{"id":19529,"date":"2025-11-20T12:57:46","date_gmt":"2025-11-20T11:57:46","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19529"},"modified":"2026-05-04T15:14:03","modified_gmt":"2026-05-04T13:14:03","slug":"paving-joint","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint","title":{"rendered":"Paving joint"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The paving joint is an inconspicuous yet central element in paving construction. It helps determine the load-bearing capacity, durability, drainage, and appearance of walkways, plazas, courtyards, and trafficked areas. Properly planned, executed, and maintained, the joint enables the necessary movement of the surfacing, distributes loads, promotes infiltration, and protects against frost damage. In deconstruction and refurbishment works, the type of joint also influences how gently and efficiently paved areas can be selectively opened or removed-an aspect just as important when choosing methods and tools as it is for new construction. Well-detailed joints reduce life-cycle costs by limiting maintenance effort and preventing premature surface distress; they also influence noise behavior, skid resistance, and susceptibility to weed ingress.<\/p>\n<h2>Definition: What is meant by a paving joint?<\/h2>\n<p>A paving joint is the narrow gap between individual pavers or slabs. This gap is filled with a suitable jointing material (e.g., sand, chippings, or mortar). The joint fulfills multiple functions: It accommodates deformations caused by temperature and moisture changes, transfers <em>shear forces<\/em> between the stones, enables uniform load transfer into the <em>pavement bedding<\/em>, and-depending on the material-can allow water to infiltrate into the <em>superstructure<\/em>. A <em>regular joint width<\/em>, an appropriate choice of material, and proper compaction are decisive. Typical joint widths are approximately 2-5 mm for concrete pavers, 3-10 mm for natural stone paving depending on tolerances, and 3-8 mm for large-format slabs. For unbound joints, angular, frost-resistant aggregates with low fines content are advisable to secure interlock and drainage.<\/p>\n<h2>Structure of the paving joint: joint width, material, and function<\/h2>\n<p>Joint width depends on stone format, manufacturing tolerance, and the intended use. With natural stone paving, dimensional tolerances are balanced through the joint; with concrete pavers, a uniform joint line predominates. Unbound joints made of sand or chippings ensure interlock between the stones across the surface and keep them movable. Bound joints based on mortar or reactive resin stiffen the surface, reduce washout, and can limit the ingress of fines. It is crucial to consider joint, bedding, <em>base course<\/em>, and edge restraint as a system. Only then do durable and low-maintenance paving surfaces emerge. As a rule of thumb, joint material grading should be coordinated with the bedding to avoid migration; filter-stable layer combinations and a continuous edge restraint complete the system.<\/p>\n<h2>Functions of the paving joint within the surfacing system<\/h2>\n<p>In conjunction with bedding and the superstructure, the paving joint fulfills several interdependent tasks:<\/p>\n<ul>\n<li><strong>Load distribution and shear transfer:<\/strong> The filled joint supports the force interaction between stones and reduces edge contact stresses.<\/li>\n<li><strong>Accommodation of movement:<\/strong> It buffers length changes due to temperature and humidity fluctuations as well as minor settlements.<\/li>\n<li><strong>Water management:<\/strong> Depending on the joint material, precipitation can infiltrate (drainable joint) or be drained across the surface (bound joint with crossfall).<\/li>\n<li><strong>Surface stability:<\/strong> Properly compacted joints minimize rattling, shifting, and washout.<\/li>\n<li><strong>Protection against frost and de-icing salt damage:<\/strong> Suitable materials and joint widths reduce frost heave and edge spalling.<\/li>\n<li><strong>Noise and vibration mitigation:<\/strong> Adequate joint filling dampens stone-to-stone impacts and reduces structure-borne noise.<\/li>\n<li><strong>Tolerance compensation and appearance:<\/strong> Joints even out manufacturing deviations and ensure a consistent visual line.<\/li>\n<\/ul>\n<h2>Joint types and jointing materials<\/h2>\n<p>The choice of jointing material depends on use, the drainage concept, stone type, and the desired maintenance intensity. Common variants are:<\/p>\n<ul>\n<li><strong>Unbound joint<\/strong> (sand, crushed sand, chippings): proven for trafficked and pedestrian areas; flexible, cost-efficient, easy to top up; requires regular re-sanding and diligent cleaning to prevent clogging.<\/li>\n<li><strong>Drainable joint<\/strong> (washed chippings, special drain mortars): promotes infiltration and surface drainage; sensitive to fines ingress and clogging; requires a permeable bedding and superstructure to function.<\/li>\n<li><strong>Bound joint<\/strong> (cementitious or polymer-bound mortar): low washout, quiet surface; higher demands on the substructure and <em>expansion joint<\/em> layout; careful workmanship is necessary to avoid cracking and efflorescence; water management must be planned via surface runoff.<\/li>\n<\/ul>\n<p><em>In practice<\/em>, a coordinated grading of joint and bedding materials is relevant. Material that is too fine can sludge; material that is too coarse does not fill the joint adequately and leads to loosening. Compatibility with freeze-thaw exposure and de-icing agents should be assessed when selecting binders and aggregates.<\/p>\n<h2>Design and execution of paving joints<\/h2>\n<p>Execution is guided by loading, stone type, and regional rules. The following approach has proven effective:<\/p>\n<ol>\n<li>Construct the superstructure: load-bearing, frost-resistant base layers; flatness and compaction as required. Provide a surface crossfall typically between 2 and 3 percent to ensure runoff if the surface is not designed to infiltrate.<\/li>\n<li>Install the bedding: uniform bedding (e.g., chippings), screeded to adequate flatness. Do not over-compact before laying. Typical thickness ranges from about 30 to 50 mm depending on the system.<\/li>\n<li>Lay the stones: use joint crosses or spacers only as needed; keep joint width uniform, neatly fit edge areas. Maintain straight joint lines and avoid pinch points.<\/li>\n<li>Introduce jointing material: sweep in or slurry in dry material, filling void-free. For unbound systems, repeat sweeping during the initial settlement phase.<\/li>\n<li>Compaction: compact the surfacing across the entire area; use a protective mat on sensitive surfaces; then refill the joints. Choose a compaction device suitable for the stone type and thickness to prevent edge spalling.<\/li>\n<li>Aftercare: top up with sand again after a few days; allow bound joints to cure according to the manufacturer\u2019s instructions. Protect fresh bound joints from rain and frost during curing.<\/li>\n<\/ol>\n<p><strong>Important<\/strong> is the edge restraint: A stable edging prevents stones from \u201cmigrating\u201d and keeps the joints permanently closed. Continuous support, frost-proof foundations, and precise height alignment are crucial to long-term stability.<\/p>\n<h2>Paving joints in existing surfaces: maintenance, repair, and refurbishment<\/h2>\n<p>Paved areas remain functional in the long term only if joints are regularly inspected and topped up as needed. Typical measures include re-sanding, removing introduced fines, and gently cleaning the surface. For bound joints, cracked zones are selectively opened and refilled. The <em>substance of adjacent stones<\/em> should be preserved. Periodic visual checks after winter and after high-traffic events help identify early loss of jointing material, pumping, or settlement.<\/p>\n<p>In refurbishment and selective deconstruction, the joint type can determine the workflow. With heavily sintered or bound joints, opening individual fields is mechanically more demanding. Depending on boundary conditions, tools from Darda GmbH can be considered in deconstruction concepts, especially when <em>low vibration levels<\/em> are required:<\/p>\n<ul>\n<li><strong>Concrete pulverizers:<\/strong> For controlled nibbling of edges on concrete pavers, <em>curb stone<\/em>s, or slabs to release jammed joints or selectively expose individual elements using <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">precision work with concrete crushers<\/a>. This is particularly helpful in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> when utilities or adjacent components must be protected.<\/li>\n<li><strong>Stone and concrete splitters:<\/strong> For targeted widening or breaking open of joints and for splitting large-format elements, e.g., when bound joints prevent damage-free removal. The low vibration of <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> is advantageous for special operations or sensitive environments.<\/li>\n<\/ul>\n<p>Such approaches support selective removal, the reuse of suitable stones, and material-separated disposal-key elements of resource-efficient refurbishment. Indicators for intervention include open joints exceeding roughly one-third of their depth, visible pumping of fines under traffic, and recurring water ponding despite adequate slope.<\/p>\n<h2>Paving joints with natural stone, concrete pavers, and slabs<\/h2>\n<h3>Natural stone paving<\/h3>\n<p>Natural dimensional tolerances require variable joint widths. Angular, stable crushed sand or chippings favor interlock. Color and grading should suit the rock type to minimize washout and visual impairment. Where color uniformity is critical, trial panels with alternative joint aggregates help evaluate appearance after wetting and drying cycles.<\/p>\n<h3>Concrete paver paving<\/h3>\n<p>Factory-uniform formats make it possible to implement narrow, homogeneous joints. Joints that are too narrow can limit movement; a balanced width increases durability and reduces edge spalling. Spacers integrated into the pavers should not be overridden during laying and compaction to maintain the designed joint line.<\/p>\n<h3>Large-format slabs<\/h3>\n<p>Slabs react more sensitively to point loads. Bound or drainable joints with careful bedding and precisely prepared bearing surfaces reduce stresses. <em>Expansion joint<\/em>s at defined grid points are advisable for larger areas. Attention to even support and the avoidance of rocking points reduces the risk of cracking under service loads.<\/p>\n<h2>Drainage, frost, and climatic influences<\/h2>\n<p>The joint is part of the drainage concept. Water path, filter stability, and frost resistance are decisive:<\/p>\n<ul>\n<li>Drainable joints require a permeable superstructure and functioning surface drainage.<\/li>\n<li>Bound joints demand sufficient surface slope and defined water removal.<\/li>\n<li>Materials should be frost-resistant; binders must be matched to the exposure.<\/li>\n<li>In winter service, the use of de-icing salts should be weighed; general guidance in the codes supports an appropriate strategy.<\/li>\n<li>Surface crossfalls of about 2-3 percent are common for non-infiltrating systems; for infiltration designs, ensure filter-stable, permeable layer packs and safeguarded outflow routes.<\/li>\n<\/ul>\n<h2>Interfaces with deconstruction, gutting works, and selective strip-out<\/h2>\n<p>When renewing trafficked and open spaces, paving fields often have to be opened in sections-for example, for utility installation, foundations, or gutting works in existing structures. The joint type determines whether stones can be pulled individually or whether edges must be deliberately broken. In areas with a sensitive environment (heritage protection, residents, vibration limitations), <strong>concrete pulverizers<\/strong> and <strong>stone and concrete splitters<\/strong> from Darda GmbH offer the option of releasing components in a controlled manner with low vibration. This is particularly relevant in <em>concrete demolition<\/em> and <em>special demolition<\/em> as well as for special operations when work is localized and adjacent structures must remain undamaged. Early coordination of access routes, protection of adjoining surfaces, and sorting for reuse improves both efficiency and sustainability.<\/p>\n<h2>Planning notes and typical defects<\/h2>\n<ul>\n<li><strong>Insufficient edge restraint:<\/strong> Leads to migrating stones and open joints. Stable edging is mandatory.<\/li>\n<li><strong>Incorrect joint width:<\/strong> Too narrow hampers movement; too wide weakens interlock. The dimension is derived from stone format and use.<\/li>\n<li><strong>Unsuitable grading:<\/strong> Material that is too fine sludges; material that is too coarse anchors poorly. Filter layers must be coordinated.<\/li>\n<li><strong>Poor compaction:<\/strong> Voids in bedding and joints favor rocking and edge breakouts.<\/li>\n<li><strong>Neglected maintenance:<\/strong> Clogged drain joints lose infiltration capacity; regular cleaning and re-sanding secure function.<\/li>\n<li><strong>Improper cleaning:<\/strong> Aggressive methods can wash out jointing material or damage binders. Choose appropriate methods.<\/li>\n<li><strong>Missing or misaligned expansion joints on bound surfaces:<\/strong> Promotes random cracking and reflective damage.<\/li>\n<li><strong>Inadequate slope or trapped water:<\/strong> Encourages frost damage and efflorescence at joint edges.<\/li>\n<\/ul>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>When producing, cleaning, or removing paving joints, pay attention to dust and noise reduction. Suitable <em>safety equipment<\/em>, dust-reduced working methods, and orderly material separation support health and the environment. Removed joint and bedding materials should be reused where possible or disposed of properly. When using machines, observe the respective manufacturer\u2019s instructions and applicable safety regulations. Measures such as <em>dust suppression<\/em>, <em>noise reduction measures<\/em>, and <em>construction waste separation<\/em> contribute to sustainable practice and <em>recycling<\/em>. Where mineral dust may be generated, select control measures and extraction systems appropriate for respirable crystalline silica risk and verify their effectiveness.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Good workmanship is evident in uniform joints, stable edges, and an even, vibration-resistant surface. Spot checks of joint fill, flatness checks, and visual inspections after initial use help detect early settlements. In refurbishment projects, traceable documentation of the joint type and installed materials facilitates later maintenance and deconstruction steps-especially when selective procedures such as controlled splitting or pulverizer work are planned. Useful records include material batch data, weather conditions during execution, compaction passes, and photo documentation of test areas and remedial actions.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The paving joint is an inconspicuous yet central element in paving construction. It helps determine the load-bearing capacity, durability, drainage, and appearance of walkways, plazas, courtyards, and trafficked areas. Properly planned, executed, and maintained, the joint enables the necessary movement of the surfacing, distributes loads, promotes infiltration, and protects against <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/paving-joint\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19529","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Paving Joint Guide - Construction &amp; Maintenance<\/title>\n<meta name=\"description\" content=\"Master the paving joint in construction \u2713 design, drainage and load transfer for durable, low-maintenance paving.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/paving-joint\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Paving Joint Guide - Construction &amp; Maintenance\" \/>\n<meta property=\"og:description\" content=\"Master the paving joint in construction \u2713 design, drainage and load transfer for durable, low-maintenance paving.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/paving-joint\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-04T13:14:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/paving-joint\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/paving-joint\",\"name\":\"Paving Joint Guide - Construction & Maintenance\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-20T11:57:46+00:00\",\"dateModified\":\"2026-05-04T13:14:03+00:00\",\"description\":\"Master the paving joint in construction \u2713 design, drainage and load transfer for durable, low-maintenance paving.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/paving-joint#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/paving-joint\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/paving-joint#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Paving joint\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Paving Joint Guide - Construction & Maintenance","description":"Master the paving joint in construction \u2713 design, drainage and load transfer for durable, low-maintenance paving.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint","og_locale":"en_US","og_type":"article","og_title":"Paving Joint Guide - Construction & Maintenance","og_description":"Master the paving joint in construction \u2713 design, drainage and load transfer for durable, low-maintenance paving.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-04T13:14:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint","url":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint","name":"Paving Joint Guide - Construction & Maintenance","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-20T11:57:46+00:00","dateModified":"2026-05-04T13:14:03+00:00","description":"Master the paving joint in construction \u2713 design, drainage and load transfer for durable, low-maintenance paving.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/paving-joint"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/paving-joint#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Paving joint"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19529"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19529\/revisions"}],"predecessor-version":[{"id":26892,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19529\/revisions\/26892"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}