{"id":19546,"date":"2025-11-21T10:32:03","date_gmt":"2025-11-21T09:32:03","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19546"},"modified":"2026-05-05T13:48:03","modified_gmt":"2026-05-05T11:48:03","slug":"site-foreman","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman","title":{"rendered":"Site foreman"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The site foreman is the central leadership role on the construction site, bridging planning and execution. In demolition, deconstruction, and structural engineering, they steer workflows, coordinate teams, and ensure that attachments, carrier machines, and the power supply work together safely and efficiently. Especially with <em>low vibration levels<\/em> methods &#8211; such as using <strong>concrete demolition shears<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> &#8211; methodical planning determines schedule adherence, quality, and safety, while ensuring compliance with permits and environmental constraints.<\/p>\n<h2>Definition: What is meant by a site foreman?<\/h2>\n<p>A site foreman (also called construction site or works foreman) is a supervisory leader responsible for execution on the construction site. This includes organization, quality assurance, scheduling, occupational safety, and the coordination of personnel, carrier machines, and attachments. In deconstruction projects, the foreman plans the sequence of work steps, selects suitable methods, and aligns the use of hydraulic power packs, <em>concrete demolition shears<\/em>, <em>rock wedge splitters<\/em>, and other demolition tools with the structural conditions. They are the interface to site management, structural analysis, disposal contractors, and adjacent trades, ensuring the defined demolition method is implemented in day-to-day operations. Method statements, risk assessments, and approvals are prepared and maintained so that execution remains compliant and verifiable.<\/p>\n<h2>Tasks and responsibilities of the foreman in demolition and deconstruction<\/h2>\n<p>In deconstruction and refurbishment works, the foreman\u2019s tasks are particularly diverse because structures, materials, and boundary conditions vary widely. They lead the team, keep the construction process stable, and make method decisions based on existing documents, site inspections, and investigations. Temporary works, access constraints, and emission limits are evaluated in advance to avoid disruptions.<\/p>\n<ul>\n<li>Site setup and construction logistics: access routes, load-bearing capacity, construction power supply and site water supply, storage areas, traffic routes, drop and transfer points.<\/li>\n<li>Method selection: mechanical crushing with <strong>concrete demolition shears<\/strong>, <em>hydraulic splitters<\/em> for low vibration levels, cutting and separation procedures during building gutting.<\/li>\n<li>Equipment management: selection of compatible carrier machines, hydraulic performance, tool weights, reaches, and mounting points.<\/li>\n<li>Coordination of trades: building gutting, selective deconstruction, demolition, construction waste sorting, haulage logistics, recycling.<\/li>\n<li>Quality and schedule: <em>takt planning<\/em>, quantity takeoff, updates to the schedule, interface control.<\/li>\n<li>Occupational safety: briefings, exclusion and protection zones, monitoring of noise emissions and dust exposure, edge protection and fall protection.<\/li>\n<li>Environmental protection and disposal: dust suppression and noise reduction measures, sealing of media lines, source separation of concrete, reinforcing steel, wood, and plastics.<\/li>\n<li>Documentation: operational reports, machine hours, inspection and maintenance records, photo documentation, and approvals.<\/li>\n<li>Temporary works and shoring: sequencing of supports, verification of load paths, release of intermediate states.<\/li>\n<li>Contingency management: emergency procedures, equipment backup concepts, and escalation paths for unexpected findings.<\/li>\n<\/ul>\n<h2>Planning equipment use: concrete demolition shears, hydraulic splitters, and hydraulic power packs<\/h2>\n<p>The site foreman decides, based on material, reinforcement density, component geometry, accessibility, and emission requirements, which attachments best meet the requirements. Products from Darda GmbH typically cover the range from low-vibration splitting to precise crushing and cutting. Important factors include payloads, hydraulic parameters, tool jaw opening, cutting forces, and the safe operation of the high-pressure hydraulic system and power unit. Compatibility of couplings, case-drain requirements, and hose protection are verified before work starts.<\/p>\n<h3>Concrete demolition shears: precise, low-vibration crushing<\/h3>\n<p><strong>Concrete demolition shears<\/strong> are suitable for the controlled removal of reinforced concrete elements. They enable defined fracture lines, preserve adjacent components, and reduce secondary damage. Typical applications include ceiling demolition, wall openings, cantilevers, balconies, and secondary crushing of concrete to target size for haulage. Correct jaw selection and a staged crushing sequence improve fragment geometry, reduce noise, and protect reinforcement to allow clean separation.<\/p>\n<h3>Hydraulic splitters: low-noise, low-vibration separation<\/h3>\n<p><em>Hydraulic splitters<\/em> &#8211; including <em>rock wedge splitters<\/em> &#8211; separate rock or concrete via wedge-driven spreading forces. They are particularly suitable in areas with strict vibration or noise limits, in sensitive environments, or for massive cross-sections. The foreman plans the borehole drilling pattern, splitting sequence, and safety distance zones to produce controlled separation joints so elements can then be removed with shears or lifting devices. Drill diameter, spacing, and alignment are matched to the wedge type to prevent uncontrolled cracking.<\/p>\n<h3>Hydraulic power packs: organizing the energy supply efficiently<\/h3>\n<p>Hydraulic power packs provide the required flow rates and pressures for splitters and shears. In addition to performance and inrush current (for electric units), transport routes, hose routing, thermal management, and emission requirements must be considered. Selecting suitable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units for splitters<\/a> helps match flow and pressure to the tools. Where exhaust gases are undesirable, the foreman plans electric or low-emission solutions and positions units so that hydraulic hose lines are short, protected, and trip-safe.<\/p>\n<ul>\n<li>Label and color-code circuits to avoid misconnections and ensure correct pressure relief.<\/li>\n<li>Protect hoses against abrasion and kinking, and check whip restraints and guards.<\/li>\n<li>Ensure ventilation and cooling clearance to stabilize oil temperature under cyclic loads.<\/li>\n<\/ul>\n<h3>Supplementary attachments for deconstruction<\/h3>\n<p>Depending on the material mix, the foreman combines <em>combination shears<\/em> and <em>multi cutters<\/em> for concrete-steel connections, uses <em>steel shears<\/em> to separate heavy sections, or employs a <em>cutting torch<\/em> for sheet tanks and pipelines. The methodical sequence &#8211; release, separate, crush, and sort &#8211; reduces manual work and increases construction site safety. Sorting grapples support on-site separation and optimize downstream recycling.<\/p>\n<h2>Method selection by area of application<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>For load-bearing elements, step-by-step unloading and controlled separation are essential in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>. <strong>Concrete demolition shears<\/strong> for selective removal and <em>hydraulic splitters<\/em> for defined separation joints allow low vibration levels and high precision. The foreman plans dismantling states, shoring, and load transfer, and arranges vibration and crack monitoring where sensitive structures are adjacent.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In interior areas, low-emission methods are required. Compact hydraulic power packs supply shears or split cylinders inside buildings. For openings and breakthroughs, concrete demolition shears are often combined with cutting or sawing methods to achieve a clean edge with limited dust development. Negative-pressure enclosures, water suppression, and local extraction reduce airborne dust and protect building users.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Underground, on slopes, or near sensitive infrastructure, splitting rock with <em>rock wedge splitters<\/em> can be a low-vibration alternative. The resulting blocks are then processed mechanically, largely avoiding vibration and flyrock, with the option of secondary crushing. Lighting, ventilation, and gas monitoring are organized to maintain safe working conditions.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When loosening raw blocks, defined fracture surfaces are crucial. Splitting with a tuned drilling pattern and controlled wedge forces enables material-friendly extraction, which the foreman plans with regard to joint progression, safety distances, and load uptake. Marker holes and trial splits are used to verify joint behavior before full extraction.<\/p>\n<h3>Special deployment<\/h3>\n<p>In special situations &#8211; such as hospitals, laboratories, or heritage structures &#8211; the foreman prioritizes quiet, low-vibration, and low-dust methods. <strong>Concrete demolition shears<\/strong> and <em>hydraulic splitters<\/em> are often the tools of choice here, supplemented by precise cutting techniques and a protective enclosure. Work windows, monitoring, and contamination control are coordinated with stakeholders in advance.<\/p>\n<h2>Interface management and communication<\/h2>\n<p>The foreman coordinates structural analysis, H&amp;S coordination, surveying, operators, disposal, and transport. They translate the methodology into clear work instructions, define exclusion and hazard zones, and coordinate crane operations and lifting installation usage. Regular short briefings, visual <em>takt<\/em> plans, and unambiguous approvals for construction states reduce misunderstandings and downtime. Responsibilities and handover criteria are documented so that interfaces remain frictionless.<\/p>\n<h2>Occupational safety, emissions, and environmental protection<\/h2>\n<p>Safety has priority. This includes hazard analysis, briefings, personal protective equipment, and adherence to the applicable rules of the art. When operating a high-pressure hydraulic system, pay particular attention to pressure relief, leakage test, and protection against crushing hazards and shear points. Splitting operations require secured zones and clear hand signals. Dust is reduced at the source through wetting and a water spray system, while noise is mitigated by adapted methods and noise reduction measures. Hydraulic fluids must be contained; suitable absorbents and spill kits are available. Demolition separation of concrete and reinforcing steel at the source facilitates recycling and reduces transport volumes.<\/p>\n<ul>\n<li>Use borehole caps or covers during splitting to prevent debris ejection and maintain safety distances.<\/li>\n<li>Monitor noise and vibration with calibrated devices where limits apply, and document exceedances with corrective measures.<\/li>\n<li>Provide protected routing and guarding for power and hydraulic lines to avoid trip and crush hazards.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation in practice<\/h2>\n<p>The foreman documents construction progress, machine hours and maintenance, monitors wear parts (tooth segments, cutting edges, wedges), and verifies target dimensions for removal thicknesses and openings. Inspection and maintenance intervals for attachments, as well as functional tests of hydraulic power packs, are recorded traceably. Acceptance criteria for openings, surface quality, and fragment size are defined and checked against drawings and method statements.<\/p>\n<ul>\n<li>Before starting work: visual inspection, function check, operating pressure and flow requirements, tool mounting.<\/li>\n<li>During work: monitor temperature and leaks, check shear geometry and splitting success, maintain protection zones.<\/li>\n<li>Post-processing: touch up edges, check source-separation purity, photo documentation, feedback into the schedule.<\/li>\n<li>Handover and acceptance: verify tolerances, sign-off by responsible parties, archive records for traceability.<\/li>\n<\/ul>\n<h2>Typical challenges and solution approaches<\/h2>\n<p>Confined access, unknown reinforcement, sensitive adjacent buildings, and tight time windows are typical challenges. The foreman responds with test cuts, field trial or test areas, and a sequence of splitting and crushing. In noise-sensitive areas, <em>hydraulic splitters<\/em> and <strong>concrete demolition shears<\/strong> are used, supplemented by time-staggered workflows. With unknown reinforcement, successive exposure with the shear and follow-up cutting with suitable cutting tools helps. Emissions are minimized by choosing appropriate hydraulic power packs and short hydraulic hose lines. Utilities detection and structural sounding reduce the risk of unplanned hits and allow safe adjustments to the method.<\/p>\n<h2>Skills and further training for foremen in deconstruction<\/h2>\n<p>Required are construction-technical understanding, basic knowledge in structural analysis, hydraulics and equipment, safety expertise, and routine in workflow planning and communication. Practice-oriented training on attachments &#8211; from the rock wedge splitter and concrete demolition shear to shear and cutter solutions &#8211; supports sound decisions on the construction site. Additional modules on environmental law, waste management, and documentation standards strengthen compliance and execution quality.<\/p>\n<h2>Practical tools: decision tree for choosing the demolition method<\/h2>\n<p>A structured process simplifies methodology and reduces detours. The following decision tree serves as an orientation framework for planning.<\/p>\n<ol>\n<li>Record existing conditions: material type, reinforcement, cross-sections, access, protected assets in the surroundings.<\/li>\n<li>Clarify boundary conditions: allowable vibration levels, noise emissions, dust exposure, working hours, load transfer, intermediate states.<\/li>\n<li>Define the objective: opening dimensions, removal thickness, fragment size, separation and construction waste sorting requirements.<\/li>\n<li>Select the method: <strong>concrete demolition shears<\/strong> for controlled crushing, <em>hydraulic splitters<\/em> for separation joints; optionally supplementary shear or cutting technology.<\/li>\n<li>Check technical suitability: carrier machine, tool weight, jaw opening, splitting performance, drive power of the hydraulic power pack.<\/li>\n<li>Define safety measures: exclusion zones, shoring, load uptake, emissions reduction.<\/li>\n<li>Execute a field trial or test: verify parameters, fine-tune tool selection.<\/li>\n<li>Cycle the series process: synchronize crew, equipment, and construction logistics; maintain ongoing documentation.<\/li>\n<li>Post-check: quality, source-separation purity, dimensional accuracy; lessons learned for subsequent sections.<\/li>\n<\/ol>\n<p>Key performance indicators for continuous improvement include cycle times per opening or meter, rework rates, tool wear per shift, and recorded emissions. Transparent tracking supports schedule reliability and optimizes tool selection for comparable future sections.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The site foreman is the central leadership role on the construction site, bridging planning and execution. In demolition, deconstruction, and structural engineering, they steer workflows, coordinate teams, and ensure that attachments, carrier machines, and the power supply work together safely and efficiently. Especially with low vibration levels methods &#8211; such <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/site-foreman\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19546","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Site Foreman - Demolition &amp; Deconstruction Role<\/title>\n<meta name=\"description\" content=\"Guide to the construction site foreman \u2713 duties in demolition, low vibration methods, safety &amp; equipment planning.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/site-foreman\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Site Foreman - Demolition &amp; Deconstruction Role\" \/>\n<meta property=\"og:description\" content=\"Guide to the construction site foreman \u2713 duties in demolition, low vibration methods, safety &amp; equipment planning.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/site-foreman\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-05T11:48:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/site-foreman\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/site-foreman\",\"name\":\"Site Foreman - Demolition & Deconstruction Role\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-21T09:32:03+00:00\",\"dateModified\":\"2026-05-05T11:48:03+00:00\",\"description\":\"Guide to the construction site foreman \u2713 duties in demolition, low vibration methods, safety & equipment planning.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/site-foreman#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/site-foreman\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/site-foreman#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Site foreman\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Site Foreman - Demolition & Deconstruction Role","description":"Guide to the construction site foreman \u2713 duties in demolition, low vibration methods, safety & equipment planning.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman","og_locale":"en_US","og_type":"article","og_title":"Site Foreman - Demolition & Deconstruction Role","og_description":"Guide to the construction site foreman \u2713 duties in demolition, low vibration methods, safety & equipment planning.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-05T11:48:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman","url":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman","name":"Site Foreman - Demolition & Deconstruction Role","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-21T09:32:03+00:00","dateModified":"2026-05-05T11:48:03+00:00","description":"Guide to the construction site foreman \u2713 duties in demolition, low vibration methods, safety & equipment planning.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/site-foreman"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/site-foreman#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Site foreman"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19546"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19546\/revisions"}],"predecessor-version":[{"id":26912,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19546\/revisions\/26912"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}