{"id":19518,"date":"2025-11-19T12:29:23","date_gmt":"2025-11-19T11:29:23","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19518"},"modified":"2026-05-02T11:13:02","modified_gmt":"2026-05-02T09:13:02","slug":"particle-measurement-test","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test","title":{"rendered":"Particle measurement test"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Particle measurement describes the systematic detection of dust and fine dust in the air. On construction sites, in deconstruction, and in natural stone extraction, mineral dust arises from concrete, mortar, rock and metal processing. For planning and executing work with concrete demolition shear, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, or in tunnel construction, understanding dust exposure is important. It helps assess health risks, steer dust suppression, and document project outcomes in a traceable way. Darda GmbH classifies particle measurements as part of careful work preparation without altering the character of the measurement as an <strong>objective, methodologically sound stocktaking<\/strong>. As a result, particulate matter is captured in a way that enables reproducible comparisons across work phases and tools while keeping methodological neutrality intact.<\/p>\n<h2>Definition: What is meant by particle measurement?<\/h2>\n<p>Particle measurement refers to the determination of <strong>size, number, and mass<\/strong> of airborne particles. Common indicators include PM10, PM2.5, and PM1 (fractions by aerodynamic diameter), distinguishing between inhalable, thoracic, and respirable. In addition, mass-related concentrations (for example mg\/m\u00b3, \u00b5g\/m\u00b3), number concentrations (particles\/cm\u00b3), or surface-specific metrics are determined. In construction and deconstruction, one often distinguishes between emission measurement near the source (e.g., at a concrete demolition shear), immission measurement in the surroundings (e.g., at the property boundary), and workplace-related measurement at breathing zone height. Where relevant, <em>material-specific constituents<\/em> (for example crystalline shares in mineral dust) can be analyzed from gravimetric samples in separate laboratory steps. The goal is the objective assessment of peak loads and averages as well as the effectiveness control of dust suppression measures. To ensure comparability, reporting should reference the applied fractions, units, and reference conditions.<\/p>\n<h2>Measurement methods and metrics in construction, demolition, and extraction<\/h2>\n<p>Gravimetric, optical, and condensation-based methods are used for particle measurement. Gravimetry determines dust mass via filter sampling with cyclonic pre-separators or impactors for defined fractions. Optical methods (light scattering, nephelometry, optical particle counters) provide time-resolved data on size and number. Condensation particle counters capture very fine particles at high number concentrations. The choice of method depends on the material (concrete, natural stone, reinforcing steel), the working technique (e.g., concrete splitter, concrete demolition shear, hydraulic shear), and the objective of the measurement (peaks, averages, trends). In practice, <em>direct-reading data<\/em> are often aligned to gravimetric values via a documented correction factor to reduce bias. Important metrics are short-term peaks, time-weighted averages (TWA), percentiles, and the distribution across size classes. <strong>Quality assurance<\/strong> includes calibration, zero and span checks, sample recovery, and correct documentation of flow rate, temperature, and humidity. Data completeness, event markers for work phases, and secure storage of raw files strengthen traceability.<\/p>\n<h2>Dust sources with a concrete demolition shear and a concrete splitter<\/h2>\n<p>Mineral dust is generated when the matrix of concrete or rock is mechanically stressed. Crushing with a concrete demolition shear creates fracture surfaces and abrasion on aggregate and matrix. When splitting with a concrete splitter, crack formation and controlled separation along the tensile zone dominate. These different material stresses generally produce different particle size distributions. Splitting processes often lead to fewer very fine fractions, while crushing methods can generate more fine content. Actual emission, however, strongly depends on strength, moisture, aggregates, reinforcement content, process parameters, and the guidance of the tool. Secondary sources such as material handling, drop heights, and vehicle traffic on contaminated surfaces can add to the measured load.<\/p>\n<h3>Influence of the processing technique<\/h3>\n<ul>\n<li>Concrete splitter: Crack initiation and propagation with low frictional abrasion, often lower fine dust formation, strongly dependent on borehole geometry and substrate moisture.<\/li>\n<li>Concrete demolition shear: Shear and compressive loading; fine fraction influenced by opening and closing speed, cutting edge condition, and springback in the structural element.<\/li>\n<li>Hydraulic shear and Multi Cutters: Primarily metal abrasion and splinters; mineral dust fractions arise mainly when separating composite materials (concrete\/steel).<\/li>\n<li>Tank cutters: Metal particles and aerosols; mineral dust fractions can occur at anchorages or in work near foundations.<\/li>\n<li>Hydraulic power pack: Influences process steadiness and thus the temporal dust emission, but does not itself generate mineral dust.<\/li>\n<li>Drilling for splitting: Drill cuttings and dry blow-out can dominate near-source peaks; wet drilling or point extraction reduce release at the borehole.<\/li>\n<\/ul>\n<h2>Planning the particle measurement on the construction site<\/h2>\n<p>A robust measurement concept is oriented to the work phases and the tools used. For work with concrete demolition shear or a concrete splitter, a combination of personal measurement in the breathing zone and fixed measurement near the source as well as in the background is recommended. This allows source, dispersion, and exposure of individual trades to be separated. Instruments are selected according to the deployment environment: rugged, shock-resistant, and moisture-resistant systems for tunnel construction and deconstruction environments; fine resolution for interior strip-out. Baseline measurements before the start of work and consideration of wind direction or ventilation flow improve attribution to the construction activity.<\/p>\n<h3>Measurement points and sampling heights<\/h3>\n<ul>\n<li>Source: 1-2 m from the point of processing, at working surface height.<\/li>\n<li>Workplace: on the person at breathing height; carried along for changing tasks.<\/li>\n<li>Background: on the wind or ventilation side to delineate ambient load.<\/li>\n<li>Sensitive receptors: additional immission points at property boundaries or fa\u00e7ades where required by the project brief.<\/li>\n<\/ul>\n<h3>Measurement duration and temporal resolution<\/h3>\n<ul>\n<li>Phase-based: start, engagement (e.g., splitting, shear stroke), material removal.<\/li>\n<li>Long-term: several hours up to per-shift monitoring for trends.<\/li>\n<li>Short-term: second- to minute-resolution for emission peaks.<\/li>\n<li>Event-linked: time stamps from equipment logs support precise assignment of peaks to actions.<\/li>\n<\/ul>\n<h3>Quality assurance and calibration<\/h3>\n<ul>\n<li>Flow control before and after the measurement, zero check, blank runs.<\/li>\n<li>Filter conditioning and weighing under stable climate conditions.<\/li>\n<li>Comparison measurements between gravimetric and optical methods for bias correction.<\/li>\n<li>Collocated samplers and field blanks to verify precision and contamination control.<\/li>\n<li>Documented acceptance criteria for calibration, data completeness, and instrument drift.<\/li>\n<\/ul>\n<h2>Occupational safety: assessing fine dust exposure<\/h2>\n<p>For occupational safety, measured values are compared with generally recognized guideline and assessment benchmarks. The usual approach is to combine personal gravimetric measurement for mass concentrations with time-resolved optical measurement for peaks. This captures both shift-long exposure and short-term loads. Where material composition suggests it, <em>fraction-specific analyses<\/em> can complement mass-based metrics. Statements on limit and guideline values must always be general and non-binding; specific requirements may vary by country, industry, and task. Results should be interpreted in relation to the specific methods used (e.g., concrete demolition shear, concrete splitter) in order to derive targeted technical and organizational measures. Documentation should include uncertainties to support robust decisions and prioritization of controls.<\/p>\n<h3>Personal and fixed measurement<\/h3>\n<ul>\n<li>Personal-worn: represents individual exposure, helpful for mobile activities and varying distances to the source.<\/li>\n<li>Fixed: shows sources and dispersion, allows evaluation of protective enclosure, negative pressure containment, or water spray.<\/li>\n<li>Task-based: short targeted samples during defined actions to quantify typical peaks and inform process optimization.<\/li>\n<\/ul>\n<h2>Emissions in tunnel construction and rock excavation<\/h2>\n<p>In tunnel construction and rock excavation, limited air volumes, varying humidity, and restricted visibility prevail. Here, the combination of rugged, time-resolved instruments and careful sample logistics is decisive. Splitting procedures can reduce fine dust formation compared to percussive methods, provided process control is calm and material handling is organized with low dust. Measurement concepts consider the flow of tunnel ventilation, working distances, rebound of fragments, and placement of devices outside direct splash zones, with practices aligned to <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. For optical instruments, heated or conditioned inlets and dew point checks help minimize humidity artifacts underground.<\/p>\n<h2>Data analysis and reporting<\/h2>\n<p>Raw data are checked for plausibility, zero drift, and outliers. This is followed by aggregation by work phase: positioning the concrete demolition shear, the actual shear stroke, release and removal; or drilling, setting, and splitting with the concrete splitter. Important evaluations are time series, percentiles, TWA, and peaks linked to specific actions. <strong>Transparency<\/strong> arises by linking measured values with the site diary, photos from a safe distance, and machine logs of the hydraulic power pack (e.g., pressure and cycle information), where available. Reports should clearly state measurement uncertainty and the limits of transferability. Clear visuals with consistent axes, annotations for control measures, and a concise methods section support comprehensibility for all project stakeholders.<\/p>\n<h2>Measures for dust suppression and their metrological control<\/h2>\n<p>The effectiveness of dust suppression is pragmatically verified with before-and-after measurements. Identical work phases with identical tool handling are repeated. Especially with concrete demolition shear and concrete splitter, the cutting\/splitting sequence, accessibility, and material preparation influence dust release. Low-dust workflows combine technical, organizational, and personal measures. A structured control hierarchy prioritizes engineering controls and process optimization before reliance on procedural steps.<\/p>\n<h3>Water, extraction, material preparation<\/h3>\n<ul>\n<li>Water spray at the point of engagement reduces fine dust; dose so that visibility and electrics are not impaired.<\/li>\n<li>Point extraction near the source; secure hose routing against kinks and leaks.<\/li>\n<li>Pre-wetting of cutting and splitting lines; remove loose dust nests before shear strokes.<\/li>\n<li>Nozzle selection and droplet size adapted to the task; avoid excessive mist formation that impairs visibility.<\/li>\n<li>Seasonal planning: ensure sufficient water availability and drainage, consider freezing protection where applicable.<\/li>\n<\/ul>\n<h3>Tool selection and process control<\/h3>\n<ul>\n<li>Work splitting first, then crushing: initiate separation cracks, then shear in a targeted way.<\/li>\n<li>Continuous rather than jerky engagement; sharp cutting edges and intact jaws on the concrete demolition shear.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> with stable delivery to avoid unnecessary peak loads.<\/li>\n<li>Moderate feed rates and reduced idle movements to keep avoidable abrasion and spikes low.<\/li>\n<\/ul>\n<p>Measured values show the effect of these measures directly: declining peaks and lower averages confirm effective implementation. Increases indicate changed material, tool wear, or unfavorable process sequences. Consistent documentation of settings and site conditions enables targeted follow-up adjustments.<\/p>\n<h2>Environmental aspects and neighborhood protection<\/h2>\n<p>Immission measurements at sensitive points (e.g., building fa\u00e7ades, property boundaries) support neighborhood protection. Time-resolved measurements help separate construction site emission and background. Low-dust workflows with concrete demolition shear and concrete splitter, complemented by protective enclosure and cleaning, reduce deposits on traffic areas and entries into drainage. Statements on environmental requirements should always remain general; specific conditions may vary by project, location, and permitting situation. Regular cleaning of transport routes and covered interim storage lower the potential for re-suspension beyond the working zone.<\/p>\n<h2>Typical measurement errors and uncertainties<\/h2>\n<p>Measurements are only as good as their quality assurance. Typical errors are humidity effects on optical devices, losses of coarse particles in intake hoses, incorrect cut-off curves on cyclones, electrostatic effects on filters, and non-representative measurement points. <em>Good practice<\/em> includes short intake paths, sufficient stabilization before weighing, on-site calibration checks, parallel measurements of different methods, and clear chain-of-custody protocols. Overloading of filters and particle bounce on impactors should be checked and documented. Uncertainties are reported to keep decisions robust.<\/p>\n<h2>Practical examples: application-oriented measurement concepts<\/h2>\n<p>The following scenarios show how measurement strategies can be adapted to the application area without providing case-specific consulting.<\/p>\n<h3>Concrete demolition with a concrete demolition shear<\/h3>\n<ul>\n<li>Measurement objective: assessment of peaks during shear strokes and rework.<\/li>\n<li>Setup: personal gravimetry (shift) plus optical source\/background.<\/li>\n<li>Measure check: comparison of peaks with and without water spray and with modified stroke sequences.<\/li>\n<li>Supplement: event markers from machine logs to assign and compare identical action windows.<\/li>\n<\/ul>\n<h3>Concrete splitter in natural stone extraction<\/h3>\n<ul>\n<li>Measurement objective: share of fine fractions during splitting in the raw block.<\/li>\n<li>Setup: optical particle counter near the splitting line, background sensor on the windward side.<\/li>\n<li>Measure check: influence of pre-wetting and borehole geometry on fine dust fractions.<\/li>\n<li>Supplement: short gravimetric sequences to validate optical readings under varying moisture.<\/li>\n<\/ul>\n<h3>Strip-out: low-dust sequences<\/h3>\n<ul>\n<li>Measurement objective: overall exposure indoors with changing activities.<\/li>\n<li>Setup: negative pressure containment with fixed monitors; personal filter sampling for selected trades.<\/li>\n<li>Measure check: effectiveness of protective enclosure and point extraction during combined use of concrete demolition shear, hydraulic shear, and Multi Cutters.<\/li>\n<li>Supplement: baseline before start of work and post-cleaning check to verify restoration of background levels.<\/li>\n<\/ul>\n<h2>Material- and process-dependent specifics<\/h2>\n<p>Concrete with a high fine cement content, dense aggregates, or dry surfaces shows different emission profiles compared to moist, carbonated, or fiber-reinforced concrete. Natural stones vary by bonding and grain. Process factors such as feed, pressure, stroke rate, jaw geometry of the concrete demolition shear, as well as drilling pattern and spreading pressures with the concrete splitter shape the particle distribution. Recycled materials and coatings can add heterogeneous fines or fibers that affect optical readings. Measurements should reflect these differences and account for them in the evaluation.<\/p>\n<h2>Integration into project management<\/h2>\n<p>Particle measurement is not an end in itself. It serves process control, effectiveness checks, and documentation for project stakeholders. Darda GmbH recommends integrating measurements early into work planning: goal definition, method selection, responsibilities, measurement points, data management. This way, insights from the measurement feed directly into the choice of tools (e.g., concrete demolition shear, concrete splitter), the sequence of work steps, and dust suppression measures. Defined reporting cycles, clear thresholds for follow-up actions, and versioned storage of protocols and raw data support consistent implementation across projects.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Particle measurement describes the systematic detection of dust and fine dust in the air. On construction sites, in deconstruction, and in natural stone extraction, mineral dust arises from concrete, mortar, rock and metal processing. For planning and executing work with concrete demolition shear, rock and concrete splitters, or in tunnel <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19518","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Particle Measurement Test - Construction Dust<\/title>\n<meta name=\"description\" content=\"Expert guide to particle measurement testing for airborne dust in construction &amp; demolition \u27a4 methods, metrics, safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Particle Measurement Test - Construction Dust\" \/>\n<meta property=\"og:description\" content=\"Expert guide to particle measurement testing for airborne dust in construction &amp; demolition \u27a4 methods, metrics, safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-02T09:13:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/particle-measurement-test\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/particle-measurement-test\",\"name\":\"Particle Measurement Test - Construction Dust\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-19T11:29:23+00:00\",\"dateModified\":\"2026-05-02T09:13:02+00:00\",\"description\":\"Expert guide to particle measurement testing for airborne dust in construction & demolition \u27a4 methods, metrics, safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/particle-measurement-test#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/particle-measurement-test\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/particle-measurement-test#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Particle measurement test\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Particle Measurement Test - Construction Dust","description":"Expert guide to particle measurement testing for airborne dust in construction & demolition \u27a4 methods, metrics, safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test","og_locale":"en_US","og_type":"article","og_title":"Particle Measurement Test - Construction Dust","og_description":"Expert guide to particle measurement testing for airborne dust in construction & demolition \u27a4 methods, metrics, safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-02T09:13:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test","url":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test","name":"Particle Measurement Test - Construction Dust","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-19T11:29:23+00:00","dateModified":"2026-05-02T09:13:02+00:00","description":"Expert guide to particle measurement testing for airborne dust in construction & demolition \u27a4 methods, metrics, safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/particle-measurement-test#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Particle measurement test"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19518"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19518\/revisions"}],"predecessor-version":[{"id":26846,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19518\/revisions\/26846"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}