{"id":19543,"date":"2025-11-21T12:49:46","date_gmt":"2025-11-21T11:49:46","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19543"},"modified":"2026-05-05T18:00:03","modified_gmt":"2026-05-05T16:00:03","slug":"plate-compaction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction","title":{"rendered":"Plate compaction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Plate compaction is a central work method in earthworks, road and pathway construction, as well as in build-up and refurbishment around concrete surfaces. It ensures that unbound layers such as crushed stone, gravel, or recycled construction material achieve sufficient density and load-bearing capacity, layer by layer. In projects involving concrete demolition, strip-out, or special deconstruction, the removal process often creates a new formation level or a base layer that must be reliably compacted before rebuilding. Especially in sensitive existing environments, good coordination of demolition methods and plate compaction is important to limit vibrations and sustainably avoid settlement. Tools such as <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> from Darda GmbH enable low-vibration steps in deconstruction, making subsequent compaction easier to plan technically. Well-executed plate compaction supports compliance with serviceability limits, extends service life, and stabilizes interfaces between existing structures and new layers.<\/p>\n<h2>Definition: What is meant by plate compaction?<\/h2>\n<p>Plate compaction refers to the compaction of unbound, mineral construction materials (e.g., gravel, crushed stone, recycled construction material) using a hand-guided vibratory plate. The aim is to reduce voids, improve interlock, and thereby increase <em>load-bearing capacity<\/em>, <em>settlement resistance<\/em>, and <em>frost resistance<\/em>. The compaction effect results from the combination of the plate\u2019s static load and dynamic excitation (frequency, amplitude, centrifugal force). Plate compaction is an essential process step before installing concrete components, pavements, floor slabs, or foundation elements &#8211; often immediately after demolition and separation tasks such as removing concrete elements with concrete demolition shears, breaking up foundations, or splitting larger rock pieces using hydraulic splitters. In practice, short test sections help calibrate lift thickness, moisture, and pass count to achieve reproducible results.<\/p>\n<h2>Basics of plate compaction: operating principle, equipment, and material behavior<\/h2>\n<p>Vibratory plates transmit cyclic forces into the ground and set the aggregate into slight motion, enabling particles to rearrange more densely. The achievable depth of compaction depends largely on the <em>centrifugal force<\/em>, <em>plate size<\/em>, <em>frequency<\/em>, and the <em>material composition<\/em>. Coarse, well-graded mixes compact efficiently; a sufficient fines fraction enables interlock, whereas too many fines or overly wet material reduces compactability. The optimal moisture is usually close to the Proctor optimum; if the material is too dry, lubrication between grains is lacking, and if it is too wet, pore water acts like a pump and prevents an increase in density. The standard practice is to install in layers whose thickness matches the available compaction energy (e.g., roughly 10 to 30 cm per lift, depending on machine and material). Reversible plates make work in confined areas easier and allow uniform overlap of passes. At edges, adjacent vertical elements, and in recesses, an increased number of passes is required because lateral confinement is missing. In deconstruction or tunnel excavation projects, pretreatment of the material &#8211; such as controlled size reduction of concrete elements or rock boulders using concrete demolition shears or hydraulic splitters &#8211; can improve gradation and thus ensure the compactability of later placement materials.<\/p>\n<h3>Machine selection and key parameters<\/h3>\n<ul>\n<li><strong>Compaction energy<\/strong>: suitable combination of frequency, amplitude, and centrifugal force matched to lift thickness and material.<\/li>\n<li><strong>Baseplate geometry<\/strong>: size and shape influence depth effect, edge reach, and overlap strategy.<\/li>\n<li><strong>Material response<\/strong>: grading curve, particle shape, and fines content govern achievable density and required moisture window.<\/li>\n<li><strong>Site factors<\/strong>: lateral confinement, proximity to structures, drainage, and temperature affect pass count and sequencing.<\/li>\n<\/ul>\n<h2>Fields of application and interfaces to deconstruction<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>After removing foundations, slabs, or floor plates with concrete demolition shears, uneven subgrades are common. Before new construction, a bearing formation level must be created, layers built up, and compacted. Plate compaction provides an even, low-settlement subbase for new concrete components or for temporary assembly areas. In contexts of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, controlled deconstruction with hydraulic tools from Darda GmbH supports the quality of subsequent compaction work. Clean separation lines and consistent piece sizes reduce reworking at edge zones and promote uniform pass patterns.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>During interior deconstruction, work often proceeds in stages: selective removal of screeds and sub-bases, cutting and lifting concrete elements, followed by compaction of leveling layers. Compact vibratory plates are used in tight building areas. Preliminary work with concrete demolition shears or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong> from Darda GmbH enables precise edges and reduces rework prior to compaction along edge zones. This sequencing shortens interfaces and helps keep vibration and dust at controlled levels.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In tunnel and gallery construction, compaction of base zones and backfills is crucial for stability. Given the constrained surroundings, low-vibration methods are in demand. Hydraulic splitters help process oversized rock into suitable size classes so that plate compaction can act effectively within placement lifts. Where access is limited, reversible plates and clearly defined pass paths support consistent coverage.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When loosening and processing natural stone, by-products arise for site roads or work platforms. Coordinated gradation processing, followed by plate compaction, creates load-bearing, non-slip surfaces for machine movements. Controlled splitting of large blocks facilitates production of compaction-ready mixes. The outcome is safer logistics and lower maintenance on temporary surfaces.<\/p>\n<h3>Special applications<\/h3>\n<p>In plant areas or when working on tanks and pipelines, emissions, sparks, and vibrations must be minimized. Tools such as <strong>steel shears<\/strong> or <strong>tank cutters<\/strong> from Darda GmbH help to cut pipelines or vessels in a controlled manner. Subsequently, lift-by-lift compaction of fills in excavations and trenches with a vibratory plate can be carried out without excessively loading adjacent components. Proper isolation of sensitive elements and a restrained energy setting reduce risks to operations.<\/p>\n<h2>Planning and execution: layer structure, moisture, and pass pattern<\/h2>\n<p>Proper plate compaction begins with assessing the subgrade and placement materials. Decisive factors are the combination of correct layer thickness, suitable compaction energy, and a moisture content near the optimal range. The goal is uniform density over the entire layer thickness, especially at edges and penetrations. Sequencing work to avoid overexposure to rain, coordinating delivery of materials with suitable moisture, and establishing consistent pass patterns improve outcomes measurably.<\/p>\n<h3>Recommendations for execution<\/h3>\n<ul>\n<li>Assess the subgrade and, if necessary, remove loose zones or pre-compact.<\/li>\n<li>Material selection: well-graded mixes with a sufficient but limited fines fraction promote density formation.<\/li>\n<li>Adjust moisture: lightly wet material that is too dry; allow overly wet material to dry or replace it.<\/li>\n<li>Match layer thickness to the machine class; with lower compaction energy, install thinner lifts.<\/li>\n<li>Plan pass patterns with sufficient overlap; perform additional passes at edges.<\/li>\n<li>Use reversible plates in confined conditions and treat edge zones separately.<\/li>\n<li>After passes along adjacent vertical elements, verify that the required depth of compaction has been achieved.<\/li>\n<\/ul>\n<h3>Common specification targets<\/h3>\n<ul>\n<li><strong>Homogeneous density<\/strong> across the entire lift without soft spots or pumping under footfall.<\/li>\n<li><strong>Even surface<\/strong> ready for subsequent layers, with tolerances agreed in project specifications.<\/li>\n<li><strong>Moisture within target range<\/strong> near the Proctor optimum for the respective mix.<\/li>\n<li><strong>Documented pass count<\/strong> and machine settings correlated with achieved bearing capacity or density checks.<\/li>\n<\/ul>\n<h2>Verification of compaction and documentation<\/h2>\n<p>Quality assurance relies on recognized test methods and simple self-checks. Depending on project requirements, proof may be based on bearing capacity or density. Early spot checks on trial areas reduce rework and allow fine-tuning of lift thickness and pass count.<\/p>\n<h3>Typical test and control methods<\/h3>\n<ul>\n<li>Plate load tests (static or dynamic) to assess deformation behavior and load-bearing capacity of unbound layers.<\/li>\n<li>Density tests and reference values for degree of compaction, based on laboratory or field values.<\/li>\n<li>Spot checks of the moisture content and gradation of the installed material.<\/li>\n<li>Visual and functional checks: uniform settlement behavior, no rutting after trial loading.<\/li>\n<\/ul>\n<h3>Acceptance and documentation checklist<\/h3>\n<ul>\n<li>Recorded machine data: model, approximate centrifugal force, baseplate size, and frequency setting.<\/li>\n<li>Lift thickness, pass count, and overlap strategy per area or lot.<\/li>\n<li>Moisture control records and any reworking measures taken.<\/li>\n<li>Test results with locations and timestamps, including retests if limits were not met initially.<\/li>\n<\/ul>\n<h2>Vibrations, noise, and structural protection<\/h2>\n<p>Plate compaction generates vibrations and noise. In sensitive areas &#8211; e.g., in existing buildings, near pipelines, or close to delicate equipment &#8211; time windows, noise levels, and vibrations must be considered. A coordinated construction sequence helps: low-vibration deconstruction methods, such as controlled cutting with concrete demolition shears or splitting with hydraulic splitters from Darda GmbH, reduce risks to surrounding structures. During compaction: reduce energy at component edges, prefer additional passes over aggressive single runs, and use alternative equipment (e.g., <em>rammers<\/em>) in niches if necessary. Notes on limits and protective measures are project-specific and should be considered proactively in construction sequencing.<\/p>\n<ul>\n<li><strong>Mitigation<\/strong>: adjust frequency and amplitude, employ protective mats near sensitive elements, and increase distance where feasible.<\/li>\n<li><strong>Monitoring<\/strong>: implement vibration and noise monitoring in settlement-critical zones to validate sequencing and pass counts.<\/li>\n<li><strong>Interface control<\/strong>: protect edges of slabs, curbs, and duct covers with staged passes and reduced energy.<\/li>\n<\/ul>\n<h2>Special situations: trenches, interior areas, and edge zones<\/h2>\n<h3>Trench and utility zones<\/h3>\n<p>Utility trenches require finer-grained materials and controlled compaction in thin lifts. In the immediate vicinity of pipes, compaction energy must be dosed; edge areas should be treated with additional passes. The haunch and side support zones demand particular care to prevent pipe deformation and maintain line and level.<\/p>\n<h3>Interior areas and existing buildings<\/h3>\n<p>After strip-out and cutting work, small, maneuverable plates are often required. On intermediate floors or existing surfaces, load and vibration tolerance must be verified. The preceding precise separation of concrete elements with concrete demolition shears facilitates creating clean, bearing contact surfaces for compaction. Where necessary, temporary load-spreading layers help limit point loads and vibration transmission.<\/p>\n<h3>Preparation of placement materials<\/h3>\n<p>Oversize or incompatible constituents hinder compaction. Targeted size reduction of concrete or rock pieces using hydraulic splitters or concrete demolition shears produces suitable gradation and improves compactability &#8211; especially for temporary site roads, work areas, or backfills. Removing deleterious materials and controlling fines content reduces the risk of later softening or frost damage.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Layer lifts that are too thick: install thinner and make more passes rather than compact unevenly.<\/li>\n<li>Incorrect moisture content: too dry or too wet results in insufficient degree of compaction.<\/li>\n<li>Unsuitable gradation: lacking fines prevent interlock; too many fines create \u201clubrication.\u201d<\/li>\n<li>Neglected edge compaction: treat edges and recesses separately.<\/li>\n<li>Compacting over a yielding subgrade: first create a load-bearing subgrade.<\/li>\n<li>Insufficient quality assurance: align tests with project specifications and document results.<\/li>\n<li>Skipping trial sections: without calibration, pass counts and lift thickness are rarely optimal.<\/li>\n<li>Uncoordinated material changes: adjust moisture and pass strategy when the grading curve or source changes.<\/li>\n<\/ul>\n<h2>Interfaces to tools and workflows of Darda GmbH<\/h2>\n<p>In many construction sequences, the need for plate compaction arises directly from the upstream or downstream deconstruction steps: selective concrete demolition with <strong>concrete demolition shears<\/strong> enables predictable edges and reduces rework in edge zones. <strong>Splitting of concrete and natural stone<\/strong> with hydraulic splitters or rock splitting cylinders processes oversize material into compaction-ready aggregates. <strong>Combination shears<\/strong>, <strong>Multi Cutters<\/strong>, <strong>steel shears<\/strong>, and <strong>tank cutters<\/strong> provide controlled separations in special applications, protecting adjacent areas for subsequent compaction. <strong>Hydraulic power packs<\/strong> supply the tools mentioned, supporting a continuous, low-vibration construction sequence. These interfaces reduce risks in settlement-critical areas and improve the quality of subsequent plate compaction &#8211; without unnecessarily burdening the workflow.<\/p>\n<h2>Material selection and recycling aspects<\/h2>\n<p>Unbound base layers can be made from primary material or recycled construction materials. Suitability for the intended use is decisive: load-bearing gradation, an appropriate fines fraction, adequate frost resistance, and verified compactability. Recycled concrete from concrete demolition can be compacted well if properly processed. When concrete is selectively deconstructed with concrete demolition shears, this promotes separation of material streams and the production of homogeneous RC mixes &#8211; a prerequisite for reproducible compaction results. Attention should also be paid to contaminants, potential sulfate content, and the angularity of aggregates, as these influence moisture demand and achievable density.<\/p>\n<h2>Notes on regulations and responsibility<\/h2>\n<p>Depending on project and region, the relevant technical rules apply to the planning, execution, and verification of compaction. Requirements for degrees of compaction, test methods, and documentation must be defined for each project. The contents presented here are general in nature, do not replace project-specific planning, and do not constitute binding advice. Roles and responsibilities for testing, acceptance, and record-keeping should be contractually assigned and reviewed before work starts.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Plate compaction is a central work method in earthworks, road and pathway construction, as well as in build-up and refurbishment around concrete surfaces. It ensures that unbound layers such as crushed stone, gravel, or recycled construction material achieve sufficient density and load-bearing capacity, layer by layer. In projects involving concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19543","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Plate Compaction Guide for Earthworks &amp; Roads<\/title>\n<meta name=\"description\" content=\"Learn plate compaction for earthworks \u2713 improve density, set correct moisture, cut vibration, verify bearing capacity.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plate Compaction Guide for Earthworks &amp; Roads\" \/>\n<meta property=\"og:description\" content=\"Learn plate compaction for earthworks \u2713 improve density, set correct moisture, cut vibration, verify bearing capacity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-05T16:00:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/plate-compaction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/plate-compaction\",\"name\":\"Plate Compaction Guide for Earthworks & Roads\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-21T11:49:46+00:00\",\"dateModified\":\"2026-05-05T16:00:03+00:00\",\"description\":\"Learn plate compaction for earthworks \u2713 improve density, set correct moisture, cut vibration, verify bearing capacity.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/plate-compaction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/plate-compaction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/plate-compaction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Plate compaction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Plate Compaction Guide for Earthworks & Roads","description":"Learn plate compaction for earthworks \u2713 improve density, set correct moisture, cut vibration, verify bearing capacity.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction","og_locale":"en_US","og_type":"article","og_title":"Plate Compaction Guide for Earthworks & Roads","og_description":"Learn plate compaction for earthworks \u2713 improve density, set correct moisture, cut vibration, verify bearing capacity.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-05T16:00:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction","url":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction","name":"Plate Compaction Guide for Earthworks & Roads","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-21T11:49:46+00:00","dateModified":"2026-05-05T16:00:03+00:00","description":"Learn plate compaction for earthworks \u2713 improve density, set correct moisture, cut vibration, verify bearing capacity.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/plate-compaction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/plate-compaction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Plate compaction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19543"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19543\/revisions"}],"predecessor-version":[{"id":26930,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19543\/revisions\/26930"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}