{"id":19491,"date":"2025-11-15T10:44:59","date_gmt":"2025-11-15T09:44:59","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19491"},"modified":"2026-04-30T17:52:02","modified_gmt":"2026-04-30T15:52:02","slug":"service-life-of-structure","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure","title":{"rendered":"Service life of structure"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The service life of a structure describes the period during which a construction can safely and economically perform its intended functions with reasonable effort. It is a central criterion in planning, execution, operation, maintenance, and deconstruction. In practice, this means clients, designers, and operators must align technical life, economic considerations, and sustainability goals. Interventions in the existing structure &#8211; from selective removal of damaged zones to special demolition &#8211; significantly influence the remaining service life. Depending on the task, tools such as a concrete demolition shear or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">low-vibration rock and concrete splitters<\/a> by Darda GmbH come into focus, because they separate structural elements with precision without unnecessarily affecting intact areas.<\/p>\n<p>Clear objectives, measurable performance criteria, and transparent documentation of all interventions create the basis for reliable decisions over the entire life cycle. Typical decision triggers include safety findings, functionality constraints, life cycle cost thresholds, and environmental impacts associated with repair or deconstruction.<\/p>\n<h2>Definition: What is meant by the service life of a structure?<\/h2>\n<p>The service life of a structure is the time in which it fulfills its intended functions under usual actions and operating conditions. In professional practice, a distinction is often made between technical and economic service life. The <em>technical<\/em> service life ends when safety-relevant or functional requirements are no longer met or when the effort for repair becomes disproportionate. The <em>economic<\/em> service life ends when alternative solutions (e.g., replacement construction, repurposing of structure) become more economical. The important concept is the <strong>remaining service life of structure<\/strong>: it denotes the remaining period until a fundamental renewal, decommissioning, or deconstruction &#8211; depending on condition, exposure, maintenance strategy, and the actions actually experienced.<\/p>\n<p>In design practice, a <em>design service life<\/em> is specified as a planning value and verified through detailing and durability measures. Typical categories are short to medium terms for temporary structures, several decades for buildings and bridges, and extended horizons for critical infrastructure. These values are not guarantees but targets that must be supported through suitable execution and maintenance.<\/p>\n<h2>Methods for determining and forecasting service life<\/h2>\n<p>The determination of service life is based on assumptions in design and on observations during operation. Designers define the design service life, operators regularly determine condition metrics and derive the remaining service life from them. In practice, experts combine experience, normative specifications, analytical models, and measurement data. For concrete structures, concrete carbonation, chloride contamination, and moisture behavior are among the key factors. From these parameters, it is possible to estimate when corrosion begins, when crack formation progresses, or when residual load-bearing capacity decreases. Forecasts are continuously reconciled with inspections. If action is required, selective interventions &#8211; such as the removal of damaged concrete zones with a concrete demolition shear or low-vibration separation with a hydraulic wedge splitter by Darda GmbH &#8211; help to deliberately extend the service life or to prepare deconstruction in a controlled manner.<\/p>\n<ul>\n<li>Approaches to prognosis: empirical rules, performance-based models, and probabilistic assessments for uncertainty handling<\/li>\n<li>Data sources: inspection records, sensors and monitoring, material testing, and load measurements<\/li>\n<li>Validation: comparison with observed deterioration rates and targeted trial openings to verify assumptions<\/li>\n<\/ul>\n<h2>Life cycle: considering planning, operation, and deconstruction together<\/h2>\n<p>The service life does not begin only at completion. Already in planning, material selection, detailing, exposure classes, and redundancies influence durability. During operation, inspection, maintenance, and repair extend service life. At the end, a decision is needed: preservation, repurposing of structure, partial deconstruction, or full demolition. In the sense of the circular economy, selective deconstruction is preferable because it preserves load-bearing elements and separates material streams. Methods from <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, gutting works and cutting, and special operations in sensitive environments enable controlled interventions with low vibration levels and reduced dust generation.<\/p>\n<ul>\n<li>Design for durability: protective details, sufficient cover, drainage concepts, and robust joints<\/li>\n<li>Design for inspection: accessibility, reference points for measurements, and space for future interventions<\/li>\n<li>Design for deconstruction: reversible connections and documented materials to facilitate later separation<\/li>\n<\/ul>\n<h3>Technical, economic, and ecological perspective<\/h3>\n<p>Technically, load-bearing capacity, serviceability, fire protection, and durability count. Economically, life cycle costs are decisive, i.e., investment, operation, maintenance, and deconstruction. Ecologically, emissions, resource use, and reuse are in focus. A balanced decision considers all three perspectives.<\/p>\n<ul>\n<li>Technical metrics: residual capacity, deformation limits, durability indicators<\/li>\n<li>Economic metrics: net present value, maintenance intervals, risk allowances and contingencies<\/li>\n<li>Ecological metrics: embodied and operational emissions, reuse potential, and recyclability<\/li>\n<\/ul>\n<h2>Factors influencing service life<\/h2>\n<p>The actual service life often deviates from the planned design life. Causes include environmental influences, usage scenarios, and maintenance quality. The most important factors at a glance:<\/p>\n<ul>\n<li>Material and structural system: concrete composition, reinforcement layout, concrete cover, joint and detail design<\/li>\n<li>Exposure: moisture, freeze-thaw cycles, chloride contamination (de-icing salts, marine proximity), chemical attack, temperature<\/li>\n<li>Actions: traffic loads, vibrations, repurposing, additional loads from building services<\/li>\n<li>Execution: construction quality, concrete curing, deviations from the design<\/li>\n<li>Operation and maintenance: inspection intervals, servicing, waterproofing, drainage<\/li>\n<li>Damage mechanisms: concrete carbonation, chloride-induced corrosion, alkali-silica reaction, fatigue, crack formation<\/li>\n<li>External constraints: legal requirements, retrofit obligations, fire protection concepts, noise control<\/li>\n<li>Changing boundary conditions: climate-related extremes, modified usage profiles, and new regulatory requirements<\/li>\n<\/ul>\n<h3>Particularities of concrete and masonry structures<\/h3>\n<p>For concrete, protecting the reinforcement against corrosion is central. Critical are water-saturated zones, edge balconies, parking decks, and elements exposed to de-icing salts. For masonry, the main causes relate to moisture, salt loading, and frost. Selective interventions &#8211; for example, opening cracks, removing damaged edge zones, and exposing corroded reinforcement &#8211; extend service life when carried out in a material-appropriate manner and with <em>low-vibration<\/em> methods. Compatibility of repair materials, adequate drying, and vapor diffusion behavior must be assured to avoid follow-up damage.<\/p>\n<h2>Condition assessment and remaining service life<\/h2>\n<p>A robust prognosis for the remaining service life is based on a systematic condition assessment. It includes documentation, testing, and a transparent derivation of measures.<\/p>\n<ol>\n<li>Preparation: visual inspection, review of documentation, usage history, damage mapping<\/li>\n<li>Testing: material properties, layer thicknesses, moisture and chloride profiles, depth of concrete carbonation<\/li>\n<li>Assessment: load-bearing capacity, serviceability, damage mechanisms, progression rate<\/li>\n<li>Strategy: continued operation with monitoring, repair, partial renewal, deconstruction<\/li>\n<\/ol>\n<p>Deliverables include a traceable condition report, risk and priority classes for measures, and a justified estimate of remaining service life with stated confidence levels. Where uncertainties are high, monitoring periods with defined reassessment points are advisable.<\/p>\n<h3>Testing and measurement methods in practice<\/h3>\n<p>Standard methods include rebound hammer, drilling dust analysis, potential measurement, concrete cores (specimens), rebar scanning, crack monitoring, and minimally invasive openings. Where openings or gutting works are necessary, controlled concrete separation\/cutting supports the assessment without weakening the structure. A concrete demolition shear enables the precise removal of cover layers, and a hydraulic wedge splitter separates elements in a targeted way with low vibration levels. Complementary methods such as ground penetrating radar, ultrasonic pulse velocity, and pull-off tests refine the data basis and reduce uncertainty.<\/p>\n<h2>Maintenance, repair, and selective deconstruction<\/h2>\n<p>With a suitable maintenance strategy, service life can be significantly extended. It is crucial to detect damage early and remedy it locally. Selective methods reduce collateral damage, keep operations running, and ensure the quality of rehabilitation.<\/p>\n<ul>\n<li>Preventive maintenance: scheduled sealing, drainage upkeep, and minor repairs before deterioration accelerates<\/li>\n<li>Corrective maintenance: targeted removal of damaged zones and functional restoration<\/li>\n<li>Predictive maintenance: condition-based interventions triggered by monitoring thresholds<\/li>\n<\/ul>\n<h3>Preservation before replacement: interventions with low vibration levels<\/h3>\n<p>Preservation measures benefit from <em>low-vibration<\/em> separation and splitting methods. Hydraulic wedge splitter, hydraulic power pack, and splitting cylinders from Darda GmbH ensure controlled splitting forces. As a result, the residual load-bearing capacity of adjacent components remains largely unaffected &#8211; a plus for service life.<\/p>\n<h3>Selective removal of damaged concrete zones<\/h3>\n<p>A concrete demolition shear is suitable for gently removing carbonated or chloride-contaminated edge zones and exposing reinforcement. In combination with combination shears, multi cutters, or a steel shear, reinforcement bars, built-in components, and beams can be separated in an orderly manner. This allows rebuilding with reprofiled or strengthened cross-sections without reconstructing large areas. Proper substrate preparation, reinforcement passivation, and compatible repair mortars are essential for durable reinstatement.<\/p>\n<h3>Work in sensitive environments<\/h3>\n<p>During ongoing operations, in inner-city locations, or in buildings with vibration-sensitive equipment, low-noise and low-vibration methods are required. Controlled splitting and cutting processes are proven here. As part of gutting works and cutting, partition walls, ceiling openings, and wall breakthroughs can be executed so that adjacent zones retain their functionality. Dust suppression, water management, and extraction with suitable filters further minimize impacts.<\/p>\n<h2>Deconstruction planning at the end of service life<\/h2>\n<p>When the service life is reached, controlled deconstruction follows. The goal is safe dismantling, separation of material streams, and minimization of impacts. An orderly sequence protects adjacent structures and enables a high recycling rate.<\/p>\n<ul>\n<li>Concept: demolition sequence, load transfer, shoring, construction logistics<\/li>\n<li>Selectivity: construction waste separation by material groups, preservation of components for reuse<\/li>\n<li>Method selection: splitting, shears, cutting, milling &#8211; depending on element and environment<\/li>\n<li>Special operations: confined spaces, areas with hazardous substances, industrial deconstruction<\/li>\n<li>Documentation: pre-demolition audit, material documentation, and traceable disposal or reuse routes<\/li>\n<\/ul>\n<p>In special demolition, a concrete demolition shear and a hydraulic wedge splitter by Darda GmbH enable precise cutting and splitting operations. For steel structures, a <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shear<\/a> is suitable. A cutting torch plays a role in the removal of technical installations or media tanks &#8211; such as in building plant rooms or infrastructure projects. All work complies with regulatory requirements and project-specific safety concepts, including any necessary deconstruction permit\/approval.<\/p>\n<h2>Rock excavation, tunnel construction, and natural stone extraction in the context of service life<\/h2>\n<p>Below ground as well, service life influences the choice of methods. In tunnel construction, the focus is on stability, deformation control, and maintenance of linings. Low-vibration splitting techniques help create connections and niches without endangering existing structures. In natural stone extraction, targeted splitting enables gentle extraction and finishing. This know-how is valuable when natural stone facades are rehabilitated, individual panels are replaced, or an anchor must be renewed &#8211; contributing to value retention and extending the service life of building envelopes.<\/p>\n<h2>Sustainability and circular economy<\/h2>\n<p>The longer a structure functions, the more favorable its carbon footprint (CO\u2082 balance). Repairs with targeted material use and selective deconstruction save emissions, energy, and resources. Designs favoring disassembly, documented materials, and reversible connections facilitate later measures. Selective methods from concrete demolition and special demolition support construction waste separation and the reuse of high-quality building materials, increasing the recycling rate.<\/p>\n<h3>Keeping life cycle costs in view<\/h3>\n<p>Investments in maintenance and timely partial measures are usually cheaper than later major rehabilitations. A reliable plan accounts for inspection intervals, intervention thresholds, and contingencies for unforeseen wear. This keeps the remaining service life manageable. Comparative evaluations should include net present value, sensitivity to material and energy price changes, and the risk of downtime during works.<\/p>\n<h2>Safety, permits, and responsibilities<\/h2>\n<p>Work on existing structures is subject to technical rules and regulatory requirements. Responsibilities and inspection obligations must be clarified for each project. Information on standards, exposure classes, or protective measures is always to be understood as general guidance. Concrete measures must be planned and supervised by qualified experts and executed in compliance with all applicable regulations. As a general rule, gentle, controlled methods reduce risks, preserve residual load-bearing capacity, and support a safe approach. Method statements, qualification of personnel, machinery certification, and coordination with all stakeholders are part of due diligence.<\/p>\n<h2>Planning practice: from strategy to implementation<\/h2>\n<p>The optimal approach arises from the interplay of diagnostics, goal definition, and method selection. A practical sequence:<\/p>\n<ol>\n<li>Define goals: continued operation, partial rehabilitation, repurposing of structure, or deconstruction<\/li>\n<li>Determine condition: surveys, testing, monitoring<\/li>\n<li>Compare options: variants of repair or deconstruction, life cycle costs<\/li>\n<li>Select methods: concrete demolition shear for selective removal, hydraulic wedge splitter for low-vibration separation, supplemented by hydraulic demolition shear, multi cutters, steel shear and, if required, cutting torch<\/li>\n<li>Plan execution: accessibility, protection of surroundings, dust suppression and noise control, construction logistics<\/li>\n<li>Ensure quality: documentation, checkpoints, acceptance, care plan for the operational phase<\/li>\n<li>Monitor and update: track performance, verify assumptions, and refine maintenance planning<\/li>\n<\/ol>\n<p>This way, service life is not left to chance but actively shaped &#8211; from the first design to the last step in deconstruction. Tools and methods are selected to respect the substance, protect the surroundings, and reliably achieve the project goal.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The service life of a structure describes the period during which a construction can safely and economically perform its intended functions with reasonable effort. It is a central criterion in planning, execution, operation, maintenance, and deconstruction. In practice, this means clients, designers, and operators must align technical life, economic considerations, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19491","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Service Life of Structures | Civil Engineering<\/title>\n<meta name=\"description\" content=\"Guide to the service life of a structure in civil engineering \u2713 assessment, durability, repair &amp; deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Service Life of Structures | Civil Engineering\" \/>\n<meta property=\"og:description\" content=\"Guide to the service life of a structure in civil engineering \u2713 assessment, durability, repair &amp; deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T15:52:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/service-life-of-structure\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/service-life-of-structure\",\"name\":\"Service Life of Structures | Civil Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-15T09:44:59+00:00\",\"dateModified\":\"2026-04-30T15:52:02+00:00\",\"description\":\"Guide to the service life of a structure in civil engineering \u2713 assessment, durability, repair & deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/service-life-of-structure#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/service-life-of-structure\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/service-life-of-structure#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Service life of structure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Service Life of Structures | Civil Engineering","description":"Guide to the service life of a structure in civil engineering \u2713 assessment, durability, repair & deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure","og_locale":"en_US","og_type":"article","og_title":"Service Life of Structures | Civil Engineering","og_description":"Guide to the service life of a structure in civil engineering \u2713 assessment, durability, repair & deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-30T15:52:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure","url":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure","name":"Service Life of Structures | Civil Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-15T09:44:59+00:00","dateModified":"2026-04-30T15:52:02+00:00","description":"Guide to the service life of a structure in civil engineering \u2713 assessment, durability, repair & deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/service-life-of-structure#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Service life of structure"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19491","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19491"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19491\/revisions"}],"predecessor-version":[{"id":26793,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19491\/revisions\/26793"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}