{"id":19603,"date":"2025-11-29T10:23:48","date_gmt":"2025-11-29T09:23:48","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19603"},"modified":"2026-05-08T10:53:03","modified_gmt":"2026-05-08T08:53:03","slug":"room-height","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/room-height","title":{"rendered":"Room height"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Room height is a decisive parameter for planning, occupational safety, and the choice of suitable procedures in demolition, in separating structural components, as well as in rock excavation and tunnel construction. It determines how tools are positioned, how loads are guided, and how material flows are organized. Especially when working with <strong>concrete demolition shear<\/strong> and <strong>rock wedge splitter and concrete splitter<\/strong>, the available height affects access to the component, the direction of force application, and the safe sequence of work steps. In regulated environments, minimum headroom, safe <em>overhead clearance<\/em>, and exclusion zones must be demonstrated in the method statement and verified during site setup.<\/p>\n<ul>\n<li><strong>Access and positioning<\/strong>: defines whether components are reached from above, at mid-height, or laterally.<\/li>\n<li><strong>Force transmission<\/strong>: influences attack angles, lever arms, and stabilizing supports.<\/li>\n<li><strong>Risk control<\/strong>: governs drop heights, debris containment, and safe evacuation routes.<\/li>\n<li><strong>Process efficiency<\/strong>: affects ventilation flow, dust extraction, and internal logistics.<\/li>\n<\/ul>\n<h2>Definition: What is meant by room height?<\/h2>\n<p>Room height is the vertical distance between the finished top of floor and the underside of the ceiling or the lowest fixed component (e.g., downstand beam, installation duct). In many cases, the clear room height is decisive &#8211; that is, the actually usable height without suspended ceilings, lines, or temporary installations. It differs from the story height, which also includes slab thicknesses and build-ups. In practice, additional terms such as passage height, headroom, and working height are used, which are relevant depending on the activity and equipment.<\/p>\n<ul>\n<li><strong>Measurement reference<\/strong>: always from the finished top of floor to the lowest obstructing element.<\/li>\n<li><strong>Clear height<\/strong>: the usable height after deducting permanent and temporary installations.<\/li>\n<li><strong>Story height<\/strong>: includes slabs, toppings, and suspended systems.<\/li>\n<li><strong>Working height<\/strong>: tool-dependent space requirement including the safety envelope.<\/li>\n<\/ul>\n<h2>Importance of room height for demolition and separation methods<\/h2>\n<p>Room height governs whether components are worked from top to bottom or laterally, whether carrier machines can enter at all, and whether components such as the <em>hydraulic hose line<\/em> can be guided safely. Low ceilings favor low-vibration methods such as splitting concrete or natural stone in controlled steps. Greater heights allow larger tools and longer lever arms but require strict load and drop-height management. For compact <strong>concrete demolition shear<\/strong> with an external <em>hydraulic power pack<\/em> and for <strong>rock wedge splitter and concrete splitter<\/strong>, clear room height is a key criterion for positioning, engaging, and safely removing in sequences.<\/p>\n<ul>\n<li>Short heights favor <strong>small tool envelopes<\/strong>, low reaction forces, and segmented removal.<\/li>\n<li>Large heights demand <strong>fall protection<\/strong>, guided lowering, and defined intermediate supports.<\/li>\n<li>Mixed profiles call for <strong>zoned methods<\/strong> with tool changes and staged material flow.<\/li>\n<\/ul>\n<h2>Influence of room height on equipment selection<\/h2>\n<p>The choice between handheld tools and <em>attachments<\/em>, between cutting, crushing, and splitting methods depends strongly on the available height profile. In confined areas, compact, quiet, and low-vibration systems have an advantage, while with generous height, reach and component orientation set the pace.<\/p>\n<ul>\n<li><strong>Handheld systems<\/strong>: short overall length, fine control, minimal setup space.<\/li>\n<li><strong>Carrier attachments<\/strong>: higher performance and reach where headroom permits safe swing paths.<\/li>\n<li><strong>Cutting vs. splitting<\/strong>: cutting needs guide clearance and support, splitting tolerates tighter headroom.<\/li>\n<\/ul>\n<h3>Low room heights: interior demolition, strip-out, and selective cutting<\/h3>\n<p>With clear heights below about 2.50&nbsp;m, specialist contractors prioritize low emissions, fine controllability, and short overall lengths. <strong>concrete demolition shear<\/strong> enable targeted crushing and breaking of concrete webs, ribs, and infill, often without large-area impact loading. <strong>rock wedge splitter and concrete splitter<\/strong> split massive components in a controlled manner into blocks that can be transported through passages. <em>hydraulic power pack<\/em>s are placed outside the immediate work zone to reduce waste heat and noise levels and to keep hose routing free of tripping hazards. Under low ceilings, dust extraction and fresh air supply must be dimensioned for the reduced clearance to avoid recirculation.<\/p>\n<h3>Large room heights: halls, shafts, large tunnel cross-sections<\/h3>\n<p>At large heights, reach, fall protection, and the controlled lowering of components play the central role. Working with <em>hydraulic shear<\/em>, <em>steel shear<\/em> or <em>cutting tool<\/em> requires clear lifting and securing concepts. Splitting technology can weaken components in advance to release smaller pieces in a defined sequence. The additional space provides freedom of movement but increases potential drop heights &#8211; therefore, the separation and size-reduction strategy is divided into smaller, manageable steps. Verified communication routes, visual control from safe vantage points, and dedicated exclusion zones reduce residual risks.<\/p>\n<h2>Room height in application areas<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>In concrete demolition, room height controls the initial scoring, the working level, and the sequence of dismantling. <strong>concrete demolition shear<\/strong> are suitable for selective removal of concrete edges, webs, and ribs &#8211; particularly overhead only with strict securing of the work zone. <strong>rock wedge splitter and concrete splitter<\/strong> minimize vibrations, which is important for sensitive neighboring structures. With limited height, components are subdivided into smaller segments that are movable without a crane. With greater heights, consistent management of drop zones and intermediate staging areas is required.<\/p>\n<ul>\n<li>Define <strong>temporary supports<\/strong> before detaching load-bearing elements.<\/li>\n<li>Use <strong>catch platforms<\/strong> or nets to cap effective drop distances.<\/li>\n<li>Coordinate <strong>removal routes<\/strong> for rebar and concrete fragments separately.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<p>During strip-out, suspended ceilings, installations, and service routes limit passage heights. This affects saw guide rails, the positioning of <em>cutting tool<\/em>, and the handling of <em>cutting torch<\/em> in industrial plants. Compact cutting and shear tools fit beneath downstand beams and work segment by segment so that cut parts can be supported or lowered in a controlled manner. <em>hydraulic power pack<\/em>s and hose bundles must be placed so that <em>escape route<\/em>s remain clear. Where hot work is necessary, spark containment, fire watch, and shielding are adapted to the restricted clearance.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In underground works, crown and heading heights define accessibility to the <em>tunnel face<\/em>. <em>Rock wedge splitters<\/em> develop their effect independently of large clearances and are therefore an option for controlled widening or loosening of rock where headroom is limited. Room height also influences ventilation routing and material transport within the tunnel cross-section. In irregular profiles, the lowest crown points dictate mucking equipment height and the staging of support installation.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone extraction, bench and lift height determine segment size. <em>Rock wedge splitters<\/em> enable separation along natural joints, even with low adit heights. Sufficient headroom facilitates turning and storing the extracted blocks; with limited height, smaller blocks are targeted and the transport logistics are adjusted accordingly. Stability of the working bench and safe scaling distances are defined in relation to the available headroom.<\/p>\n<h3>Special applications<\/h3>\n<p>In tanks, shafts, silos, and vessels, passage and working heights are usually highly limited. Tools such as the <em>cutting torch<\/em> or compact shears require careful planning of hose routing and extraction. The low room height necessitates short working distances, a reduced risk of sparks, and coordinated rescue routes. Gas monitoring, lighting layout, and confined-space permits must explicitly reference the measured clear height.<\/p>\n<h2>Ergonomics, safety, and room height<\/h2>\n<p>Room height and ergonomics are closely linked. Overhead work increases physical strain and calls for short, lightweight tools or auxiliary structures. <strong>concrete demolition shear<\/strong> are guided so that fracture lines remain predictable; <strong>rock wedge splitter and concrete splitter<\/strong> require sufficient standing area to introduce splitting forces in a controlled way. Safety nets, <em>support scaffold<\/em>s, and intermediate supports reduce drop heights. Specifications for protected areas and exclusion zones must be defined project-specifically and reviewed regularly.<\/p>\n<ul>\n<li>Plan within <strong>ergonomic reach zones<\/strong> to limit overhead exposure time.<\/li>\n<li>Provide <strong>job rotation<\/strong> and micro-breaks where headroom enforces awkward postures.<\/li>\n<li>Control <strong>noise and heat<\/strong> buildup under low ceilings with timed operation and extraction.<\/li>\n<\/ul>\n<h2>Planning: determine, document, and account for<\/h2>\n<p>Accurate capture of room heights prevents delays and poor decisions in equipment selection. In addition to clear height, downstand beams, lines, temporary <em>shoring prop<\/em>s, and local <em>built-in component<\/em>s must be recorded. The following steps have proven effective:<\/p>\n<ol>\n<li>Survey of clear heights per section, including the lowest points.<\/li>\n<li>Entry of bottlenecks, <em>escape route<\/em>s, and planned material routes into a work plan.<\/li>\n<li>Matching of equipment dimensions (tool length, <em>opening width<\/em>, hose bend radii) with the height profile.<\/li>\n<li>Definition of assembly and dismantling segments depending on the available headroom.<\/li>\n<li>Plan for dust extraction and exhaust routing under confined ceilings, position of the <em>hydraulic power pack<\/em>s.<\/li>\n<\/ol>\n<p>Digital capture using laser measurement or structured photogrammetry shortens verification cycles. Coordinated section drawings and height codes in the work plan enable clear communication between demolition crews, logistics, and safety coordination.<\/p>\n<h2>Hydraulic power packs and hose management at low height<\/h2>\n<p><em>hydraulic power pack<\/em>s should be located outside tight work zones to keep heat, noise, and exhaust away from the crew (see <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>). With low room height, tight hose bend radii must be avoided; <em>kink protection<\/em> and short runs increase operational safety. Hose bridges or ceiling suspensions keep traffic routes clear and reduce tripping hazards.<\/p>\n<ul>\n<li>Define <strong>hose corridors<\/strong> and fixings before work starts to prevent snagging.<\/li>\n<li>Use <strong>quick-acting couplings<\/strong> where changeouts must occur within restricted headroom.<\/li>\n<li>Inspect <strong>heat buildup<\/strong> under low ceilings and throttle duty cycles where necessary.<\/li>\n<\/ul>\n<h2>Carrier machines or handheld: decision based on room height<\/h2>\n<p>If room height is limited, handheld systems with <strong>concrete demolition shear<\/strong> and <strong>rock wedge splitter and concrete splitter<\/strong> offer advantages because they have short overall lengths and do not require large counterweights. With sufficient height, attachments such as <em>hydraulic shear<\/em>, <em>steel shear<\/em>, or <em>cutting tool<\/em> with greater <em>opening width<\/em> can be used. The decision should always consider component thickness, reinforcement content, the <em>transport route<\/em> of the pieces, and the permissible emissions situation.<\/p>\n<ul>\n<li><strong>Handheld<\/strong>: minimal setup, precise, good in congested zones; limited by operator effort and reaction forces.<\/li>\n<li><strong>Carrier-based<\/strong>: higher productivity and reach; requires safe swing paths, bearing capacity checks, and exclusion zoning.<\/li>\n<\/ul>\n<h2>Structural analysis and load transfer in the context of room height<\/h2>\n<p>Room height influences spans and thus potential deformations during removal. In tall spaces, temporary <em>shoring<\/em> and intermediate supports are often necessary to ensure controlled load paths. Statements on <em>load-bearing capacity<\/em> may only be made on the basis of project-specific verifications; in general: smaller segments, short drop distances, and redundant safeguards increase execution safety. In vibration-sensitive structures, pre-weakening by splitting and staged release reduces dynamic effects.<\/p>\n<h2>Practical reference values and tolerances<\/h2>\n<p>In existing buildings, clear heights often vary by several centimeters, due to floor build-ups, service routing, or settlement. A pragmatic approach:<\/p>\n<ul>\n<li>Residential and office areas: commonly 2.30-2.80&nbsp;m clear height; preferably compact shears and splitting techniques.<\/li>\n<li>Industrial halls: 4.00-8.00&nbsp;m and more; larger tools possible, but with strict drop-zone management.<\/li>\n<li>Tunnels\/adits: highly variable; plan based on the lowest points (crown, installations).<\/li>\n<\/ul>\n<p>Reference values are non-binding and do not replace object-specific measurements or verifications. Allowances for temporary works, platforms, and extraction units should be subtracted early from nominal headroom.<\/p>\n<h2>Terminological distinctions in daily work<\/h2>\n<p><em>Room height<\/em> denotes the total vertical measure between floor and ceiling underside. <em>Clear room height<\/em> is the actually usable height accounting for downstand beams and installations. <em>Passage height<\/em> is the minimum height at which people or components can pass safely. <em>Working height<\/em> results from tool length, working angle, and the necessary safety distance.<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Capturing only the average instead of the lowest room height: leads to collisions of tools with installations.<\/li>\n<li>Underestimating hose routing: tight radii favor leaks and uncontrolled movements.<\/li>\n<li>Overhead work without intermediate supports: increases drop and splinter risk.<\/li>\n<li>Not adapting segment sizes to transport routes: leads to congestion and rework.<\/li>\n<li>No allowance for scaffolds, lifting devices, or extraction units: reduces usable headroom below minimum values.<\/li>\n<li>Ignoring phased states: temporary reductions in headroom during shoring or staging not reflected in the method plan.<\/li>\n<li>Missing interface checks: clash between tool envelopes and ventilation or cable trays during execution.<\/li>\n<\/ul>\n<h2>Tendering and work preparation: information on room height<\/h2>\n<p>For clear bids and smooth execution, room heights should be documented in a structured way. Useful are drawings with height profiles per axis, information on bottlenecks, permissible component weights per section, as well as the intended methods (e.g., splitting, size reduction with <strong>concrete demolition shear<\/strong>, cutting). This allows equipment such as <strong>rock wedge splitter and concrete splitter<\/strong>, <em>hydraulic power pack<\/em>s, and supplementary tools to be planned precisely.<\/p>\n<ul>\n<li>Provide <strong>scaled sections<\/strong> with lowest points marked and tolerances stated.<\/li>\n<li>List <strong>temporary works<\/strong> that reduce headroom during specific phases.<\/li>\n<li>Define <strong>logistics windows<\/strong> for removal, interim storage, and evacuation routes matched to clear height.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Room height is a decisive parameter for planning, occupational safety, and the choice of suitable procedures in demolition, in separating structural components, as well as in rock excavation and tunnel construction. It determines how tools are positioned, how loads are guided, and how material flows are organized. Especially when working <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/room-height\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19603","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Room Height for Demolition &amp; Excavation Planning<\/title>\n<meta name=\"description\" content=\"Master demolition \u27a4 and tunneling with clear guidance on room height in construction planning, safety and equipment.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/room-height\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Room Height for Demolition &amp; Excavation Planning\" \/>\n<meta property=\"og:description\" content=\"Master demolition \u27a4 and tunneling with clear guidance on room height in construction planning, safety and equipment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/room-height\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-08T08:53:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/room-height\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/room-height\",\"name\":\"Room Height for Demolition & Excavation Planning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-29T09:23:48+00:00\",\"dateModified\":\"2026-05-08T08:53:03+00:00\",\"description\":\"Master demolition \u27a4 and tunneling with clear guidance on room height in construction planning, safety and equipment.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/room-height#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/room-height\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/room-height#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Room height\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Room Height for Demolition & Excavation Planning","description":"Master demolition \u27a4 and tunneling with clear guidance on room height in construction planning, safety and equipment.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/room-height","og_locale":"en_US","og_type":"article","og_title":"Room Height for Demolition & Excavation Planning","og_description":"Master demolition \u27a4 and tunneling with clear guidance on room height in construction planning, safety and equipment.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/room-height","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-08T08:53:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/room-height","url":"https:\/\/www.darda.de\/en\/knowledge\/room-height","name":"Room Height for Demolition & Excavation Planning","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-29T09:23:48+00:00","dateModified":"2026-05-08T08:53:03+00:00","description":"Master demolition \u27a4 and tunneling with clear guidance on room height in construction planning, safety and equipment.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/room-height#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/room-height"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/room-height#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Room height"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19603"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19603\/revisions"}],"predecessor-version":[{"id":27174,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19603\/revisions\/27174"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}