{"id":19596,"date":"2025-11-28T09:18:38","date_gmt":"2025-11-28T08:18:38","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19596"},"modified":"2026-05-08T13:32:03","modified_gmt":"2026-05-08T11:32:03","slug":"edge-protection","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection","title":{"rendered":"Edge protection"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Edge protection in construction, deconstruction, and stone processing refers to all measures that protect edges and edge zones of components made of concrete, reinforced concrete, masonry, or natural stone against spalling, edge breakage, uncontrolled cracking, and secondary damage. It is a central component of a component-friendly and low-emission workflow &#8211; especially where hydraulic demolition and separation tools such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> are used. Edge protection equally serves the preservation of adjacent components, safety at the workplace, and the quality of the outcome. In practice, it is synonymous with <strong>edge preservation<\/strong> and <em>edge safeguarding<\/em> through controlled force application and suitable auxiliary means.<\/p>\n<h2>Definition: What is meant by edge protection?<\/h2>\n<p>Edge protection is understood as the planning and practical bundle of precautions to specifically stabilize and preserve the <em>edge areas<\/em> and <em>edge zones<\/em> of a component or block. These include:<\/p>\n<ul>\n<li>constructive measures (e.g., sufficient edge distances, temporary shoring, chamfers),<\/li>\n<li>procedural measures (e.g., sequence of work, force-controlled tool guidance, pre- and post-processing),<\/li>\n<li>mechanical protective means (e.g., protective strips, elastic pads, coverings, splash protection),<\/li>\n<li>quality-assurance measures (e.g., visual inspection, measurement, documentation),<\/li>\n<li>organizational measures (e.g., defined exclusion zones, clear marking of edges at risk).<\/li>\n<\/ul>\n<p>In the context of controlled deconstruction with hydraulic tools, edge protection particularly means controlling the introduction of forces, vibrations, and wedge effects so that component edges do not break out unintentionally and adjacent structures remain intact. This also reduces dust, noise, and rework.<\/p>\n<h2>Objectives and fields of application of edge protection<\/h2>\n<p>Edge protection pursues three main objectives: <strong>component preservation<\/strong>, <strong>safety<\/strong>, and <strong>quality<\/strong>. It is used in all application areas where powerful yet controlled methods are employed:<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>During selective separation of concrete components, edge-protective measures prevent spalling at visible edges, reduce secondary damage in adjacent fields, and minimize rework. Concrete demolition shears, combination shears, and multi cutters are then preferably guided so that forces are introduced into zones with sufficient load-bearing capacity. A defined working direction and suitable jaw geometry further reduce notch effects and support clean fracture progression. These practices align with <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>When sawing, drilling, and separating, <em>pre-cuts<\/em>, <em>chamfers<\/em>, and <em>load relief during the cut<\/em> are crucial to avoid edge breakouts. Mechanical coverings prevent flaking at edges and retain chips. Additional aids such as adhesive tapes or sacrificial backer boards at the exit side further stabilize the edge zone.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In rock and for natural stone blocks, defined drilling patterns, controlled splitting sequences, and intermediate shoring ensure edge stability. Stone and concrete splitters as well as stone splitting cylinders are planned with regard to edge distances and rock joints. Orientation to natural planes of weakness and uniform jack spacing limits tensile peaks at the margins.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Clean fracture edges increase yield. Here, edge protection means guiding the break along preferred lines, maintaining minimum distances to the block edge, and avoiding constraint. Pre-wedging with small steps and careful relief cuts help to keep corner integrity intact.<\/p>\n<h3>Special applications<\/h3>\n<p>In sensitive environments &#8211; such as existing load-bearing structures, tanks, or plants &#8211; procedural edge protection concepts take center stage: low vibration, controlled force peaks, and effective shielding. Shielding and defined handling zones limit collateral effects on neighboring equipment and finishes.<\/p>\n<h2>Material and edge zone behavior: Why edges are particularly sensitive<\/h2>\n<p>Edge zones are more brittle due to geometry and material behavior and are more susceptible to tensile stresses. Stresses concentrate at sharp edges; microcracks can quickly develop into spalling under excessive point load. In concrete, compressive strength, aggregate, moisture, reinforcement layout, and age influence edge stability; in natural stone, joints, texture, and grain bonding are decisive. Edge protection reduces local stress peaks, distributes loads over larger areas, and limits dynamic effects. Rounded transitions, continuous bedding, and small step lengths counteract stress risers and keep crack tips from propagating.<\/p>\n<h2>Methods of edge protection in practice<\/h2>\n<h3>Constructive edge protection<\/h3>\n<ul>\n<li>Maintain minimum edge distances for drilling, splitting wedges, and gripping points.<\/li>\n<li>Temporary chamfers or scoring of the edge before separation to prevent spalling.<\/li>\n<li>Shoring, packing, and load bedding under edges and cantilevers.<\/li>\n<li>Sacrificial layers or angle profiles as <em>temporary edge guards<\/em> on visible surfaces.<\/li>\n<\/ul>\n<h3>Mechanical edge protection<\/h3>\n<ul>\n<li>Elastic protective strips, hardwood or rubber buffers at tool bearing points.<\/li>\n<li>Coverings made of robust fabrics or boards to bind splinters.<\/li>\n<li>Splash protection to control water, slurry, and fine particles at cut edges.<\/li>\n<li>Corner guards and protective mats to increase contact area and reduce notch effects.<\/li>\n<\/ul>\n<h3>Procedural edge protection<\/h3>\n<ul>\n<li>Build up forces slowly; pre-tension instead of loading abruptly.<\/li>\n<li>Sequence work from the load-bearing field toward the edge rather than the reverse.<\/li>\n<li>Use small step lengths; perform separation or splitting in stages.<\/li>\n<li>Pilot cuts and test bites to verify edge behavior before full-depth operations.<\/li>\n<\/ul>\n<h2>Edge protection with concrete demolition shears: procedure and settings<\/h2>\n<p>Concrete demolition shears enable controlled \u201cbiting off\u201d of concrete structures. Edge protection here begins with the selection of suitable engagement points and a force-regulated working method.<\/p>\n<ul>\n<li>Gripper positioning: Do not place the shear directly on the visible edge, but keep sufficient edge distance; relieve edges first.<\/li>\n<li>Bedding: Elastically pad the bearing points of the components to reduce notch stresses.<\/li>\n<li>Smaller bites: Work in several small bites to prevent edge breakage.<\/li>\n<li>Consider reinforcement: Position teeth so that tensile forces in the reinforcement are intercepted; pre-cut near reinforcement if necessary.<\/li>\n<li>Force build-up: Ramp up hydraulic pressure moderately; avoid load peaks.<\/li>\n<li>Jaw and tooth condition: Keep cutting edges sharp and free of burrs to minimize slippage and unintended chipping.<\/li>\n<li>Return control: Release pressure in a controlled manner to avoid rebound loads at exposed edges.<\/li>\n<\/ul>\n<p>In confined situations, combination shears and multi cutters support gentle exposure before larger cross-sections are processed. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a> with sensitive control facilitate <em>gentle<\/em> force build-up and precise modulation in the approach to visible edges.<\/p>\n<h2>Edge protection with stone and concrete splitters and stone splitting cylinders<\/h2>\n<p>When splitting with hydraulic cylinders, the drilling pattern is crucial. Edge protection is achieved through spaced, uniform load distribution and a sequential splitting sequence.<\/p>\n<ol>\n<li>Plan the drilling pattern: Maintain minimum edge distance (depending on strength and reinforcement); choose uniform hole spacing.<\/li>\n<li>Edge securing: Pack under edges and install coverings to retain splinters.<\/li>\n<li>Sequence: Position splitting cylinders from the inside out; only release the edge once the field has been weakened.<\/li>\n<li>Force dosing: Increase pressure step by step; include intermediate pauses for relaxation.<\/li>\n<li>Control: After each step, visually inspect the edges and monitor crack propagation.<\/li>\n<li>Bore quality: Keep hole diameter, perpendicularity, and depth within tolerance; clean drillings to ensure even jack contact and avoid eccentric loading near edges.<\/li>\n<\/ol>\n<p>In natural stone blocks, stone splitting cylinders support guidance along natural planes of weakness. Too small an edge distance increases the risk of uncontrolled edge breakage; larger distances increase safety and edge quality. Where feasible, use pilot holes to validate edge response before extending the pattern.<\/p>\n<h2>Edge protection when sawing, drilling, and separating<\/h2>\n<ul>\n<li>Pre-cut\/chamfer: Score or chamfer the edge to avoid spalling at breakthrough.<\/li>\n<li>Load relief: Shore the component during the cut so that the kerf opens in a controlled manner.<\/li>\n<li>Protect the exit side: When core drilling, cover the exit area and brace from the rear.<\/li>\n<li>Cooling and flushing: Sufficient cooling reduces thermal stresses and edge spalling.<\/li>\n<li>Cut sequence: Divide long cuts and close them successively to avoid uncontrolled breaking.<\/li>\n<li>Backer materials: Use backing boards, tapes, or clamped-on guides to stabilize surfaces at entries and exits.<\/li>\n<li>Low-impact settings: Prefer low-vibration modes; deactivate impact when drilling near visible edges.<\/li>\n<\/ul>\n<h2>Edge distances, edge stability, and influencing factors<\/h2>\n<p>The choice of safe edge distances depends on material, geometry, reinforcement, and load condition. The more brittle the material and the sharper the edge, the larger the distance should be from drill holes, shear grips, and splitting wedges. Influencing factors:<\/p>\n<ul>\n<li>Concrete and rock strength, moisture, and temperature.<\/li>\n<li>Reinforcement layout and cover; anchorage lengths near edges.<\/li>\n<li>Component geometry, chamfers, existing cracks or joints.<\/li>\n<li>Tool tips, shear jaw contour, and contact areas.<\/li>\n<li>Working direction, bearing, and shoring.<\/li>\n<\/ul>\n<p>A simple rule of thumb in practice: it is better to work one step farther from the edge and introduce forces over larger areas than to attack directly at the visible edge. If uncertainties remain, verify edge behavior with a small-scale trial before proceeding.<\/p>\n<h2>Edge protection in Darda GmbH\u2019s application areas<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>Concrete demolition shears allow slabs, walls, and beams to be released step by step from the field. Edge protection results from small bites, gentle pressure build-up, and targeted exposure of reinforcement before edge areas are processed. Hydraulic power packs with sensitive control support precise dosing. Coordinated sequencing with shoring keeps edges stress-relieved until the final step.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>When opening slab edges, door and window openings, pre-cuts and temporary shoring prevent spalling. Multi cutters and combination shears complement the separation process in densely reinforced zones. Clean exit sides and controlled kerf closure are prioritized to safeguard visible edges.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>Stone and concrete splitters with stone splitting cylinders work with low-vibration, controlled splitting tension. Here, edge protection also means preserving the surrounding structure and not impairing existing supports. Sequential activation with intermediate inspections keeps crack propagation predictable at perimeter zones.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Clean block edges increase usability. Well-coordinated drilling patterns and stepwise splitting produce straight fracture surfaces with minimal breakouts. Corner protection and progressive unloading of the block further stabilize yield-critical edges.<\/p>\n<h3>Special applications<\/h3>\n<p>For tanks and pipelines, steel shears and tank cutters minimize edge deformation when cuts are performed load-free and with suitable bearing. Shields reduce spark emissions and protect adjacent edges. Defined clamping and support points avoid ovalization and maintain cut quality at openings.<\/p>\n<h2>Quality assurance, documentation, and rework<\/h2>\n<ul>\n<li>Visual inspection of cut and fracture edges after each work step.<\/li>\n<li>Measurement of edge spalling against project-specific tolerances.<\/li>\n<li>Documentation of work sequence, tool parameters, and shoring.<\/li>\n<li>Rework: blunting sharp edges, adding small chamfers, removing loose material.<\/li>\n<li>Acceptance criteria: define maximum permissible spalling dimensions and surface quality classes before execution.<\/li>\n<li>Photographic records with scale reference for traceability and later reuse decisions.<\/li>\n<\/ul>\n<p>Structured documentation facilitates the assessment of component preservation and forms the basis for further processing or reuse of components. Consistent criteria improve comparability across sections and stages.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Attacking directly at the visible edge: better start with a setback and work in stages.<\/li>\n<li>Excessive point load: enlarge contact areas, use elastic pads.<\/li>\n<li>Insufficient shoring: close load paths, secure cantilevers.<\/li>\n<li>Missing pre-cut: score or chamfer edges, protect exit sides.<\/li>\n<li>Overhasty force build-up: increase hydraulic pressure slowly, avoid pressure peaks.<\/li>\n<li>Incorrect drill diameter or spacing near margins: follow pattern specifications and maintain minimum distances.<\/li>\n<li>Skipping intermediate inspections: check edge condition regularly and adapt parameters promptly.<\/li>\n<\/ul>\n<h2>Occupational safety and framework conditions<\/h2>\n<p>Edge protection also serves personal protection: intact edges reduce the risk of falling parts and uncontrolled fragments. Protective coverings, splash and chip protection, as well as defined exclusion zones are proven measures. Legal requirements and recognized rules of technology must be considered on a project-specific basis; however, they do not replace expert assessment of individual cases. Appropriate personal protective equipment, dust and slurry control, and clear signaling of danger areas contribute to reliable processes and safe execution.<\/p>\n<h2>Sustainability through component-friendly working<\/h2>\n<p>Good edge protection reduces material loss, lowers dust and noise, and increases the reusability of elements. Components with intact edges are easier to further process, saving resources and reducing disposal costs. This supports circular construction strategies by preserving value and extending service life.<\/p>\n<h2>Practice-oriented selection of the edge protection strategy<\/h2>\n<ul>\n<li>Analyze component and material: strength, reinforcement, geometry, edge quality.<\/li>\n<li>Select the method: concrete demolition shear for selective demolition, stone and concrete splitters for quiet separation, supplemented by sawing\/drilling.<\/li>\n<li>Combine protective measures: constructive, mechanical, and procedural.<\/li>\n<li>Fine-tune parameters: hydraulic pressure, bite size, drilling pattern, cut sequence.<\/li>\n<li>Check and adapt continuously: short-interval visual inspections and documentation.<\/li>\n<li>Pilot operations: perform small test cuts or trial splits to validate settings at critical edges.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Edge protection in construction, deconstruction, and stone processing refers to all measures that protect edges and edge zones of components made of concrete, reinforced concrete, masonry, or natural stone against spalling, edge breakage, uncontrolled cracking, and secondary damage. It is a central component of a component-friendly and low-emission workflow &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-protection\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19596","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Edge Protection for Concrete &amp; Natural Stone<\/title>\n<meta name=\"description\" content=\"Practical edge protection for concrete, masonry &amp; natural stone \u2713 Prevent spalling, cracks and secondary damage.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-protection\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Edge Protection for Concrete &amp; Natural Stone\" \/>\n<meta property=\"og:description\" content=\"Practical edge protection for concrete, masonry &amp; natural stone \u2713 Prevent spalling, cracks and secondary damage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/edge-protection\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-08T11:32:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-protection\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-protection\",\"name\":\"Edge Protection for Concrete & Natural Stone\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-28T08:18:38+00:00\",\"dateModified\":\"2026-05-08T11:32:03+00:00\",\"description\":\"Practical edge protection for concrete, masonry & natural stone \u2713 Prevent spalling, cracks and secondary damage.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-protection#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-protection\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-protection#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Edge protection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Edge Protection for Concrete & Natural Stone","description":"Practical edge protection for concrete, masonry & natural stone \u2713 Prevent spalling, cracks and secondary damage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection","og_locale":"en_US","og_type":"article","og_title":"Edge Protection for Concrete & Natural Stone","og_description":"Practical edge protection for concrete, masonry & natural stone \u2713 Prevent spalling, cracks and secondary damage.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-08T11:32:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection","url":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection","name":"Edge Protection for Concrete & Natural Stone","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-28T08:18:38+00:00","dateModified":"2026-05-08T11:32:03+00:00","description":"Practical edge protection for concrete, masonry & natural stone \u2713 Prevent spalling, cracks and secondary damage.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/edge-protection"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-protection#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Edge protection"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19596"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19596\/revisions"}],"predecessor-version":[{"id":27182,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19596\/revisions\/27182"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}