{"id":19502,"date":"2025-11-18T10:46:52","date_gmt":"2025-11-18T09:46:52","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19502"},"modified":"2026-05-01T14:25:03","modified_gmt":"2026-05-01T12:25:03","slug":"top-chord","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/top-chord","title":{"rendered":"Top chord"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <strong>top chord<\/strong> is an upstanding beam that runs above a floor or slab surface. In practice, it appears in building construction as an upstand reinforced-concrete beam, as a ring-shaped masonry or reinforced-concrete beam in wall crowns, and as an upstanding steel beam at slab edges and openings. Top chords bundle loads, bridge larger spans, and create flat soffits without hanging components. In refurbishment and deconstruction projects, they influence the sequence of works, the choice of shoring, and the selection of suitable, low-vibration methods such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, for example in building gutting or special demolition. In technical usage, the term is often used synonymously with <em>upstand beam<\/em> or <em>ring beam<\/em> when located at edges and crowns. The contents of this page are technically oriented and relate to typical applications and tools of Darda GmbH.<\/p>\n<h2>Definition: What is meant by the top chord?<\/h2>\n<p>A <strong>top chord<\/strong> is a beam arranged above the adjacent surface and appearing as an upstand. It is used to transfer loads from walls, slabs, or bearing points into columns or walls without interrupting the underside of the slab. In contrast to a downstand beam, which hangs beneath a slab, the top chord as an <em>upstanding beam<\/em> sits on or projects from the structure. Construction is often in reinforced concrete, sometimes in steel or timber. Typical locations include slab edges, openings (e.g., for stairwells), large room bays, and ring beams in masonry construction. Geometries range from low upstands integrated into the slab build-up to parapet-height elements that simultaneously fulfill enclosure or facade-anchoring functions.<\/p>\n<h2>Structure, materials, and typical executions<\/h2>\n<p>Top chords are designed to suit material and function. In reinforced-concrete construction, they are usually reinforced upstand beams, cast monolithically with the slab or added later. In masonry construction, a ring-shaped reinforced-concrete beam (ring beam) often assumes the function of a top chord. In steel construction, upstanding rolled or composite beams occur that bound upper surfaces or integrate parapets. Interfaces to adjacent components are decisive for force transfer, crack control, and durability.<\/p>\n<ul>\n<li><strong>Reinforced concrete:<\/strong> Closed stirrup cages with sufficient anchorage, top and side cover appropriate to exposure class, and reliable shear connection to the slab by headed bars or lattice girders. Where cast later, dowels or post-installed rebars ensure composite action.<\/li>\n<li><strong>Masonry with ring beam:<\/strong> Continuous reinforcement in a closed ring, proper seating on masonry with even bearing, and tie-ins at internal walls prevent differential movement. Thermal and moisture separation to exterior layers is coordinated with facade build-ups.<\/li>\n<li><strong>Steel:<\/strong> Rolled, welded, or composite sections with corrosion protection, shear connectors for composite slabs, and detailing for drainage at external positions. Connections are designed for inspectability and replacement where necessary.<\/li>\n<\/ul>\n<h2>Structural function and detailing specifics<\/h2>\n<p>The top chord resists bending moments and shear force, distributes loads from slab bays or walls, and routes them in a controlled manner into load-bearing members. Because it sits above the slab, the soffit remains smooth. Constructive details such as starter reinforcement, anchorage lengths, shear connection to the slab, and thermal breaks at facades are relevant. At slab edges, the top chord can additionally serve as a support for parapets, sills, or guardrails. At irregular geometries and openings, torsion and restraint forces can govern and must be covered by detailing and checks.<\/p>\n<ul>\n<li><strong>Key detailing points:<\/strong> continuous top reinforcement over supports, verified lap lengths, shear and torsion design at edge beams, and movement joints to limit restraint where long runs or facade connections exist.<\/li>\n<li><strong>Interfaces:<\/strong> verified diaphragm action in the slab, compatible stiffness at spandrels, and crack width control to protect waterproofing layers at external upstands.<\/li>\n<\/ul>\n<h2>Planning and building physics: Reasons for the top chord<\/h2>\n<p>Reasons for choosing a top chord over a downstand beam include clear room geometries without downstands, service routing at the slab soffit, fire protection requirements, or architectural aspects. From a building physics perspective, thermal bridges at external upstands and moisture protection at parapets must be considered. For repurposing of the structure, residual load-bearing capacity must be critically assessed; changes in loads or column grids may require strengthening. Additional aspects include acoustic flanking transmission at facade lines, airtightness and vapor control at roof edges, and coordinated drainage and capping details to prevent standing water.<\/p>\n<ul>\n<li><strong>Typical decision factors:<\/strong> headroom optimization, integration of building services, facade and parapet connections, and the need for a flat soffit for finishes or prefabricated ceiling modules.<\/li>\n<\/ul>\n<h2>Top chord in deconstruction: Procedure and tool-conserving techniques<\/h2>\n<p>For partial or complete deconstruction of a top chord, <strong>low vibration levels<\/strong>, dust and noise mitigation, and <em>controlled load transfer<\/em> are paramount. In sensitive settings (hospitals, laboratory buildings, inner-city existing buildings, tunnel portals), concrete demolition shears and splitting technology are particularly suitable for opening massive sections without percussive impact and converting them into manageable segments. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Compact hydraulic power units<\/a> provide the necessary drive power for mobile tools. A method statement with defined segment weights, protection measures, and monitoring criteria reduces risk and supports permitting where vibration or noise thresholds apply.<\/p>\n<h3>Load release, shoring, and work safety<\/h3>\n<p>Before intervention, the top chord is taken off-load by structural measures, adjacent slab bays are temporarily shored, and load redistributions are avoided. The sequence of cuts and partial removals is chosen to prevent restraint forces. General protective measures against dust and noise as well as controlled handling of reinforcement are part of a safe workflow.<\/p>\n<ul>\n<li>Engineering verification of shoring capacity, settlement limits, and robustness during intermediate states.<\/li>\n<li>Defined exclusion zones, lifting and securing points, and restraint of segments against unintended rotation.<\/li>\n<li>Clear communication of stop criteria and an emergency plan for unexpected cracking or instability.<\/li>\n<\/ul>\n<h3>Preparation: Separation cuts and core drilling<\/h3>\n<p>Saw or separation cuts and core drilling delineate the work area, create starting points for shears or splitting wedges, and reduce disturbance. In edge zones and at supports, cuts are brought up to just before the reinforcement to enable targeted separation. For steel top chords, cross-section reductions are prepared at defined locations. Prior scanning for reinforcement and embedded utilities improves accuracy; selection of wall saw, wire saw, or track-guided systems depends on access, thickness, and required cut quality.<\/p>\n<h3>Removal with concrete shears<\/h3>\n<p><strong>Concrete demolition shears<\/strong> break out concrete in a controlled manner, reduce sections, and expose reinforcement. Especially for upstanding top chords on slabs, working from above is advantageous because the soffit remains protected and fragments can be guided inward in a controlled way. Reducing the section in parts lowers peak loads on the shoring. Tools are applied progressively from non-critical spans toward supports, avoiding prying that could introduce unintended torsion; temporary edge protection or mats preserve adjacent finishes.<\/p>\n<h3>Bringing down by splitting<\/h3>\n<p><strong>Hydraulic splitters<\/strong> work with hydraulic pressure via splitting cylinders. They induce cracks along previously drilled holes, without impact. This allows massive upstands to be divided into large but controllably breaking segments, minimizing vibrations and protecting adjacent components. In interior spaces and special operations, such methods are often the first choice. Hole patterns and wedge orientation are set to steer crack propagation; restraints and catching devices prevent falling pieces and secondary damage.<\/p>\n<h3>Handling reinforcement and embedded items<\/h3>\n<p>Exposed reinforcement is cut in sections. Depending on the material, multi cutters, combination shears, or steel shears are used. Inserts such as starter bars, punching reinforcement, or embedded mounting parts are neatly cut to length to prevent uncontrolled crack propagation. Where prestressing is suspected, intervention is postponed until a structural assessment defines a safe release and cutting sequence.<\/p>\n<h3>Reducing emissions<\/h3>\n<p>Water-cooled cuts, low-dust size reduction, and avoiding impact tools reduce emissions. In sensitive environments, such as during building gutting, splitting techniques and shear processing are particularly advantageous because they markedly limit building vibrations. Local enclosures with negative pressure, mobile acoustic screens, and managed process water collection complete the mitigation concept.<\/p>\n<h2>Typical damage patterns and repairs<\/h2>\n<p>Cracks in the top chord often occur in the span (bending) and at supports (shear, restraint). Edge-near corrosion of the top reinforcement can cause spalling, especially where concrete cover is inadequate. Additional patterns include torsional cracking at re-entrant corners and moisture-related deterioration at parapet zones. Repairs include concrete repair with suitable systems, strengthening by overlays, external reinforcement, or steel-concrete composite solutions. For severe damage, controlled dismantling and rebuilding is often more economical, for which concrete demolition shears and splitters enable a low-vibration approach. Surface protection and improved detailing at interfaces reduce the likelihood of recurrence.<\/p>\n<h2>Top chord and downstand beam compared: Impact on deconstruction and logistics<\/h2>\n<p>For a downstand beam, intervention often occurs from below with greater protection needs for the occupied level; for a top chord, the position on the slab allows working from above with lower risk to the soffit. The transport path for fragments is often shorter for the top chord, as material can be moved on the slab level. The choice between shears, splitters, and cutting methods depends on cross-section, reinforcement ratio, boundary conditions, and vibration limits.<\/p>\n<ul>\n<li><strong>Key differences in practice:<\/strong> access and containment concept, headroom and service interference, shielding effort for occupied spaces, and handling routes for segment removal.<\/li>\n<\/ul>\n<h2>Application relevance to use cases<\/h2>\n<p>Top chords occur in several scenarios. Relevant areas and typical tasks include:<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>; deconstruction of upstanding reinforced-concrete beams at slab edges, controlled removal by size reduction with concrete demolition shears; for massive sections, combined with splitting cylinders.<\/li>\n<li><strong>Building gutting and cutting:<\/strong> Selective removal of upstands in existing buildings to prepare new floor plans; low-vibration methods with splitters and precise separation cuts.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Top chords as upstand beams at portals and galleries; low vibrations are important, splitting technology reduces effects on the surrounding rock mass.<\/li>\n<li><strong>Special operations:<\/strong> Work in vibration-sensitive environments (heritage protection, laboratory areas). Hydraulic splitters enable controlled crack formation without impact impulse.<\/li>\n<li><strong>Facade and parapet connections:<\/strong> Adaptation of edge upstands for new cladding lines, railing fixings, or waterproofing upgrades with careful control of thermal bridges.<\/li>\n<\/ul>\n<h2>Steel top chords: Cutting and size reduction<\/h2>\n<p>For upstanding <strong>steel beams<\/strong> (e.g., as an upstand on composite slabs), dismantling is performed with suitable cutting or shear tools. Steel shears cut sections; combination shears and multi cutters separate plates, stiffeners, and attachments. Prior unloading and segment-by-segment dismantling remain essential to avoid deformations. Depending on constraints, cold cutting methods minimize sparks and heat, while thermal cutting requires fire watches, spark containment, and coordination with coatings and possible hazards from enclosed spaces.<\/p>\n<h2>Procedure in the project workflow<\/h2>\n<ol>\n<li><strong>Existing-condition survey:<\/strong> Determination of cross-section, material, reinforcement position, connection details, load paths, and embedded items.<\/li>\n<li><strong>Temporary load-bearing structure:<\/strong> Planning of shoring and load release; definition of intervention limits.<\/li>\n<li><strong>Separation concept:<\/strong> Defining cuts, drillings, and segment sizes, considering transport paths and loads.<\/li>\n<li><strong>Removal:<\/strong> Combination of concrete demolition shears for concrete removal, splitters for controlled crack formation, and suitable shears for reinforcement and steel parts.<\/li>\n<li><strong>Logistics and disposal:<\/strong> Clean separation of concrete, reinforcement, and steel sections for recycling.<\/li>\n<li><strong>Monitoring and permits:<\/strong> Alignment with project-specific vibration and noise limits, measurement concept, and approvals where required.<\/li>\n<li><strong>Documentation and handover:<\/strong> As-built updates, test records, and acceptance of interfaces and temporary works removed.<\/li>\n<\/ol>\n<h2>Quality and safety aspects<\/h2>\n<p>Quality results from precise cuts, controlled segmentation, and minimal damage to adjacent components. Safety-relevant factors include load redistributions, stability of partial pieces, and safe guidance during crack creation. Methods with <em>low vibration and impact energy<\/em> help limit risks and avoid damage to the existing structure. Clear acceptance criteria for residual surfaces and edges, documented monitoring of vibration and dust, and traceable sequencing underpin reliable outcomes in confined or sensitive environments.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A top chord is an upstanding beam that runs above a floor or slab surface. In practice, it appears in building construction as an upstand reinforced-concrete beam, as a ring-shaped masonry or reinforced-concrete beam in wall crowns, and as an upstanding steel beam at slab edges and openings. Top chords <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/top-chord\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19502","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Top Chord - Upstand Beam in Building Construction<\/title>\n<meta name=\"description\" content=\"Structural guide to the top chord upstand beam in buildings \u2713 design load paths, deconstruction &amp; low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/top-chord\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Top Chord - Upstand Beam in Building Construction\" \/>\n<meta property=\"og:description\" content=\"Structural guide to the top chord upstand beam in buildings \u2713 design load paths, deconstruction &amp; low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/top-chord\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-01T12:25:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/top-chord\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/top-chord\",\"name\":\"Top Chord - Upstand Beam in Building Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-18T09:46:52+00:00\",\"dateModified\":\"2026-05-01T12:25:03+00:00\",\"description\":\"Structural guide to the top chord upstand beam in buildings \u2713 design load paths, deconstruction & low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/top-chord#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/top-chord\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/top-chord#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Top chord\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Top Chord - Upstand Beam in Building Construction","description":"Structural guide to the top chord upstand beam in buildings \u2713 design load paths, deconstruction & low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/top-chord","og_locale":"en_US","og_type":"article","og_title":"Top Chord - Upstand Beam in Building Construction","og_description":"Structural guide to the top chord upstand beam in buildings \u2713 design load paths, deconstruction & low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/top-chord","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-01T12:25:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/top-chord","url":"https:\/\/www.darda.de\/en\/knowledge\/top-chord","name":"Top Chord - Upstand Beam in Building Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-18T09:46:52+00:00","dateModified":"2026-05-01T12:25:03+00:00","description":"Structural guide to the top chord upstand beam in buildings \u2713 design load paths, deconstruction & low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/top-chord#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/top-chord"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/top-chord#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Top chord"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19502"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19502\/revisions"}],"predecessor-version":[{"id":26820,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19502\/revisions\/26820"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}