{"id":19605,"date":"2025-11-29T12:28:36","date_gmt":"2025-11-29T11:28:36","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19605"},"modified":"2026-05-08T16:17:03","modified_gmt":"2026-05-08T14:17:03","slug":"crawler-undercarriage","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage","title":{"rendered":"Crawler undercarriage"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A crawler undercarriage is the load-bearing base of numerous construction machines and mobile carrier machines used in concrete demolition, special demolition, rock excavation, tunnel construction, and natural stone extraction. Thanks to the large-area footprint of the tracks, a crawler undercarriage provides high traction, low ground pressure, and stability on uneven, slippery, or sensitive ground. In combination with hydraulic attachments from Darda GmbH &#8211; such as <strong>concrete demolition shear<\/strong>, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>, combination shears, multi cutters, or steel shear &#8211; the crawler undercarriage forms the foundation for precise, low-vibration, and controlled work under demanding conditions. Its geometry and mass distribution enable reproducible positioning and high process reliability in constrained or safety-critical environments.<\/p>\n<h2>Definition: What is meant by a crawler undercarriage?<\/h2>\n<p>A crawler undercarriage is an undercarriage with two endless track chains (steel or rubber tracks) that run over drive sprockets, idlers, carrier and track rollers, as well as track guides. The drive is usually hydrostatic, with steering via different rotational speeds of the left and right track. Such a crawler undercarriage distributes mass evenly, reduces ground contact pressure, and increases stability. In interaction with hydraulically powered tools &#8211; such as <em>concrete demolition shear<\/em>, <em>rock wedge splitter<\/em>, or tank cutters &#8211; it enables productive work where wheeled undercarriages reach their limits. For demanding tasks, the undercarriage acts as a vibration-damping base that supports accurate initiation of forces during cutting and splitting.<\/p>\n<h2>Design and operating principle of a crawler undercarriage<\/h2>\n<p>The core system consists of the track frames, track chains, track and carrier rollers, support rollers, idler with tensioning device, and the drive sprocket. Depending on the application, the track is designed as a robust steel track with individual shoes or as an elastic rubber track. Power is transmitted from the drive sprocket to the track links. Steering and turning on the spot (small turning radius up to rotation about the vertical axis) are possible through differential track speeds. The combination of a large footprint and low center of gravity ensures secure working positions &#8211; an essential advantage for precise cutting and splitting operations.<\/p>\n<h3>Track tensioning and guidance<\/h3>\n<p>Correct track tension protects rollers and links, prevents derailment, and reduces energy losses. Tensioning devices compensate for elongation due to wear and temperature. Guide plates and guards stabilize the chain line in reversing and on uneven terrain.<\/p>\n<ul>\n<li>Check sag per manufacturer specification after short travel to warm up the chain.<\/li>\n<li>Remove debris at the idler and sprocket to prevent false tension.<\/li>\n<li>Inspect carrier rollers and guides for wear patterns indicating misalignment.<\/li>\n<\/ul>\n<h3>Steel vs rubber tracks<\/h3>\n<p>Steel tracks offer high wear resistance, directional stability, and traction on abrasive surfaces such as concrete, rock, or gravel. Rubber tracks reduce vibration and ground damage, are quieter, and are suitable for indoor areas or sensitive grounds. For work with <strong>hydraulic splitter<\/strong> on natural stone and in quarries, steel tracks are often advantageous, while for strip-out and cutting operations in existing buildings, rubber tracks protect the substrate.<\/p>\n<ul>\n<li>Steel tracks: maximum robustness on sharp-edged rubble and blasting debris, tolerant of heat and sparks from cutting.<\/li>\n<li>Rubber tracks: low-noise travel and minimal imprinting on coatings, suitable for delicate floor structures.<\/li>\n<li>Hybrid solutions: steel tracks with bolt-on pads when ground protection and traction must be balanced.<\/li>\n<\/ul>\n<h3>Undercarriage width, ground clearance, and support area<\/h3>\n<p>Wider tracks and longer ground contact increase stability, while ground clearance facilitates overcoming obstacles. An adapted track gauge and track width are important when working with booms and heavy tools &#8211; such as <strong>concrete demolition shear<\/strong> or combination shears &#8211; to improve the tipping safety factor. Telescopic or extendable undercarriages can increase the gauge for precise work and retract for transport constraints.<\/p>\n<h2>Use in concrete demolition and special demolition<\/h2>\n<p>In the deconstruction of reinforced concrete structures, precise positioning is as important as controlled material removal. A crawler undercarriage enables sensitive approach to components, safe work on slabs or ramps, and holding the tool in the optimal position. With <strong>concrete demolition shear<\/strong>, components can be separated with low noise and vibration. The stable base of the crawler undercarriage limits unwanted oscillations and supports clean separation joints. In highly sensitive areas &#8211; such as special demolition during ongoing operations &#8211; compact crawler undercarriages with electric power supply are particularly suitable.<\/p>\n<h3>Process control in confined structures<\/h3>\n<ul>\n<li>Define tool approach angles to minimize rebound forces on the undercarriage.<\/li>\n<li>Coordinate sequencing to avoid local overloads at slab edges and openings.<\/li>\n<li>Use spot rotation and incremental tracking to maintain constant working line and field of view.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<p>In strip-out operations in existing buildings, low emissions and compact dimensions are crucial. Crawler-mounted carrier machines can be operated with external <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> to reduce the burden from exhaust and noise. In combination with multi cutters or combination shears, lines, rebar, and lightweight components can be disconnected in a controlled manner. The crawler undercarriage enables safe maneuvering in confined corridors and on load-bearing intermediate slabs.<\/p>\n<h2>Rock excavation, tunnel construction, and natural stone extraction<\/h2>\n<p>In rock and underground work (see <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>), the terrain topology demands a secure footprint with simultaneously low ground pressure. A crawler undercarriage adapts to rough ground and holds position when controlled stresses are applied to rock or concrete components using <strong>hydraulic splitter<\/strong>, <strong>rock wedge splitter<\/strong>, or <em>concrete demolition shear<\/em>. Especially in tunnel construction, advance, positioning accuracy, and a calm machine are important to keep crack patterns predictable and protect surrounding structures.<\/p>\n<p>On gradients and broken rock, grouser geometry and roller protection are decisive for traction and component life. Water ingress and fines require adapted cleaning intervals and splash protection to sustain reliability.<\/p>\n<h2>Hydraulics and power supply on the crawler undercarriage<\/h2>\n<p>Crawler-mounted carrier machines provide hydraulic power for attachments or use external <strong>hydraulic power pack<\/strong>. Important parameters include pressure, flow rate, tank return, and drain line to ensure efficient, cavitation-free operation. Organized hose management and protected lines are mandatory &#8211; especially when working with sharp-edged demolition materials and in dust-laden environments.<\/p>\n<h3>Hose management and filtration<\/h3>\n<ul>\n<li>Protect hoses with abrasion sleeves and route them with wide radii to reduce heat and pressure peaks.<\/li>\n<li>Install return-line filtration and monitor contamination classes to extend valve and seal life.<\/li>\n<li>Use pressure-free case drains where specified to prevent seal blow-by under thermal load.<\/li>\n<\/ul>\n<h3>Performance parameters for concrete demolition shear and splitters<\/h3>\n<p>Decisive factors are the required operating pressure and a stable flow rate so that <strong>concrete demolition shear<\/strong> can develop its cutting force and <strong>hydraulic splitter<\/strong> can build the necessary splitting pressure. Return lines should be generously sized and low-pressure. For external power packs, the rule is: hose lengths as short as possible and only as long as necessary &#8211; to minimize pressure losses. Thermal management and oil conditioning are equally important to maintain consistent tool performance over longer duty cycles.<\/p>\n<h2>Selection criteria for the appropriate crawler undercarriage<\/h2>\n<p>The selection is based on the application, site-specific boundary conditions, and the tools to be mounted. The interaction of operating weight, reach, ground conditions, and the required level of precision is decisive.<\/p>\n<ul>\n<li>Load capacity and stability in relation to attachments such as <strong>concrete demolition shear<\/strong>, combination shears, or steel shear<\/li>\n<li>Track width, track length, and track gauge for low ground contact pressure and tipping stability<\/li>\n<li>Drive and power concept: diesel-hydraulic, electric with <strong>hydraulic power pack<\/strong>, or hybrid<\/li>\n<li>Transport width, clearance height, total mass, and load distribution (special considerations for work on slabs)<\/li>\n<li>Ground protection: rubber or steel tracks, protective pads, mats<\/li>\n<li>Dust, noise, and exhaust requirements &#8211; especially for indoor work and in tunnels<\/li>\n<li>Maintenance accessibility, hose routing, guards, and service intervals<\/li>\n<\/ul>\n<h3>Preselection checklist<\/h3>\n<ol>\n<li>Define the primary task and tool, then derive hydraulic and stability needs.<\/li>\n<li>Verify slab or subgrade bearing capacity against total machine and payload.<\/li>\n<li>Plan transport and access constraints early, including turning radii and ramp angles.<\/li>\n<\/ol>\n<h2>Safety, ergonomics, and operation<\/h2>\n<p>Working with crawler undercarriages requires thorough instruction, anticipatory driving, and coordinated site logistics. Slopes, edge loads, and load-bearing capacities should be evaluated conservatively. Safety distances during splitting and cutting must be observed, especially when stresses are released or components may yield unpredictably. Personal protective equipment, machine safety devices, and a structured emergency concept are obligatory. Legal requirements may vary by country and application and should be observed in general.<\/p>\n<h3>Operator aids and signaling<\/h3>\n<ul>\n<li>Use clearly visible status lights and acoustic signals during tool actuation and travel.<\/li>\n<li>Employ remote operation with stable video or line-of-sight where exposure risks exist.<\/li>\n<li>Standardize handover and lockout-tagout routines for tool changes and maintenance.<\/li>\n<\/ul>\n<h2>Environmental influences and ground protection<\/h2>\n<p>A crawler undercarriage distributes loads over a large area, reduces rutting, and protects sensitive surfaces. Nevertheless, support plates, mats, or protective layers are advisable to preserve coverings and waterproofing. Oil management, leak checks, and dust suppression &#8211; such as by misting or adapted work methods &#8211; serve environmental protection. For indoor areas and tunnels, electrically powered carriers with external <strong>hydraulic power pack<\/strong> are gaining importance to keep emissions low. Where permitted, biodegradable hydraulic oils can further reduce environmental risk.<\/p>\n<h2>Maintenance, wear, and service life<\/h2>\n<p>Dust, splinters, and abrasive fines from concrete and rock accelerate wear. Regular cleaning and inspection of tracks, rollers, seals, and tensioning systems increase availability. Track tension and alignment should be checked to avoid uneven wear. Guards and line routing should be intact so that hydraulic components of <strong>concrete demolition shear<\/strong>, <strong>hydraulic splitter<\/strong>, and other tools are reliably supplied. Wear parts should be replaced based on condition.<\/p>\n<h3>Service intervals and inspection points<\/h3>\n<ul>\n<li>Measure track chain pitch growth and monitor sprocket tooth profiles.<\/li>\n<li>Check idler recoil function and sealing surfaces after impact-intensive shifts.<\/li>\n<li>Grease pivot points and clean roller shields to prevent heat build-up.<\/li>\n<\/ul>\n<h2>Transport, logistics, and site organization<\/h2>\n<p>Transport height and width, lashing points, and ramp angles must match the crawler undercarriage. On site, delivery routes, slab loads, and surface loads must be considered. In buildings, protective boards and load-distribution plates help. Clear routing minimizes maneuvering, shortens cycle times, and increases safety &#8211; especially important on confined projects such as strip-out.<\/p>\n<h2>Typical key figures and terms<\/h2>\n<p>Key parameters include ground contact pressure, gradeability, ground clearance, track gauge, track length on the ground, and travel speed. For demolition and splitting work, tipping stability in the working direction also matters; it can be improved with wider tracks, appropriate ballasting, and a matched boom geometry.<\/p>\n<ul>\n<li>Ground contact pressure: effective mass divided by support area, target as low as feasible for the substrate.<\/li>\n<li>Gradeability: maximum negotiable slope considering tool mass and surface condition.<\/li>\n<li>Track gauge and contact length: primary levers for static stability and straight-line tracking.<\/li>\n<\/ul>\n<h2>Compatibility with Darda GmbH attachments<\/h2>\n<p>The combination of crawler undercarriage and hydraulic tools requires matched interfaces. These include coupling systems, hydraulic connections, return lines, and a coherent performance window. <strong>concrete demolition shear<\/strong> benefit from stable carriers with sensitive hydraulics. <strong>hydraulic splitter<\/strong> and <strong>rock wedge splitter<\/strong> require secure positioning and controlled pressure build-up. Multi cutters, combination shears, steel shear, and tank cutters place additional demands on hydraulic performance, hose protection, and stability &#8211; particularly for cuts in heavily reinforced zones or during tank deconstruction.<\/p>\n<h3>Examples of practical configurations<\/h3>\n<ul>\n<li>Compact crawler undercarriage with rubber tracks and external power supply for interior deconstruction with <strong>concrete demolition shear<\/strong><\/li>\n<li>Medium carrier class with steel tracks and wide gauge for precise splitting in rock with <strong>hydraulic splitter<\/strong><\/li>\n<li>Crawler-mounted carrier in a tunnel with adapted lighting concept, dust protection, and robust hose management for combination shears and multi cutters<\/li>\n<li>Compact unit with extendable undercarriage for rapid change between narrow access and high-stability setup during slab edge work<\/li>\n<\/ul>\n<h2>Planning and risk assessment<\/h2>\n<p>Before starting, record ground conditions, load-bearing capacity, slopes, obstacles, and escape routes. Working areas are clearly marked and load cases set conservatively. For splitting and cutting, plan run-out zones and retreat options. General legal requirements for occupational safety, emissions, and disposal must be observed; concrete interpretation may vary regionally.<\/p>\n<h3>Method statements and permits<\/h3>\n<ul>\n<li>Create a method statement covering tool, undercarriage configuration, and sequence control.<\/li>\n<li>Obtain necessary permits for transport, access, and work in restricted zones.<\/li>\n<li>Define inspection hold points for stability checks after each change in setup.<\/li>\n<\/ul>\n<h2>Future trends for the crawler undercarriage<\/h2>\n<p>Electrified carriers with external <strong>hydraulic power pack<\/strong>, energy-efficient drives, telematic condition monitoring, and improved damping concepts increase efficiency and precision. Advances in track links, seals, and coatings reduce wear in the abrasive environments of concrete demolition, rock excavation, and tunnel construction. Automated assistance functions for leveling and driving dynamics support safe positioning &#8211; a sensible basis for fine interventions with <strong>concrete demolition shear<\/strong> and for controlled splitting in natural stone. Data-supported maintenance and predictive diagnostics further stabilize availability and lifecycle costs.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A crawler undercarriage is the load-bearing base of numerous construction machines and mobile carrier machines used in concrete demolition, special demolition, rock excavation, tunnel construction, and natural stone extraction. Thanks to the large-area footprint of the tracks, a crawler undercarriage provides high traction, low ground pressure, and stability on uneven, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19605","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Crawler Undercarriage for Construction Equipment<\/title>\n<meta name=\"description\" content=\"Gain traction, low ground pressure &amp; stability \u2713 crawler undercarriage is a tracked base for construction machines.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Crawler Undercarriage for Construction Equipment\" \/>\n<meta property=\"og:description\" content=\"Gain traction, low ground pressure &amp; stability \u2713 crawler undercarriage is a tracked base for construction machines.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-08T14:17:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-undercarriage\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-undercarriage\",\"name\":\"Crawler Undercarriage for Construction Equipment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-29T11:28:36+00:00\",\"dateModified\":\"2026-05-08T14:17:03+00:00\",\"description\":\"Gain traction, low ground pressure & stability \u2713 crawler undercarriage is a tracked base for construction machines.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-undercarriage#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-undercarriage\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-undercarriage#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Crawler undercarriage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Crawler Undercarriage for Construction Equipment","description":"Gain traction, low ground pressure & stability \u2713 crawler undercarriage is a tracked base for construction machines.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage","og_locale":"en_US","og_type":"article","og_title":"Crawler Undercarriage for Construction Equipment","og_description":"Gain traction, low ground pressure & stability \u2713 crawler undercarriage is a tracked base for construction machines.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-08T14:17:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage","url":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage","name":"Crawler Undercarriage for Construction Equipment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-29T11:28:36+00:00","dateModified":"2026-05-08T14:17:03+00:00","description":"Gain traction, low ground pressure & stability \u2713 crawler undercarriage is a tracked base for construction machines.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/crawler-undercarriage#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Crawler undercarriage"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19605"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19605\/revisions"}],"predecessor-version":[{"id":27190,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19605\/revisions\/27190"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}