{"id":19573,"date":"2025-11-25T09:41:59","date_gmt":"2025-11-25T08:41:59","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19573"},"modified":"2026-09-12T19:53:19","modified_gmt":"2026-09-12T17:53:19","slug":"ashlar-wall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall","title":{"rendered":"Ashlar wall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The ashlar wall is among the most precise forms of masonry made from natural stone or concrete blocks. It is characterized by rectangular, dimensionally accurate stones with flat bed and head faces that enable a regular, calm appearance and high load-bearing capacity. Ashlar walls are found in building and civil engineering, as retaining walls in landscape construction, on bridges, tunnel portals, and in historic facades. For construction, adaptation, refurbishment, and deconstruction, controlled, low-vibration methods play a central role-for example, hydraulic splitting of large-format blocks or selective separation of components with suitable <em>pulverizers<\/em> and shears. Darda GmbH is frequently involved in these work steps when precise splitting of stone and concrete or powerful yet low-vibration separation techniques are required. In practice, low-emission techniques limit secondary damage, help meet environmental requirements, and enable source-separated workflows that support reuse.<\/p>\n<h2>Definition: What is meant by an ashlar wall?<\/h2>\n<p>An ashlar wall is masonry built of <em>ashlars<\/em>-that is, <strong>rectangular, dressed dimension stones<\/strong>-laid with tight joints in regular courses (layers). Bed joints run horizontally, head joints vertically; the stones are coordinated in height and depth. The wall can be single-wythe, multi-wythe (a facing wythe with backing masonry), or constructed from massive blocks. Depending on the task, natural stones (e.g., granite, limestone, sandstone) or concrete ashlars are used. Typical properties include high compressive strength, low deformation, good durability, and a high-quality exposed face, which may be rusticated, bush-hammered, or finely ground. In technical usage, the term also covers <em>ashlar masonry<\/em> that exhibits defined tolerances, coordinated bonding, and reproducible joint geometry.<\/p>\n<h2>Structure, materials, and jointing patterns<\/h2>\n<p>Ashlar walls differ by workmanship, bonding, and jointing patterns. The bearing surfaces are planar to distribute loads evenly; head joints are tight and staggered to avoid continuous vertical joints. Joints may be dry or mortared. In exposed masonry, joint design is a central design element; technically it influences deformation, water ingress, and frost resistance. Tolerances for bed and head joints must be defined project-specifically to ensure consistent coursing, drainage behavior, and surface evenness.<\/p>\n<h3>Dimension stones and blocks<\/h3>\n<ul>\n<li>Natural-stone ashlars: dressed stones with defined tolerances and finishes (e.g., rusticated, line-chiseled, bush-hammered).<\/li>\n<li>Concrete ashlars: large-format concrete blocks, often used as coursed masonry for retaining walls and angle retaining structures.<\/li>\n<li>Anchorage: depending on the system with dowels, anchors, or clamps, particularly for facing facade wythes.<\/li>\n<li>Edge protection: eased arrises or chamfers reduce spalling at exposed corners and improve durability under handling.<\/li>\n<li>Surface finishes: the selected texture influences slip resistance, water runoff, and visual depth.<\/li>\n<\/ul>\n<h3>Bonding and coursing<\/h3>\n<ul>\n<li>Coursed masonry with uniform lifts for a calm joint pattern.<\/li>\n<li>Alternating courses (headers\/stretchers) to interlock in depth.<\/li>\n<li>Rusticated ashlars for sculptural surfaces and edge protection.<\/li>\n<li>Quoins and corner bonding: accurate alternation of stretcher and header stones ensures dimensional control and load transfer at corners.<\/li>\n<\/ul>\n<h2>Production: extraction, dressing, and laying<\/h2>\n<p>The production of an ashlar wall begins with the extraction and processing of the stones. In <strong>natural stone extraction<\/strong>, raw blocks are detached, split, and sized. Precision at the bearing surface reduces later adjustments on site. During laying, flatness of the beds, joint thickness, backfilling, and any required anchorage are decisive. For mortared execution, compatible mortar grading curves and moisture control at the bedding surfaces are essential to limit shrinkage and maintain bond strength.<\/p>\n<h3>Gentle loosening and splitting<\/h3>\n<p>In rock excavation and quarrying, <em>low-vibration splitting<\/em> is a key method for obtaining crack-free ashlars. <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Hydraulic rock and concrete splitters<\/a><\/strong> as well as <strong>stone splitting cylinders<\/strong> are hydraulically operated and generate controlled splitting forces directly in predrilled holes. Via <strong>hydraulic power packs<\/strong>, the output can be precisely metered, which supports the quality of the dimension stones and the safety of the workflow. Predrilling patterns, hole diameters, and split sequencing are coordinated with the stone&#8217;s natural bedding to minimize waste and edge damage.<\/p>\n<h3>Adjustments on site<\/h3>\n<ul>\n<li>Fine adjustment of ashlar dimensions by splitting along natural bedding or joint lines.<\/li>\n<li>Fitting corner stones and headers to achieve interlock in depth.<\/li>\n<li>Producing highly planar bearing surfaces to minimize settlement.<\/li>\n<li>Trial dry-laying of critical courses to verify coursing, joint alignment, and tolerances before final setting.<\/li>\n<\/ul>\n<h2>Structural and building physics aspects<\/h2>\n<p>Ashlar walls predominantly carry compressive forces. In retaining walls, earth pressure, water pressure, and dynamic effects also act. Relevant building-physics aspects include water management, resistance to frost and de-icing salts, and the durability of the joints. Thermal movement, salt crystallization, and cyclic freeze-thaw exposure must be accounted for in detailing and in the selection of stone and joint materials.<\/p>\n<h3>Essential verifications and construction details<\/h3>\n<ol>\n<li>Stability against overturning and sliding, particularly for free-standing retaining walls.<\/li>\n<li>Load transfer into the foundation zone; adequate founding and uniform bearing.<\/li>\n<li>Drainage and ventilation to relieve pressure and avoid moisture damage.<\/li>\n<li>Joint design (dry or mortared) depending on use and exposure.<\/li>\n<li>For facing wythes: secure anchorage of the facing to the load-bearing structure.<\/li>\n<li>Backfill characteristics and compaction adjacent to the wall to avoid unintended surcharge.<\/li>\n<\/ol>\n<h2>Execution variants of ashlar walls<\/h2>\n<p>The choice of execution depends on the task, design intent, structural action, and environmental conditions. Common variants are:<\/p>\n<ul>\n<li>Dry-stone ashlar walls for landscape-oriented retaining walls with good drainage.<\/li>\n<li>Mortared ashlar masonry for higher loads and defined stiffness.<\/li>\n<li>An ashlar facing wythe in front of a concrete load-bearing structure as high-grade exposed masonry.<\/li>\n<li>Massive concrete ashlar walls (coursed construction) for temporary and permanent excavation shoring, storage, and retaining structures.<\/li>\n<li>Hybrid constructions with an ashlar facing and engineered backfill systems for performance and cost balance.<\/li>\n<\/ul>\n<h2>Integration into practice: fields of application and typical uses<\/h2>\n<p>Ashlar walls are used in several fields where precision, durability, and a high-quality appearance are required. At the same time, construction, adaptation, and deconstruction demand methods that are gentle on the surroundings and remain controllable. Typical drivers for the method choice include access constraints, adjacent traffic or vibration-sensitive assets, and requirements for selective dismantling for reuse.<\/p>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>For ashlar facades mounted on concrete frames or for concrete ashlar walls, selective methods are needed. <strong>Concrete pulverizers<\/strong> allow concrete sections to be removed without large-scale vibration. For targeted openings or releasing individual blocks, <strong>stone and concrete splitters<\/strong> can create controlled separations along rows of drill holes.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In strip-out- such as when exposing historic ashlar walls behind later layers-precise cuts and gentle release are crucial. Where reinforcing steel, anchors, or embedded parts occur, shears or cutting tools are used as appropriate. Hydraulically powered equipment with finely controllable forces enables a controlled approach that preserves exposed faces.<\/p>\n<h3>Rock excavation and tunneling<\/h3>\n<p>At tunnel portals and in ashlar retaining bodies, the ground is decisive. Hydraulic splitting of rock to produce stable excavations and foundations creates the basis for precise placement of heavy ashlars. The reduced vibration protects adjacent existing structures and sensitive components.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>For ashlar walls with high visual quality, raw-block extraction is crucial. Hydraulic splitting with <strong>stone splitting cylinders<\/strong> along natural parting planes yields low-crack blocks with minimal waste, which can reduce subsequent processing effort.<\/p>\n<h3>Special applications<\/h3>\n<p>In special situations- such as confined spaces, sensitive existing environments, or listed monuments-low-vibration, low-emission methods are often the first choice. <strong>Hydraulic power packs<\/strong> supply compact tools that can also operate indoors with limited media services.<\/p>\n<h2>Planning and detailing for ashlar walls<\/h2>\n<p>Good planning reduces later damage and facilitates deconstruction. In addition to structural verifications, construction details and the sequence of operations are crucial.<\/p>\n<ul>\n<li>Foundation: uniform bearing, frost-free depth, adequate footing width.<\/li>\n<li>Drainage: filter gravel, drain lines, weep holes; splash-water protection at the base.<\/li>\n<li>Movements: joint planning for long runs; consider thermal and settlement behavior.<\/li>\n<li>Surfaces: protect sensitive exposed faces during construction and deconstruction; use suitable cleaning methods.<\/li>\n<li>Tolerances and interfaces: define permissible deviations for course heights, openings, and connections to adjacent trades.<\/li>\n<li>Mock-ups and samples: confirm stone type, finish, and joint profile before full execution to reduce rework.<\/li>\n<\/ul>\n<h2>Refurbishment, repair, and deconstruction of ashlar walls<\/h2>\n<p>In existing structures, common damage patterns include weathering of joints, edge spalls, voids, settlements, or moisture ingress. Refurbishment and deconstruction require interventions that respect the structure and protect adjacent components. Where joints are repointed, compatible mortars, careful raking, and controlled moisture management are essential to avoid salt transport and delamination.<\/p>\n<h3>Gentle exposure and partial deconstruction<\/h3>\n<ul>\n<li>Selective removal of concrete backings or reinforcements with <strong>concrete pulverizers<\/strong> to minimize vibration.<\/li>\n<li>Releasing individual ashlars through core drill holes and targeted <em>hydraulic splitting<\/em> with <strong>stone and concrete splitters<\/strong> to preserve edges.<\/li>\n<li>For steel anchors: controlled separation of metal parts with suitable hydraulic shears, if required.<\/li>\n<li>Dust control and debris management: water mist and staged removal reduce emissions and protect adjacent finishes.<\/li>\n<\/ul>\n<h3>Openings and adjustments in existing structures<\/h3>\n<ol>\n<li>Survey and as-built analysis (bonding, jointing pattern, voids, anchors).<\/li>\n<li>Define separation lines along joints or natural planes of weakness.<\/li>\n<li>Preparation by drilling, then controlled splitting with <strong>stone splitting cylinders<\/strong> to reduce block size.<\/li>\n<li>Removal of concrete toppings or backings with <strong>concrete pulverizers<\/strong> and hydraulically powered cutting tools.<\/li>\n<li>Gentle lowering and safe intermediate storage of released ashlars for reuse.<\/li>\n<\/ol>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>Work on ashlar walls requires a careful hazard assessment. Dust, noise, falling objects, and vibration are central risks. Hydraulically operated splitting tools and shears\/pulverizers enable a controlled approach with low vibration and reduced emissions. Protective measures must be defined project-specifically and checked regularly; legal requirements must always be observed.<\/p>\n<ul>\n<li>Personal and collective protection: PPE, exclusion zones, and secured lifting paths for heavy units.<\/li>\n<li>Emission controls: dust suppression, tool selection based on the applicable noise limits, and operation of hydraulic power packs matched to the required pressure and flow.<\/li>\n<li>Monitoring: vibration, noise, and particulate tracking where sensitive neighbors or assets are present.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>For durability and appearance, quality assurance and complete documentation are important.<\/p>\n<ul>\n<li>Material certificates: strength, resistance to frost and de-icing salts, water absorption.<\/li>\n<li>Joint quality: uniform widths, sufficient compaction\/grouting when mortared.<\/li>\n<li>Flatness and positional accuracy of the courses; flush or defined setbacks.<\/li>\n<li>Post-treatment and protection of exposed faces until acceptance.<\/li>\n<li>Documentation of interventions, especially during deconstruction or refurbishment, for traceability.<\/li>\n<li>Trial panels and retention samples: verify appearance and workmanship against acceptance criteria.<\/li>\n<\/ul>\n<h2>Sustainability and circularity<\/h2>\n<p>Ashlar walls offer good conditions for reuse and source-separated dismantling. Recovered ashlars can be used again in the same building or elsewhere. <em>Hydraulic splitting<\/em> reduces the need for explosives, vibration, and dust and helps obtain material in reusable formats. For concrete ashlar walls, selective separation with <strong>concrete pulverizers<\/strong> facilitates separation into aggregates and steel. Life-cycle considerations benefit from durable detailing, reparability, and documentation that enables future reuse.<\/p>\n<h2>Design and visual quality<\/h2>\n<p>Beyond its load-bearing function, the ashlar wall as exposed masonry shapes the space. Dimensionally accurate rows, finely balanced joint patterns, and carefully finished surfaces convey value. For additions to existing work, stone type, color, texture, and finish should be matched. Precise, low-vibration processing in situ- such as splitting instead of hammering-preserves edges and exposed faces. Alignment of joints with openings, reveals, and adjacent materials reinforces visual coherence and reduces cut stones.<\/p>\n<h2>Practical guide: tool selection for work on the ashlar wall<\/h2>\n<p>The choice of technique depends on material, member thickness, surroundings, and objective (adjustment, opening, deconstruction):<\/p>\n<ul>\n<li>Extracting and dimensioned release of large blocks: <strong>stone and concrete splitters<\/strong> or <strong>stone splitting cylinders<\/strong> with suitable <strong>hydraulic power packs<\/strong>.<\/li>\n<li>Selective removal of concrete toppings, backings, or reinforcements: <strong>concrete pulverizers<\/strong> with metered force.<\/li>\n<li>Fine cutting and control at steel inserts: hydraulic cutting and shearing tools suited to cross-section and access.<\/li>\n<li>Confined or sensitive environments: low-vibration, low-emission hydraulic tools limit transmission to neighboring structures.<\/li>\n<\/ul>\n<h2>Terminology and common misinterpretations<\/h2>\n<p>In everyday language, masonry made of rectangular stones is sometimes generally referred to as ashlar walls. Technically, however, it is essential that the stones are dimensionally accurate and square and that they form a regular joint pattern. Rubble masonry, cyclopean masonry, or loosely laid natural-stone walls differ significantly in tolerances, load transfer, and building-physics behavior. For planning, execution, refurbishment, and deconstruction this differentiation is essential-it affects tool selection, construction sequence, and verifications. Brick veneers or irregular blockwork must not be conflated with ashlar masonry from a structural or detailing perspective.<\/p>\n<h2>Historical development and current practice<\/h2>\n<p>The ashlar wall has a long tradition in civil and monumental construction. Today, projects combine historical appeal with modern techniques: dimension stone is precisely extracted, jointing is controlled, and interventions in existing structures use <em>low-vibration<\/em> methods. In complex projects-from tunnel portals and bridge abutments to urban retaining walls-hydraulic splitting and shearing\/pulverizing tools enable workflows that preserve the fabric and protect the surroundings. The result is precise, repairable masonry that balances structural performance, durability, and visual quality.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The ashlar wall is among the most precise forms of masonry made from natural stone or concrete blocks. It is characterized by rectangular, dimensionally accurate stones with flat bed and head faces that enable a regular, calm appearance and high load-bearing capacity. Ashlar walls are found in building and civil <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19573","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ashlar Wall Masonry - Definition, Structure &amp; Uses<\/title>\n<meta name=\"description\" content=\"Discover ashlar wall masonry \u2713 precise dimension stone, tight joints &amp; low vibration methods for durable builds.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ashlar Wall Masonry - Definition, Structure &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Discover ashlar wall masonry \u2713 precise dimension stone, tight joints &amp; low vibration methods for durable builds.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:19+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ashlar-wall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ashlar-wall\",\"name\":\"Ashlar Wall Masonry - Definition, Structure & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-25T08:41:59+00:00\",\"dateModified\":\"2026-09-12T17:53:19+00:00\",\"description\":\"Discover ashlar wall masonry \u2713 precise dimension stone, tight joints & low vibration methods for durable builds.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ashlar-wall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ashlar-wall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ashlar-wall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ashlar wall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ashlar Wall Masonry - Definition, Structure & Uses","description":"Discover ashlar wall masonry \u2713 precise dimension stone, tight joints & low vibration methods for durable builds.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall","og_locale":"en_US","og_type":"article","og_title":"Ashlar Wall Masonry - Definition, Structure & Uses","og_description":"Discover ashlar wall masonry \u2713 precise dimension stone, tight joints & low vibration methods for durable builds.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:19+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall","url":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall","name":"Ashlar Wall Masonry - Definition, Structure & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-25T08:41:59+00:00","dateModified":"2026-09-12T17:53:19+00:00","description":"Discover ashlar wall masonry \u2713 precise dimension stone, tight joints & low vibration methods for durable builds.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/ashlar-wall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Ashlar wall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19573"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19573\/revisions"}],"predecessor-version":[{"id":29122,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19573\/revisions\/29122"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}