{"id":19493,"date":"2025-11-17T13:32:57","date_gmt":"2025-11-17T12:32:57","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19493"},"modified":"2026-05-01T08:51:03","modified_gmt":"2026-05-01T06:51:03","slug":"topsoil-application","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application","title":{"rendered":"Topsoil application"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Topsoil application is a central step in restoring and shaping areas after demolition, deconstruction, rock excavation or earthworks. It combines soil science know-how with practical construction execution and ensures that vegetation can establish, water infiltrates, and surfaces remain permanently stable. In the context of Darda GmbH\u2019s fields of application &#8211; such as concrete demolition and special demolition, building gutting and concrete cutting, rock excavation and tunnel construction, or natural stone extraction &#8211; proper topsoil application forms the final step or an intermediate stage to convert construction and work areas into functional green or recultivation areas. The quality of the preliminary works already has a decisive influence, for example the low-vibration separation of foundation remnants with a concrete demolition shear or the controlled release of rock with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, on the subsequent quality of the topsoil and its placement. Executed with care, it links demolition and earthworks with durable, resilient landscape establishment.<\/p>\n<h2>Definition: What is meant by topsoil application?<\/h2>\n<p>Topsoil application refers to placing, distributing, and installing the fertile soil of the uppermost soil layer (colloquially topsoil, humic topsoil) on a prepared subgrade. The aim is a <em>vegetation-suitable, water-permeable<\/em> and site-adapted cover layer that supports roots, soil life, and the small-scale water balance. Topsoil is usually installed after producing a stable formation level and &#8211; depending on use &#8211; on a base course or leveling layer. Important properties include, among others, structural stability, suitable particle size distribution, sufficient humus content, a site-typical pH value, low foreign matter content, and freedom from construction debris.<\/p>\n<ul>\n<li><strong>Structure:<\/strong> stable crumb structure with adequate macropores for infiltration and gas exchange.<\/li>\n<li><strong>Grading:<\/strong> balanced particle size distribution to limit erosion while preserving permeability.<\/li>\n<li><strong>Organic matter:<\/strong> sufficient humus for nutrient storage and aggregate stability without excessive fines.<\/li>\n<li><strong>Chemical balance:<\/strong> site-typical pH and low salinity that suit the intended vegetation.<\/li>\n<li><strong>Cleanliness:<\/strong> minimal foreign matter and no construction debris, slag, or sharp inclusions.<\/li>\n<\/ul>\n<h2>Process, layer structure, and preparation of the subgrade<\/h2>\n<p>Proper topsoil application follows a clear sequence: first, components, foundation remnants and built-ins are completely removed; then the formation level is produced, drainage and slope are secured and &#8211; if required &#8211; a base course is installed. Only then is the topsoil placed and graded, followed by adapted light compaction and profiling. Clean construction waste separation already pays off at this stage. Where, for example, concrete elements were separated with low-vibration methods using a concrete demolition shear and reinforcing steel was selectively separated, the subgrade remains free of foreign bodies, reducing subsequent damage and rework during topsoil application. Targeted splitting of massive concrete elements or rock with a rock wedge splitter and a concrete splitter also facilitates the production of homogeneous, well-draining subgrades.<\/p>\n<ol>\n<li><strong>Clear site:<\/strong> remove remnants, utilities, and inclusions; verify clearance certificates.<\/li>\n<li><strong>Shape subgrade:<\/strong> establish formation level, slope, and transitions without lenses or humps.<\/li>\n<li><strong>Provide drainage:<\/strong> check outlets, edge restraints, and flanking drains; install base course where required.<\/li>\n<li><strong>Place topsoil:<\/strong> install in lifts, grade evenly, and preserve structure.<\/li>\n<li><strong>Finish:<\/strong> light compaction, profiling, and quality checks before seeding or planting.<\/li>\n<\/ol>\n<h3>Layer thicknesses and material parameters<\/h3>\n<p>Layer thicknesses depend on use and site. For simple green areas, 10-20 cm is often sufficient; for planting areas or extensive recultivation, 20-35 cm is frequently specified. Decisive factors are the <strong>site water balance<\/strong>, bearing capacity, and the intended vegetation. The topsoil should be sufficiently porous to allow infiltration and gas exchange without causing waterlogging or erosion. Excessive compaction must be avoided; installation moisture should be selected so that the natural soil structure is not destroyed.<\/p>\n<ul>\n<li><strong>Lawns and extensive greens:<\/strong> typically 10-20 cm with fine, even grading for levelness.<\/li>\n<li><strong>Perennial and shrub beds:<\/strong> typically 20-35 cm with higher structural stability and water-holding capacity.<\/li>\n<li><strong>Trees and woody plants:<\/strong> locally increased rootable depth with uncompacted transition to subsoil.<\/li>\n<\/ul>\n<h3>Drainage and erosion control<\/h3>\n<p>A defined slope, functioning flanking drainage, and site-appropriate surface roughness prevent waterlogging and washout. On slopes, topsoil application can be stabilized against erosion by temporary covers, mulch, or coarse-grained admixtures. In tunnel portal areas and on rock cuts, as occur in projects with rock excavation, structure-friendly placement methods and a coordinated water drainage concept are particularly important.<\/p>\n<ul>\n<li><strong>Slopes:<\/strong> keep continuous fall; roughen surface crosswise to slope where appropriate.<\/li>\n<li><strong>Temporary protection:<\/strong> mulch, fiber mats, or erosion control blankets until vegetation closes.<\/li>\n<li><strong>Interfaces:<\/strong> avoid smooth planes between base course and topsoil; ensure interlock and drainage paths.<\/li>\n<\/ul>\n<h2>Topsoil application in the context of concrete demolition and special demolition<\/h2>\n<p>After the deconstruction of foundation slabs, floor buildups, or pavements, areas are often repurposed or returned to green spaces. In special demolition, selective separation steps are essential: metal parts are cut with a steel shear or a hydraulic shear (demolition shear), concrete elements are reduced with a concrete demolition shear, and massive components are, if necessary, released with a rock wedge splitter and a concrete splitter &#8211; powered by a <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power unit<\/a>. The quality of these preliminary works determines how free from foreign matter the subsequent topsoil zone is. If residual concrete, reinforcing steel, or pipelines have been completely removed, the sub-base can be produced evenly and topsoil application executed without disruptions. Processed mineral construction debris can, if suitable, become a base course or leveling layer on which the topsoil follows. Where acceptance tests confirm bearing capacity and drainage, rework and settlements are minimized.<\/p>\n<h3>Building gutting and cutting as a precursor<\/h3>\n<p>Before topsoil application on former building areas or industrial sites, building gutting and separation works are often required. Lines and profiles can be cut with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel Shears<\/a> and a hydraulic shear (demolition shear); tanks and pipe runs can be removed depending on the material with a cutting torch and a hydraulic shear (demolition shear). Such preparatory steps minimize the risk of later obstructions in the soil and create the prerequisite for a homogeneous build-up of the topsoil layer. Proper removal and disposal of residual media and auxiliaries prevent contamination of the root zone.<\/p>\n<h2>Topsoil application in rock excavation, tunnel construction, and natural stone extraction<\/h2>\n<p>In projects with rock removal, tunnel portals, or quarries, recultivation often follows the intervention in the geological structure. Dismantled work areas, spoil heaps, or temporary access roads are profiled and covered with topsoil. Where rock and blocky material were previously released in a controlled manner with a rock wedge splitter or rock splitting cylinders, the resulting fracture edges enable targeted adaptation of the subgrade. Here, topsoil application serves not only greening but also microclimatic balance and stabilization of surfaces against erosion. In tunnel construction projects, the portal areas are typical zones where topsoil is applied and permanently secured after completion of the construction works.<\/p>\n<h3>Special use: sensitive existing structures and confined spaces<\/h3>\n<p>On inner-city sites, near vibration-sensitive installations, or within existing structures, low-vibration working methods are crucial. Controlled separation of concrete with a concrete demolition shear or splitting with a rock wedge splitter and a concrete splitter reduces impacts on the subgrade. This then facilitates topsoil application, as settlement and disturbances in the layer composite are minimized. Gentle logistics and short load paths further protect the formation level.<\/p>\n<h2>Quality requirements for topsoil<\/h2>\n<p>The topsoil must be free of construction debris, metal, plastics, and other foreign matter. It must not contain harmful admixtures, problematic seeds, or root parts of invasive species. A site-adapted particle size distribution and sufficient humus content promote structure and nutrient storage. For planting areas, stability and water-holding capacity are decisive; for lawn areas, levelness and a balanced water household are paramount. Depending on use, sieving can be sensible to remove coarse constituents.<\/p>\n<h3>Testing and documentation<\/h3>\n<p>Before installation, simple field trial\/test methods (visual inspection, smell, touch) and &#8211; depending on the project &#8211; laboratory-based investigations of particle size distribution, organic matter, and potential hazardous substances are advisable. Documentation of origin, transport logistics, intermediate storage, installation time, and weather supports quality assurance. For public projects, additional soil-protection evidence and coordination are often required.<\/p>\n<ul>\n<li><strong>Verification:<\/strong> sampling of deliveries, retention samples, and photo documentation of stockpiles.<\/li>\n<li><strong>Moisture control:<\/strong> note installation moisture and rework if structure is at risk.<\/li>\n<li><strong>Contaminant screening:<\/strong> perform targeted analyses where prior uses indicate potential risks.<\/li>\n<\/ul>\n<h3>Material sourcing, storage, and handling<\/h3>\n<p>Stripped topsoil should be stored separately from subsoil on clean, drained surfaces, in stockpiles of moderate height to limit compaction and anaerobic conditions. Avoid handling in heavy wet conditions, prevent weed ingress on stockpiles, and keep mixing with mineral demolition material to a minimum. During reinstallation, blend gently only where required to achieve uniformity without destroying aggregates.<\/p>\n<h2>Execution: equipment, logistics, and installation practice<\/h2>\n<p>Installation is carried out in layers using excavators, grading equipment, and suitable compaction equipment. On secondary areas, grading and light rolling are usually sufficient; the natural soil structure should be preserved. Narrow sections and edge areas along foundation edges or lines require precise work; here, a handheld tool powered by a hydraulic power pack can facilitate profiling and touch-up. An execution adapted to site and weather is important: do not install in heavy wet conditions, avoid unnecessary passes, and use temporary construction roads to prevent compaction in the future root zone.<\/p>\n<ul>\n<li><strong>Layered placement:<\/strong> install in thin lifts and avoid pushing long distances to prevent segregation.<\/li>\n<li><strong>Track discipline:<\/strong> designate haul routes and use low ground-pressure equipment where feasible.<\/li>\n<li><strong>Edges and details:<\/strong> hand-finish along structures and utilities; ensure positive fall away from edges.<\/li>\n<li><strong>Weather windows:<\/strong> suspend works during thaw, saturation, or heat extremes that risk structure loss.<\/li>\n<li><strong>Interface checks:<\/strong> verify bearing capacity, drainage paths, and levelness before seeding.<\/li>\n<\/ul>\n<h3>Occupational safety and soil protection<\/h3>\n<p>After demolition and cutting work, edges, shafts, and trenches present increased hazard potential. Safeguarding, clear traffic routes, and orderly construction logistics are mandatory. For soil protection, the principles are: minimal surface pressure, short driving times, and avoiding point loads. Especially on recultivation areas on slopes, temporary securing against sliding and washout is required.<\/p>\n<ul>\n<li><strong>Safety perimeters:<\/strong> secure drop edges and portal areas; mark exclusion zones around active machinery.<\/li>\n<li><strong>Utility protection:<\/strong> locate and safeguard remaining lines; coordinate isolations prior to excavation.<\/li>\n<li><strong>Clean logistics:<\/strong> separate clean and dirty routes; prevent mud tracking onto finished layers.<\/li>\n<\/ul>\n<h2>Aftercare: maintenance, establishment of vegetation, and monitoring<\/h2>\n<p>After topsoil application, seeding, planting, or the application of site-appropriate greening follow. In the first months, irrigation, reseeding at bare spots, and light reprofiling are important. Settlement is compensated early, drainage elements are kept clear. On areas originating from concrete demolition or in tunnel portal zones, a tight monitoring system has proven effective to identify erosion, sealing, and unwanted inputs at an early stage.<\/p>\n<ul>\n<li><strong>0-4 weeks:<\/strong> ensure germination moisture, repair rills and settlement quickly.<\/li>\n<li><strong>Months 1-3:<\/strong> mow or cut as specified, spot-reseed, maintain erosion control measures.<\/li>\n<li><strong>Months 4-12:<\/strong> optimize nutrient supply if indicated by visual assessment; keep drains and inlets unobstructed.<\/li>\n<li><strong>After 12 months:<\/strong> inspect root development and surface stability; schedule follow-up maintenance adapted to use.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Installation at excessively high soil moisture, which destroys structure and promotes sealing.<\/li>\n<li>Insufficient removal of obstructions such as concrete remnants, reinforcing steel, or lines before application.<\/li>\n<li>Lack of drainage and insufficient slope, leading to waterlogging.<\/li>\n<li>Excessive compaction of the topsoil with loss of pore volume and poor root development.<\/li>\n<li>Layer thicknesses that are too small or non-uniform, hindering vegetation development.<\/li>\n<li>Non site-appropriate topsoil mix, for example with excessive fines or unsuitable pH value.<\/li>\n<li>Mixing subgrade and topsoil during grading, resulting in weak, heterogeneous layers.<\/li>\n<li>Improper stockpiling with prolonged saturation, causing structural collapse and anaerobic conditions.<\/li>\n<li>Skipping acceptance checks of formation level and interfaces before seeding or planting.<\/li>\n<\/ul>\n<h2>Sustainability and circular economy<\/h2>\n<p>Topsoil application is an integral part of sustainable site development. Through clean deconstruction &#8211; such as selective separation of concrete with a concrete demolition shear and controlled crushing &#8211; single-type fractions are created that can be used as base course or leveling layer material. Topsoil from construction projects should be stripped separately, placed in topsoil storage, and later re-installed. Short transport routes, the use of recycled construction material below the topsoil, and planning that considers the water balance and biodiversity reduce resource consumption and emissions.<\/p>\n<ul>\n<li><strong>Material efficiency:<\/strong> prioritize on-site reuse of suitable soils and recycled aggregates with clean separation layers.<\/li>\n<li><strong>Water-sensitive design:<\/strong> integrate infiltration, retention, and evaporation surfaces from the outset.<\/li>\n<li><strong>Biodiversity:<\/strong> select seed mixes and planting adapted to site conditions that enhance habitat quality.<\/li>\n<\/ul>\n<h2>Legal and technical notes<\/h2>\n<p>Requirements for soil protection, utilization of mineral materials, and the reuse of topsoil depend on local regulations and project-specific rules. In cases of doubt, regulatory coordination and expert assessments are advisable. Execution should follow recognized rules of the art. These notes are general in nature, not legally binding, and do not replace an assessment of individual cases. Where prior uses indicate potential contamination, obtain suitable evidence and approvals before earthworks commence.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Topsoil application is a central step in restoring and shaping areas after demolition, deconstruction, rock excavation or earthworks. It combines soil science know-how with practical construction execution and ensures that vegetation can establish, water infiltrates, and surfaces remain permanently stable. In the context of Darda GmbH\u2019s fields of application &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19493","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Topsoil Application in Construction &amp; Earthworks<\/title>\n<meta name=\"description\" content=\"Guide to topsoil application in construction for soil placement, planting, drainage &amp; erosion control \u27a4 best practices.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Topsoil Application in Construction &amp; Earthworks\" \/>\n<meta property=\"og:description\" content=\"Guide to topsoil application in construction for soil placement, planting, drainage &amp; erosion control \u27a4 best practices.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-01T06:51:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/topsoil-application\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/topsoil-application\",\"name\":\"Topsoil Application in Construction & Earthworks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-17T12:32:57+00:00\",\"dateModified\":\"2026-05-01T06:51:03+00:00\",\"description\":\"Guide to topsoil application in construction for soil placement, planting, drainage & erosion control \u27a4 best practices.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/topsoil-application#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/topsoil-application\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/topsoil-application#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Topsoil application\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Topsoil Application in Construction & Earthworks","description":"Guide to topsoil application in construction for soil placement, planting, drainage & erosion control \u27a4 best practices.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application","og_locale":"en_US","og_type":"article","og_title":"Topsoil Application in Construction & Earthworks","og_description":"Guide to topsoil application in construction for soil placement, planting, drainage & erosion control \u27a4 best practices.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-01T06:51:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application","url":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application","name":"Topsoil Application in Construction & Earthworks","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-17T12:32:57+00:00","dateModified":"2026-05-01T06:51:03+00:00","description":"Guide to topsoil application in construction for soil placement, planting, drainage & erosion control \u27a4 best practices.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/topsoil-application"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/topsoil-application#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Topsoil application"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19493"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19493\/revisions"}],"predecessor-version":[{"id":26799,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19493\/revisions\/26799"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}