{"id":19592,"date":"2025-11-27T08:26:22","date_gmt":"2025-11-27T07:26:22","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19592"},"modified":"2026-05-07T16:55:03","modified_gmt":"2026-05-07T14:55:03","slug":"non-explosive-concrete-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition","title":{"rendered":"Non-explosive concrete demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Non-explosive concrete demolition describes the low-vibration and controlled loosening, splitting, and crushing of concrete and rock structures without the use of explosives. The method is established in dense urban centers, sensitive industrial facilities, existing buildings, as well as in tunnel and rock construction. At its core are hydraulic tools such as <strong>concrete pulverizers<\/strong> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, which precisely separate components, guide cracks in a targeted way, and prepare the material for removal. Dispensing with explosives can reduce emissions such as noise, vibrations, and dust in many scenarios, which supports occupational safety and planning reliability on the construction site. In practice, the approach is also known as controlled, low-vibration demolition and is characterized by reproducible sequences that fit within tight schedules and complex site logistics.<\/p>\n<ul>\n<li><strong>High process control:<\/strong> targeted crack initiation and defined separation joints.<\/li>\n<li><strong>Reduced emissions:<\/strong> lower noise, vibrations, and dust compared to percussive or blasting techniques.<\/li>\n<li><strong>Compatibility with sensitive surroundings:<\/strong> adjacent structures, utilities, and ongoing operations can be safeguarded more effectively.<\/li>\n<li><strong>Efficient downstream handling:<\/strong> preparatory size reduction enables clean sorting and recycling.<\/li>\n<\/ul>\n<h2>Definition: What is meant by non-explosive concrete demolition?<\/h2>\n<p>Non-explosive concrete demolition refers to mechanical, hydraulic, or combined methods for removing and segmenting concrete, reinforced concrete, and natural stone without detonating charges. Characteristic features are controlled load introduction, targeted cracking through compressive and tensile stresses, and subsequent size reduction and separation. In practice, hydraulic <em>splitting cylinders<\/em> in <em>rock and concrete splitters<\/em> as well as powerful <em>concrete pulverizers<\/em> are primarily used. The approach enables both <strong>primary demolition<\/strong> (releasing large elements) and <strong>secondary demolition<\/strong> (crushing, separating reinforcement, sorting) and is suitable for <strong>concrete demolition and special demolition<\/strong>, <strong>interior demolition and concrete cutting<\/strong>, <strong>rock excavation and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, as well as <strong>special demolition<\/strong>. Chemical expansive agents can be used as a complementary non-explosive option in select cases, though mechanical and hydraulic methods allow faster, more controllable cracking in many project settings.<\/p>\n<h2>Methods and operating principles in non-explosive concrete demolition<\/h2>\n<p>Non-explosive methods rely on the controlled introduction of forces into the material. These include hydraulic splitting, pulverizer-based demolition, and supplementary cutting or separating steps. The selection depends on member thickness, degree of reinforcement, accessibility, concrete strength, and the permissible emissions at the work site. An integrated method statement typically defines which sequence of splitting, crushing, and cutting will deliver the required tolerances and cycle times.<\/p>\n<h3>Hydraulic splitting with rock and concrete splitters<\/h3>\n<p>In the splitting method, core bores or slim drill holes are created according to a defined drilling pattern. A splitting cylinder with a wedge set is inserted into these holes. Under hydraulic pressure, the wedge expands, transfers high radial forces into the concrete, and initiates cracks along previously planned lines. In this way, massive foundations, thick-walled members, and rock can be segmented into transportable sections without impact or blasting energy. <strong>Rock splitting cylinders<\/strong> are particularly suitable when vibrations must be minimized or adjacent structures need protection. Typical parameters include hole diameters in the range of 30 to 50 mm, spacing adapted to cross section and reinforcement, and splitting forces reaching hundreds of kilonewtons per cylinder. Clean drilling, correct wedge stroke, and staged pressurization improve crack guidance and limit overbreak at edges. Dust can be reduced by wet drilling or vacuum extraction at the drill head.<\/p>\n<h3>Demolition with concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> apply high closing forces to the member and break concrete predominantly through compressive and shear action. Tooth and jaw geometry are designed for gripping, crushing, and spalling. This enables targeted nibbling of edges, exposing reinforcement, and producing piece sizes suitable for logistics. In dense surroundings or during <em>interior demolition<\/em>, pulverizer demolition can complement or replace drilling and splitting, for example for <strong>ceiling openings<\/strong>, <strong>wall breakthroughs<\/strong>, and for removing brackets or beams. Rotating head designs support precise positioning, while integrated cutting blades allow on-the-spot rebar separation. Short cycle times and suitable jaw openings are decisive for throughput when working in confined bays or at height.<\/p>\n<h3>Secondary demolition, sorting and separation<\/h3>\n<p>After releasing large elements, secondary processing often follows: reducing to stockpiles, removing reinforcing steel, and pre-sorting separation. Alongside concrete pulverizers, <em>steel shears<\/em> or <em>multi cutters<\/em> are used to cut reinforcement and embedded parts. This achieves a site-suitable particle size and improves recyclability through efficient demolition sorting. Clear separation into concrete mineral fraction, ferrous metals, and other fractions (such as cables or embedded fixtures) shortens disposal routes and supports high recycling rates.<\/p>\n<h2>Application areas and boundary conditions in practice<\/h2>\n<p>Non-explosive methods are versatile whenever precision, low vibration levels, and reproducible processes are required.<\/p>\n<ul>\n<li>Concrete demolition and special demolition: controlled openings, partial demolition, removal of components while maintaining ongoing operations.<\/li>\n<li>Interior demolition and concrete cutting: selective deconstruction in existing buildings, preparation for sawing and drilling work.<\/li>\n<li>Rock excavation and tunnel construction: exposures, profile correction, excavation in sensitive areas where blasting is not permitted.<\/li>\n<li>Natural stone extraction: gentle release of blocks along natural joints.<\/li>\n<li>Special demolition: working near infrastructure, utilities, machines, or cultural heritage with strict emission limits.<\/li>\n<\/ul>\n<p>Boundary conditions include limited access, overhead work, and the need to protect finishes or services. Early mock-ups on representative sections can validate drilling patterns, splitting energy, and expected piece sizes.<\/p>\n<h2>Planning, safety, and emission control<\/h2>\n<p>Planning includes an assessment of the load-bearing structure, load paths during the works, accessibility, and the separation lines. Measures for fall protection, underpinning, and load transfer management must be defined early. Regarding occupational safety, personal protective equipment, safe setup of the equipment, and handling hydraulic pressure are central. Requirements for noise, dust, and vibrations should be evaluated for the specific site and limited by suitable means such as water mist, extraction, technical enclosure, and low-vibration methods. Legal requirements may vary by project, region, and permit and should be coordinated with the responsible authorities. Risk assessments, method statements, and lift plans are to be aligned so that demolition, handling, and logistics form a coherent sequence.<\/p>\n<ul>\n<li><strong>Noise control:<\/strong> selection of low-noise tooling, time windows, and acoustic shielding. Monitoring via dB(A) logs where required.<\/li>\n<li><strong>Vibration control:<\/strong> limiting peak particle velocity at sensitive receptors through method selection and staged splitting. Seismograph monitoring can document compliance.<\/li>\n<li><strong>Dust control:<\/strong> wet drilling, water mist at the pulverizer jaw, and point extraction minimize fine particulate load. Handling of slurry and residues must be organized.<\/li>\n<li><strong>Hydraulic safety:<\/strong> pressure relief, hose protection, and regular leak checks; pressure ratings must match the tool and the power unit.<\/li>\n<\/ul>\n<h3>Monitoring and documentation<\/h3>\n<p>Structured measurement and documentation underpin planning certainty. Typical elements include baseline measurements, threshold values, continuous monitoring during critical operations, and as-built documentation of separation lines and material flows.<\/p>\n<h2>Selection of equipment and sizing<\/h2>\n<p>The choice between <strong>rock and concrete splitters<\/strong> and <strong>concrete pulverizers<\/strong> depends on member thickness, reinforcement content, the desired crack guidance, and logistical boundary conditions. Key aspects are:<\/p>\n<ul>\n<li>Member geometry: wall and slab thickness, foundation height, edges, and bearings.<\/li>\n<li>Material properties: concrete strength, aggregate, moisture, degree and position of reinforcement.<\/li>\n<li>Accessibility: working space for drilling and jaw opening, attachment points, lifting loads.<\/li>\n<li>Hydraulic performance: pressure and oil flow of the <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power unit<\/a><\/em> matched to the tool\u2019s performance class.<\/li>\n<li>Carrier and handling: handheld operation or <strong>excavator attachment<\/strong>, transport routes, and the disposal chain.<\/li>\n<\/ul>\n<ul>\n<li><strong>Typical splitting setup:<\/strong> hole diameter and spacing tailored to section depth and reinforcement layout, wedge stroke sufficient to bridge the kerf, and synchronized multi-cylinder operation for straight crack planes.<\/li>\n<li><strong>Pulverizer pointers:<\/strong> select jaw opening and closing force for the maximum cross section, ensure cycle time supports the planned takt, and verify compatibility with the carrier\u2019s hydraulic circuit.<\/li>\n<\/ul>\n<h3>Key performance parameters<\/h3>\n<p>For splitting work, splitting force, wedge stroke, and hole spacing are decisive. In pulverizer demolition, jaw opening, cutting force, cycle times, and tool geometry influence performance. A well-considered combination of both methods accelerates progress: splitting to initiate cracks, pulverizer demolition for rapid reduction to manageable pieces. Indicative ranges include wedge strokes of several tens of millimeters, splitting forces in the high kN to MN range, and pulverizer cycle times on the order of a few seconds depending on carrier size.<\/p>\n<h2>Workflow: step by step<\/h2>\n<ol>\n<li>Exploration and exposure: identify utilities, embedded parts, reinforcement paths, and boundary conditions.<\/li>\n<li>Separation and drilling concept: define drilling pattern, crack path, pulverizer attack points, and supports.<\/li>\n<li>Splitting operation: produce drill holes, insert splitting cylinders, build pressure cyclically, monitor cracks.<\/li>\n<li>Pulverizer demolition: grip, break, and pre-sort elements; expose reinforcement and cut if required.<\/li>\n<li>Secure and remove segments: coordinate slings, lifting operations, and transport logistics.<\/li>\n<li>Follow-up: level surfaces, dress edges, clean the site, and document material flow.<\/li>\n<li>Monitoring and reporting: record noise, vibration, and dust where specified, and update quality records for traceability.<\/li>\n<\/ol>\n<h2>Quality assurance and troubleshooting<\/h2>\n<p>A consistent process and control of splitting and fracture results safeguard time and quality. Typical issues in practice:<\/p>\n<ul>\n<li>Incomplete crack: check drilling pattern, wedge stroke and hydraulic pressure, ensure hole cleaning.<\/li>\n<li>Reinforcement blockages: adjust crack path, plan combination with a concrete pulverizer, expose and cut reinforcement in a targeted way.<\/li>\n<li>Tool wear: inspect teeth and wedges, check hydraulic filters and oil condition, regrind\/replace in time.<\/li>\n<li>Fluctuating hydraulic performance: verify unit pressure and oil flow, bleed lines, consider temperature management.<\/li>\n<li>Edge spalling or overbreak: use protective backing at edges, apply staged splitting, and refine drilling layout at discontinuities.<\/li>\n<li>Dust exceedances: adapt drilling method to wet process, increase misting volume, and improve enclosure or extraction.<\/li>\n<\/ul>\n<h2>Environmental and sustainability aspects<\/h2>\n<p>Non-explosive methods enable orderly separation of concrete, reinforcement, and embedded parts. This facilitates recycling and reduces transports. Noise and vibration levels are often lower than with percussive methods. Dust can be minimized through adapted drilling techniques and water mist for dust suppression. Forward-looking sorting at the source improves recycling rates and acceptance in urban environments. On-site crushing for reuse as aggregate and clean reinforcement streams contribute to resource efficiency and can support project sustainability goals.<\/p>\n<h2>Comparison with alternative methods<\/h2>\n<p>Compared to blasting, the non-explosive approach offers higher control and lower permitting and safeguarding efforts, although cycle times are usually longer for very large volumes. Compared to sawing and cutting, <strong>concrete pulverizers<\/strong> and splitting are often more flexible on irregular geometries and require less continuous cooling. A <em>pneumatic hammer \/ jackhammer<\/em> is mobile but generates stronger vibrations and noise. A combined approach leverages strengths: splitting for controlled crack formation, pulverizer demolition for rapid volume reduction, cutting for clean separation joints. Where strictly dust-free edges or architectural finishes are required, wire or wall sawing can be integrated locally to complement splitting lines.<\/p>\n<h2>Typical application examples<\/h2>\n<ul>\n<li>Bridge modification: removing curbs and brackets with pulverizers; releasing massive abutments by splitting.<\/li>\n<li>Foundation demolition: crack deep blocks with splitting cylinders, then reduce with a pulverizer.<\/li>\n<li>Interior strip-out in existing buildings: create openings in slabs and walls using a pulverizer, with low vibration and high control.<\/li>\n<li>Tunnel construction and rock removal: profile finishing and block release without blasting energy in sensitive environments.<\/li>\n<li>Natural stone extraction: block separation along joints with splitters, gentle on material and surroundings.<\/li>\n<li>Shaft and pit works: enlarging or deepening confined shafts by staged splitting where blasting is restricted.<\/li>\n<\/ul>\n<h2>Role of equipment selection in the project workflow<\/h2>\n<p>A project-specific combination of <strong>rock and concrete splitters<\/strong>, <strong>concrete pulverizers<\/strong>, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em>, and complementary tools such as <em>steel shears<\/em>, <em>hydraulic shears<\/em>, <em>multi cutters<\/em>, or <em>tank cutters<\/em> supports an efficient and safe process. By matching performance classes, suitable jaw openings, and the right hydraulic supply, reproducible results are achieved that meet both technical and organizational requirements in <em>concrete demolition and special demolition<\/em>. Coordinated training, preventive maintenance, and a defined spare parts concept reduce unplanned downtime and stabilize takt times across shifts.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Non-explosive concrete demolition describes the low-vibration and controlled loosening, splitting, and crushing of concrete and rock structures without the use of explosives. The method is established in dense urban centers, sensitive industrial facilities, existing buildings, as well as in tunnel and rock construction. At its core are hydraulic tools such <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19592","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Non-Explosive Concrete Demolition Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Discover non-explosive concrete demolition with hydraulic tools for precise, low-vibration removal in cities \u27a4 tunnels.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Non-Explosive Concrete Demolition Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Discover non-explosive concrete demolition with hydraulic tools for precise, low-vibration removal in cities \u27a4 tunnels.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-07T14:55:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-concrete-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-concrete-demolition\",\"name\":\"Non-Explosive Concrete Demolition Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-27T07:26:22+00:00\",\"dateModified\":\"2026-05-07T14:55:03+00:00\",\"description\":\"Discover non-explosive concrete demolition with hydraulic tools for precise, low-vibration removal in cities \u27a4 tunnels.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-concrete-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-concrete-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-concrete-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Non-explosive concrete demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Non-Explosive Concrete Demolition Methods & Tools","description":"Discover non-explosive concrete demolition with hydraulic tools for precise, low-vibration removal in cities \u27a4 tunnels.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition","og_locale":"en_US","og_type":"article","og_title":"Non-Explosive Concrete Demolition Methods & Tools","og_description":"Discover non-explosive concrete demolition with hydraulic tools for precise, low-vibration removal in cities \u27a4 tunnels.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-07T14:55:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition","name":"Non-Explosive Concrete Demolition Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-27T07:26:22+00:00","dateModified":"2026-05-07T14:55:03+00:00","description":"Discover non-explosive concrete demolition with hydraulic tools for precise, low-vibration removal in cities \u27a4 tunnels.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-concrete-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Non-explosive concrete demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19592"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19592\/revisions"}],"predecessor-version":[{"id":27164,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19592\/revisions\/27164"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}