{"id":19533,"date":"2025-11-20T11:21:57","date_gmt":"2025-11-20T10:21:57","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19533"},"modified":"2026-05-04T12:10:03","modified_gmt":"2026-05-04T10:10:03","slug":"pilot-hole","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole","title":{"rendered":"Pilot hole"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The pilot hole is a key aid in concrete demolition, rock excavation, and natural stone extraction. As a targeted, small pre-drill, it guides larger drillings, enables the insertion of splitting tools, and helps steer fracture edges in a controlled manner. In conjunction with concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, the pilot hole structures the workflow: it creates starting points, reduces uncontrolled spalling, and improves precision in confined or sensitive environments. Properly planned pilot holes increase productivity, lower rework rates, and support low-emission methods in noise and dust sensitive zones.<\/p>\n<h2>Definition: What is meant by a pilot hole?<\/h2>\n<p>A pilot hole is a deliberately placed, usually smaller pre-drilled hole (pre-drill, guide hole, pilot hole) that technically prepares the subsequent process &#8211; such as enlarging, controlled splitting, or cutting and separating. It serves as a <em>guide<\/em> for subsequent work steps, for positional control in reinforced concrete or layered rock, and as an opening for force transmission, e.g., when using stone and concrete splitting devices or stone splitting cylinders. In contrast to large-diameter <em>core drilling<\/em>, the pilot hole is primarily designed for guidance, exploration, and crack steering. It is not an anchor or dowel hole and not intended to bear long-term loads; common diameters range from very small guide holes to medium sizes precisely matched to splitting wedges or cylinders.<\/p>\n<h2>Objectives and functions of the pilot hole in demolition and extraction<\/h2>\n<p>Pilot holes are the inconspicuous timekeepers in many projects. They define where forces act and how material separates or splits. This is particularly relevant when concrete demolition shears or stone and concrete splitting devices are to work precisely, with low vibration, and in a predictable manner.<\/p>\n<ul>\n<li><strong>Guidance and centering:<\/strong> Prevents subsequent drillings from wandering and stabilizes the work process.<\/li>\n<li><strong>Force introduction:<\/strong> Creates the opening for wedges or cylinders of stone and concrete splitting devices.<\/li>\n<li><strong>Crack steering and fracture line control:<\/strong> Establishes separation planes, reduces uncontrolled spalling, and protects adjacent components.<\/li>\n<li><strong>Position check:<\/strong> Explores material build-up (e.g., reinforcement, voids, layering) and adapts the approach.<\/li>\n<li><strong>Reduction of vibrations:<\/strong> Enables gentle, targeted separation &#8211; an advantage in special deconstruction, building strip-out, and special operations.<\/li>\n<li><strong>Process economy:<\/strong> Shorter downtimes, less rework, better planning of follow-up work with concrete demolition shears and splitting devices.<\/li>\n<li><strong>Measurement and verification:<\/strong> Provides reference points for depth gauges, inspection cameras, or cover meters to verify tolerances before splitting.<\/li>\n<\/ul>\n<h2>Sizing: diameter, depth, angle, and hole pattern<\/h2>\n<p>Sizing depends on the material, target geometry, and the planned method. For later insertion of splitting wedges or stone splitting cylinders, the diameter must fit the tool intake; for steering fracture edges, the line, spacing, and depth of pilot holes take priority. Technical data of the tools used must be considered. As a rule of thumb, a near-press fit with minimal clearance improves force transmission while still allowing clean insertion and removal.<\/p>\n<h3>Choosing the diameter<\/h3>\n<p>In concrete and rock demolition, common pilot diameters are often in the small to medium range. For stone and concrete splitting devices, precisely fitting hole diameters are required so wedge or cylinder units can work safely. Holes that are too small make insertion difficult; holes that are too large reduce force transmission. For pure guide holes (pre-centering), a small diameter often suffices. For splitting wedges, typical intake diameters are frequently within the lower to mid two-digit millimeter range; for hydraulic cylinders, medium diameters are common. Observe manufacturer tolerances, typically in the order of \u00b10.5 to \u00b11.0 mm.<\/p>\n<h3>Drilling depth and angle<\/h3>\n<p>The depth is based on component thickness, the planned separation plane, and tool length. In massive concrete, a depth of 80-95% of the component thickness is often recommended so that remaining cross-sections can be detached in a controlled manner with concrete demolition shears. In rock, embedment depth and drilling angle steer crack development along the planned extraction front. A vertical alignment favors a clear split line; inclined holes are useful when geology requires redirection of cracks. Keep angular deviation low to avoid off-axis loading &#8211; a maximum of 1-2 degrees is a practical target in precision work.<\/p>\n<h3>Hole pattern and spacing<\/h3>\n<p>The hole pattern defines how forces act. Linear rows are suitable for creating clear separation cuts; grid patterns are used for large-area deconstruction. The spacing should be chosen so cracks link up without running ahead uncontrollably. For work with concrete demolition shears, a <em>pre-stressed<\/em> edge achieved by closer spacing can be helpful to apply the shear with less force. In homogeneous concrete, spacing is often selected in a corridor related to hole diameter or component thickness to ensure consistent crack linkage.<\/p>\n<ul>\n<li>Linear drilling row for defined predetermined breaking edges.<\/li>\n<li>Staggered arrangement in heterogeneous rock to interlink cracks.<\/li>\n<li>Closer spacing at sensitive component edges, larger spacing in the field.<\/li>\n<li>Curved or stepped rows to follow geometry transitions or layered geology.<\/li>\n<\/ul>\n<h2>Process: from planning to the completed pilot hole<\/h2>\n<ol>\n<li>Pre-survey: material analysis (concrete strength, reinforcement density, rock fabric, water flow), component geometry, accessibility.<\/li>\n<li>Definition of objective, hole pattern, and tolerances: define separation cut, opening, split line, or exploration purpose.<\/li>\n<li>Selection of drilling technique: impact drilling, rotary drilling, diamond core drilling; dry or wet &#8211; depending on dust and water requirements.<\/li>\n<li>Marking and scribing: visible, unambiguous marking for positional accuracy and occupational safety.<\/li>\n<li>Drilling: with controlled feed, coordinated rotation\/impact rate, suitable drilling fines management (extraction\/flushing).<\/li>\n<li>Inspection: check position, depth, diameter; probe for obstacles if necessary (e.g., reinforcement).<\/li>\n<li>Post-processing: deburr and clean the hole; documentation for follow-on trades (e.g., use of stone and concrete splitting devices or concrete demolition shears).<\/li>\n<\/ol>\n<h3>Quality assurance in practice<\/h3>\n<p>Regular dimensional checks, functional dust extraction, sharp bits\/crowns, and a calm, even feed are crucial. Deviations are corrected early so splitting devices can be centered precisely. Practical tolerances include diameter within specification, axial runout kept minimal over depth, and angular deviation maintained within defined limits for the chosen tool set.<\/p>\n<h2>Pilot hole in concrete demolition and special deconstruction<\/h2>\n<p>In massive and reinforced concrete, the pilot hole prepares defined separation edges, creates intakes for splitting units, and supports low-vibration methods. It is especially valuable where adjacent uses, vibration-sensitive systems, or heritage protection require a controlled approach. Prior scanning for reinforcement and embedded items increases planning certainty, reduces bit damage, and avoids unintended force paths.<\/p>\n<h3>Interaction with concrete demolition shears<\/h3>\n<p>Concrete demolition shears separate components, crush chunks, and work on edges. A preceding pilot hole can <strong>mitigate<\/strong> the edge: it steers cracks and reduces spalling. For thick components, a hole pattern along the planned line allows the shear to follow cleanly with less force. If the shear meets reinforcement, exposure points are prepared by pilot holes so cutting off can proceed more controllably. Corner relief holes reduce stress concentrations and help prevent uncontrolled corner breakout when shears take over.<\/p>\n<h3>Interaction with stone and concrete splitting devices<\/h3>\n<p>Stone and concrete splitting devices as well as stone splitting cylinders require precisely fitting holes to accept the splitting wedges or cylinders. Here, the pilot hole is effectively the <em>working hole<\/em>: diameter, depth, and axial accuracy determine splitting quality. A clean, plumb hole transmits splitting forces linearly and minimizes off-axis loading. Hydraulic power packs supply the necessary energy, while the hole sets the direction &#8211; this reduces vibrations and ensures precise separation joints that can then be finished with concrete demolition shears. Keep the hole clean and slightly moistened where appropriate to lower friction and achieve repeatable splitting pressures.<\/p>\n<h2>Pilot hole in rock excavation and tunneling<\/h2>\n<p>In rock excavation, pilot holes control crack propagation along natural joints or designated planes. During tunnel advance, they are used for pre-investigation, stress relief, and as intake holes for splitting devices when low vibrations are required. The combination of a drilling row and controlled splitting enables controlled removal geometries with minimal impact on the surroundings. Where permissible, pilot-based pre-splitting is a proven alternative to higher-energy methods to protect the excavation boundary.<\/p>\n<h3>Geological influences<\/h3>\n<p>Layering, joint spacing, moisture, and abrasive mineralogy influence drilling behavior. In water-bearing zones, support, coordinated flushing, and short drilling intervals help. In anisotropic rock, orienting the pilot hole along natural planes of weakness can significantly increase the efficiency of stone and concrete splitting devices. Parameters such as intact rock strength and joint roughness inform the choice of spacing, angle, and drilling method.<\/p>\n<h2>Pilot hole in natural stone extraction<\/h2>\n<p>In the extraction of natural stone blocks, pilot holes determine the block geometry. Rows of holes mark separation joints into which stone splitting cylinders are inserted. Careful alignment along the natural bedding reduces the required force, improves block quality, and reduces waste. After splitting, edges can be refined with concrete demolition shears or &#8211; where metal structures are present &#8211; with supplementary cutting tools. Observing bed, rift, and grain directions minimizes breakage and enhances dimensional accuracy of blocks.<\/p>\n<h2>Tools and power supply<\/h2>\n<p>Hammer drills, rotary-percussive systems, or diamond core drilling machines are used for pilot holes. The choice depends on material, dust management, and desired edge quality. Splitting or separating then brings hydraulic energy into play &#8211; hydraulic power packs feed stone and concrete splitting devices, stone splitting cylinders, and other hydraulic cutting or shear tools. In multi-stage processes, metal inserts can be cut after splitting with steel shear tools or combination shears; multi cutters are available for special cutting tasks.<\/p>\n<ul>\n<li>Drilling technology: percussive, rotary, diamond-impregnated (dry\/wet).<\/li>\n<li>Energy: electric, hydraulic, pneumatic &#8211; adapted to location and emission requirements.<\/li>\n<li>Peripherals: extraction\/flushing, measuring and marking tools, control tools (depth, diameter).<\/li>\n<li>Bit selection: carbide for percussive drilling in concrete and many rocks, diamond crowns for reinforced sections and high edge quality.<\/li>\n<\/ul>\n<h2>Occupational safety, environmental, and health protection<\/h2>\n<p>The pilot hole reduces vibrations and noise compared to conventional methods, but still requires consistent protective measures. Dust, noise, and debris ejection are minimized by appropriate methods. On-site specifications must be observed; measures are to be adapted to the situation. Clear work zones and communication routines further reduce risk during splitting and shearing operations.<\/p>\n<ul>\n<li>Dust mitigation: extraction or wet drilling; collect drilling fines in a controlled manner.<\/li>\n<li>Noise control: appropriate protective equipment, temporal control of the work.<\/li>\n<li>Safe guidance: non-slip standing areas, fixed templates, steady feed.<\/li>\n<li>Material control: identify reinforcement, voids, and foreign objects before drilling.<\/li>\n<li>Respect force paths: maintain safety distances during splitting work, plan potential crack paths.<\/li>\n<li>Personal protection: certified respiratory, hearing, eye, and hand protection appropriate to the method and exposure.<\/li>\n<\/ul>\n<h2>Typical errors and how to avoid them<\/h2>\n<ul>\n<li>Unsuitable diameter: leads to poor force transmission of splitting tools &#8211; observe tool requirements.<\/li>\n<li>Deviating drill axis: causes off-axis loading and uncontrolled cracks &#8211; use stable guidance and marking.<\/li>\n<li>Depth too shallow: remaining cross-sections separate unevenly &#8211; match depth to component thickness.<\/li>\n<li>Poor cleaning: drilling fines reduce frictional engagement &#8211; clean the holes.<\/li>\n<li>Incorrect hole pattern: cracks do not interlink &#8211; choose spacing according to material behavior.<\/li>\n<li>Insufficient pre-investigation: reinforcement or joints not considered &#8211; plan positional checks and trial holes.<\/li>\n<li>Excessive percussive energy: creates microcracks and weakens edges &#8211; adapt drilling mode and feed pressure.<\/li>\n<\/ul>\n<h2>Documentation and finishing<\/h2>\n<p>Clear documentation of position, depth, and diameter of pilot holes supports subsequent steps. After splitting, targeted finishing follows: edges are refined with concrete demolition shears, remaining cross-sections are separated in a controlled manner. Holes that are no longer needed can be closed or used as starting points for further processes. This creates a coordinated sequence from the first pilot hole to the finished separation cut &#8211; efficient, controlled, and material-appropriate. As-built records with photos, depth logs, and marked plans shorten handovers and improve repeatability in subsequent stages.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The pilot hole is a key aid in concrete demolition, rock excavation, and natural stone extraction. As a targeted, small pre-drill, it guides larger drillings, enables the insertion of splitting tools, and helps steer fracture edges in a controlled manner. In conjunction with concrete demolition shears or hydraulic rock and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19533","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pilot Hole in Concrete &amp; Rock | Uses &amp; Sizing<\/title>\n<meta name=\"description\" content=\"Achieve precise, low-vibration splitting in concrete, rock &amp; stone with a pilot hole \u2713 steer cracks, cut downtime.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pilot Hole in Concrete &amp; Rock | Uses &amp; Sizing\" \/>\n<meta property=\"og:description\" content=\"Achieve precise, low-vibration splitting in concrete, rock &amp; stone with a pilot hole \u2713 steer cracks, cut downtime.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-04T10:10:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pilot-hole\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pilot-hole\",\"name\":\"Pilot Hole in Concrete & Rock | Uses & Sizing\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-20T10:21:57+00:00\",\"dateModified\":\"2026-05-04T10:10:03+00:00\",\"description\":\"Achieve precise, low-vibration splitting in concrete, rock & stone with a pilot hole \u2713 steer cracks, cut downtime.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pilot-hole#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pilot-hole\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pilot-hole#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pilot hole\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pilot Hole in Concrete & Rock | Uses & Sizing","description":"Achieve precise, low-vibration splitting in concrete, rock & stone with a pilot hole \u2713 steer cracks, cut downtime.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole","og_locale":"en_US","og_type":"article","og_title":"Pilot Hole in Concrete & Rock | Uses & Sizing","og_description":"Achieve precise, low-vibration splitting in concrete, rock & stone with a pilot hole \u2713 steer cracks, cut downtime.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-04T10:10:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole","url":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole","name":"Pilot Hole in Concrete & Rock | Uses & Sizing","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-20T10:21:57+00:00","dateModified":"2026-05-04T10:10:03+00:00","description":"Achieve precise, low-vibration splitting in concrete, rock & stone with a pilot hole \u2713 steer cracks, cut downtime.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pilot-hole"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pilot-hole#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pilot hole"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19533","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19533"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19533\/revisions"}],"predecessor-version":[{"id":26882,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19533\/revisions\/26882"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}