{"id":19615,"date":"2025-12-01T13:51:08","date_gmt":"2025-12-01T12:51:08","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19615"},"modified":"2026-05-09T15:25:03","modified_gmt":"2026-05-09T13:25:03","slug":"construction-regulatory-framework","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework","title":{"rendered":"Construction regulatory framework"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The Construction Regulatory Framework consolidates the totality of laws, ordinances, standards, technical rules, and official requirements that govern the planning, execution, and control of construction projects. For demolition works, deconstruction, building gutting, rock excavation, and tunnel construction, there are clear guardrails for occupational safety, structural stability, environmental protection measures and immission control, as well as for handling construction waste. Within this framework, mechanical methods with low vibration levels and reduced dust &#8211; such as with <strong>concrete demolition shear<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH &#8211; are often preferred because they enable precise work in sensitive areas and reliably meet requirements for emissions and vibrations. In addition, they minimize secondary damage, facilitate permitting and monitoring concepts, and support high-quality recycling workflows.<\/p>\n<h2>Definition: What is meant by the Construction Regulatory Framework?<\/h2>\n<p>The term \u201cConstruction Regulatory Framework\u201d refers to the totality of binding and generally recognized rules of technology that apply to the planning, construction, maintenance, deconstruction, and special demolition of structures. These include in particular:<\/p>\n<ul>\n<li>public-law provisions (e.g., building codes, immission control, and occupational safety requirements),<\/li>\n<li>standards and technical specifications (e.g., DIN standards, EN standards, and Eurocodes for load-bearing structures, concretes, steels),<\/li>\n<li>industry-specific rules and information sheets (e.g., on demolition, deconstruction, hazardous substance remediation, recycling),<\/li>\n<li>trade association rules and information on the safe use of work equipment,<\/li>\n<li>municipal requirements, permits, and project-specific ancillary conditions.<\/li>\n<\/ul>\n<p>The Construction Regulatory Framework is dynamic: it evolves with the state of the art and with current guidance and case law. Companies are obliged to continuously consider changes, adapt processes, and instruct personnel. Requirements differ by federal state and municipality; a project-specific review is always necessary. Non-compliance risks delays, sanctions, and reputational damage &#8211; systematic compliance management mitigates these risks.<\/p>\n<h2>Overview of standards, guidelines, and technical rules<\/h2>\n<p>For demolition and deconstruction, rules on structural stability, occupational safety, noise, vibrations, dust, hazardous substances, waste management, and water protection are particularly relevant. The focus includes:<\/p>\n<ul>\n<li><strong>Structural and material standards<\/strong> for assessment, separation, and demolition methods for concrete, reinforced concrete, masonry, or steel components.<\/li>\n<li><strong>Occupational safety<\/strong> including hazard analysis, qualification, instruction, and the use of suitable work equipment (testing and documentation obligations).<\/li>\n<li><strong>Immission control<\/strong> (noise, dust, vibrations) with forecasts and measurements as well as protection concepts, for example when working on existing buildings in sensitive environments such as hospitals, schools, laboratories.<\/li>\n<li><strong>Waste and circular economy<\/strong>: deconstruction concepts, source separation during demolition, documentation, and high-quality recycling of mineral construction waste.<\/li>\n<li><strong>Hazardous substances in existing structures<\/strong> (e.g., asbestos, PCB, PAH, heavy metals) with special protective measures, releases, and documentation.<\/li>\n<li><strong>Traffic and construction site safety<\/strong>, access and rescue concepts, barriers, and coordination of trades.<\/li>\n<\/ul>\n<p>Mechanical methods such as <em>hydraulic splitting<\/em> or <em>shears and demolition shears<\/em> often meet these requirements particularly well: they reduce sparks, spray mist, and vibrations, enable controlled interventions, and make it easier to comply with project-specific constraints. Where required, they can be combined with enclosures, negative pressure concepts, and real-time monitoring to document compliance.<\/p>\n<h2>Fields of application in demolition and deconstruction<\/h2>\n<p>The Construction Regulatory Framework addresses the selection of suitable methods for different areas of application. Depending on the construction task, specific tools and work steps are suitable for safely complying with standards and official requirements:<\/p>\n<h3>Selective deconstruction and building gutting<\/h3>\n<p>In selective deconstruction, components are dismantled step by step to record and recover material streams separately. <strong>concrete demolition shear<\/strong> enables precise, low-vibration separation of concrete and reinforced concrete elements; reinforcement is exposed and can then be further separated with <em>steel shear<\/em>. In interior areas, compact, hydraulically powered tools support compliance with noise and dust limits. A careful hazard analysis, a SiGe plan, method statements, and a dust-suppressed working method (e.g., water mist, <em>dust extraction plant<\/em>) are mandatory elements. Where necessary, enclosures with negative pressure and staged waste logistics ensure clean material flows.<\/p>\n<h3>Concrete demolition in sensitive zones<\/h3>\n<p>In areas with vibration constraints &#8211; such as adjacent existing buildings, laboratories, data centers, or near sensitive installations &#8211; the hydraulic splitting method with <strong>hydraulic splitter<\/strong> is suitable. By generating controlled splitting forces, defined cracks are created with minimal vibration. This supports compliance with vibration requirements and reduces secondary emissions. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">electrically powered hydraulic power units<\/a> from Darda GmbH provide the energy supply and are matched to the respective cylinders and shears. Pre-weakening by splitting and subsequent cutting of reinforcement shortens intervention times and minimizes rework.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In rock and during heading in urban or geologically sensitive areas, low vibrations and precise crack guidance are required. <strong>rock wedge splitter<\/strong> perform well here because they avoid explosives, protect the surroundings, and enable controlled block formation. The framework requires verification of structural stability and measures against rockfall, including securing with nets, bolts, and timely clearance. Pre-splitting reduces overbreak and helps maintain excavation profiles.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, splitting supports extraction with limited crack propagation and high dimensional accuracy. Requirements for slope angles, site security, dust and noise protection apply, as do requirements for the regular inspection of the deployed <em>hydraulics<\/em>. Water management and access control are coordinated with operational plans and environmental stipulations.<\/p>\n<h3>Special applications<\/h3>\n<p>For tanks, vessels, or contaminated components, spark reduction, controlled separation cuts, and explosion prevention are paramount. <em><a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter<\/a><\/em> works cold and precisely; accompanying clearance measurements, inerting or cleaning, fire protection, and permanent monitoring are common requirements. Seamless documentation and release processes remain mandatory. Gas detection, emergency response planning, and coordination with fire authorities are regularly integrated.<\/p>\n<h2>Planning and permitting process<\/h2>\n<p>A process compliant with the framework begins with systematic planning. The following steps are common:<\/p>\n<ol>\n<li><strong>Survey of existing conditions<\/strong>: documents, utilities, load-bearing structure, usage history, assets to protect (neighbors, water bodies, monument protection).<\/li>\n<li><strong>Contaminant investigation<\/strong>: laboratory analyses, evaluation, remediation sequence, and releases.<\/li>\n<li><strong>Deconstruction concept<\/strong>: construction sequence, separation and dismantling strategy, use of <em>concrete demolition shear<\/em>, <em>hydraulic splitter<\/em>, <em>steel shear<\/em>, or <em>hydraulic demolition shear<\/em>.<\/li>\n<li><strong>Hazard analysis and SiGe plan<\/strong>: protective measures, traffic and rescue routes, training.<\/li>\n<li><strong>Immission and vibration forecast<\/strong>: measurement concept, limits, working time windows, communication with neighbors.<\/li>\n<li><strong>Permits and notifications<\/strong>: regulatory ancillary conditions, waste documentation, traffic regulations.<\/li>\n<li><strong>Site setup<\/strong>: media, separators, water and power management, decontamination areas.<\/li>\n<li><strong>Continuous monitoring<\/strong>: noise, dust, ground vibration monitoring, structural stability checks, documentation.<\/li>\n<li><strong>Stakeholder and risk communication<\/strong>: scheduling of noisy phases, contact channels, incident routines.<\/li>\n<\/ol>\n<h2>Safety and health protection<\/h2>\n<p>Safe execution relies on qualified personnel, suitable work equipment, and a robust organization. Hydraulic handheld tools must be inspected, marked, and used as intended. <strong>concrete demolition shear<\/strong> and splitting cylinders are set up according to manufacturer specifications; the pressure supply by <em>hydraulic power pack<\/em> must be monitored for leak-tightness, temperature, hose protection, and appropriate operating pressure. Lockout-tagout for utilities, clear exclusion zones, and task-specific PPE are essential building blocks of the safety concept.<\/p>\n<h3>Dust, noise, and vibrations<\/h3>\n<p>Dust is controlled by wet or mist methods, enclosures, and point-source extraction. When shearing and crushing concrete, fine fractions are generated; they are significantly lower with splitting. Noise control includes damping mats, sound insulation, and time-based organization. Vibrations are forecast, measured, and reduced by methods with low energy input &#8211; such as hydraulic splitting or fine\u2011metered work with <em>concrete demolition shear<\/em> &#8211; to maintain low vibration levels. Calibrated sensors, baseline surveys, and event-triggered alarms ensure traceable evidence.<\/p>\n<h3>Hazardous substances in existing structures<\/h3>\n<p>For hazardous substances, qualification-bound procedures, protection levels, clearance measurements, and disposal chains must be observed. Material-separating deconstruction takes place only after release. Spark- and heat-free methods, e.g., with <em>hydraulic demolition shear<\/em> or <em>tank cutter<\/em>, support the risk and fire protection concept, including asbestos remediation where applicable. Waste coding, packaging, and transport documentation follow the applicable regulatory chain of custody.<\/p>\n<h2>Environmental and resource aspects<\/h2>\n<p>The Construction Regulatory Framework promotes recycling: components are separated, hazardous substances are removed, and mineral fractions are recovered. <strong>concrete demolition shear<\/strong> facilitates exposing reinforcing steel for metallic recycling, while <em>hydraulic splitter<\/em> split large components along guided cracks to optimize transport, crushing, and reuse. Water management, sediment retention, and the avoidance of emissions are integral parts of a permit-compliant deconstruction. Where permissible, on-site processing and quality-assured secondary aggregates close material loops and reduce transport emissions.<\/p>\n<h2>Selection and use of technology in light of the framework<\/h2>\n<p>Tool selection follows project goals, component properties, and requirements. Typical constellations:<\/p>\n<ul>\n<li><strong>Interior demolition with strict immission constraints<\/strong>: compact <em>concrete demolition shear<\/em>, electrically powered <em>hydraulic power pack<\/em>, enclosure, mist.<\/li>\n<li><strong>Massive components near sensitive infrastructure<\/strong>: <em>hydraulic splitter<\/em> for low-vibration pre-separation, followed by <em>rebar cutter<\/em> for reinforcement.<\/li>\n<li><strong>Steel and mixed structures<\/strong>: <em>steel shear<\/em> for sections, <em>hydraulic demolition shear<\/em> for mixed materials, controlled separation cuts.<\/li>\n<li><strong>Rock and tunnels<\/strong>: <em>rock wedge splitter<\/em> for controlled crack management, monitoring of deformations and low vibration levels.<\/li>\n<li><strong>Fire and explosion protection<\/strong>: low-spark methods, <em>tank cutter<\/em> with accompanying releases and gas detection technology.<\/li>\n<\/ul>\n<p>Decisive factors include stability verification, accessibility, the load-bearing capacity of intermediate floor slabs, the protection of adjacent components, and a logistics concept for material flow and intermediate storage. Ergonomics, energy supply, and compatibility with the monitoring concept complete the selection matrix.<\/p>\n<h2>Documentation, inspections, and verifications<\/h2>\n<p>Tools and systems are subject to testing and documentation obligations. These include regular visual and functional inspections, pressure and leak tests on <em>hydraulic power pack<\/em> and lines, test certificates, and operating manuals. Conducting training, recording measurements (dust, noise, vibrations), and seamless waste documentation form the documentary core of a compliant project. Calibration records, maintenance logs, and photographic evidence substantiate the applied methods and outcomes.<\/p>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<ul>\n<li>Insufficient survey of existing conditions and utility line detection before cutting.<\/li>\n<li>Lack of a vibration forecast for sensitive neighboring buildings.<\/li>\n<li>Unclear planning of cuts and load transfer when deconstructing load-bearing components.<\/li>\n<li>Unsuitable tool selection: crushing instead of splitting despite vibration constraints.<\/li>\n<li>Incomplete hazardous substance investigation before starting building gutting.<\/li>\n<li>Insufficient coordination of working hours, noise phases, and protection windows.<\/li>\n<li>Deficiencies in inspection intervals for <em>hydraulics<\/em> and hoses.<\/li>\n<li>Missing temporary works design or inadequate verification of intermediate states.<\/li>\n<li>Underestimation of logistics constraints and intermediate storage capacities.<\/li>\n<\/ul>\n<h2>Practical examples in the framework context<\/h2>\n<p>During the deconstruction of a hospital wing in ongoing operation, <strong>concrete demolition shear<\/strong> were used to release slab fields section by section; vibrations remained below agreed thresholds, and dust was reduced by mist. The work plan integrated quiet windows and continuous monitoring to maintain operations. In an inner-city gap site, <strong>hydraulic splitter<\/strong> split a foundation block with low vibrations before reinforcement was cut to length with <em>steel shear<\/em>. Real-time dashboards and neighbor communication ensured transparency. In mining-style tunnel support, <em>rock wedge splitter<\/em> were used to control geologically induced crack patterns. During the dismantling of a tank, low-spark <em>tank cutter<\/em>, together with clearance measurements, ventilation, and fire watch, ensured a compliant process. Each project phase was underpinned by documented measurements, permits, and release protocols.<\/p>\n<h2>Terminology and classification in German-speaking countries<\/h2>\n<p>The Construction Regulatory Framework encompasses both binding legal norms and recognized rules of technology. While laws and ordinances are mandatory, standards reflect the state of the art and are generally used as the reference to be observed. Information sheets and guidelines clarify technical interpretation. Regional differences, municipal requirements, and project-specific ancillary conditions are common; careful review and documentation are therefore essential. Methods using <strong>concrete demolition shear<\/strong> and <strong>hydraulic splitter<\/strong> support compliant implementation when they are professionally planned, monitored, and documented. The framework also extends to temporary works, dewatering, and traffic management where relevant interfaces exist.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Construction Regulatory Framework consolidates the totality of laws, ordinances, standards, technical rules, and official requirements that govern the planning, execution, and control of construction projects. For demolition works, deconstruction, building gutting, rock excavation, and tunnel construction, there are clear guardrails for occupational safety, structural stability, environmental protection measures and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19615","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Regulatory Framework for Demolition<\/title>\n<meta name=\"description\" content=\"Navigate the construction regulatory framework for building law &amp; standards \u2713 safety, emissions &amp; waste compliance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Regulatory Framework for Demolition\" \/>\n<meta property=\"og:description\" content=\"Navigate the construction regulatory framework for building law &amp; standards \u2713 safety, emissions &amp; waste compliance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-09T13:25:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-regulatory-framework\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-regulatory-framework\",\"name\":\"Construction Regulatory Framework for Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-01T12:51:08+00:00\",\"dateModified\":\"2026-05-09T13:25:03+00:00\",\"description\":\"Navigate the construction regulatory framework for building law & standards \u2713 safety, emissions & waste compliance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-regulatory-framework#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-regulatory-framework\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-regulatory-framework#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction regulatory framework\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Regulatory Framework for Demolition","description":"Navigate the construction regulatory framework for building law & standards \u2713 safety, emissions & waste compliance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework","og_locale":"en_US","og_type":"article","og_title":"Construction Regulatory Framework for Demolition","og_description":"Navigate the construction regulatory framework for building law & standards \u2713 safety, emissions & waste compliance.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-09T13:25:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework","url":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework","name":"Construction Regulatory Framework for Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-01T12:51:08+00:00","dateModified":"2026-05-09T13:25:03+00:00","description":"Navigate the construction regulatory framework for building law & standards \u2713 safety, emissions & waste compliance.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-regulatory-framework#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Construction regulatory framework"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19615"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19615\/revisions"}],"predecessor-version":[{"id":27228,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19615\/revisions\/27228"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}