{"id":19525,"date":"2025-11-19T13:27:53","date_gmt":"2025-11-19T12:27:53","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19525"},"modified":"2026-05-02T17:16:02","modified_gmt":"2026-05-02T15:16:02","slug":"pile-system","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pile-system","title":{"rendered":"Pile system"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pile systems are among the load-bearing elements of deep foundation engineering and secure structures where near-surface soil cannot adequately take up loads. They transfer forces deep into load-bearing soil layers or rock and are used in building construction, bridges, port facilities, retaining structures, as well as in tunneling and special foundation engineering. Planning, execution, testing, and later deconstruction require geotechnical know-how, precise workflows, and suitable tools. In construction phases where pile heads are produced, adjusted, or removed, powerful yet low-vibration methods play a central role &#8211; such as with <strong>concrete crushers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> from Darda GmbH.<\/p>\n<p><em>Low-emission hydraulic techniques<\/em> support schedule reliability and quality at interfaces between the deep foundation and the superstructure. They are particularly effective where access is limited, vibration thresholds are strict, or adjacent assets must remain in operation.<\/p>\n<h2>Definition: What is meant by a pile system?<\/h2>\n<p>A <strong>pile system<\/strong> is a foundation made up of individual piles that transfers vertical and horizontal actions via skin friction and\/or end-bearing into deeper, load-bearing layers. Piles may be arranged singly, in groups, or as a pile wall; they are connected to a pile cap or foundation slab via pile heads. In addition to the piles themselves, pile foundations include head trimming, reinforcement connections, sealing, and testing measures. Depending on ground conditions, groundwater, and loads, bored piles, driven\/displacement piles, micropiles, or steel pipe piles are used.<\/p>\n<p>Functionally, a distinction is made between <em>friction piles<\/em>, which mobilize shaft resistance along the pile surface, and <em>end-bearing piles<\/em>, which transfer loads into stiff strata or rock at the toe. Hybrid behavior is common in practice.<\/p>\n<h2>Configuration and functional principles<\/h2>\n<p>Pile systems consist of the pile element (concrete, steel, timber, or composite), the pile head connection to the superstructure, and, where applicable, pile groups and capping beams. Load transfer occurs via <em>skin friction<\/em> along the pile surface and\/or via <em>end bearing<\/em> in a competent layer. Side effects such as negative skin friction, settlements, group effects, and lateral actions (e.g., from wind, earthquakes, or traffic) must be considered in design. In pile walls, piles additionally provide retaining and\/or sealing functions for excavation support or slope stabilization.<\/p>\n<ul>\n<li><strong>Key interaction drivers:<\/strong> relative stiffness of pile and soil, construction method, groundwater regime, cyclic loading, and long-term consolidation effects.<\/li>\n<li><strong>Serviceability criteria:<\/strong> settlement, rotation, and deflection limits at the superstructure interface, including differential settlement within pile groups.<\/li>\n<li><strong>Lateral performance:<\/strong> p-y behavior, pile head fixity, and kinematic effects from seismic or traffic loads.<\/li>\n<\/ul>\n<h2>Pile types and construction methods<\/h2>\n<p>The pile type is selected based on ground conditions, structural loads, environmental requirements, and construction sequencing. Common variants:<\/p>\n<ul>\n<li><strong>Bored piles<\/strong> (cast-in-place): Constructed by drilling with or without casing, possibly with support fluid. Flexible in diameter and length, including large-diameter bored piles.<\/li>\n<li><strong>Displacement and driven piles<\/strong>: Precast concrete elements or steel sections are driven or pressed into the ground. Low excavation volumes, potentially higher noise emissions.<\/li>\n<li><strong>Micropiles<\/strong>: Slender, often cased or pressure-grouted systems for underpinning, structural rehabilitation, or for taking up tension and lateral forces.<\/li>\n<li><strong>Steel pipe and composite piles<\/strong>: Suitable for maritime applications, high tension\/compression loads, or temporary structures.<\/li>\n<li><strong>Pile walls<\/strong> (tangent\/secant): Retaining walls formed from individual piles for excavation support, often with a grouted base and capping beam.<\/li>\n<li><strong>Continuous flight auger (CFA) piles<\/strong>: Cast-in-place piles installed with a hollow-stem auger, enabling rapid production and reduced spoil at the surface.<\/li>\n<li><strong>Drilled displacement piles<\/strong>: Combine drilling and soil displacement to limit spoil and improve shaft capacity in suitable soils.<\/li>\n<\/ul>\n<h2>Design, load-transfer mechanisms, and quality assurance<\/h2>\n<p>Geotechnical models describe the interaction between pile and soil. Key aspects are skin friction (adhesive and frictional components), end bearing, settlement behavior, and buckling and flexural stiffness. Group effects and load redistribution are considered for pile grids. Quality assurance includes test borings, conformity tests of concrete and reinforcement, pile integrity tests, load tests, and ongoing documentation. Execution tolerances (e.g., verticality, embedment depth, concrete cover) are essential for load-bearing capacity and durability.<\/p>\n<ul>\n<li><strong>Verification methods:<\/strong> analytical design with characteristic soil parameters, numerical interaction models, and calibration by load testing.<\/li>\n<li><strong>Testing portfolio:<\/strong> low-strain integrity testing, crosshole sonic logging, static maintained load tests, rapid load testing, and, where relevant, dynamic testing during driving.<\/li>\n<li><strong>Documentation and traceability:<\/strong> installation logs, concrete volumes and pressures, reinforcement records, and as-built surveys for each pile position.<\/li>\n<\/ul>\n<h2>Pile head construction and pile head deconstruction<\/h2>\n<p>After constructing cast-in-place piles, the <strong>pile head<\/strong> is exposed down to sound concrete placed without vibration to achieve a monolithic connection with the pile cap. During conversion, rehabilitation, or full deconstruction, pile heads often must be removed, reinforcement selectively exposed, and separated. Especially in sensitive environments, <em>low-vibration and noise-reduced methods<\/em> are required.<\/p>\n<h3>Methods for deconstruction<\/h3>\n<ul>\n<li><strong>Concrete crushers<\/strong> from Darda GmbH break pile heads in a controlled manner and enable precise exposure of reinforcement, for example in confined excavations, under bridges, or close to existing structures.<\/li>\n<li><strong>Rock and concrete splitters<\/strong> generate defined split lines in concrete and reduce vibrations and far-field effects. This is advantageous near sensitive neighboring structures or utilities.<\/li>\n<li><strong>Steel shears<\/strong> or <strong>Multi Cutters<\/strong> cut exposed reinforcement cleanly and accelerate segregated material separation.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a><\/strong> supply the tools with the required pressure and flow; compact units facilitate use in constrained conditions.<\/li>\n<\/ul>\n<h3>Work steps in detail<\/h3>\n<ol>\n<li>Mark the target elevation and determine concrete quality at the pile head.<\/li>\n<li>Center-punching or <em>pre-weakening<\/em> the concrete along the removal edge.<\/li>\n<li>Controlled breaking with concrete crushers; alternatively, drill splitting holes and hydraulically crack the pile head.<\/li>\n<li>Expose, align, and cut reinforcement with steel shears\/Multi Cutters, or prepare it for connection.<\/li>\n<li>Segregated haul-off of concrete rubble and reinforcing steel for recycling.<\/li>\n<\/ol>\n<h3>Acceptance criteria and tolerances<\/h3>\n<ul>\n<li><strong>Sound concrete<\/strong> free of laitance at the contact surface to the pile cap.<\/li>\n<li><strong>Defined reinforcement projection<\/strong> and spacing for couplers or lap lengths.<\/li>\n<li><strong>Dimensional accuracy<\/strong> of the trimmed head relative to design elevation, with clean edges and no uncontrolled cracking into the shaft.<\/li>\n<\/ul>\n<h2>Pile walls, excavations, and local adaptations<\/h2>\n<p>For pile walls, capping beams, anchor heads, and bearing zones often require finishing. Local openings for penetrations, utility runs, or temporary auxiliary structures are preferably produced <em>selectively<\/em>. In practice, concrete crushers enable precise recesses, while rock and concrete splitters minimize the risk of uncontrolled crack propagation. In rock contact zones &#8211; such as at the pile tip or at anchors &#8211; splitters can detach rock protrusions with low vibration, creating interfaces to rock excavation and tunneling.<\/p>\n<ul>\n<li><strong>Typical interfaces:<\/strong> tie-back anchor windows, drainage outlets, recesses for bracing, and adjustment of capping beam geometry.<\/li>\n<li><strong>Controls:<\/strong> verification of wall verticality, continuity of sealing segments, and preservation of tolerances at adjoining slabs or struts.<\/li>\n<\/ul>\n<h2>Low-vibration methods and environmental protection<\/h2>\n<p>Quiet, hydraulic methods reduce vibration, airborne noise, and dust. They are suitable for urban sites, hospitals, laboratories, existing buildings, and operating infrastructure facilities. Water wetting, localized extraction, clear separation areas, and short haul routes support environmental protection and site logistics. Where thermal or explosive methods are excluded, <strong>concrete crushers<\/strong> and <strong>hydraulic splitters<\/strong> offer a controlled alternative.<\/p>\n<ul>\n<li><strong>Emissions management:<\/strong> vibration and noise monitoring against project thresholds, dust suppression at the tool interface, and efficient material flows.<\/li>\n<li><strong>Neighbor protection:<\/strong> time windows, buffer zones, and predictive communication based on measured data.<\/li>\n<\/ul>\n<h2>Safety and organizational aspects<\/h2>\n<p>Safety takes precedence: Structural conditions must be checked before interventions, load redistributions considered, and work areas secured. Personal protective equipment, clearances, operator instructions, and exclusion zones are mandatory. When working on pile heads, the location and condition of reinforcement, potential prestressing, and utilities must be clarified. Statements in this text are general in nature and do not replace project-specific planning.<\/p>\n<ul>\n<li><strong>Risk assessment:<\/strong> stability checks of excavation faces and adjacent structures, with contingency measures for unexpected voids or obstructions.<\/li>\n<li><strong>Operational control:<\/strong> tool inspection, pressure settings, and hold points for intermediate acceptance.<\/li>\n<li><strong>Monitoring:<\/strong> settlement points, crack gauges at neighboring assets, and real-time logging of process parameters where required.<\/li>\n<\/ul>\n<h2>Typical damage patterns and repair<\/h2>\n<p>Common findings include spalling at the pile head, insufficient concrete cover, corrosion, out-of-plumb piles, or incomplete embedment. Repairs include removing damaged zones, producing defined contact surfaces, preparing reinforcement connections, and reprofiling. Selective removal methods with concrete crushers and rock and concrete splitters support joint quality and reduce consequential damage.<\/p>\n<ul>\n<li><strong>Diagnosis:<\/strong> visual inspection, hammer sounding, cover meter surveys, and non-destructive integrity testing to localize defects.<\/li>\n<li><strong>Remedial design:<\/strong> re-anchoring or supplemental micropiles where capacity is deficient, corrosion mitigation, and reinstatement with suitable repair mortars.<\/li>\n<\/ul>\n<h2>Application areas and interfaces in practice<\/h2>\n<p>Pile systems touch numerous fields of work: In <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/strong>, pile heads are adjusted or removed; during <strong>strip-out and cutting<\/strong>, openings are created in pile walls; in <strong>rock excavation and tunneling<\/strong>, pile foundations encounter rock caps or anchor zones; in <strong>natural stone extraction<\/strong>, splitting techniques from the quarry can be applied to rock contact zones; in <strong>special deployments<\/strong>, confined or emission-critical situations must be managed. Tools from Darda GmbH &#8211; especially <strong>concrete crushers<\/strong> as well as <strong>rock and concrete splitters<\/strong> &#8211; integrate well into workflows thanks to their controlled, modular application.<\/p>\n<p>Interfaces with temporary works, traffic management, and utility protection demand precise coordination so that pile work proceeds without disrupting adjacent trades or operations.<\/p>\n<h2>Planning, logistics, and cost-effectiveness<\/h2>\n<p>An economical pile head removal combines precise methods, short setup times, and clean material logistics. Compact hydraulic power packs simplify transport, especially on scaffolds or in shafts. Early coordination of pile locations, target elevations, reinforcement layouts, and construction stages reduces rework. By adapting the removal method to concrete strength, reinforcement density, and surroundings, emissions and costs are limited.<\/p>\n<ul>\n<li><strong>Lean sequencing:<\/strong> batch processing of similar pile details, standardized setups, and just-in-time removal to match cap casting.<\/li>\n<li><strong>Site logistics:<\/strong> defined load paths for equipment, interim storage for segregated materials, and efficient crane or hoist utilization.<\/li>\n<li><strong>Cost drivers:<\/strong> access constraints, concrete hardness, reinforcement congestion, and disposal routes for rubble and steel.<\/li>\n<\/ul>\n<h2>Sustainability and recycling in pile deconstruction<\/h2>\n<p>Selective deconstruction supports the reuse of concrete and steel. Controlled breaking and splitting facilitate separation, avoid oversize material, and reduce landfill fractions. The focus is on minimal impact to the existing structure and ground to conserve resources. Precise documentation of material flows and clear site organization contribute to a sustainable process.<\/p>\n<ul>\n<li><strong>Resource efficiency:<\/strong> maximizing recyclable fractions, minimizing rework, and reducing transport through compact handling.<\/li>\n<li><strong>Quality of recyclate:<\/strong> clean reinforcement and size-controlled concrete fragments enable higher-value reuse options.<\/li>\n<li><strong>Evidence:<\/strong> traceable waste codes, weight tickets, and, where applicable, project-specific sustainability metrics.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pile systems are among the load-bearing elements of deep foundation engineering and secure structures where near-surface soil cannot adequately take up loads. They transfer forces deep into load-bearing soil layers or rock and are used in building construction, bridges, port facilities, retaining structures, as well as in tunneling and special <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pile-system\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19525","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pile System in Deep Foundation Engineering<\/title>\n<meta name=\"description\" content=\"Explore pile systems for deep foundation with design, types, load transfer &amp; low vibration methods \u2713 for urban sites.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pile-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pile System in Deep Foundation Engineering\" \/>\n<meta property=\"og:description\" content=\"Explore pile systems for deep foundation with design, types, load transfer &amp; low vibration methods \u2713 for urban sites.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pile-system\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-02T15:16:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pile-system\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pile-system\",\"name\":\"Pile System in Deep Foundation Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-19T12:27:53+00:00\",\"dateModified\":\"2026-05-02T15:16:02+00:00\",\"description\":\"Explore pile systems for deep foundation with design, types, load transfer & low vibration methods \u2713 for urban sites.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pile-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pile-system\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pile-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pile system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pile System in Deep Foundation Engineering","description":"Explore pile systems for deep foundation with design, types, load transfer & low vibration methods \u2713 for urban sites.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pile-system","og_locale":"en_US","og_type":"article","og_title":"Pile System in Deep Foundation Engineering","og_description":"Explore pile systems for deep foundation with design, types, load transfer & low vibration methods \u2713 for urban sites.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pile-system","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-02T15:16:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pile-system","url":"https:\/\/www.darda.de\/en\/knowledge\/pile-system","name":"Pile System in Deep Foundation Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-19T12:27:53+00:00","dateModified":"2026-05-02T15:16:02+00:00","description":"Explore pile systems for deep foundation with design, types, load transfer & low vibration methods \u2713 for urban sites.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pile-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pile-system"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pile-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pile system"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19525"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19525\/revisions"}],"predecessor-version":[{"id":26862,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19525\/revisions\/26862"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}