{"id":19503,"date":"2025-11-18T15:01:22","date_gmt":"2025-11-18T14:01:22","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19503"},"modified":"2026-05-01T10:15:03","modified_gmt":"2026-05-01T08:15:03","slug":"exposure-of-utilities","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities","title":{"rendered":"Exposure of utilities"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The exposure of utilities &#8211; often also referred to as exposing cables, pipes, and utility lines &#8211; is a central work step in construction, refurbishment works, and deconstruction. The goal is to make the actual position, depth, and condition of supply and disposal lines visible in order to avoid damage and to enable safe connections, inspections, or dismantling. In existing buildings, in the road corridor, and in industrial plants, a careful, low-vibration, and as spark-free as possible approach determines quality, schedule reliability, and occupational safety. Especially in the vicinity of reinforced concrete components and densely occupied corridors, controlling, selective methods prove their worth &#8211; for example, the targeted use of a <strong>concrete pulverizer<\/strong> or <strong>concrete splitter<\/strong> in combination with a suitable <strong>hydraulic power pack<\/strong> by Darda GmbH, for example with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>. Reliable exposure contributes to <em>damage prevention, transparent documentation, and coordinated handoffs<\/em> across project stakeholders.<\/p>\n<h2>Definition: What is meant by the exposure of utilities?<\/h2>\n<p>\u201cExposure of utilities\u201d means the controlled uncovering of existing utility infrastructure (including power cables, telecommunications lines, gas, water, and district heating pipes, sewer lines, as well as industrial media pipelines) by localized excavation or structural opening. The purpose is to make utilities visible and accessible for identification, surveying, testing, repair, decommissioning, or connection. Exposure can take place in soil, under paved surfaces, or within components made of concrete, masonry, and natural stone. <strong>Decisive is a risk-minimized approach that is gentle on utilities and structures<\/strong>, often using selective deconstruction procedures from concrete demolition and special demolition. In many jurisdictions, exposure is an integral verification step before tie-ins or deconstruction and must be documented in a traceable manner.<\/p>\n<h2>Application areas and objectives of utility exposure<\/h2>\n<p>Depending on the project phase, exposure serves different purposes and acts as a link between planning, investigation, and execution. It also supports schedule and cost certainty by reducing rework and preventing unplanned service interruptions.<\/p>\n<h3>Typical reasons<\/h3>\n<ul>\n<li>Existing-condition survey prior to conversion, refurbishment works, or extension<\/li>\n<li>Establishing new house connections and cross-connections<\/li>\n<li>Verification of positional data (as-built check)<\/li>\n<li>Damage investigation, leak detection, and condition assessment<\/li>\n<li>Selective deconstruction in buildings and industrial plants<\/li>\n<li>Work in sensitive areas such as hospitals, laboratories, tunnels, or refineries (special operation)<\/li>\n<li>Emergency access after incidents or suspected third-party damage<\/li>\n<li>Clash detection and clearance in the context of planning coordination<\/li>\n<\/ul>\n<h3>Outcome orientation<\/h3>\n<ul>\n<li>Reproducible surveying of position and depth<\/li>\n<li>Visual inspection of sheath, insulation, and corrosion condition<\/li>\n<li>Safe segregation, rerouting, or connection<\/li>\n<li>Documentation for planning, operations, and maintenance<\/li>\n<li>Up-to-date as-built data for GIS and model-based planning<\/li>\n<\/ul>\n<h2>Planning and preparation: from utility records to site setup<\/h2>\n<p>Precise preparation reduces risks and consequential damage. It creates the basis for efficient, low-disruption work &#8211; in the soil as well as in reinforced concrete components. <em>Permits, responsibilities, and interfaces<\/em> must be clarified before work starts.<\/p>\n<h3>Utility records, locating, and marking<\/h3>\n<ul>\n<li>Obtain available record drawings and utility records<\/li>\n<li>Electromagnetic and radar-based locating methods (depending on subsoil and material), including ground-penetrating radar (GPR)<\/li>\n<li>Surface marking of routes and potential crossings<\/li>\n<li>Verification pits at critical nodes to validate records and signal responses<\/li>\n<\/ul>\n<h3>Technical and organizational preparation<\/h3>\n<ul>\n<li>Hazard analysis, cordons\/barriers, traffic management, escape routes<\/li>\n<li>Releases and shutdowns according to generally accepted rules of technology (e.g., pressure relief, utility power isolation within the operator\u2019s responsibility)<\/li>\n<li>Construction power supply, dewatering system, dust protection and noise control, emission limitation if necessary<\/li>\n<li>Provision of suitable equipment: hand tools, vacuum\/suction devices, concrete pulverizer, concrete splitter, hydraulic power pack by Darda GmbH, measuring and test instruments<\/li>\n<li>Communication and escalation plan with network and facility operators<\/li>\n<li>Permit to work and confined-space procedures where applicable<\/li>\n<\/ul>\n<h2>Procedures in the ground: non-destructive and controlled<\/h2>\n<p>In soil, avoiding damage to utilities is paramount. Mechanical earthworks are reduced to a minimum once the utility zone is reached. Non-conductive, non-sparking tools and insulated equipment increase safety near live or pressurized lines.<\/p>\n<h3>Proven approaches<\/h3>\n<ul>\n<li>Hand excavation in the vicinity of utilities (spade tool, shovel, non-sharp-edged)<\/li>\n<li>Vacuum\/suction methods for low-damage exposure of fine-grained soils<\/li>\n<li>Water\/air assistance only where unavoidable and permitted<\/li>\n<li>Lateral shoring for deeper test pits, securing adjacent components<\/li>\n<li>Use of insulated tools when approaching electrical utilities<\/li>\n<\/ul>\n<h3>Quality and protective measures<\/h3>\n<ul>\n<li>Stepwise approach, opening above the presumed route axis<\/li>\n<li>Continuous visual control, checking soil discolorations, feeler gauges<\/li>\n<li>After exposure: cleaning, photo documentation, surveying<\/li>\n<li>Temporary utility protection during subsequent construction phases<\/li>\n<li>Protective sleeves, mats, or covers to prevent accidental contact and impact<\/li>\n<\/ul>\n<h2>Exposure in reinforced concrete and masonry: selective rather than extensive<\/h2>\n<p>When dealing with embedded parts, beams, shafts, slabs, or walls, separating the component from the utility is demanding. <em>Selective, low-vibration procedures<\/em> reduce the risk of secondary damage and increase control over work progress. Limiting microcracking and preventing moisture ingress into remaining structures preserve durability and serviceability.<\/p>\n<h3>Procedure in load-bearing and non-load-bearing areas<\/h3>\n<ol>\n<li>Locating utilities and reinforcement (e.g., cover, reinforcement information)<\/li>\n<li>Creating relief and guide cuts (low-dust and low-emission where possible)<\/li>\n<li>Targeted removal of concrete around the utility:\n<ul>\n<li><strong>Concrete pulverizer<\/strong> for controlled nibbling of concrete, especially in selective deconstruction and building gutting<\/li>\n<li><strong>Concrete splitter<\/strong> for low-vibration opening of components, e.g., at edges, foundations, or massive blocks<\/li>\n<\/ul>\n<\/li>\n<li>Free cutting or separation of reinforcing steel with suitable cutting tools (e.g., multi cutters, steel shear)<\/li>\n<li>Gentle exposure of the utility, cleaning, and visual inspection<\/li>\n<li>Temporary stabilization or bracing of uncovered sections where required<\/li>\n<\/ol>\n<h3>Advantages of controlled, hydraulic procedures<\/h3>\n<ul>\n<li>Low vibrations &#8211; protection of sensitive installations and adjacent components<\/li>\n<li>High dimensional control &#8211; pinpoint exposure instead of large-area removal<\/li>\n<li>Reduced spark generation &#8211; important with flammable media and in special demolition<\/li>\n<li>Good combinability with core drilling and separation cut<\/li>\n<li>Lower noise emissions and high controllability in confined spaces<\/li>\n<\/ul>\n<p>Hydraulic power packs by Darda GmbH provide the energy for compact tools that can be used in shafts, plant rooms, or on tight construction sites with limited space. Short setup times and modular components facilitate staged work sequences.<\/p>\n<h2>Safety and health protection: principles with good judgment<\/h2>\n<p>Safety measures follow the generally accepted rules of technology and project-specific requirements. They must always be specified based on site and operator conditions. A documented risk assessment with defined stop points and authority to stop work enhances control.<\/p>\n<h3>General protection goals<\/h3>\n<ul>\n<li>Safe release of energies (electrical, thermal, hydraulic\/pneumatic)<\/li>\n<li>Hazardous substance and gas measurements in shafts and rooms without sufficient ventilation<\/li>\n<li>Explosion protection through low-spark procedures, grounding, and suitable work equipment<\/li>\n<li>Personal protective equipment, load handling, ergonomic workplaces<\/li>\n<li>Protection against falls, burial, and uncontrolled component movements (fall protection, shoring)<\/li>\n<li>Fire prevention and hot-work coordination, including fire watch where necessary<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>After exposure, measurement and documentation steps are crucial for planning, operation, and later maintenance. <strong>Traceability and reproducibility<\/strong> are essential for subsequent approvals and handovers.<\/p>\n<ul>\n<li>Georeferenced capture of position, depth, and alignment<\/li>\n<li>Photo\/video documentation, material and condition description<\/li>\n<li>Recording protective measures, transition structures, and temporary works<\/li>\n<li>Coordination with planning and execution on further steps (connection, rerouting, dismantling)<\/li>\n<li>Assignment of unique identifiers to exposed utilities and integration into asset registers<\/li>\n<\/ul>\n<h2>Tools and application areas of Darda GmbH in the context of exposure<\/h2>\n<p>Depending on the construction task and environmental conditions, products and application areas of Darda GmbH can be assigned in a factual and purpose-oriented way. The focus is on controllability, low emissions, and compatibility with constrained access conditions.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<ul>\n<li><strong>Concrete pulverizer<\/strong> for selective removal of concrete at cable ducts, slab openings, and shaft heads<\/li>\n<li><strong>Concrete splitter<\/strong> for opening massive components with low vibration<\/li>\n<li>Additionally: <em>hydraulic power pack<\/em> as a compact energy source<\/li>\n<li>Noise-reduced operation for work near occupied or sensitive areas<\/li>\n<\/ul>\n<h3>Gutting and cutting<\/h3>\n<ul>\n<li>Precise exposure in confined spaces, nibbling residual concrete around utilities<\/li>\n<li>Separating embedded steels with multi cutters or steel shear after exposure<\/li>\n<li>Sequenced cutting to maintain structural stability while uncovering lines<\/li>\n<\/ul>\n<h3>Rock excavation and tunnel construction<\/h3>\n<ul>\n<li>Exposure of utility crossings in rocky subsoil by controlled splitting, consistent with <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/li>\n<li>Reduction of vibrations in sensitive existing areas<\/li>\n<li>Improved control where blasting or impact methods are restricted<\/li>\n<\/ul>\n<h3>Special operation<\/h3>\n<ul>\n<li>Spark-reduced and low-vibration procedures for areas with flammable or sensitive media<\/li>\n<li>Planned dismantling: controlled exposure prior to the use of cutting torch or steel shear<\/li>\n<li>Remote or distance-enhancing operation to reduce personnel exposure<\/li>\n<\/ul>\n<h2>Practical workflow: reaching the goal in clear steps<\/h2>\n<ol>\n<li>Define project objectives and clarify responsibilities<\/li>\n<li>Obtain utility records, perform locating, mark routes<\/li>\n<li>Agree on the work and safety concept, obtain approvals<\/li>\n<li>Set up the site, cordon off, provide ventilation and lighting<\/li>\n<li>Approach: selectively excavate soil or open the component in a targeted way<\/li>\n<li>Introduce hold points and monitoring (e.g., gas checks, vibration limits, acceptance of intermediate states)<\/li>\n<li>Fine exposure: use concrete pulverizer or concrete splitter in a controlled manner<\/li>\n<li>Clean and visually inspect the utility; cut reinforcement or embedded parts if required<\/li>\n<li>Surveying, photo documentation, condition log<\/li>\n<li>Temporary utility protection, coordination of follow-on trades<\/li>\n<li>Dismantle temporaries or convert to permanent solutions<\/li>\n<li>Handover of as-built data and documentation into the operator\u2019s systems<\/li>\n<\/ol>\n<h2>Typical risks and how to reduce them<\/h2>\n<ul>\n<li><strong>Unclear records:<\/strong> Probe in advance, expose step-by-step, document<\/li>\n<li><strong>Damage to the utility:<\/strong> Always process the last centimeters manually or with finely controllable hydraulics<\/li>\n<li><strong>Vibrations:<\/strong> Prefer selective procedures; splitting instead of extensive impact<\/li>\n<li><strong>Spark\/ignition hazards:<\/strong> Choose spark-reduced cutting and removal techniques, perform measurements<\/li>\n<li><strong>Statics and stability:<\/strong> Check load transfer, provide temporary shoring<\/li>\n<li><strong>Water ingress or flooding:<\/strong> Monitor groundwater, provide dewatering and backflow protection<\/li>\n<\/ul>\n<h2>Post-processing and reinstatement<\/h2>\n<p>After completion of the works, utilities must be secured, excavations or openings properly backfilled or temporarily closed. A coordinated rebuild (e.g., concrete repair, surface treatment) ensures durability and operational safety. <em>The complete project documentation forms the basis for later operations, maintenance, and conversions.<\/em> Backfill compaction, surface reinstatement, and sealing must meet site specifications and be confirmed by suitable testing where required.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The exposure of utilities &#8211; often also referred to as exposing cables, pipes, and utility lines &#8211; is a central work step in construction, refurbishment works, and deconstruction. The goal is to make the actual position, depth, and condition of supply and disposal lines visible in order to avoid damage <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19503","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Exposure of Utilities in Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Safely uncover underground utilities \u2713 Methods for exposing cables, pipes and lines in construction with low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Exposure of Utilities in Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Safely uncover underground utilities \u2713 Methods for exposing cables, pipes and lines in construction with low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-01T08:15:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/exposure-of-utilities\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/exposure-of-utilities\",\"name\":\"Exposure of Utilities in Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-18T14:01:22+00:00\",\"dateModified\":\"2026-05-01T08:15:03+00:00\",\"description\":\"Safely uncover underground utilities \u2713 Methods for exposing cables, pipes and lines in construction with low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/exposure-of-utilities#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/exposure-of-utilities\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/exposure-of-utilities#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Exposure of utilities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Exposure of Utilities in Construction & Demolition","description":"Safely uncover underground utilities \u2713 Methods for exposing cables, pipes and lines in construction with low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities","og_locale":"en_US","og_type":"article","og_title":"Exposure of Utilities in Construction & Demolition","og_description":"Safely uncover underground utilities \u2713 Methods for exposing cables, pipes and lines in construction with low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-01T08:15:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities","url":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities","name":"Exposure of Utilities in Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-18T14:01:22+00:00","dateModified":"2026-05-01T08:15:03+00:00","description":"Safely uncover underground utilities \u2713 Methods for exposing cables, pipes and lines in construction with low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/exposure-of-utilities#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Exposure of utilities"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19503","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19503"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19503\/revisions"}],"predecessor-version":[{"id":26803,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19503\/revisions\/26803"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}