{"id":19600,"date":"2025-11-28T14:08:49","date_gmt":"2025-11-28T13:08:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19600"},"modified":"2026-05-08T15:50:03","modified_gmt":"2026-05-08T13:50:03","slug":"edge-shoring","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring","title":{"rendered":"Edge shoring"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Edge shoring describes all technical measures for securing construction edges and structure perimeters-from the excavation pit to existing buildings, from rock cut faces to tunnel pre-support. The goal is the temporary or permanent stabilization of adjacent soils, structural components, and infrastructures so that removal, excavation, deconstruction, or new construction can take place in a controlled and safe manner. In practice, this concerns not only excavation pits, but also selective concrete demolition at the building edge, slope stabilization along transportation routes, or targeted rock removal. Where low vibration, low noise emissions, and high precision are required, <strong>concrete demolition shear<\/strong> as well as <strong>hydraulic splitters<\/strong> from Darda GmbH are typically used, powered by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a> and complemented by combination shears, steel shears, or Multi Cutters-depending on the material and boundary conditions.<\/p>\n<p><em>In edge zones with tight tolerances and active surroundings, controlled separating and crushing methods reduce secondary effects, protect neighboring assets, and support verifiable compliance with deformation, noise, and vibration limits.<\/em><\/p>\n<h2>Definition: What is meant by edge shoring?<\/h2>\n<p>Edge shoring refers to the entirety of construction safety measures at the edges of excavation pits, slope cuts, foundation underpinning, terrain edges, and structural terminations. This includes classic shoring types such as soldier pile and lagging walls (Berlin shoring), sheet pile walls, bored pile walls and diaphragm walls, as well as nail walls with a shotcrete facing, and temporary bracing and anchors. Edge shoring confines the soil, protects neighboring buildings and utilities, controls groundwater and surface water, limits deformations, and provides the working space. It is therefore a core element of geotechnical engineering, concrete demolition, and specialized deconstruction-especially when working in existing structures and when safety measures are closely interlocked with the removal method.<\/p>\n<ul>\n<li><strong>Primary functions:<\/strong> retention and stabilization, water control, work area provision, protection of adjacent structures.<\/li>\n<li><strong>Interfaces:<\/strong> demolition and cutting methods, monitoring, traffic management, environmental protection.<\/li>\n<\/ul>\n<h2>Tasks and requirements in edge shoring<\/h2>\n<p>Edge shoring must balance safety, economy, and environmental protection. Central aspects are structural stability, serviceability (deformation control), and the minimization of noise, vibration, and dust. In urban environments and near sensitive installations, low-vibration and precise methods such as <strong>hydraulic splitters<\/strong> and <strong>concrete demolition shear<\/strong> are particularly relevant to keep the effects on the edge shoring and surroundings low.<\/p>\n<p>Typical requirements include:<\/p>\n<ul>\n<li>Structural safety against overturning, sliding, and bearing failure, including sufficient embedment depths and uplift checks.<\/li>\n<li>Limitation of deformations to protect neighboring buildings and infrastructure.<\/li>\n<li>An effective water and drainage concept for perched or pressurized water conditions.<\/li>\n<li>Coordination of construction sequence, excavation stages, bracing, and anchoring.<\/li>\n<li>Alignment of demolition and cutting methods with the shoring to avoid impermissible additional loads or vibrations.<\/li>\n<li>Defined dust and noise control with documented measures for suppression, extraction, and enclosures.<\/li>\n<li>Stakeholder coordination for access, logistics, and time windows in constrained environments.<\/li>\n<\/ul>\n<h2>Types and systems of edge shoring<\/h2>\n<p>The choice of system depends on soil, groundwater, neighboring conditions, construction time, and permissible deformations. The following are common solutions and their characteristics-with a view to demolition and cutting work at the edge. Consideration of reuse potential of elements and the life cycle of temporary works can further optimize system selection.<\/p>\n<h3>Soldier pile and lagging wall (Berlin shoring)<\/h3>\n<p>H- or I-sections are driven or drilled, and the spaces between are successively lagged with timber, steel, or shotcrete elements. Advantages are construction speed and adaptability. For edge demolitions, removal can proceed in short cycles. <em>Low-vibration<\/em> methods such as <strong>concrete demolition shear<\/strong> reduce impact loads into the piles, facilitating deformation control.<\/p>\n<p><em>Practical note:<\/em> sequence short advance steps with immediate lagging; when cutting near flanges or webs, use controlled jaw closure and staged pre-cuts to avoid flange bending.<\/p>\n<h3>Sheet pile wall<\/h3>\n<p>Interlocked steel sheet pile profiles are driven or vibrated in and form a water-retarding wall. They allow deep excavations where space is limited. In sensitive environments, low-vibration demolition techniques are advisable. <strong>Hydraulic splitters<\/strong> are suitable for releasing adjacent components in a controlled manner without undesirably mobilizing the sheet pile field.<\/p>\n<p><em>Practical note:<\/em> maintain clearance to interlocks; avoid prying loads on the sheets by pre-splitting concrete edges and separating reinforcement before lifting.<\/p>\n<h3>Bored pile wall and diaphragm wall<\/h3>\n<p>Constructed from bored piles or as a continuous diaphragm wall, these systems offer high stiffness and low deformations. Near such walls, demolition is often selective cutting and cracking. <strong>Concrete demolition shear<\/strong> with suitable jaw geometry enables controlled edge removal, while <strong>Multi Cutters<\/strong> neatly separate reinforcement and sections.<\/p>\n<p><em>Practical note:<\/em> verify minimum stand-off to reinforcement cages and stop-ends; if present, protect waterproofing membranes with sacrificial boards during crushing.<\/p>\n<h3>Nail wall with shotcrete<\/h3>\n<p>The in-situ soil is secured by soil nails and a shotcrete facing. The stepwise excavation requires phased working. For edge removal along the facing, <strong>rock wedge splitters<\/strong> provide a way to avoid tension cracks and not unnecessarily disturb the soil bond.<\/p>\n<p><em>Practical note:<\/em> keep bite sizes small and maintain the nail grid integrity; re-spray shotcrete promptly where cover is reduced.<\/p>\n<h3>Temporary bracing and anchors<\/h3>\n<p>Depending on the construction stage, steel frames, walers, or strand anchors are used. In edge demolition, these systems are often active and sensitive. Load jumps from impact tools can be reduced through <em>hydraulically controlled<\/em> methods. Here, concrete demolition shear, combination shears, and steel shears play a role, operated with suitable hydraulic power packs from Darda GmbH.<\/p>\n<p><em>Practical note:<\/em> capture reaction forces with verified bearings and shims; monitor pre-stress and re-tighten connections after each major removal step.<\/p>\n<h2>Edge shoring in concrete demolition and specialized deconstruction<\/h2>\n<p>Selective removal at edges is a core application: slab edges, cantilevers, balcony slabs, stair flights, or column heads are dismantled while safeguarding adjacent components. The edge shoring can be an excavation shoring, a temporary catcher system, or a load-transfer structure.<\/p>\n<h3>Partial deconstruction at the building edge<\/h3>\n<p>At the edge, precision comes before speed. <strong>Concrete demolition shear<\/strong> enables controlled crushing of concrete with integrated separation of reinforcement. This keeps edge bearings and safety elements effective. In confined conditions, <strong>hydraulic splitters<\/strong> minimize vibrations because material is released by splitting pressure rather than impact.<\/p>\n<p><em>Execution tip:<\/em> mark load paths and no-go areas on the element; process in small segments with intermediate support to keep rotations minimal.<\/p>\n<h3>Reinforcement and section cutting<\/h3>\n<p>After the concrete matrix is released, steel is separated. <strong>Steel shears<\/strong> and <strong>Multi Cutters<\/strong> cut beam flanges, reinforcement, pipelines, or steel components. <strong>Combination shears<\/strong> combine cutting and crushing functions and reduce tool changes-an advantage at secured edges with restricted access.<\/p>\n<p><em>Execution tip:<\/em> pre-tension long bars before cutting to avoid whipping; protect active anchors and bracing with guards against flying fragments.<\/p>\n<h3>Power supply and mobility<\/h3>\n<p>For consistent performance and sensitive control, <strong>hydraulic power packs<\/strong> are key. Matching them to pressure, flow rate, and hose lengths is crucial so that no unexpected load peaks occur at the edge and reaction forces remain under control.<\/p>\n<ul>\n<li><strong>Key parameters:<\/strong> operating pressure range, nominal flow, oil temperature control, hose diameter and length, return line backpressure.<\/li>\n<li><strong>Control:<\/strong> proportional valves and fine metering enable gradual force build-up and repeatable crushing or splitting cycles.<\/li>\n<li><strong>Logistics:<\/strong> plan hose routing and quick couplers to avoid trip hazards and minimize setup changes at the edge.<\/li>\n<\/ul>\n<h2>Edge shoring in rock excavation and tunnel construction<\/h2>\n<p>In rock, edge shoring often takes the form of slope stabilization, anchor and net systems, or a shotcrete shell. When creating cuts, niches, or portals, controlled removal at the edge is decisive to avoid breakouts and overhangs.<\/p>\n<h3>Controlled rock removal<\/h3>\n<p><strong>Hydraulic splitters<\/strong> as well as <strong>rock wedge splitters<\/strong> from Darda GmbH create defined separation planes in the rock. This reduces vibrations and protects adjacent safety systems. In tunnel headings and at portal walls, the method supports a clean edge, facilitates lining installation, and protects anchor heads.<\/p>\n<p><em>Execution tip:<\/em> define splitter hole spacing and depth for the rock mass class; align splitting planes parallel to the protected edge to guide crack propagation.<\/p>\n<h3>Transition to cement-bound base layers<\/h3>\n<p>Where rock and concrete meet (e.g., foundation upstands, abutments, shotcrete), <strong>concrete demolition shear<\/strong> enable flush removal without damaging the edge shoring. This is particularly relevant where grout bodies, injection hoses, or drainage elements must not be impaired.<\/p>\n<h2>Edge shoring in building gutting and cutting<\/h2>\n<p>During the gutting of existing buildings, temporary edge conditions arise at slab openings, shafts, and penetrations. Cutting and separation work must be synchronized with edge safety.<\/p>\n<h3>Cutting, separating, securing<\/h3>\n<p>Handheld and carrier-mounted cutting devices create openings while supports and edge bracing ensure load transfer. <strong>Multi Cutters<\/strong> and <strong>steel shears<\/strong> separate sections and installations, <strong>concrete demolition shear<\/strong> release concrete edges in small steps. This keeps deflections and vibrations low, supporting the serviceability of the edge safety.<\/p>\n<p><em>Coordination tip:<\/em> link the cutting plan with the temporary works plan; confirm residual capacities of edge supports before each cut phase.<\/p>\n<h2>Planning, verification, and monitoring<\/h2>\n<p>The planning of edge shoring covers geometry, soil properties, water levels, construction stages, and load cases from traffic, machinery, and wind. For edge deconstruction, additional load redistribution, dismantling effects, and equipment actions are considered.<\/p>\n<ul>\n<li>Preparation: ground investigation, water regime, neighboring buildings, utilities, vibration sensitivities.<\/li>\n<li>Design: stability, deformation, and serviceability checks in accordance with accepted engineering practice.<\/li>\n<li>Monitoring: survey targets, settlement measurements, anchor loads, inclinometer readings, vibration and noise measurements.<\/li>\n<li>Construction sequence: phasing of excavation and removal, timely bracing\/anchoring, free-cutting of edges with suitable tools.<\/li>\n<\/ul>\n<p><strong>Good practice additions:<\/strong><\/p>\n<ul>\n<li>Use clearly defined hold points with acceptance criteria for each stage before advancing the edge.<\/li>\n<li>Combine instrumentation data with photo documentation to correlate events and measured responses.<\/li>\n<li>Maintain an action matrix with thresholds and pre-agreed mitigation steps for exceedances.<\/li>\n<\/ul>\n<h2>Safety, environment, and permitting<\/h2>\n<p>Work at edges is exposed. Personal protective equipment, <strong>fall protection<\/strong>, safe setup areas, and clear communication paths are mandatory. Noise and vibration limits are site-specific; compliance is facilitated by low-dynamic methods. <em>Legal requirements<\/em> depend on applicable local regulations and must be checked before execution. Planning should fundamentally be performed by competent professionals.<\/p>\n<ul>\n<li><strong>Dust and debris control:<\/strong> water spray, extraction, and containment to protect personnel and surroundings.<\/li>\n<li><strong>Access management:<\/strong> guardrails, exclusion zones, and tag-out for active edges and lifting areas.<\/li>\n<li><strong>Emergency readiness:<\/strong> rescue plans for work at height and confined edges, including clear access routes.<\/li>\n<\/ul>\n<h2>Typical pitfalls and practical recommendations<\/h2>\n<ul>\n<li>Insufficient coordination between demolition method and shoring: avoid dynamic load peaks-use <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitters<\/strong> instead.<\/li>\n<li>Missing water management: reduce pressures at edges, plan drainage early.<\/li>\n<li>Undersized bracing: design intermediate states separately, consider equipment weights and reaction forces.<\/li>\n<li>Imprecise edge removal: work in small steps, separate reinforcement with <strong>steel shears<\/strong> or <strong>Multi Cutters<\/strong> in a targeted manner.<\/li>\n<li>Insufficient monitoring: define thresholds and trigger an action plan when exceeded.<\/li>\n<li>Lack of interface protection: shield anchors, membranes, and utilities before starting edge work.<\/li>\n<li>Overlooking backpressure and hose effects: tune the power pack and hose set to prevent delayed force spikes.<\/li>\n<\/ul>\n<h2>Material selection, load paths, and edge processing<\/h2>\n<p>Edge shoring only works when load paths are clear: which forces go where? During edge removal, ensure that tool reaction forces are safely introduced via supports and bracing. This includes a suitable choice of equipment. Hydraulically fine-meterable <strong>concrete demolition shear<\/strong> and <strong>hydraulic splitters<\/strong> offer advantages because they are controllable and have low side effects. In combination with powerful <strong>hydraulic power packs<\/strong> from Darda GmbH, removal performance can be matched to the sensitivity of the edge shoring.<\/p>\n<p><em>Detailing essentials:<\/em> pre-load temporary props where needed, limit eccentricities at bite points, and deburr cut edges when interfaces require clean bearing or waterproofing adhesion.<\/p>\n<h2>Fields of application and typical use cases<\/h2>\n<p>Edge shoring appears in numerous scenarios. In <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and specialized deconstruction<\/a><\/strong>, for example, for catcher systems and selective edge removal. During <strong>building gutting and cutting<\/strong>, new edge conditions arise that must be secured temporarily. In <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/strong>, edge shoring defines stable cuts and portals. In <strong>natural stone extraction<\/strong>, controlled splitting operations provide exact edge formation. For <strong>special operations<\/strong>-for example, in facilities with sensitive infrastructure-low-vibration, low-emission methods with precise execution are essential.<\/p>\n<p>Further use cases include staged fa\u00c3\u00a7ade removal with active pedestrian protection, underpass widenings adjacent to live traffic, and retrofit works where work windows and emissions are tightly constrained.<\/p>\n<h2>Conclusion for the practice of edge shoring<\/h2>\n<p>Edge shoring is more than a wall in the ground: it is the coordinated interaction of geotechnical safety, construction sequence, and suitable removal technology. Where edges must be protected, deformations limited, and neighborhoods spared, <strong>concrete demolition shear<\/strong> as well as <strong>hydraulic splitters<\/strong> from Darda GmbH provide a precise and <em>low-vibration<\/em> foundation. Combined with thoughtful planning, consistent monitoring, and careful execution, a safe and efficient path emerges from the first cut to the finished edge.<\/p>\n<p><em>Result:<\/em> predictable performance, minimized side effects, and robust documentation across all stages of edge work.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Edge shoring describes all technical measures for securing construction edges and structure perimeters-from the excavation pit to existing buildings, from rock cut faces to tunnel pre-support. The goal is the temporary or permanent stabilization of adjacent soils, structural components, and infrastructures so that removal, excavation, deconstruction, or new construction can <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19600","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Edge Shoring in Construction - Types &amp; Methods<\/title>\n<meta name=\"description\" content=\"Learn how edge shoring in construction stabilizes excavation edges with low vibration &amp; precise methods \u2713 for safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Edge Shoring in Construction - Types &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Learn how edge shoring in construction stabilizes excavation edges with low vibration &amp; precise methods \u2713 for safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-08T13:50:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-shoring\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-shoring\",\"name\":\"Edge Shoring in Construction - Types & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-28T13:08:49+00:00\",\"dateModified\":\"2026-05-08T13:50:03+00:00\",\"description\":\"Learn how edge shoring in construction stabilizes excavation edges with low vibration & precise methods \u2713 for safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-shoring#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-shoring\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-shoring#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Edge shoring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Edge Shoring in Construction - Types & Methods","description":"Learn how edge shoring in construction stabilizes excavation edges with low vibration & precise methods \u2713 for safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring","og_locale":"en_US","og_type":"article","og_title":"Edge Shoring in Construction - Types & Methods","og_description":"Learn how edge shoring in construction stabilizes excavation edges with low vibration & precise methods \u2713 for safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-08T13:50:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring","url":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring","name":"Edge Shoring in Construction - Types & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-28T13:08:49+00:00","dateModified":"2026-05-08T13:50:03+00:00","description":"Learn how edge shoring in construction stabilizes excavation edges with low vibration & precise methods \u2713 for safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/edge-shoring"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-shoring#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Edge shoring"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19600"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19600\/revisions"}],"predecessor-version":[{"id":27186,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19600\/revisions\/27186"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}