{"id":19526,"date":"2025-11-20T13:34:41","date_gmt":"2025-11-20T12:34:41","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19526"},"modified":"2026-09-12T19:53:19","modified_gmt":"2026-09-12T17:53:19","slug":"pavement-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition","title":{"rendered":"Pavement demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pavement demolition is a central work step in the deconstruction of traffic areas, plazas, and industrial sites. It means the systematic lifting, separating, and removing of paving stones, edge restraints, and the associated layers. The focus is on both concrete pavers and natural stone paving. Depending on the build-up, the deconstruction requires <strong>low-vibration<\/strong>, <strong>low-emission<\/strong>, and precise methods. Especially for edge beams, curb stones, drainage channels, or bound installations, hydraulic tools such as concrete pulverizers as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a>, powered by suitable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a>, are used. This enables components to be released in a controlled manner, downsized, and prepared for the material cycle &#8211; within the context of concrete demolition and special demolition as well as during building gutting and cutting or special operations in sensitive areas. Clean interfaces, staged detachment, and source-separated handling support circular use and minimize collateral damage to adjacent structures.<\/p>\n<h2>Definition: What is meant by pavement demolition?<\/h2>\n<p>Pavement demolition refers to the orderly deconstruction of paved surfaces and their components. This includes loosening and lifting the paving stones, removing the bedding (usually chippings or mortar), working the edge zones (curb stones, kerbs, drainage channels, edgings), separating mortar or concrete residues on the underside, and removing base courses where this is required by the project. The <em>goal<\/em> is the safe exposure of the subsoil, creating clearance for new utility lines, assemblies, or load-bearing structures, and feeding the recovered construction materials into recycling and reuse in source-separated quality. Pavement demolition differs from asphalt removal due to the largely element-based construction and the resulting possibility of selective dismantling of individual stones up to large-format slabs, which promotes reuse and reduces breakage rates.<\/p>\n<h2>Process and typical work steps in pavement demolition<\/h2>\n<p>The exact process depends on the use, construction, and condition of the surface. A structured, low-vibration, and dust-minimized deconstruction with clear separation of material streams has proven effective. Preparatory clarifications regarding permits, access routes, and utility clearances reduce rework and interruptions.<\/p>\n<ol>\n<li>Existing-condition survey: document bond patterns, stone formats, joint material, bedding (unbound\/bound), edge restraints, drainage elements, and potential utility lines.<\/li>\n<li>Protection and closure measures: plan traffic management, dust and noise control, and protection of sensitive neighboring components.<\/li>\n<li>Open joints and loosen stones: lift stones row by row; for bonded areas, carry out controlled separation.<\/li>\n<li>Work edge zones: selectively separate curbs, channels, and foundations, e.g., with concrete pulverizers for massive concrete components.<\/li>\n<li>Downsizing and separation: split large formats and concrete adherences with stone and concrete splitters or stone splitting cylinders; separate metal parts.<\/li>\n<li>Remove bedding and base course: remove chippings and mortar in layers, maintain the bearing capacity of the subsoil.<\/li>\n<li>Sorting and logistics: reusable stones (<strong>relaying<\/strong>), recycled-concrete-suitable fractions, separate contaminants; use short routes and clearly defined storage areas.<\/li>\n<li>Finishing works: prepare the formation level (planum), apply temporary protection, or hand over to follow-on trades (e.g., utility installation).<\/li>\n<\/ol>\n<ul>\n<li><em>Optional process refinements<\/em>: pre-drilling patterns for controlled splitting, test fields to verify separation behavior, and temporary covers for weather protection.<\/li>\n<\/ul>\n<h2>Construction types and material influences<\/h2>\n<p>The deconstruction methods are largely determined by material, bond pattern, and bedding. Three configurations govern the choice of tools and steps. Additional influences include moisture content, temperature, reinforcement density, accessibility, and the target share of reusable elements.<\/p>\n<h3>Concrete pavers<\/h3>\n<p>Interlocking concrete pavers in unbound construction can usually be lifted segment by segment. Adhering mortar pockets, interlocking edges, and slurried joints can make loosening more difficult. For concreted-in channels or reinforced edge zones, concrete pulverizers are proven for precise separation of concrete components without extensive damage to adjacent areas. Depending on the thickness class and compressive strength, pre-scoring or light pre-splitting shortens subsequent handling.<\/p>\n<h3>Natural stone paving<\/h3>\n<p>Granite, basalt, or sandstone are hard and often irregular. Mortar bridges on the underside or bound beddings require controlled splitting. Stone and concrete splitters as well as stone splitting cylinders enable the <em>directed<\/em> opening of separation joints &#8211; with reduced crack propagation in the stone and lower noise development. Anisotropy and existing cleavage planes should be considered to orient separation lines for reuse-quality results.<\/p>\n<h3>Large formats and slab coverings<\/h3>\n<p>Large slabs and dense bond patterns often require pre-separation at defined intended break lines. Hydraulically powered splitting technology reduces lifting weights and facilitates source-separated removal. For reinforced edge beams, concrete pulverizers and supplementary steel shears support selective cutting of the reinforcement. Handling aids and edge protection prevent chipping when tilting or moving large elements.<\/p>\n<h3>Moisture and seasonal effects<\/h3>\n<p>Wet or frozen bedding increases adhesion and friction, affecting lifting forces and cycle times. In such cases, pre-drainage, thaw time, or intermediate drying reduces resistance and improves split quality.<\/p>\n<h2>Overview of methods and tools<\/h2>\n<p>For precise, low-vibration work in pavement demolition, various hydraulic tools are used, supplied by performance-matched hydraulic power packs. The selection is based on component thickness, degree of reinforcement, material, and space constraints. Compatibility of quick couplers, hose routing, and remote control options improves safety and productivity.<\/p>\n<ul>\n<li>Concrete pulverizers: controlled gripping and breaking of concreted edge zones, curb foundations, and ramps.<\/li>\n<li>Stone and concrete splitters: targeted, low-crack splitting of stones and adhering concrete residues, even in confined spaces.<\/li>\n<li>Stone splitting cylinders: localized expansion of predrilled holes to form separation joints in natural stone or high-strength concrete.<\/li>\n<li>Combination shears and multi cutters: flexible cutting of metal parts, built-ins, and light profiles in edgings or channels.<\/li>\n<li>Steel shears: cutting thicker steel, e.g., reinforcement in edge beams.<\/li>\n<li>Hydraulic power packs: demand-based supply of tools with pressure and flow for consistent performance.<\/li>\n<li>Accessories: hoses, manifolds, remote controls, shields, and protective mats for adjacent surfaces.<\/li>\n<\/ul>\n<p>A coherent tool chain with matched oil flow and pressure limits prevents performance drops and mitigates overloads. Short hydraulic lines and clear operator sightlines increase control quality in sensitive surroundings.<\/p>\n<h3>Use of concrete pulverizers<\/h3>\n<p>Concrete pulverizers enable <strong>precise<\/strong> notching and breaking of concrete curbs, drainage slabs, and local foundation reinforcements. A key advantage is the fine controllability of crack formation, which protects adjacent paved areas or utility lines. Interchangeable tooth profiles and adjustable closing force support both rough downsizing and fine separating cuts close to valuable components.<\/p>\n<h3>Stone and concrete splitters as well as stone splitting cylinders<\/h3>\n<p>Splitting technology relies on controlled tensile and compressive stresses. With natural stone paving and thicker slabs, defined joints can be produced using splitters. Stone splitting cylinders work in drilled holes with high spreading force and are suitable for deconstruction in sensitive areas because the working method is low-vibration and comparatively quiet. Drill-hole spacing and depth should be adapted to material hardness and desired fragment size to avoid uncontrolled breaks.<\/p>\n<h3>Hydraulic power packs and control<\/h3>\n<p>The choice of hydraulic power pack depends on the required flow rate and pressure. Sensitive control supports clean approach to the breaking load &#8211; important to avoid uncontrolled crack propagation and to <em>separate components in a targeted manner<\/em>. Electrically driven power packs reduce exhaust and noise emissions indoors or in dense urban contexts.<\/p>\n<h3>Combination shears, multi cutters, and steel shears<\/h3>\n<p>These tools ensure the cutting of reinforcement, meshes, built-in parts, and profiles in the vicinity of the paved area. They complement pulverizer and splitting technology when metallic components need to be released from the composite. Burr-minimized cuts facilitate subsequent sorting and reduce injury risks during handling.<\/p>\n<h2>Proper separation of edge restraints, channels, and foundations<\/h2>\n<p>Edge zones are often force-locked with the superstructure. Curbs, concrete channels, and ramps often contain reinforcement. Concrete pulverizers and steel shears allow stepwise reduction of cross-sections and the safe detachment of individual segments. For natural stone curbs, defined separation lines can be created by predrilled hole rows and the use of stone splitting cylinders, which promotes the reuse of whole elements.<\/p>\n<ul>\n<li>Pre-score visible faces to preserve arrises and avoid spalling.<\/li>\n<li>Work from weak points toward stronger sections to steer crack paths.<\/li>\n<li>Support detached elements immediately to prevent secondary breaks and edge damage.<\/li>\n<\/ul>\n<h2>Low-emission and low-vibration execution<\/h2>\n<p>In inner-city locations, during special operations in sensitive environments, or during ongoing operations, low emissions are crucial. Hydraulic methods work in a targeted way and minimize vibration and noise.<\/p>\n<ul>\n<li>Dust reduction through localized water application and clean cutting\/splitting guidance.<\/li>\n<li>Reduced vibrations thanks to splitting technology and controlled use of pulverizers.<\/li>\n<li>Short cycle times and small sub-segments to minimize peak loads.<\/li>\n<li>Organized material streams for short routes and fewer rehandlings.<\/li>\n<li>Use of electric or low-noise power packs where exhaust or noise restrictions apply.<\/li>\n<li>Temporary acoustic screens and vibration monitoring for compliance with local limits.<\/li>\n<\/ul>\n<h2>Substructure, bedding, and base course<\/h2>\n<p>The behavior of the subsoil determines the demolition methodology. Unbound constructions require different steps than bound or partially bound systems. Geotextiles, drainage layers, and frost protection courses should be identified to avoid unnecessary removal.<\/p>\n<h3>Unbound construction<\/h3>\n<p>With chippings bedding, after lifting the stones the material is to be removed in layers. Compacted base courses (frost protection) are loosened only where required by the follow-on trade. Even removal planning prevents settlements and supports subsequent reinstatement. Where geotextiles are present, careful peeling reduces contamination of reusable aggregates.<\/p>\n<h3>Bound-installed paving<\/h3>\n<p>Bound beddings and mortar joints increase the bond. Here, controlled splitting with stone and concrete splitters is recommended. The goal is separation into manageable segments with the least possible damage to reusable elements. Residual mortar should be removed mechanically without overheating to limit microcracks.<\/p>\n<h2>Safety, utilities, and protection of existing structures<\/h2>\n<p>Utility lines, shafts, or drainage elements often run in the vicinity of paved areas. Safety measures follow recognized rules of technology and must be adapted to the project.<\/p>\n<ul>\n<li>Utility information and probing in advance.<\/li>\n<li>Protection of sensitive components by shoring and separation cuts.<\/li>\n<li>Load management during lifting and gripping operations.<\/li>\n<li>Dust and noise control according to local requirements.<\/li>\n<li>Permit-to-dig procedures, cable locating, and gas detection where applicable.<\/li>\n<li>Defined emergency response and stop-work criteria for unforeseen finds.<\/li>\n<\/ul>\n<p>Legal requirements can vary depending on location, scope of work, and environmental conditions. Notes are to be understood in general terms and do not replace a project-specific review.<\/p>\n<h2>Recycling, reuse, and disposal<\/h2>\n<p>Sustainable pavement demolition separates construction materials by type and feeds them back into the cycle. The cleaner the fractions, the better the material recovery.<\/p>\n<ul>\n<li>Reuse: properly palletize intact natural stones and concrete pavers.<\/li>\n<li>Recycling: split off concrete adherences to produce recycled-concrete-suitable fractions.<\/li>\n<li>Contaminants: separate mortar residues, asphalt islands, metals, and inserts.<\/li>\n<li>Documentation: record quantities and weighbridge tickets in line with the project.<\/li>\n<li>Quality assurance: sampling of aggregates where specifications require, and dry storage to prevent cross-contamination.<\/li>\n<\/ul>\n<h2>Typical challenges and proven practical solutions<\/h2>\n<ul>\n<li>Slurried\/fouled joints: loosen joint material first, then lift stone by stone.<\/li>\n<li>Bound bedding: use splitting technology in combination with concrete pulverizers for segmentation.<\/li>\n<li>Reinforced edge beams: deploy concrete pulverizers with supplementary steel shear.<\/li>\n<li>Confined conditions: use compact stone splitting cylinders for localized separation.<\/li>\n<li>Heritage protection and preservation: dose splitting forces low to enable reuse.<\/li>\n<li>Mixed build-ups: identify transitions early and adjust tooling and sequence before contact.<\/li>\n<li>Cold and moisture: allow for thaw or drying times and adapt pre-drilling to rising adhesion.<\/li>\n<\/ul>\n<h2>Application areas and special conditions<\/h2>\n<p>Pavement demolition takes place in several application areas. In concrete demolition and special demolition, edge foundations, channels, and edgings frequently need to be separated &#8211; a field for concrete pulverizers and splitters. In building gutting and cutting, for example in courtyards and interior areas, low emissions and precise dismantling are crucial. Techniques from rock excavation and tunnel construction &#8211; especially controlled splitting &#8211; can be transferred to hard natural stones. Splitting methods proven in natural stone extraction help secure historic paving in large pieces. In special operations, for example at hospitals, schools, or inner-city squares, low-vibration working methods with hydraulic splitting and pulverizer\/shear technology are regularly advantageous.<\/p>\n<h2>Planning, logistics, and quality assurance<\/h2>\n<p>Forward-looking planning increases safety, productivity, and material quality. From takt planning to interim storage, the following applies: short routes, clear processes, defined interfaces.<\/p>\n<ol>\n<li>Deconstruction concept with zoning and sequence of sections.<\/li>\n<li>Definition of tools (e.g., concrete pulverizers, stone and concrete splitters) and required hydraulic power packs.<\/li>\n<li>Material logistics with separate storage areas for reuse and recycling.<\/li>\n<li>Ongoing documentation of quantities, qualities, and special component findings.<\/li>\n<\/ol>\n<ul>\n<li><strong>Quality criteria<\/strong>: target fragment sizes, maximum residual mortar on reusable stones, share of intact elements, and clean separation of materials.<\/li>\n<li><strong>Process control<\/strong>: checklists for section handover, interface definitions to follow-on trades, and acceptance records with photos.<\/li>\n<\/ul>\n<h2>Performance indicators and influencing factors<\/h2>\n<p>Performance in pavement demolition depends on the construction, the tools, and the logistics. For reliable indicators, test fields are useful.<\/p>\n<ul>\n<li>Stone formats and bond patterns: small-format bonds are more time-consuming; large-format slabs require high-performance splitting technology.<\/li>\n<li>Bedding and bonding: bound systems reduce lifting performance; splitting methods compensate for this.<\/li>\n<li>Edge zones: reinforced areas require additional work steps with pulverizers and shears.<\/li>\n<li>Accessibility: tight courtyards and inner cities demand smaller, finely controllable tools.<\/li>\n<\/ul>\n<p>Representative output measurement should log area or linear meters per shift, pre-drilling time, tool changeovers, and waiting times. Short feedback cycles and minor parameter adjustments (pressure, sequence, drill pattern) often yield measurable gains without changing the method.<\/p>\n<h2>Methodological borrowings from adjacent disciplines<\/h2>\n<p>Experience from rock excavation and tunnel construction as well as from natural stone extraction shows how <strong>directed<\/strong> splitting forces control crack paths. Transferred to pavement demolition, reproducible separation joints are created that reduce material losses and promote reuse. Hydraulically driven splitters and concrete pulverizers, supplied by suitable hydraulic power packs, can be used for defined deconstruction tasks. Dust, noise, vibration, safety and secondary-material quality must be assessed and documented for the project.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pavement demolition is a central work step in the deconstruction of traffic areas, plazas, and industrial sites. It means the systematic lifting, separating, and removing of paving stones, edge restraints, and the associated layers. The focus is on both concrete pavers and natural stone paving. Depending on the build-up, the <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19526","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pavement Demolition | Paver Removal &amp; Methods<\/title>\n<meta name=\"description\" content=\"Guide to pavement demolition in civil works \u2713 precise, low-vibration removal, dust control and material separation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pavement Demolition | Paver Removal &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Guide to pavement demolition in civil works \u2713 precise, low-vibration removal, dust control and material separation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:19+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-demolition\",\"name\":\"Pavement Demolition | Paver Removal & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-20T12:34:41+00:00\",\"dateModified\":\"2026-09-12T17:53:19+00:00\",\"description\":\"Guide to pavement demolition in civil works \u2713 precise, low-vibration removal, dust control and material separation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pavement demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pavement Demolition | Paver Removal & Methods","description":"Guide to pavement demolition in civil works \u2713 precise, low-vibration removal, dust control and material separation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition","og_locale":"en_US","og_type":"article","og_title":"Pavement Demolition | Paver Removal & Methods","og_description":"Guide to pavement demolition in civil works \u2713 precise, low-vibration removal, dust control and material separation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:19+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition","name":"Pavement Demolition | Paver Removal & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-20T12:34:41+00:00","dateModified":"2026-09-12T17:53:19+00:00","description":"Guide to pavement demolition in civil works \u2713 precise, low-vibration removal, dust control and material separation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pavement-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pavement demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19526","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19526"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19526\/revisions"}],"predecessor-version":[{"id":29119,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19526\/revisions\/29119"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19526"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}