{"id":19598,"date":"2025-11-28T10:34:33","date_gmt":"2025-11-28T09:34:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19598"},"modified":"2026-05-08T16:59:02","modified_gmt":"2026-05-08T14:59:02","slug":"contour-blasting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting","title":{"rendered":"Contour blasting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Contour blasting is a specialized blasting technology used to break rock or concrete along a predefined line in a controlled manner. The goal is a clean, predictable fracture edge with minimal vibrations and reduced flyrock. In practice, this method is encountered in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, in rock excavation and tunnel construction, as well as in natural stone extraction. Contour blasting is often combined with non-explosive steps &#8211; such as hydraulic splitting or the targeted nibbling of residual edges with <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong> from Darda GmbH. In the context of rock works, the approach is also referred to as <em>smooth blasting<\/em> or <em>perimeter blasting<\/em>, emphasizing controlled crack guidance.<\/p>\n<h2>Definition: What is meant by contour blasting?<\/h2>\n<p>Contour blasting refers to the controlled placement and initiation of explosive charges along a planned contour in order to specifically release material at the outer edge of an excavation or deconstruction. The resulting cracks are steered toward the desired separation line so that the remaining structure stays as undamaged as possible. In rock, one often speaks of contour or smooth blasting; in concrete deconstruction, of edge-near (near-edge) release. The common feature is the <em>precise crack control<\/em> with the aim of minimizing rework, vibrations, and noise.<\/p>\n<h2>Technical classification and objectives<\/h2>\n<p>Contour blasting creates a defined interface between the material to be released and the existing structure. It is used to shape cross-sections precisely, expose reinforcement, or extract natural stone blocks to an exact contour. The quality of the fracture edge depends significantly on the drilling pattern, the initiation sequence, and on geology or concrete properties. In many projects, contour blasting performs the <em>contouring<\/em>, while removal, sorting, or the gentle release of residual webs then proceeds mechanically &#8211; e.g., with <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong> in combination with suitable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> from Darda GmbH.<\/p>\n<ul>\n<li><strong>Primary objectives:<\/strong> limit overbreak, safeguard edges, and reduce vibration-induced impacts on adjacent structures.<\/li>\n<li><strong>Secondary objectives:<\/strong> minimize rework, improve surface quality, and keep noise and dust within permissible ranges.<\/li>\n<\/ul>\n<h2>Fields of application and interfaces to equipment<\/h2>\n<p>In <strong>concrete demolition and special demolition<\/strong>, contour blasting helps create openings or define component edges without overloading load-bearing zones. Material released near the edge can then be separated in a controlled manner with concrete demolition shear. In <strong>rock excavation and tunnel construction<\/strong>, contour blasting limits overbreak and secures the contour of the excavation. In <strong>natural stone extraction<\/strong>, it supports release along natural joints; precise edges can be refined after blasting by hydraulic splitter or stone split cylinders. In <strong>gutting works and cutting<\/strong>, it is used less frequently, with mechanical methods predominating; where contouring is carried out by blasting technology, mechanical separation with concrete demolition shear, combination shears, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> usually follows. For <strong>special-application<\/strong> scenarios &#8211; such as sensitive areas with strict vibration limits &#8211; hydraulic alternatives come to the fore.<\/p>\n<ul>\n<li>Concrete and reinforced concrete: edge definition, opening creation, exposure of reinforcement with subsequent mechanical separation.<\/li>\n<li>Rock and tunnels: overbreak control, smooth excavation profiles, stability of excavation walls.<\/li>\n<li>Natural stone: block extraction along joints with vibration-reduced refinement steps.<\/li>\n<\/ul>\n<h2>Planning, safety, and legal framework<\/h2>\n<p>Blasting works are subject to legal requirements and may only be performed by qualified, authorized personnel. Permits, safety distances, shielding, and a project-specific blasting plan are mandatory. In built-up areas, vibration protection, airborne sound limitation, and dust reduction are the focus. Protective mats, coverings, and a coordinated initiation sequence reduce flyrock. Statements here are always general; specific requirements result from standards, conditions, and the local hazard assessment.<\/p>\n<h3>Protective measures at a glance<\/h3>\n<p>Common protective measures include fall-safe work areas, secured exclusion zones, function-tested initiation devices, validated coverings, and continuous team communication. Ground vibration monitoring and airborne sound monitoring provide evidence of compliance with limit values. In edge areas close to sensitive structures, a combination of reduced charge density and subsequent mechanical rework with concrete demolition shear is recommended.<\/p>\n<ul>\n<li>Defined exclusion zones and access control with clear signage.<\/li>\n<li>Protective mats, covers, and shielding screens tailored to the site layout.<\/li>\n<li>Calibrated initiation systems with verified delay timing.<\/li>\n<li>Real-time vibration and noise monitoring with documented thresholds.<\/li>\n<li>Fallback concepts for misfires and standardized communication protocols.<\/li>\n<\/ul>\n<h2>Process sequence in practice<\/h2>\n<p>The typical sequence begins with an as-built assessment: material class, strength, jointing, and &#8211; in concrete &#8211; reinforcement layout are recorded. This is followed by the drilling and loading concept, the definition of the initiation sequence, and the setup of protective measures. After controlled initiation, the released material is cleared, the contour is checked, and, if necessary, reworked. Especially at edges, the combination of cautious contour blasting and mechanical <em>fine removal<\/em> with concrete demolition shear or with hydraulic splitter has proven effective to maintain the desired tolerances.<\/p>\n<ol>\n<li>Survey and diagnosis: structure, geology, reinforcement, constraints, and limits.<\/li>\n<li>Concept: drilling pattern, charge selection and coupling, delay plan.<\/li>\n<li>Protection: coverings, exclusion zones, monitoring setup, briefing.<\/li>\n<li>Execution: controlled initiation and immediate condition check.<\/li>\n<li>Post-processing: clearing, inspection, targeted mechanical refinement.<\/li>\n<\/ol>\n<h2>Quality of the fracture edge and post-processing<\/h2>\n<p>A successful contour blasting shows a nearly smooth contour with limited overbreak. The quality of the fracture is influenced by the spacing of the boreholes, the coupling of the charge, and the delay between initiation points &#8211; numerical values are determined project-specifically. Where the edge appearance or surface roughness is insufficient, <strong>concrete demolition shear<\/strong> are used for controlled edge removal. In natural stone quarries or when exposing foundation edges, <strong>hydraulic splitter<\/strong> are also used to fine-tune without vibrations. In the metallic periphery &#8211; such as embedded items or tanks &#8211; separation is not performed by blasting technology but with suitable tools such as steel shear or tank cutters, depending on the material and safety conditions.<\/p>\n<ul>\n<li>Influencing factors: hole spacing and alignment, charge decoupling, and delay intervals.<\/li>\n<li>Acceptance criteria: minimal overbreak, consistent roughness, and intact adjacent structure.<\/li>\n<li>Refinement: selective trimming with concrete demolition shear or splitting without added vibration.<\/li>\n<\/ul>\n<h2>Limits, risks, and alternatives<\/h2>\n<p>Contour blasting reaches its limits when vibration limits are extremely low, when the environment is highly sensitive, or when gas and dust explosion risks exist. In such cases, <em>non-explosive<\/em> methods are used instead: hydraulic splitting with <strong>hydraulic splitter<\/strong> or stone split cylinders, mechanical nibbling with <strong>concrete demolition shear<\/strong>, cutting with multi cutters, or separating with combination shears. These methods are slower but allow very fine control of forces. In the deconstruction of reinforced components, concrete demolition shear offer the advantage of separating concrete and reinforcement in a single pass after the edge zone has already been weakened.<\/p>\n<h2>Drilling and loading pattern: principles without numerical values<\/h2>\n<p>For contour blasting, boreholes are arranged along the desired contour so that crack formation is directed toward the edge. Smaller, decoupled charges are often used to meter the energy. Delayed initiation sequences help reduce loading on the existing structure. In brittle rocks, a preceding presplit or a contour of closely spaced boreholes can prepare the crack network. In concrete deconstruction, reinforcement influences crack propagation; here the combination of edge-near drilling and mechanical rework helps.<\/p>\n<ul>\n<li>Hole alignment follows the target profile to steer crack propagation reliably.<\/li>\n<li>Energy input is minimized near sensitive edges by decoupling and reduced charge density.<\/li>\n<li>Delay timing is tuned to limit superposition and protect the remaining structure.<\/li>\n<\/ul>\n<h2>Measurement, monitoring, and documentation<\/h2>\n<p>Quality assurance includes measurements of vibrations, airborne sound, and, if required, dust and particle emissions. Documentation covers drilling logs, initiation plans, protective measures, and measurement results. This evidence is not only important for clients but also serves to optimize future work steps. Where limit values are tight, a short feedback loop &#8211; check, adjust, execute again &#8211; can improve the fracture edge step by step. Mechanical systems such as concrete demolition shear close this loop by correcting fine details without further initiations.<\/p>\n<ul>\n<li>Monitoring: vibration velocity and frequency content, airborne sound levels, dust concentrations if specified.<\/li>\n<li>Records: borehole logs, charge sheets, delay plans, and protective setups.<\/li>\n<li>Evaluation: comparison with limits, derivation of corrective actions, and lessons learned.<\/li>\n<\/ul>\n<h2>Specifics in concrete structures<\/h2>\n<p>Unlike natural rock, concrete has a heterogeneous structure with reinforcement, inserts, and bonding agents. These elements deflect or arrest cracks. For contour blasting in concrete, small energy quantities near the edge are therefore preferred, combined with mechanical methods. <strong>Concrete demolition shear<\/strong> then separate the remaining cross-sections in a controlled manner and cut through reinforcement. In thick components, a staged approach can be sensible: blast near the edge, create an opening, proceed step by step, and complete mechanically. For detail-critical openings in plants, it is often advisable to completely forgo blasting technology in favor of hydraulic splitting or cutting.<\/p>\n<h2>Specifics in rock and tunnel construction<\/h2>\n<p>In tunnel construction, contour blasting serves to maintain the contour and minimize overbreak to ensure the stability of the excavation wall and to facilitate the lining. Geological discontinuities such as joints and foliations influence crack guidance; the drilling pattern is adapted accordingly. In exposed stone applications, such as natural stone extraction, value is placed on an even, visually appealing fracture surface. After blasting, <strong>hydraulic splitter<\/strong> can produce fine corrections without additional vibration.<\/p>\n<h2>Material-appropriate selection of supplementary tools<\/h2>\n<p>The choice of supplementary equipment depends on material, geometry, and environmental requirements. <strong>Concrete demolition shear<\/strong> are predestined for reinforced concrete, as they separate steel and concrete and define edges. <strong>Hydraulic splitter<\/strong> and stone split cylinders show their strengths in brittle rock and in massive concrete when vibrations must be minimized. Combination shears and multi cutters support the separation of mixed building materials, steel shear handle massive metal sections, and tank cutters are used for hollow bodies &#8211; always observing safety. Hydraulic power packs from Darda GmbH supply these tools with the required energy and enable finely adjustable working pressures.<\/p>\n<ul>\n<li>Selection criteria: material behavior, reinforcement share, target edge quality, and vibration limits.<\/li>\n<li>Operating environment: access conditions, space constraints, and protection goals.<\/li>\n<li>Energy supply: hydraulic power units matched to tool flow and pressure requirements.<\/li>\n<\/ul>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<p>Frequent causes of insufficient edge quality are unsuitable hole spacing, uneven coupling, missing or unsuitable delay, and an unconsidered reinforcement layout. Remedies include a clean as-built analysis, a consistent drilling scheme, and &#8211; especially in concrete &#8211; the early planning of mechanical rework. If a very tight contour is required, contour blasting can deliberately be carried out with lower energy density and the final geometry then produced precisely with concrete demolition shear or <strong>hydraulic splitter<\/strong>.<\/p>\n<ul>\n<li>Avoid irregular spacing and misalignment by using precise templates and verified surveying.<\/li>\n<li>Ensure consistent coupling via uniform stemming and controlled charge placement.<\/li>\n<li>Validate delay timing with test shots where permissible and adjust to site response.<\/li>\n<li>Account for reinforcement: scan, mark, and integrate mechanical separation steps.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Contour blasting is a specialized blasting technology used to break rock or concrete along a predefined line in a controlled manner. The goal is a clean, predictable fracture edge with minimal vibrations and reduced flyrock. In practice, this method is encountered in concrete demolition and special deconstruction, in rock excavation <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19598","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Contour Blasting - Rock Excavation &amp; Concrete<\/title>\n<meta name=\"description\" content=\"Controlled rock and concrete breaking with contour blasting \u2713 clean edges, low vibration &amp; reduced flyrock.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Contour Blasting - Rock Excavation &amp; Concrete\" \/>\n<meta property=\"og:description\" content=\"Controlled rock and concrete breaking with contour blasting \u2713 clean edges, low vibration &amp; reduced flyrock.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-08T14:59:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/contour-blasting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/contour-blasting\",\"name\":\"Contour Blasting - Rock Excavation & Concrete\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-28T09:34:33+00:00\",\"dateModified\":\"2026-05-08T14:59:02+00:00\",\"description\":\"Controlled rock and concrete breaking with contour blasting \u2713 clean edges, low vibration & reduced flyrock.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/contour-blasting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/contour-blasting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/contour-blasting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Contour blasting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Contour Blasting - Rock Excavation & Concrete","description":"Controlled rock and concrete breaking with contour blasting \u2713 clean edges, low vibration & reduced flyrock.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting","og_locale":"en_US","og_type":"article","og_title":"Contour Blasting - Rock Excavation & Concrete","og_description":"Controlled rock and concrete breaking with contour blasting \u2713 clean edges, low vibration & reduced flyrock.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-08T14:59:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting","url":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting","name":"Contour Blasting - Rock Excavation & Concrete","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-28T09:34:33+00:00","dateModified":"2026-05-08T14:59:02+00:00","description":"Controlled rock and concrete breaking with contour blasting \u2713 clean edges, low vibration & reduced flyrock.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/contour-blasting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/contour-blasting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Contour blasting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19598"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19598\/revisions"}],"predecessor-version":[{"id":27194,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19598\/revisions\/27194"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}