u2019s strengths has proven effective. The ripper tooth prepares; other tools separate, crush, or selectively segregate materials.<\/p>\n<ol>\n<li>Preliminary investigation: determine material type, strength, reinforcement ratio, layer sequences, and constraints (vibration, noise).<\/li>\n<li>Ripping: use the ripper tooth to initiate cracks, open edges, trace joints, and loosen blocks.<\/li>\n<li>Secondary processing: use concrete pulverizers to break concrete cross-sections, expose and cut reinforcement; for large components, controlled splitting with rock and concrete splitters.<\/li>\n<li>Selective separation: combination shears or multi cutters for mixed cross-sections; <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears for massive steel<\/a> once it has been exposed and needs to be cut.<\/li>\n<li>Hydraulic supply: <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> for hand-held splitting technology and cylinders; the sizing of the supply affects cycle times and productivity.<\/li>\n<li>Finishing and sorting: adjust material sizes, separate reinforcement, and stockpile by type.<\/li>\n<li>Monitoring and documentation: capture vibration and noise values, record tool changes and wear, and verify conformity with site requirements.<\/li>\n<\/ol>\n<h2>Selection criteria and sizing<\/h2>\n<p>The performance of a ripper tooth is closely tied to proper sizing for the carrier machine and the material to be worked. Careful selection increases efficiency and service life and reduces misloading.<\/p>\n<ul>\n<li>Carrier machine: operating weight, breakout and ripping force, hydraulic pressure and flow rate, kinematics (stick\/bucket cylinder), and quick coupler compatibility.<\/li>\n<li>Tooth geometry: curvature radius, tip angle, and shank shape influence penetration and levering. <em>Tapered<\/em> geometries penetrate better; broader tips stabilize crack propagation.<\/li>\n<li>Material properties: compressive strength and toughness of concrete or rock, reinforcement ratio, jointing, moisture content, and frost condition.<\/li>\n<li>Process integration: plan for subsequent processing with concrete pulverizers (jaw opening, cutting) or rock and concrete splitters (borehole diameter, splitting force) during planning.<\/li>\n<li>Wear protection: tip hardness, replaceable inserts, hardfacing in highly stressed zones, and regular inspection of the adapter.<\/li>\n<li>Attachment orientation: quick coupler offset and tool alignment determine effective attack angle and leverage; rotatable mounts expand positioning options.<\/li>\n<li>Operating environment: space constraints, access routes, permitted working windows, and emission or noise limits influence tool choice and throughput.<\/li>\n<\/ul>\n<h2>Occupational safety and health protection<\/h2>\n<p>Operating a ripper tooth requires clear safety measures. In principle, safety distances, orderly communication paths, and proactive work planning must be observed. Safety takes priority over speed.<\/p>\n<ul>\n<li>Cordon off the hazard zone; beware of flying chunks and breaking edges.<\/li>\n<li>Ensure the carrier machine\u2019s stability; no levering movements outside the permissible kinematics.<\/li>\n<li>Personal protective equipment: hard hat, eye protection, hearing protection, gloves, safety boots.<\/li>\n<li>Check the subsurface: utilities, voids, tendons; proceed carefully around prestressed reinforcement.<\/li>\n<li>Dust and noise mitigation: wetting, adapted working technique; in sensitive areas, plan alternative steps with rock and concrete splitters.<\/li>\n<li>Maintenance condition: regularly check tips, pins, adapter, and mounts; replace loose or worn parts immediately.<\/li>\n<li>Work control: implement a task-specific risk assessment, define signals and a spotter system, and verify exclusion zones at every relocation.<\/li>\n<\/ul>\n<h2>Use in sensitive environments<\/h2>\n<p>In densely built-up or vibration-sensitive areas, <strong>low-vibration<\/strong> methods are essential. The ripper tooth can offer advantages here when used with controlled pressure and short levering strokes. For defined separation cuts and minimal edge influence, rock and concrete splitters can be added; for subsequent breaking and exposing reinforcement, concrete pulverizers are used. Measurements of vibration and noise levels as well as regulatory requirements must always be observed. Where necessary, pre-drilling guides crack paths and further reduces transmission to adjacent components.<\/p>\n<h2>Comparison with alternative methods<\/h2>\n<p>The choice of method depends on material, boundary conditions, and target geometry. The ripper tooth is particularly effective when existing crack or bedding systems can be used and selective work is required.<\/p>\n<ul>\n<li>Hydraulic breakers: high point performance but more noise and vibration; sensible for compact, high-strength zones without joints.<\/li>\n<li>Milling\/sawing: precise edges and smooth cuts; higher energy demand; can be combined with a ripper tooth to break remaining webs.<\/li>\n<li>Drilling and splitting: highly controlled and quiet; ideal in sensitive areas; the ripper tooth accelerates opening drilled joints and pre-loosening.<\/li>\n<li>Cutting tools: concrete pulverizers for crushed concrete and rebar separation; steel shears, multi cutters, and combination shears for metallic components after exposure by the ripper tooth.<\/li>\n<li>Diamond wire sawing: very accurate on complex geometries and thick sections; typically slower and costlier; complements ripping where kerfs or openings must be exact.<\/li>\n<\/ul>\n<h2>Maintenance, wear, and service life<\/h2>\n<p>A well-maintained ripper tooth works reliably and economically. Wear occurs primarily at the tip and along sliding surfaces. Prevention and timely replacement secure performance and reduce unplanned downtime.<\/p>\n<ul>\n<li>Check tip condition and replace in time; dull tips increase energy demand and crack pressure.<\/li>\n<li>Inspect adapter and pins; avoid play; lubricate according to specifications.<\/li>\n<li>Visually inspect the shank for cracks; stop work and assess the component if abnormalities are found.<\/li>\n<li>Do not overload: no lateral levering beyond the design; execute edge attacks in a controlled manner.<\/li>\n<li>Leverage synergy: loosen roughly with the ripper tooth, then downsize with concrete pulverizers &#8211; this reduces peak loading and wear.<\/li>\n<li>Fasteners and interfaces: check torque on bolted joints and the quick coupler interface at defined intervals to prevent fretting and misalignment.<\/li>\n<\/ul>\n<h2>Practice-oriented application notes<\/h2>\n<p>Efficiency arises from the interplay of tool choice, attack angle, and process sequence. Short, repeated cuts into the material, followed by levering along existing joints, usually deliver the best results. For massive components, it is advisable to scribe predetermined breaking lines with the ripper tooth and then carry out controlled separation with rock and concrete splitters. In areas with high reinforcement density, immediate follow-up with concrete pulverizers is recommended to release tensile bars in a targeted manner and relieve the fracture surface. Temperature and moisture influence brittleness and crack behavior; in cold conditions, controlled ripping may progress faster, whereas saturated materials may require modified angles and shorter strokes.<\/p>\n<h2>Terminological classification and distinction<\/h2>\n<p>The ripper tooth differs from the bucket tooth of a standard excavator through its massive, single hook shape and pronounced curvature that favors <em>levering<\/em>. Variants with reinforced tips are often referred to as frost ripper teeth. Ripper hooks and rippers are common names for identical or functionally similar tools, as are formulations such as single-tooth ripper. Compared to cutting or percussive methods, the focus is on controlled ripping and preparing separation joints &#8211; ideal for subsequently continuing in a material-appropriate way with concrete pulverizers or rock and concrete splitters. In combination with steel shears, combination shears, or multi cutters, metallic components can also be cut efficiently after exposure; for special steel tanks, tank cutters may be considered if conditions permit.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The ripper tooth is a specialized excavator attachment for hydraulic excavators that purposefully tears open hard and brittle materials such as rock, frozen ground, asphalt, or concrete. In demolition and earthworks, it enables controlled pre-breaking, ripping, and exposure &#8211; often as a preparatory step before material is crushed with concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19623","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ripper Tooth - Excavator Attachment for Demolition<\/title>\n<meta name=\"description\" content=\"For controlled demolition \u2713 Ripper tooth for excavators selectively rips rock and concrete with lower noise &amp; vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ripper Tooth - Excavator Attachment for Demolition\" \/>\n<meta property=\"og:description\" content=\"For controlled demolition \u2713 Ripper tooth for excavators selectively rips rock and concrete with lower noise &amp; vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:22+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ripper-tooth\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ripper-tooth\",\"name\":\"Ripper Tooth - Excavator Attachment for Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-01T07:54:16+00:00\",\"dateModified\":\"2026-09-12T17:53:22+00:00\",\"description\":\"For controlled demolition \u2713 Ripper tooth for excavators selectively rips rock and concrete with lower noise & vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ripper-tooth#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ripper-tooth\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ripper-tooth#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ripper tooth\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ripper Tooth - Excavator Attachment for Demolition","description":"For controlled demolition \u2713 Ripper tooth for excavators selectively rips rock and concrete with lower noise & vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth","og_locale":"en_US","og_type":"article","og_title":"Ripper Tooth - Excavator Attachment for Demolition","og_description":"For controlled demolition \u2713 Ripper tooth for excavators selectively rips rock and concrete with lower noise & vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:22+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth","url":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth","name":"Ripper Tooth - Excavator Attachment for Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-01T07:54:16+00:00","dateModified":"2026-09-12T17:53:22+00:00","description":"For controlled demolition \u2713 Ripper tooth for excavators selectively rips rock and concrete with lower noise & vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/ripper-tooth#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Ripper tooth"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19623","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19623"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19623\/revisions"}],"predecessor-version":[{"id":29317,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19623\/revisions\/29317"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}