{"id":19495,"date":"2025-11-17T12:48:06","date_gmt":"2025-11-17T11:48:06","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19495"},"modified":"2026-09-12T19:53:19","modified_gmt":"2026-09-12T17:53:19","slug":"surface-treatment","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment","title":{"rendered":"Surface treatment"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Surface treatment describes all measures used to purposefully alter the condition of concrete, steel, or natural stone surfaces. In the context of demolition, deconstruction, strip-out, cutting, and natural stone extraction, it governs how safely components can be further processed, how well systems bond, and how durably protective layers adhere. Especially when using Darda GmbH hydraulic tools &#8211; such as concrete crushers, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, combination shears, multi cutters, steel shears, tank cutters, stone splitting cylinders, and the associated <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> &#8211; the right surface treatment determines whether cut and fracture edges meet requirements for load-bearing capacity, tightness, corrosion protection, and subsequent reuse. Consistent, specification-driven surface quality reduces rework, shortens interfaces between trades, and supports reuse concepts within circular construction.<\/p>\n<h2>Definition: What is meant by surface treatment?<\/h2>\n<p>Surface treatment means the targeted <em>alteration<\/em> of a material\u2019s surface &#8211; mechanically, water-guided, or chemically &#8211; to achieve defined properties. This includes <strong>roughening<\/strong> for bonding, <strong>smoothing<\/strong> for edge stability, <strong>deburring<\/strong> for safety, <strong>cleaning<\/strong> for coatability, and <strong>profiling<\/strong> for mechanical interlock or media guidance. In the application areas of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, strip-out and cutting, rock excavation and tunnel construction, natural stone extraction, and special operations, surface treatment is usually carried out immediately after separating, splitting, or crushing. It influences the material structure, roughness parameters, and near-surface zone properties and is therefore a key step in the process chain. Typical target values include <em>roughness profile<\/em> for mineral substrates and <em>Ra or Rz<\/em> for metallic surfaces, along with cleanliness and edge geometry fit for the subsequent system.<\/p>\n<h2>Role of surface treatment in demolition and deconstruction<\/h2>\n<p>The separation method shapes the surface: shear cuts produced by steel shears create compressed cut faces and burr; splitting operations with stone and concrete splitters or stone splitting cylinders result in irregular fracture surfaces; concrete crushers create granular edges with exposed aggregates; tank cutters and combination shears generally provide cold-cut edges without thermal heat-affected zones. Subsequent surface treatment purposefully compensates for these differences &#8211; for example through deburring, edge breaking, roughening, or fine cleaning &#8211; so that assembly, sealing, coating, or further processing function reliably. It also creates predictable interfaces between trades, ensuring compatibility with mortars, injection resins, waterproofing, and corrosion protection systems.<\/p>\n<h2>Materials and typical surface goals<\/h2>\n<h3>Concrete and reinforced concrete<\/h3>\n<p>For concrete surfaces, the focus is on the load-bearing capacity of the edge zone, bonding for mortars, fillers, waterproofing, or coatings, and uniform roughness. After using concrete crushers, <em>edges are broken<\/em> and the surface is cleaned to remove loose constituents. Split edges from stone and concrete splitters possess natural roughness that can be advantageous for bonded systems but should be cleaned and, if necessary, homogenized. In addition, the moisture state, removal of cement laitance, and sufficient surface strength are verified to avoid premature failure such as delamination or blistering.<\/p>\n<h3>Steel<\/h3>\n<p>For steel surfaces, the priorities are deburring, edge geometry (chamfer, radius), cleanliness, and corrosion protection. Cut faces from steel shears, multi cutters, or tank cutters are deburred, degreased, and prepared for coatings or bolted connections. The goal is a metal-clean, reproducible surface without sharp edges and without temper colors or heat-affected zones such as those that can occur with thermal processes. Where required, checks for residual oil, salts, or flash rust and the alignment of the surface temperature with the ambient dew point are included to ensure coating integrity.<\/p>\n<h3>Natural stone<\/h3>\n<p>In natural stone extraction, the split face determines appearance, further processing, and dimensional accuracy. Depending on the rock fabric, splitting cylinders generate characteristic surfaces; light finishing produces defined edges and reduces spalling. For cladding, a homogeneous roughness profile may be required, while in rock excavation the stability and water guidance of the surface take precedence. Particular attention is paid to veins, laminations, and moisture transport to prevent staining and to maintain visual uniformity on visible faces.<\/p>\n<h2>Procedures of surface treatment in the demolition context<\/h2>\n<p>Depending on the objective and material, mechanical, water-guided, and combined procedures are used. Selection and parameters are always tied to the preceding separation technique.<\/p>\n<ul>\n<li>Mechanical removal: chiseling, milling, grinding, brushing, blasting (e.g., shot blasting), scarifying, and needle scaling. Objective: material removal, roughening, leveling, deburring.<\/li>\n<li>Water-guided methods: high- to ultra-high-pressure water jetting for cleaning, exposing aggregates, or removing weak surface layers. Parameter control includes pressure, flow rate, stand-off distance, and traverse speed.<\/li>\n<li>Post-processing of cut edges: edge breaking, chamfering, creating a radius to reduce injury risk and optimize coating edges. Defined edge geometry minimizes coating thinning at arrises.<\/li>\n<li>Cleaning: removing dust, oil, release agents, rust, loose cement laitance, or mill scale to ensure adhesion. Combine vacuum extraction with wiping or rinsing where specification requires dust-free surfaces.<\/li>\n<li>Combined sequences: mechanical pre-roughening followed by water-guided fine cleaning to reduce dust and standardize the roughness profile.<\/li>\n<\/ul>\n<p>Darda GmbH tools enable controlled preparatory work: uniform hydraulic pressures of the hydraulic power packs ensure reproducible splitting; concrete crushers reduce large components without thermal effects; steel shears and tank cutters produce cold-cut edges that can be efficiently deburred. Surface treatment builds on this and achieves the required surface quality with stable, verifiable parameters.<\/p>\n<h2>Influence of the separation method on the subsequent surface<\/h2>\n<ul>\n<li>Splitting (stone and concrete splitters, stone splitting cylinders): rough, interlocked fracture pattern; good for mechanical interlock, but cleaning is necessary. Local microcrack zones often require slight removal at highly stressed component edges.<\/li>\n<li>Crushing\/sizing (concrete crushers, combination shears): granular edge zone, exposed aggregates; suitable for subsequent roughening and leveling. Loose grains are removed to achieve a load-bearing near-surface zone.<\/li>\n<li>Shearing (steel shears, multi cutters, tank cutters): shear tension and compression zones with burr formation; rework through deburring, chamfering, and surface cleaning. Attention to local deformations ensures correct fit for bolted or welded follow-up steps.<\/li>\n<\/ul>\n<h2>Process chain: prepare, process, post-process, inspect<\/h2>\n<ol>\n<li>Prepare: define the objective (roughness, edge geometry, cleanliness), assess the component, choose the appropriate method. Where useful, plan mock-ups and test areas and coordinate hold points.<\/li>\n<li>Process: mechanical removal, roughening, deburring, or water jetting with controlled parameters. Document equipment settings and tool condition to ensure reproducibility.<\/li>\n<li>Post-process: cleaning, drying, protection until further processing (e.g., coating, sealing, injection). Temporary corrosion protection or covering prevents recontamination.<\/li>\n<li>Inspect: visual checks, simple roughness checks, pull-off or cross-cut tests where required. Complementary checks can include dust tape tests, moisture measurement for mineral substrates, and chloride or salt screening on steel where relevant.<\/li>\n<\/ol>\n<h2>Quality criteria and test approaches<\/h2>\n<ul>\n<li>Roughness and profile: sufficient surface profile for bonded systems; uniform appearance for visible surfaces. For steel, target ranges in Ra or Rz are defined; for concrete, a comparable profile class is specified.<\/li>\n<li>Edge zone condition: no loose constituents, no extensive microcracking in highly stressed edges.<\/li>\n<li>Cleanliness: free from dust, oil, and release agents; for steel, also oxide-free prior to coating.<\/li>\n<li>Edge geometry: controlled chamfer or radius for safety and durable coating edges.<\/li>\n<li>Bond strength: where required, tests according to standardized methods; evaluation always aligned with the respective system.<\/li>\n<li>Moisture and climate: substrate moisture within specified limits and surface temperature above the dew point to avoid condensation under coatings.<\/li>\n<\/ul>\n<h2>Occupational safety, emissions, and environmental protection<\/h2>\n<p>Surface treatment generates dust, noise, and vibration. A <strong>low-dust working practice<\/strong> &#8211; e.g., with extraction or water mist &#8211; improves safety and reduces emissions. Personal protective equipment, careful site logistics, and proper disposal of slurries and blasting media are mandatory elements of proper execution. For water-guided procedures, wastewater treatment and retention of solids must be planned. Information on limits and protective measures should take recognized rules of the art into account without replacing case-specific assessment.<\/p>\n<ul>\n<li>Measures include noise control, vibration exposure management, dust capture with HEPA-capable extraction, and splash protection for water-guided steps.<\/li>\n<li>Waste streams are segregated and documented; contaminated media are disposed of in compliance with the applicable requirements.<\/li>\n<\/ul>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Appropriate surface treatment extends the service life of components, enables clean material separation, and increases reusability. Cold cutting methods &#8211; such as shearing with steel shears, multi cutters, or tank cutters &#8211; avoid heat-affected zones and can reduce energy demand in rework. Splitting techniques with stone and concrete splitters minimize vibrations and preserve the fabric of adjacent areas, which reduces rework. Minimizing removal to the necessary extent, avoiding recontamination, and protecting prepared surfaces against damage reduce waste and support circular construction goals.<\/p>\n<h2>Practice-oriented notes by application area<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<ul>\n<li>After crushing with concrete crushers: clean edges, remove loose material, achieve the required roughness for bonded systems.<\/li>\n<li>For openings and interface joints: deliberately roughen flanks and keep them dust-free to reliably anchor waterproofing and injection resins.<\/li>\n<li>For high-value surfaces: uniform finishing to minimize visible transitions.<\/li>\n<li>Before coating or bonding: check substrate moisture and surface tensile strength to align with system limits.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<ul>\n<li>Steel shears, multi cutters, tank cutters: remove burrs, break edges, degrease surfaces, and remove mill scale before applying protective layers.<\/li>\n<li>When removing reinforcement: keep cut faces flat to facilitate force-transmitting connections in subsequent steps.<\/li>\n<li>After preparation: protect metallic surfaces against flash rust and recontamination within the defined time window.<\/li>\n<\/ul>\n<h3>Rock excavation and tunnel construction<\/h3>\n<ul>\n<li>Splitting technique with stone splitting cylinders: check fracture faces for loose particles, consider water guidance, secure local edges.<\/li>\n<li>For shotcrete and waterproofing systems: provide sufficient surface profile; maintain clean surfaces free of slurry residues.<\/li>\n<li>Coordinate preparation and inspection with geotechnical requirements and the detailing of sealing systems to ensure continuity.<\/li>\n<\/ul>\n<h3>Natural stone extraction<\/h3>\n<ul>\n<li>After splitting: homogenize edges, check dimensional accuracy, and, if necessary, perform light grinding passes for defined visible faces.<\/li>\n<li>For visible and fa\u00e7ade panels: ensure a consistent roughness level for anchors and adhesive systems.<\/li>\n<li>Use clean cooling or rinsing water and avoid excessive heat input to prevent discoloration or microcracking in sensitive stones.<\/li>\n<\/ul>\n<h3>Special operations<\/h3>\n<ul>\n<li>In sensitive areas: prioritize low-dust and low-vibration methods, e.g., water-guided cleaning after cold cutting.<\/li>\n<li>For contaminated surfaces: define cleaning and disposal routes in advance; choose surface treatment that minimizes spread.<\/li>\n<li>Plan time windows and enclosures so that emissions remain below thresholds for adjacent uses such as healthcare or heritage environments.<\/li>\n<\/ul>\n<h2>Failure patterns and avoidance<\/h2>\n<ul>\n<li>Insufficient cleaning: leads to poor bond; countermeasure: coordinated wet or dry cleaning with verification.<\/li>\n<li>Excessive removal: weakens components; countermeasure: defined removal limits and regular measurements.<\/li>\n<li>Cutting burr on steel edges: increases injury risk and impairs coatings; countermeasure: deburring, chamfering, follow-up cleaning.<\/li>\n<li>Microcrack formation at concrete fracture edges: risk in highly stressed zones; countermeasure: lightly rework the edge zone and inspect.<\/li>\n<li>Inhomogeneous roughness: visible patchiness or uneven bonding; countermeasure: uniform parameters and systematic overlap of processing passes.<\/li>\n<li>Recontamination after preparation: dust or moisture compromises adhesion; countermeasure: protect surfaces and repeat final cleaning immediately before application.<\/li>\n<\/ul>\n<h2>Planning and parameterization<\/h2>\n<p>To achieve reproducible results, target values should be defined in advance: desired roughness and edge geometry, permissible removal, cleanliness level, and test methods. The choice of tools &#8211; such as concrete crushers for controlled demolition, stone and concrete splitters for defined split faces, or steel shears and tank cutters for cold cuts &#8211; depends on the material, component geometry, and subsequent work. The performance of Darda GmbH hydraulic power packs provides constant pressure and thereby consistent starting conditions for the subsequent surface treatment. Practical planning elements include small-scale trials, clearly assigned responsibilities, and hold points for acceptance before progressing.<\/p>\n<h2>Documentation and quality assurance<\/h2>\n<p>Simple yet consistent documentation increases process reliability: record the procedures used, parameters, visual inspections, and &#8211; where required &#8211; measurement results. Photo documentation, short reports, and approvals structure the workflow and reduce rework. In this way, surface treatment becomes a controlled, traceable step within the overall project. Time-stamped records of environmental conditions and protection measures further support compliance and facilitate later verification of performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Surface treatment describes all measures used to purposefully alter the condition of concrete, steel, or natural stone surfaces. In the context of demolition, deconstruction, strip-out, cutting, and natural stone extraction, it governs how safely components can be further processed, how well systems bond, and how durably protective layers adhere. Especially <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19495","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Surface Treatment in Demolition &amp; Deconstruction<\/title>\n<meta name=\"description\" content=\"Demolition made safer with surface treatment for concrete, steel &amp; natural stone \u2713 ensures bonding, protection &amp; reuse.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Surface Treatment in Demolition &amp; Deconstruction\" \/>\n<meta property=\"og:description\" content=\"Demolition made safer with surface treatment for concrete, steel &amp; natural stone \u2713 ensures bonding, protection &amp; reuse.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:19+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/surface-treatment\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/surface-treatment\",\"name\":\"Surface Treatment in Demolition & Deconstruction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-17T11:48:06+00:00\",\"dateModified\":\"2026-09-12T17:53:19+00:00\",\"description\":\"Demolition made safer with surface treatment for concrete, steel & natural stone \u2713 ensures bonding, protection & reuse.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/surface-treatment#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/surface-treatment\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/surface-treatment#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Surface treatment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Surface Treatment in Demolition & Deconstruction","description":"Demolition made safer with surface treatment for concrete, steel & natural stone \u2713 ensures bonding, protection & reuse.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment","og_locale":"en_US","og_type":"article","og_title":"Surface Treatment in Demolition & Deconstruction","og_description":"Demolition made safer with surface treatment for concrete, steel & natural stone \u2713 ensures bonding, protection & reuse.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:19+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment","url":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment","name":"Surface Treatment in Demolition & Deconstruction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-17T11:48:06+00:00","dateModified":"2026-09-12T17:53:19+00:00","description":"Demolition made safer with surface treatment for concrete, steel & natural stone \u2713 ensures bonding, protection & reuse.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/surface-treatment"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/surface-treatment#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Surface treatment"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19495"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19495\/revisions"}],"predecessor-version":[{"id":29315,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19495\/revisions\/29315"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}