{"id":19575,"date":"2025-11-26T10:54:31","date_gmt":"2025-11-26T09:54:31","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19575"},"modified":"2026-05-06T12:49:03","modified_gmt":"2026-05-06T10:49:03","slug":"quartz-quarry","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry","title":{"rendered":"Quartz quarry"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A quartz quarry is a demanding work environment: hard rock with a high quartz content requires precise, low-vibration methods and robust tools. In practice, geological expertise, drilling and splitting techniques, and structured workflows converge. Depending on location and constraints, quartz quarries frequently employ <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, <em>rock splitting cylinders<\/em>, and suitable <strong>hydraulic power packs<\/strong>. During modifications, deconstruction, or maintenance of the concrete infrastructure in the quarry, <strong>concrete demolition shears<\/strong> also play an important role. This article classifies terminology, methods, safety, and quality assurance and links fundamentals with practical guidance for <strong>natural stone extraction<\/strong>, <strong>rock breakout<\/strong>, and <strong>special demolition<\/strong>.<\/p>\n<p>Key objectives in quartz-rich rock include high dimensional accuracy at low vibration levels, predictable crack propagation, and minimized dust and noise emissions. Coordinated planning, equipment sizing matched to rock strength, and consistent documentation across the process chain are decisive for efficiency, safety, and environmental compatibility.<\/p>\n<h2>Definition: What is meant by a quartz quarry?<\/h2>\n<p>A quartz quarry is an extraction operation in which quartz-rich hard rock such as quartzite, quartz sandstone, or quartz-bearing gneisses is extracted, loosened, dimensioned, and further processed. The goal is to supply natural stone blocks or mineral raw materials with defined properties. Extraction typically proceeds in benches via drilling, splitting, or <strong>blasting<\/strong> methods, followed by <strong>secondary crushing<\/strong>. Characteristic are the material\u2019s high abrasiveness, a high compressive strength range, and the necessity of consistent control of dust, noise, and vibration. In sensitive areas, <strong>non-explosive rock removal<\/strong> and low vibration levels are often preferred, for example hydraulic splitting with <strong>hydraulic wedge splitters<\/strong>.<\/p>\n<ul>\n<li>Typical products: <em>dimension stone blocks<\/em>, <em>armor stone<\/em>, and <strong>bulk aggregates<\/strong> for further processing<\/li>\n<li>Performance indicators: block yield, split face planarity, oversize share, and specific energy input per volume<\/li>\n<li>Bench geometry: height, slope angle, berm widths, and access adapted to equipment and safety margins<\/li>\n<\/ul>\n<h2>Geological properties and material behavior of quartz rock<\/h2>\n<p>Quartz has a Mohs hardness of 7, is brittle-elastic, and highly abrasive. Quartzite, due to metamorphic transformation, exhibits pronounced grain bonding with high compressive and flexural tensile strength. Quartz sandstone shows cement-related variance in bonding. These properties influence drilling behavior, tool wear, and splitability. Natural bedding, joints, and faults can create preferred separation planes that can be used for splitting. At the same time, micro-cracked zones increase the risk of uncontrolled breaks, making careful orientation of drilling patterns and splitting direction essential.<\/p>\n<ul>\n<li>Influence on tools: elevated <em>bit wear<\/em> and higher feed forces at constant penetration rates<\/li>\n<li>Visible indicators: sheen on drill cuttings, hard cement in sandstones, and anisotropy due to foliation or bedding<\/li>\n<li>Rock mass quality: joint spacing, roughness, and weathering degree determine achievable block sizes<\/li>\n<\/ul>\n<h3>Relevance for drilling and splitting<\/h3>\n<p>In a quartz quarry, drill bits with long service life and matched feed force are crucial. Borehole diameter and spacing must be aligned with rock strength, joint orientation, and the desired block size. Hydraulic splitting using <em>rock splitting cylinders<\/em> utilizes boreholes as defined weaknesses to initiate and propagate cracks in a controlled manner. The longitudinal axis of the borehole row should ideally follow natural structures (joint sets, bedding) to obtain clean separation planes.<\/p>\n<ul>\n<li><strong>Borehole geometry:<\/strong> maintain straight, perpendicular holes with low deviation to keep line loads uniform<\/li>\n<li><strong>Spacing strategy:<\/strong> closer spacing in massive, interlocked zones; wider spacing along favorably oriented joint sets<\/li>\n<li><strong>Validation:<\/strong> pilot row and test split to confirm assumptions before serial execution<\/li>\n<\/ul>\n<h2>Process chain in a quartz quarry: from drilling to haulage<\/h2>\n<p>Extraction follows a clear process chain focused on material quality and operational safety. From exploration to loading, planning, documentation, and the selection of suitable methods are decisive:<\/p>\n<ul>\n<li>Geological mapping, strength and fabric analysis, alignment to joints\/bedding<\/li>\n<li>Drilling plan (pattern, hole diameter, depth, edge distances, staggering)<\/li>\n<li>Primary loosening: hydraulic splitting or <strong>blasting<\/strong>, depending on constraints<\/li>\n<li><strong>Secondary crushing<\/strong>: reducing oversize by splitting or mechanical tools<\/li>\n<li>Quality sorting: selection by block size, freedom from cracks, color, and texture<\/li>\n<li>Haulage to further processing or to the <strong>crushing plant<\/strong>\/screening plant<\/li>\n<\/ul>\n<p>Digital mapping, GNSS-based positioning, and photo documentation enhance traceability and reproducibility. Clearly defined interfaces between geology, drilling, splitting, and loading reduce idle times and improve block yield.<\/p>\n<ul>\n<li>Key process metrics: drilling meters per shift, split success rate, oversize share, and rework effort on split faces<\/li>\n<\/ul>\n<h2>Hydraulic splitting in a quartz quarry: low-vibration and precise<\/h2>\n<p>Hydraulic splitting is established in quartz quarries when vibration must be minimized, sensitive structures are adjacent, or tight tolerances are required. <strong>Hydraulic wedge splitters<\/strong> generate high line forces in the borehole via <em>rock splitting cylinders<\/em> to create controlled separation joints. Advantages include low fly rock, reduced edge cracking, and good reproducibility of results. Limits lie in drilling effort and in very massive, tightly interlocked zones where tighter drilling patterns and staged splitting sequences are necessary.<\/p>\n<ul>\n<li><strong>Advantages:<\/strong> low vibration levels, minimal collateral damage, accurate crack guidance, and clean split planes<\/li>\n<li><strong>Limitations:<\/strong> higher drilling share, sensitivity to hole cleanliness, and reduced efficiency in intensely locked fabrics<\/li>\n<\/ul>\n<h3>Rock splitting cylinders and hydraulic power packs: interaction of components<\/h3>\n<p>The <em>rock splitting cylinder<\/em> is inserted into a cleaned borehole with a suitable diameter. A <strong>hydraulic power pack<\/strong> builds up the pressure that moves wedges or pressure shoes radially against the rock to initiate a split. Decisive factors are sufficient flow rate, stable system pressure, functional couplings, and pressure-resistant hoses. Drill cuttings must be removed before splitting so that contact faces seat cleanly. Staged pressure cycles reduce the risk of uncontrolled breakouts, especially at free edges or in heterogeneous zones.<\/p>\n<ul>\n<li><strong>Hydraulic parameters:<\/strong> provide adequate flow for the number of cylinders used in parallel and maintain stable operating pressure under load<\/li>\n<li><strong>Oil cleanliness:<\/strong> filtration and condition monitoring support consistent force build-up and component life<\/li>\n<li><strong>Interfaces:<\/strong> secure couplings, hose protection at abrasion points, and mechanical locking where applicable<\/li>\n<\/ul>\n<h2>Secondary crushing, plant infrastructure, and the use of concrete demolition shears<\/h2>\n<p>Beyond rock loosening, operation of a quartz quarry also involves the built infrastructure: foundations of crushers, bunkers, ramps, silos, water channels, and concrete pedestals. During modifications, maintenance, or deconstruction of such components, <strong>concrete demolition shears<\/strong> are used. They enable controlled removal of concrete, trimming of stressed edges, and exposing reinforcement. In combination with <em>multi cutters<\/em> or <em>steel shear<\/em>, exposed reinforcement can be cut to size appropriately. This keeps production as uninterrupted as possible while in-plant works are handled safely and with low emissions.<\/p>\n<ul>\n<li><strong>Selection criteria:<\/strong> member thickness, reinforcement ratio, access conditions, and target fragment size<\/li>\n<li><strong>Execution:<\/strong> stepwise biting, edge relief cuts, and immediate separation of concrete and steel<\/li>\n<li><strong>Emission control:<\/strong> water spray at the jaw, local extraction, and disciplined debris handling<\/li>\n<\/ul>\n<h3>Material cycle and recycling in the quarry<\/h3>\n<p>Deconstruction of concrete plant components generates mineral construction debris that &#8211; where conditions allow &#8211; can be processed and returned to the material cycle. Clean separation of concrete and steel facilitates recovery. <em>Combination shears<\/em> support selective cutting of mixed material composites, while <em>steel shear<\/em> size the steel fractions. Tool choice depends on member thickness, reinforcement ratio, and the desired degree of size reduction.<\/p>\n<ul>\n<li>Contamination control: keep soils, wood, and plastics out of mineral streams to preserve recyclate quality<\/li>\n<li>Documentation: record material volumes and destinations to meet regulatory and audit requirements<\/li>\n<\/ul>\n<h2>Planning, drilling pattern, and parameter selection in hard rock<\/h2>\n<p>For clean separation planes, coordinated drilling planning is central. Typical borehole diameters for hydraulic splitting in quartz quarries &#8211; depending on tool and cylinder &#8211; are in the moderate to larger range. Hole spacing is based on rock strength, joint orientation, and target block size; spacings at free edges should be reduced. Boreholes should be perpendicular to the target separation plane and form a parallel, straight row. The splitting sequence often starts at a free-standing corner and proceeds section by section along the row to relieve stresses in a controlled manner.<\/p>\n<ol>\n<li>Geological investigation and marking of joint systems<\/li>\n<li>Design of the drilling grid with edge, row, and depth parameters<\/li>\n<li>Pilot hole row and test split to validate assumptions<\/li>\n<li>Serial splitting with defined pressure stages and intermediate checks<\/li>\n<li>Touch-up at edges and adjustment of hole spacing as needed<\/li>\n<li>Documentation of results and wear, adjustment of maintenance intervals<\/li>\n<\/ol>\n<ul>\n<li><strong>Rules of thumb:<\/strong> hole spacing typically ranges from 8 to 12 times the hole diameter in massive rock and can be increased along favorable discontinuities<\/li>\n<li>Edge offsets of roughly half the row spacing help prevent uncontrolled break-outs at free faces<\/li>\n<li>Keep hole collars level and aligned to maintain uniform load transfer along the row<\/li>\n<\/ul>\n<h2>Occupational safety, health protection, and environment in a quartz quarry<\/h2>\n<p>Quartz dust requires special attention: fine, respirable fractions must be minimized. Effective measures include wet drilling, dust suppression via water mist, point extraction, and consistent cleaning of work areas. Personal protective equipment must be provided according to activity. Noise emissions should be reduced through shielding, machine maintenance, and adapted operating practices. Vibration can be reduced by hydraulic splitting, protecting neighbors, structures, and sensitive zones. Working with hydraulic pressure requires safe hose routing, regular inspections, and depressurizing systems before changeover. Measures for soil protection, water management, and material flow management support environmentally compatible extraction.<\/p>\n<ul>\n<li>Wet drilling and targeted <strong>dust suppression<\/strong> at the source and transfer points<\/li>\n<li>Regular inspection and maintenance of <strong>hydraulic power packs<\/strong>, couplings, and hoses<\/li>\n<li>Stable <strong>work platforms<\/strong>, safe access, keeping the splitting line clear<\/li>\n<li>Low-emission methods in sensitive areas (low vibration levels, reduced noise)<\/li>\n<li>Separate collection of concrete, steel, and natural stone for orderly <strong>recycling<\/strong><\/li>\n<li>Respiratory and hearing protection matched to exposure levels; fit checks and correct assignment are essential<\/li>\n<li>Energy control: depressurize hydraulic circuits, secure suspended loads, and apply lockout-tagout for maintenance<\/li>\n<li>Water stewardship: closed-loop water use where feasible and sediment control by settling or filtration<\/li>\n<\/ul>\n<h2>Quality assurance, block yield, and surfaces<\/h2>\n<p>Quality assurance starts at the face: crack mapping, measurement of block geometry, and inspection of surfaces after splitting. The goal is high block yield with minimal rework. Clean, planar split faces reduce sawing and grinding effort. Alignment along favorable joint systems and a controlled splitting sequence increase dimensional accuracy. For bulk materials, grading curves and purity requirements apply, achieved by tailored crushing and screening stages.<\/p>\n<ul>\n<li>Checks include dimensional control, planarity of split faces, and documentation of joint-related rejects<\/li>\n<li>Photogrammetric surveys and structured logging of split outcomes support continuous improvement<\/li>\n<li>For aggregates: regular sieve analyses and monitoring of fines share and contaminant content<\/li>\n<\/ul>\n<h2>Typical challenges and practical solutions<\/h2>\n<p>Quartz-rich rocks place high demands on people and machines. With proper preparation and technology, recurring issues can be managed:<\/p>\n<ul>\n<li>High tool wear: select durable drilling tools, adjust feed and rotation speed, resharpen in time<\/li>\n<li>Incomplete splitting: reduce hole spacing, adjust drilling depth, run splitting sequence in stages<\/li>\n<li>Undesired edge break-offs: mitigation at free edges, protective wedges, reduced pressure stages<\/li>\n<li>Borehole backfill with cuttings: consistently blow out or flush before splitting<\/li>\n<li>Crack propagation in heterogeneous zones: align with joint systems and add edge holes if needed<\/li>\n<li>Logistics bottlenecks: cadence work steps, structure intermediate storage, keep routes clear<\/li>\n<li>Hole deviation: use centralizers and maintain bit condition to keep rows straight<\/li>\n<li>Cold weather effects: protect hydraulics and water lines to ensure reliable pressure build-up and dust control<\/li>\n<\/ul>\n<h2>Relation to products and application areas<\/h2>\n<p>The quartz quarry connects several application areas: In <strong>natural stone extraction<\/strong> and <strong>rock breakout<\/strong>, <strong>hydraulic wedge splitters<\/strong> with matching <strong>hydraulic power packs<\/strong> are an established method for low-vibration, precise separations. In <strong>special demolition<\/strong> &#8211; for example near sensitive structures &#8211; hydraulic splitting offers a controlled alternative. Within the plant premises, <strong>concrete demolition shears<\/strong> support <strong>concrete demolition and special demolition<\/strong> of foundation pedestals, ramps, or plant components. <em>Multi cutters<\/em>, <em>combination shears<\/em>, and <em>steel shear<\/em> are additionally used to cut steel components. In this way, the requirements for dimensional accuracy, safety, and environmental compatibility in a quartz quarry can be met in a targeted manner.<\/p>\n<p>Successful implementation depends on compatible component sizing, trained operation, and consistent maintenance intervals that reflect the high abrasiveness and loading conditions of quartz-rich rock.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A quartz quarry is a demanding work environment: hard rock with a high quartz content requires precise, low-vibration methods and robust tools. In practice, geological expertise, drilling and splitting techniques, and structured workflows converge. Depending on location and constraints, quartz quarries frequently employ hydraulic rock and concrete splitters, rock splitting <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19575","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Quartz Quarry - Extraction, Drilling &amp; Splitting<\/title>\n<meta name=\"description\" content=\"Insights on quartz quarry stone extraction \u2713 geology, low vibration hydraulic splitting, safety &amp; quality.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Quartz Quarry - Extraction, Drilling &amp; Splitting\" \/>\n<meta property=\"og:description\" content=\"Insights on quartz quarry stone extraction \u2713 geology, low vibration hydraulic splitting, safety &amp; quality.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-06T10:49:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/quartz-quarry\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/quartz-quarry\",\"name\":\"Quartz Quarry - Extraction, Drilling & Splitting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-26T09:54:31+00:00\",\"dateModified\":\"2026-05-06T10:49:03+00:00\",\"description\":\"Insights on quartz quarry stone extraction \u2713 geology, low vibration hydraulic splitting, safety & quality.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/quartz-quarry#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/quartz-quarry\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/quartz-quarry#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Quartz quarry\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Quartz Quarry - Extraction, Drilling & Splitting","description":"Insights on quartz quarry stone extraction \u2713 geology, low vibration hydraulic splitting, safety & quality.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry","og_locale":"en_US","og_type":"article","og_title":"Quartz Quarry - Extraction, Drilling & Splitting","og_description":"Insights on quartz quarry stone extraction \u2713 geology, low vibration hydraulic splitting, safety & quality.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-06T10:49:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry","url":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry","name":"Quartz Quarry - Extraction, Drilling & Splitting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-26T09:54:31+00:00","dateModified":"2026-05-06T10:49:03+00:00","description":"Insights on quartz quarry stone extraction \u2713 geology, low vibration hydraulic splitting, safety & quality.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/quartz-quarry#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Quartz quarry"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19575"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19575\/revisions"}],"predecessor-version":[{"id":26950,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19575\/revisions\/26950"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}