{"id":19593,"date":"2025-11-28T15:23:28","date_gmt":"2025-11-28T14:23:28","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19593"},"modified":"2026-05-07T14:43:05","modified_gmt":"2026-05-07T12:43:05","slug":"edge-foundation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation","title":{"rendered":"Edge foundation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>An edge foundation is a load-bearing structural element at the outer termination of a structure. It transfers loads from walls, columns, or edge beams into the subsoil, stabilizes the floor slab against edge deformations, and protects the building envelope against frost and moisture. In existing buildings, the edge foundation is often a central starting point for selective deconstruction, adjustments, or refurbishments &#8211; such as conversions, extensions, or partial demolition. In such situations, the professional environment frequently employs <strong>concrete demolition shear<\/strong> or systems such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> to proceed in a controlled manner, with low vibration levels and high dimensional accuracy. In technical literature, the term is sometimes used synonymously with <em>perimeter foundation<\/em> or <em>edge beam<\/em> of a slab-on-grade, emphasizing its function as a <strong>load path<\/strong> and <strong>detailing zone<\/strong> for sealing and thermal protection.<\/p>\n<h2>Definition: What is meant by an edge foundation?<\/h2>\n<p>An edge foundation is the foundation arranged along the exterior edges of a structure, usually formed as a continuous strip foundation or as a reinforced edge beam of a floor slab. It takes over the load transfer from rising structural elements, limits settlements at building edges, and serves as constructive reinforcement against torsion, overturning moments, and shear. Depending on subsoil, building class, and climatic conditions, it can be executed as a frost-free foundation with appropriate depth, as an insulated frost protection solution, or as a combined edge beam of the floor slab. In existing buildings, edge foundations are often heavily reinforced and locally compacted, which requires a differentiated choice of tools and methods during deconstruction. In practice, the edge zone also coordinates interfaces to <em>waterproofing<\/em>, <em>drainage<\/em>, and <em>earthing<\/em>, which makes precision during both new construction and selective deconstruction essential.<\/p>\n<h2>Structure, sizing, and reinforcement of an edge foundation<\/h2>\n<p>Edge foundations are generally made of reinforced concrete. Sizing is based on vertical actions (permanent and variable loads), horizontal loads from wind or earth pressure, subsoil parameters, and the geometry of the structure. Constructively decisive are sufficient foundation width to accommodate bearing pressures, a frost-proof founding depth, and appropriate crack-width control by reinforcement. For floor slabs, the edge zone often functions as a reinforced edge beam with increased shear and flexural capacity. Design checks typically include bearing pressure and settlement verification, sliding and overturning safety, and robustness against accidental actions; detailing ensures adequate anchorage lengths, corner continuity, and minimum cover suitable to the exposure class.<\/p>\n<h3>Material, reinforcement, and connection details<\/h3>\n<p>Normal concretes with a compressive strength appropriate to load requirements and exposure class are typical. The reinforcement is designed for bending, shear, and restraint effects; corner regions and lap joints require special attention. Connection reinforcement to the floor slab, sealing measures such as waterstops and injection joints, as well as a foundation earth electrode along the edge are frequently used. Clean load transfer and sealing guidance at the edge are essential for durability and serviceability. In chloride- or freeze-thaw-exposed zones, increased cover or specially protected reinforcement can be expedient; for structural connections, <em>starter bars<\/em> and sleeves must be coordinated with waterproofing details to avoid leakage paths.<\/p>\n<h3>Waterproofing, frost protection, and subsoil<\/h3>\n<p>The transition between edge foundation and rising components requires a functional waterproofing layer. In frost-prone locations, a frost-free founding or effective frost protection (for example by insulation and drainage) must be planned. The subsoil is assessed with regard to load-bearing capacity, deformation, and water conditions, since edge foundations are sensitive to differential settlements. A capillary break and controlled drainage reduce moisture ingress; in high groundwater or perched water, negative-side waterproofing and carefully sealed penetrations are crucial. Ground improvement or substitution layers may be necessary where heterogeneous soils could trigger edge rotation or step settlements.<\/p>\n<h2>Lifecycle: construction, use, repair, and deconstruction<\/h2>\n<p>During construction, formwork alignment, concrete placement, and compaction at component edges are quality-critical. In service, edge foundations are subjected not only to loads but also to environmental influences such as moisture variation and temperature gradients. Repairs often concern waterproofing, cracks, and zones at risk of corrosion. During deconstruction, the edge zone is predestined for selective interventions &#8211; such as partial strip-out, openings, or trimming foundation edges without damaging adjacent components. Low-vibration techniques that create controlled crack planes or splitting processes are often preferred here. Condition assessments commonly combine visual inspection, cover depth measurements, and non-destructive testing to inform targeted repair or dismantling strategies and to maintain the residual load-bearing capacity during phased works.<\/p>\n<h3>Typical damage patterns in the edge zone<\/h3>\n<ul>\n<li>Cracks due to restraint, temperature fluctuations, or differential settlements<\/li>\n<li>Spalling at edges caused by mechanical impacts or rebar oxidation<\/li>\n<li>Moisture ingress at connection and construction joints<\/li>\n<li>Frost damage in case of insufficient depth or inadequate protection<\/li>\n<li>Loss of subgrade support due to erosion or washout leading to local voids and edge settlement<\/li>\n<li>Corrosion-induced expansion at lap zones and corners with subsequent corner spalls<\/li>\n<li>Detachment or puncture of waterproofing layers at transitions under movement or negative water pressure<\/li>\n<\/ul>\n<h2>Deconstruction of edge foundations: methods and work steps<\/h2>\n<p>The deconstruction of edge foundations requires a coordinated approach to avoid uncontrolled reduction of reserve capacity in the existing structure, to protect attachments, and to limit emissions. Depending on boundary conditions, concrete cutter, <strong>concrete demolition shear<\/strong>, <strong>hydraulic splitter<\/strong>, and supplemental tools for rebar cutting are used. Hydraulically powered systems with external <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> allow controlled process steps with high repeatability. Prior to any intervention, verification of load paths and, where required, temporary shoring or sequencing plans are essential to maintain stability and safeguard adjacent components and finishes.<\/p>\n<h3>Preparation and exposure<\/h3>\n<p>Before starting, utility lines are located, component build-ups are investigated, and the work area is exposed. In the strip-out and cutting phase, non-load-bearing layers are removed and, if required, separation cuts are made to secure load transfer and define clear deconstruction sections. Survey control, reinforcement location by scanning, and targeted trial openings improve planning certainty; access, exclusion zones, and logistics routes are defined to minimize interface conflicts.<\/p>\n<h3>Segmentation, splitting, and downsizing<\/h3>\n<ol>\n<li>Establish separation cuts and predetermined crack planes along the desired edge alignment.<\/li>\n<li>Drill wedge holes at defined spacing.<\/li>\n<li>Use <strong>hydraulic splitter<\/strong> and <strong>rock wedge splitter<\/strong> to open the edge foundation in a controlled manner and divide it into segments &#8211; with low vibration levels and limited crack propagation.<\/li>\n<li>Secondary breaking and profiling with <strong>concrete demolition shear<\/strong> for precise edge shaping and to expose reinforcing steel.<\/li>\n<li>Cut exposed reinforcement with <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shear<\/a><\/strong> or suitable cutting tools; for complex cross-sections, <em>combination shears<\/em> or <em>Multi Cutters<\/em> can offer advantages.<\/li>\n<li>Orderly removal of segments and haulage logistics.<\/li>\n<li>Temporary edge stabilization and protection of adjacent waterproofing or finishes where interfaces are retained.<\/li>\n<li>Post-processing for new connections, surface preparation, and documentation of revealed reinforcement and joints.<\/li>\n<\/ol>\n<p>This sequence enables selective deconstruction in the edge zone, as required in concrete demolition and special demolition in inner-city settings. In sensitive environments with strict emission requirements, splitting methods are preferred, while shears allow precise finishing. Systematic waste segregation and water control for drilling and dust suppression complete an efficient and compliant workflow.<\/p>\n<h3>Special boundary conditions<\/h3>\n<p>Where adjacent components have a low tolerance to vibration &#8211; for example near sensitive installations or in special demolition &#8211; controlled splitting with hydraulic cylinders offers advantages. In areas with high reinforcement density, a combination of splitting and downsizing can be sensible to expose steel selectively and cut it with <strong>steel shear<\/strong>. Edge-adjacent soil or paving should be supported to prevent undermining; in confined spaces, lightweight attachments and short hose runs improve handling and reduce setup times.<\/p>\n<h2>Selecting suitable tools for edge foundations<\/h2>\n<p>The choice between <strong>concrete demolition shear<\/strong> and <strong>hydraulic splitter<\/strong> depends on component thickness, reinforcement ratio, edge distances, and environmental requirements:<\/p>\n<ul>\n<li>Splitters are suitable where low vibration levels, low noise, and minimal impact on the existing structure are required. They generate predictable crack patterns along predefined drilling rows.<\/li>\n<li>Concrete demolition shear excel at precise contouring and downsizing of reinforced edge zones, especially after a preceding splitting step.<\/li>\n<li><em>Combination shears<\/em> and <em>Multi Cutters<\/em> can, depending on configuration, both crush concrete and cut profiles, reinforcement, and embedded parts &#8211; helpful at changing material transitions in the edge area.<\/li>\n<li><strong>Hydraulic power packs<\/strong> by Darda GmbH provide the required drive power for mobile, compact systems with high operator control.<\/li>\n<li>Match jaw opening and splitter wedge dimensions to section thickness and expected crack path to avoid uncontrolled breakout at visible edges.<\/li>\n<li>Check required oil flow and pressure against available power supply and hose lengths; ensure tool weight and reach suit access constraints at the building edge.<\/li>\n<\/ul>\n<h2>Safety, emissions, and environmental protection<\/h2>\n<p>Dust and noise mitigation, low-vibration work, and safe handling of loads are key requirements in the edge zone. Coordinated water spray system, pinpoint force application, and the use of low-noise procedures support environmental protection. All work should be planned and executed in accordance with the applicable rules of the art and relevant occupational safety requirements, without generalizing the individual case. Water and slurry management, selective waste collection, safe lifting points for segments, and clear communication protocols further reduce risks and environmental impact.<\/p>\n<h2>Relation to application areas: from concrete demolition to tunnel construction<\/h2>\n<p>Edge foundations occur particularly often in concrete demolition and special demolition &#8211; for example during selective removal of building edges. In the area of strip-out and cutting, separating preliminaries serve clean segment formation. Parallels exist to rock excavation and tunnel construction as well as to natural stone extraction: Controlled splitting with hydraulic cylinders follows the same physical principle, adapted to the material concrete with reinforcement. Special demolition includes situations with restricted access, sensitive neighbors, or strict emission specifications &#8211; typical framework conditions at building edges. Comparable process control is also required at bridge parapets, retaining wall copings, and slab cantilevers, where precision at the outer boundary is decisive.<\/p>\n<h2>Planning, costing, and feasibility<\/h2>\n<p>For a structured sequence, component data (thickness, reinforcement, concrete compressive strength class), subsoil conditions, accessibility, and disposal routes are recorded. Costing considers the mix of drilling, splitting, downsizing, and cutting as well as required safeguarding measures. Pilot sections or a field trial or test can help optimize drilling grids and segment sizes and validate the performance of <strong>hydraulic splitter<\/strong> and <strong>concrete demolition shear<\/strong> in the specific existing structure. Constraint mapping (working windows, vibration and noise limits, neighbor interfaces) and productivity benchmarks per drilling meter or per segment improve schedule and cost reliability.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Documentation includes drilling and splitting plans, tool parameters used, and evidence of emission reduction and protection of adjacent components. Ongoing checks of edge quality, adherence to tolerances, and monitoring of ground vibration and noise emission safeguard execution quality. For rebar cuts, traceability from segmentation to steel cutting is helpful, particularly where residual load-bearing capacity must be maintained. Photo logs, as-built surveys of edge lines, and sign-off records for interfaces to waterproofing and reinforcement splices close the quality loop.<\/p>\n<h2>Practice-oriented tips for the edge zone<\/h2>\n<p>Narrow foundation strips benefit from closely spaced splitting points and short segment lengths to avoid unwanted crack propagation. For heavily reinforced edge beams, it is advisable to first open the concrete cover by splitting, then downsize the matrix with <strong>concrete demolition shear<\/strong>, and finally cut the exposed reinforcement with <strong>steel shear<\/strong>. In tight courtyards or occupied existing buildings, the use of compact hydraulic systems by Darda GmbH supports a safe, low-emission process. Stagger drilling rows to steer crack development away from finishes, use compressible edge protection where surfaces are to remain, and preload splitting tools symmetrically to prevent sudden release and preserve the desired edge geometry.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>An edge foundation is a load-bearing structural element at the outer termination of a structure. It transfers loads from walls, columns, or edge beams into the subsoil, stabilizes the floor slab against edge deformations, and protects the building envelope against frost and moisture. In existing buildings, the edge foundation is <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19593","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Edge Foundation | Construction Definition &amp; Uses<\/title>\n<meta name=\"description\" content=\"Explore edge foundation in structural engineering \u2713 design, reinforcement, waterproofing &amp; low-vibration deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Edge Foundation | Construction Definition &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Explore edge foundation in structural engineering \u2713 design, reinforcement, waterproofing &amp; low-vibration deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-07T12:43:05+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-foundation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-foundation\",\"name\":\"Edge Foundation | Construction Definition & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-28T14:23:28+00:00\",\"dateModified\":\"2026-05-07T12:43:05+00:00\",\"description\":\"Explore edge foundation in structural engineering \u2713 design, reinforcement, waterproofing & low-vibration deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-foundation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-foundation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-foundation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Edge foundation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Edge Foundation | Construction Definition & Uses","description":"Explore edge foundation in structural engineering \u2713 design, reinforcement, waterproofing & low-vibration deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation","og_locale":"en_US","og_type":"article","og_title":"Edge Foundation | Construction Definition & Uses","og_description":"Explore edge foundation in structural engineering \u2713 design, reinforcement, waterproofing & low-vibration deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-07T12:43:05+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation","url":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation","name":"Edge Foundation | Construction Definition & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-28T14:23:28+00:00","dateModified":"2026-05-07T12:43:05+00:00","description":"Explore edge foundation in structural engineering \u2713 design, reinforcement, waterproofing & low-vibration deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/edge-foundation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-foundation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Edge foundation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19593"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19593\/revisions"}],"predecessor-version":[{"id":27108,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19593\/revisions\/27108"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}