{"id":19566,"date":"2025-11-25T08:19:17","date_gmt":"2025-11-25T07:19:17","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19566"},"modified":"2026-05-06T17:27:02","modified_gmt":"2026-05-06T15:27:02","slug":"construction-project-management","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management","title":{"rendered":"Construction project management"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Construction project management connects strategy, engineering, and practice. It ensures that deconstruction, demolition, and new-build projects are delivered on schedule, with cost transparency and quality compliance &#8211; from feasibility assessment through to acceptance. In areas such as <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\"><strong>concrete demolition<\/strong> and deconstruction<\/a> and special demolition, building gutting and <strong>concrete cutting<\/strong>, rock excavation and tunnel construction, or natural stone extraction, project management becomes particularly important because methods, equipment, and boundary conditions are tightly interlinked. Wherever <em>concrete demolition shear<\/em> or <em>hydraulic wedge splitter<\/em> are used, this equally affects the process, construction logistics, environmental requirements (construction), and occupational safety. Methodical planning enables selective demolition, minimizes interfaces, and keeps permits, neighbors, and stakeholders aligned.<\/p>\n<h2>Definition: What is meant by construction project management?<\/h2>\n<p>Construction project management refers to the overarching organization, coordination, and control of all project-related tasks outside direct site execution. It includes the targeted control of schedules, costs, quality, contracts, risks, resources, and communication. Project management forms the interface between clients, designers, contractors, authorities, and other stakeholders and ensures compliance with specifications, standards, and permits. Decision papers are prepared, alternatives are compared, and the project course is safeguarded by KPIs, reports, and audit processes. In practice, this is supported by a <strong>work breakdown structure<\/strong>, <strong>critical path<\/strong> and lookahead planning, binding <em>method statements<\/em> and RAMS, as well as baseline and change control for transparent governance.<\/p>\n<h2>Tasks and responsibilities in construction project management<\/h2>\n<p>Project management brings together technical, economic, and organizational tasks. It steers goal achievement and creates transparency. In the construction and deconstruction context, this particularly includes:<\/p>\n<ul>\n<li><strong>Schedule control:<\/strong> Structure and process planning, buffer and takt planning, progress checks, adjustments to subsoil conditions and existing-structure risks.<\/li>\n<li><strong>Cost control:<\/strong> Budgeting, cost tracking, forecasting, evaluation of changes and change orders.<\/li>\n<li><strong>Quality assurance:<\/strong> Requirements management, inspection and approval processes, documentation, acceptances.<\/li>\n<li><strong>Risk management:<\/strong> Systematic identification of technical, permitting, and safety-relevant risks as well as action planning.<\/li>\n<li><strong>Contract and interface management:<\/strong> Clarification of responsibilities, scope boundaries, steering of collaboration.<\/li>\n<li><strong>Resource and equipment management:<\/strong> Capacity planning, selection of suitable methods and equipment &#8211; such as <em>concrete demolition shear<\/em> or <em>hydraulic wedge splitter<\/em> &#8211; and their logistical integration.<\/li>\n<li><strong>Stakeholder and permit management:<\/strong> Coordination with authorities, utilities, and neighbors, securing work windows and access approvals.<\/li>\n<li><strong>Information management:<\/strong> Version-safe plans, site instructions, and reporting with clear responsibilities and archive rules.<\/li>\n<\/ul>\n<h2>Phases and milestones in the construction and deconstruction context<\/h2>\n<p>Structuring in phases facilitates planning and control. Names vary by project size and legal framework, but the logic remains similar. Gate reviews and go-no-go decisions ensure readiness before each phase transition:<\/p>\n<ol>\n<li><strong>Initiation and feasibility:<\/strong> Goal definition, variant studies (e.g., demolition via <em>concrete demolition shear<\/em> vs. hydraulic splitting), initial cost and schedule frames, permitting path.<\/li>\n<li><strong>Planning and preparation:<\/strong> As-built investigations, method selection, process and safety concept, <strong>method statement and RAMS<\/strong>, tender documents, disposal concepts.<\/li>\n<li><strong>Award and contracting:<\/strong> Evaluation, risk allocation, schedules and quality requirements, interface rules.<\/li>\n<li><strong>Execution and control:<\/strong> Trade takt, coordination of the equipment fleet (e.g., <em>hydraulic power pack<\/em>, combination shears, <em>steel shear<\/em>, <em>hydraulic shear<\/em>), quality inspections, reporting, lookahead and constraint management.<\/li>\n<li><strong>Close-out and handover:<\/strong> Punch list, documentation, proof (e.g., disposal and <strong>recycling rate<\/strong>), lessons learned, update of as-built records.<\/li>\n<\/ol>\n<h2>Method selection: plan equipment deployment systematically<\/h2>\n<p>The choice of demolition or extraction method affects schedule, cost, safety, and the environment. A structured comparison considers material, accessibility, load behavior, emission limits, and disposal routes. Where relevant, whole-life impacts, energy demand, and circularity targets are assessed in addition:<\/p>\n<ul>\n<li><strong>Low vibration and precise:<\/strong> <em>hydraulic wedge splitter<\/em> and splitting cylinders are suitable in vibration-sensitive environments, such as near existing buildings or in tunnels.<\/li>\n<li><strong>Targeted component separation:<\/strong> <em>concrete demolition shear<\/em> supports controlled deconstruction of reinforced concrete with good selectivity; <strong>reinforcement<\/strong> can be fed separately.<\/li>\n<li><strong>Metal cutting:<\/strong> <em>steel shear<\/em> and <em>hydraulic shear<\/em> for sections, reinforcement, and steel structures; <em>cutting torch<\/em> for thick-walled vessels in special operations.<\/li>\n<li><strong>Power supply:<\/strong> <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em> provide the required <strong>drive power<\/strong>; their provision and positioning are part of construction logistics.<\/li>\n<\/ul>\n<h3>Decision criteria for the equipment mix<\/h3>\n<ul>\n<li>Component thicknesses, degree of reinforcement, material mix (concrete, natural stone, steel).<\/li>\n<li>Accessibility, load-bearing capacity of slabs\/substrates, use of lifting equipment.<\/li>\n<li>Emission constraints: noise, low vibration levels, dust, media leakage.<\/li>\n<li>Selectivity to support the circular economy (clean material separation).<\/li>\n<li>Schedule pressure and takt: serializable steps, set-up times, changeover cycles.<\/li>\n<li>Permits and working-hour windows, neighborhood protection requirements.<\/li>\n<\/ul>\n<h2>Process and schedule control in concrete demolition<\/h2>\n<p>A robust process plan breaks deconstruction into manageable work packages and sequences them in line with structural analysis, safety, and logistics. In urban settings, low-noise, low-vibration sequencing is often required. Here, hydraulic splitting and <em>concrete demolition shear<\/em> can relieve the critical path. Work breakdown structures, CPM networks, and two-to-six-week lookahead plans stabilize throughput and make constraints visible early.<\/p>\n<h3>Practical building blocks<\/h3>\n<ul>\n<li><strong>Takt planning:<\/strong> Repeatable steps (drilling, splitting, downsizing, clearing) with clear times and handovers.<\/li>\n<li><strong>Buffers:<\/strong> Weather effects and as-built surprises (e.g., unexpected reinforcement layout) are factored in.<\/li>\n<li><strong>Material flow:<\/strong> Organized routes for haulage logistics, interim <strong>material storage<\/strong>, and disposal without crossings with equipment traffic.<\/li>\n<li><strong>Lookahead and constraints:<\/strong> Rolling two-to-six-week lookahead with constraint log and daily coordination.<\/li>\n<li><strong>Permit windows:<\/strong> Integration of quiet hours, delivery slots, and road closures in the schedule.<\/li>\n<\/ul>\n<h2>Quality, safety, and environment in focus<\/h2>\n<p>Quality assurance, occupational safety, and environmental protection are integral objectives. Project management defines checkpoints, coordinates measurements, and anchors protection measures in the process. Acceptance criteria and hold points are documented to secure traceability and compliance.<\/p>\n<h3>Protective and precautionary measures<\/h3>\n<ul>\n<li>Structural approvals, temporary support concepts, restricted areas, signaling.<\/li>\n<li>Dust suppression and noise reduction measures, media management (water, oils), proper disposal.<\/li>\n<li>Risk assessments and briefings; emergency and construction site escape routes.<\/li>\n<li>Equipment-related checks: <strong>hydraulic hose line<\/strong>, <strong>coupling piece<\/strong>, <strong>operating pressure<\/strong> levels, functional tests of the shears and splitting cylinders (<em>concrete demolition shear<\/em>, <em>hydraulic wedge splitter<\/em>).<\/li>\n<li>Monitoring where required: vibration, dust, and noise with thresholds and documented readings.<\/li>\n<li>Permit-to-work routines for hot work and confined spaces where applicable.<\/li>\n<\/ul>\n<p>Hydraulically powered methods such as splitting concrete or rock reduce vibrations and can thus meet requirements in sensitive zones more effectively. <strong>concrete demolition shear<\/strong> enable selective separation cuts, improving construction waste sorting and thereby promoting recycling. Electrically driven power units can reduce local emissions and support ESG and neighborhood goals where grid access allows.<\/p>\n<h2>Resource and equipment logistics<\/h2>\n<p>Equipment deployment plans describe capacities, set-up times, transport routes, and energy demand. The following points are essential for high-performance processes. A simple utilization matrix and shift model help avoid bottlenecks and idle times:<\/p>\n<ul>\n<li>Sizing the <em>hydraulic power pack<\/em> to match the shear size, splitting cylinders, and shears (<em>concrete demolition shear<\/em>, <em>hydraulic wedge splitter<\/em>, <em>steel shear<\/em>).<\/li>\n<li>Reach, attachment changeover, gripping and cutting sequences (e.g., rough downsizing with <em>concrete demolition shear<\/em>, trimming with <em>steel shear<\/em>).<\/li>\n<li>Access and set-up areas for mobile power units, crane or carrier equipment.<\/li>\n<li>Backup equipment and wear parts anchored in the takt plan to avoid downtime; ensure <strong>spare parts supply<\/strong>.<\/li>\n<li>Energy and media management: fueling or charging, spill prevention, and hose routing to avoid trip hazards.<\/li>\n<\/ul>\n<h2>Digital control: quantities, models, 4D\/5D<\/h2>\n<p>Digital models, quantity takeoff, and schedule linkages increase forecast quality and transparency. 4D and 5D approaches connect components with time and cost data so that changes propagate immediately. For demolition and deconstruction, model-based as-built data (e.g., component thicknesses, reinforcement information) are particularly valuable to realistically pace the output of <em>concrete demolition shear<\/em> or splitting cylinders (<em>hydraulic wedge splitter<\/em>). Reality capture via laser scanning or photogrammetry and basic telemetry for equipment runtime can further tighten feedback loops.<\/p>\n<h3>Transparency through KPIs<\/h3>\n<ul>\n<li>Progress per takt (m\u00c2\u00b3\/h, t\/shift), equipment utilization, reasons for disruptions.<\/li>\n<li>Quality indicators (conformity of separation cuts, construction waste sorting purity).<\/li>\n<li>Occupational safety indicators (near misses, inspection rates).<\/li>\n<li>Resource indicators (energy consumption per shift, recycling yield, emissions proxies).<\/li>\n<\/ul>\n<h2>Cost and risk control<\/h2>\n<p>Cost drivers in deconstruction often include component complexity, constraints (accessibility, emissions), disposal routes, and equipment availability. Project management establishes countermeasures:<\/p>\n<ul>\n<li><strong>Scenario comparison:<\/strong> Splitting vs. cutting; rough downsizing on site vs. transport in one piece.<\/li>\n<li><strong>Early exposure:<\/strong> Test drilling and test cut areas to verify reinforcement and material bonds.<\/li>\n<li><strong>Contract options:<\/strong> Clearly regulated changes and change orders, defined quantity frameworks, price adjustment logic.<\/li>\n<li><strong>Risk reserves:<\/strong> Time and budget buffers, escalation paths, backup equipment.<\/li>\n<li><strong>Supplier involvement:<\/strong> Early engagement of disposal and logistics partners to secure capacities and fixed time windows.<\/li>\n<\/ul>\n<h2>Legal and normative framework<\/h2>\n<p>Regulations, standards, and industry-typical contract frameworks set the context. These include, among others, technical standards, requirements for occupational and environmental protection, and disposal law. Project management ensures compliant tenders, evidence, and documentation. Legal assessments remain case-independent; within the project, clear responsibilities, inspection routines, and reporting paths are defined. Where applicable, permits for noise, vibration, road use, and waste transport are scheduled with sufficient lead time.<\/p>\n<h2>Sustainability and circular economy<\/h2>\n<p>Selective deconstruction increases the reuse rate. Methods using <strong>concrete demolition shear<\/strong> or <strong>hydraulic wedge splitter<\/strong> support clean separation of concrete aggregates and reinforcement, reduce fines, and ease sorting. Project management integrates recycling targets, deconstruction instructions, and material flow management into process and cost planning. Pre-demolition audits, material passports, and documented segregation plans enhance transparency and enable higher-value reuse.<\/p>\n<h2>Special operations and boundary conditions<\/h2>\n<p>In tunnels, with massive foundations, in plant areas, or on vessels, tailored processes are required. <em>cutting torch<\/em> and <em>steel shear<\/em> take on specific separation tasks, while splitting cylinders (<em>hydraulic wedge splitter<\/em>) loosen massive cross-sections with low vibration. Where space is tight, equipment changeover is minimized, takts are condensed, and the positioning of the <em>hydraulic power pack<\/em> is optimized for safety and accessibility. Additional constraints such as confined spaces, potentially explosive atmospheres, or water-protection zones necessitate adapted RAMS and monitoring.<\/p>\n<h2>Typical failure patterns and how to avoid them<\/h2>\n<ul>\n<li>Underestimated set-up and changeover times in the equipment mix &#8211; countermeasure: takt and set-up time measurement in a pilot area.<\/li>\n<li>Unclear interfaces between demolition crew, disposal, and transport &#8211; countermeasure: binding handover points in the process plan.<\/li>\n<li>Lack of exposure before cutting\/splitting &#8211; countermeasure: define test drilling and pre-cutting.<\/li>\n<li>Safety and environmental requirements involved too late &#8211; countermeasure: inspection and measurement checkpoints embedded in the schedule.<\/li>\n<li>Insufficient data integration between model, site logs, and reporting &#8211; countermeasure: single source of truth and daily data sync.<\/li>\n<\/ul>\n<h2>Practical guide for project management in deconstruction<\/h2>\n<ol>\n<li>Define objectives, boundary conditions, and permitting path; clarify emission and safety requirements.<\/li>\n<li>Survey the as-built, verify material and structural data; set up test areas.<\/li>\n<li>Compare method and equipment mix (e.g., <em>concrete demolition shear<\/em>, splitting cylinders <em>hydraulic wedge splitter<\/em>, <em>steel shear<\/em>, <em>hydraulic shear<\/em>); plan the power supply via <em>hydraulic power pack<\/em>.<\/li>\n<li>Plan takt and material flow, define buffers, integrate quality assurance and evidence.<\/li>\n<li>Tender services, define interfaces, map changes and change orders cleanly in the contract.<\/li>\n<li>Control execution: measure progress, analyze disruptions, stabilize takts, perform safety inspection.<\/li>\n<li>Close-out phase: documentation, disposal evidence, acceptances, secure lessons learned.<\/li>\n<li>Post-project review: validate KPIs, update standard method statements, and archive data for reuse.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction project management connects strategy, engineering, and practice. It ensures that deconstruction, demolition, and new-build projects are delivered on schedule, with cost transparency and quality compliance &#8211; from feasibility assessment through to acceptance. In areas such as concrete demolition and deconstruction and special demolition, building gutting and concrete cutting, rock <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19566","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Project Management for Demolition<\/title>\n<meta name=\"description\" content=\"Expert guide for construction project management in demolition, deconstruction &amp; new-builds \u2713 on time, budget &amp; quality.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Project Management for Demolition\" \/>\n<meta property=\"og:description\" content=\"Expert guide for construction project management in demolition, deconstruction &amp; new-builds \u2713 on time, budget &amp; quality.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-06T15:27:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-project-management\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-project-management\",\"name\":\"Construction Project Management for Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-25T07:19:17+00:00\",\"dateModified\":\"2026-05-06T15:27:02+00:00\",\"description\":\"Expert guide for construction project management in demolition, deconstruction & new-builds \u2713 on time, budget & quality.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-project-management#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-project-management\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-project-management#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction project management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Project Management for Demolition","description":"Expert guide for construction project management in demolition, deconstruction & new-builds \u2713 on time, budget & quality.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management","og_locale":"en_US","og_type":"article","og_title":"Construction Project Management for Demolition","og_description":"Expert guide for construction project management in demolition, deconstruction & new-builds \u2713 on time, budget & quality.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-06T15:27:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management","url":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management","name":"Construction Project Management for Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-25T07:19:17+00:00","dateModified":"2026-05-06T15:27:02+00:00","description":"Expert guide for construction project management in demolition, deconstruction & new-builds \u2713 on time, budget & quality.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/construction-project-management"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-project-management#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Construction project management"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19566"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19566\/revisions"}],"predecessor-version":[{"id":26964,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19566\/revisions\/26964"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}