{"id":19488,"date":"2025-11-15T15:39:06","date_gmt":"2025-11-15T14:39:06","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19488"},"modified":"2026-04-30T15:57:02","modified_gmt":"2026-04-30T13:57:02","slug":"construction-site-emergency-lighting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting","title":{"rendered":"Construction site emergency lighting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Construction site emergency lighting is a central element of occupational safety. It ensures that employees and first responders remain oriented, find escape routes safely, and avoid hazardous areas in the event of a power failure, smoke development, or unexpected incidents. This is especially true for high-risk activities such as concrete demolition and special demolition, strip-out and cutting, rock excavation and tunnel construction, as well as natural stone extraction. Wherever concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a>, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a> are in use, darkness or loss of visibility can abruptly increase the hazard level. A carefully planned and robust construction site emergency lighting setup significantly reduces these risks and supports compliance with site safety plans and evacuation concepts during day and night operations.<\/p>\n<h2>Definition: What is meant by construction site emergency lighting?<\/h2>\n<p>On construction sites, emergency lighting refers to an <strong>independent, automatically operating safety lighting<\/strong> that takes over when the general lighting fails. It typically includes escape route lighting, anti-panic lighting, and emergency exit sign luminaires. The goal is safe evacuation, prevention of panic, and orientation in areas with particular hazards. Emergency lighting differs from work lights or site floodlights in that it is <em>autonomous<\/em> (e.g., via self-contained batteries or a central battery system), provides predefined minimum illuminance levels, and is positioned so that <strong>escape routes, stairs, platforms, edges, trenches, passages, and assembly points<\/strong> remain reliably visible. On construction sites, it must be planned for temporary, often changing situations and regularly checked for functionality. Typical design targets include <em>clear wayfinding<\/em>, <em>redundant guidance<\/em>, and <em>fail-safe switching<\/em> for all relevant zones.<\/p>\n<h2>Design and operating principle of emergency lighting on construction sites<\/h2>\n<p>A site-suitable emergency lighting system usually consists of robust luminaires with their own power supply (self-contained battery) or a system with central power supply (central battery\/emergency power), emergency exit sign luminaires with clearly recognizable pictograms, and an automatic changeover mechanism that activates the emergency supply when the general lighting fails. For changing construction states, flexible mounting points, shock-resistant housings, dust and splash water protection, as well as low-glare optics are crucial to ensure visibility and orientation without dazzling those involved. For outdoor or particularly harsh environments, <strong>appropriate IP protection<\/strong> against moisture and dust and <strong>IK impact resistance<\/strong> increase service life and operational reliability.<\/p>\n<h3>Operating modes and power supply<\/h3>\n<ul>\n<li><strong>Non-maintained mode (not permanently on)<\/strong>: Luminaires switch on only in the event of mains failure. Suitable for areas where general lighting is normally reliably available.<\/li>\n<li><strong>Maintained mode (permanently on)<\/strong>: Luminaires are in constant operation and maintain lighting during a power outage. Useful in areas with frequently changing site conditions, dust, or smoke, where permanent orientation is beneficial.<\/li>\n<li><strong>Self-contained luminaires<\/strong>: Each luminaire has its own battery. Advantageous for extensive or segmented sites where cable or supply routes are frequently re-routed.<\/li>\n<li><strong>Central battery systems<\/strong>: A central energy source supplies multiple luminaires. Suitable for larger, structured sites (e.g., during tunnel heading or complex deconstruction projects) with clear escape routes and plannable infrastructure.<\/li>\n<li><strong>Hybrid concepts<\/strong>: Combining self-contained units in highly dynamic zones with centrally supplied lines on stable routes can balance flexibility and monitoring.<\/li>\n<\/ul>\n<h3>Autonomy times and test functions<\/h3>\n<p>Common autonomy times are 1 to 3 hours. The exact design is based on the size and structure of the site, escape route lengths, and likely evacuation times. In areas with extended evacuation or firefighting access, longer durations may be required. Automatic self-tests indicate the condition of the battery and luminaire; in addition, regular visual and functional tests should be scheduled to ensure readiness at all times. Where available, <strong>central monitoring<\/strong> shortens troubleshooting and supports documented compliance.<\/p>\n<h2>Legal basis and normative guidance<\/h2>\n<p>In practice, commonly accepted rules of technology and relevant standards are often used for designing emergency lighting, for example specifications for lighting of escape routes, open areas (anti-panic areas), pictograms, and recognition distances. These sets of rules define, among other things, minimum illuminance levels, uniformity, glare limitation, and requirements for marking escape routes. On construction sites, there are also occupational safety obligations arising from general regulations and the respective safety and health plan. All information is to be understood as <em>general guidance<\/em>; it does not replace case-by-case assessment or a binding interpretation. Roles and responsibilities for inspection, maintenance, and documentation should be assigned explicitly within the site management framework.<\/p>\n<h2>Requirements in demolition, strip-out, and cutting<\/h2>\n<p>During concrete demolition and special demolition, strip-out, or cutting and separating, dust, noise, vibration, and changing traffic routes occur. When concrete demolition shears or combination shears release components, new cut edges, fall edges, and openings appear. Emergency lighting must reflect these changes and make hazard zones around machines clearly identifiable. In dusty or smoky phases, <em>maintained mode<\/em> and increased base brightness can improve contrast and prevent loss of orientation.<\/p>\n<h3>Deliberately illuminate typical hazard locations<\/h3>\n<ul>\n<li><strong>Fall edges and openings<\/strong> (ceiling openings, shafts): escape route luminaires along walkways, anti-panic lighting in open areas.<\/li>\n<li><strong>Equipment zones<\/strong> such as around concrete demolition shears, multi cutters, and steel shears: position low-glare, impact-resistant luminaires outside the danger radius to visualize movement envelopes.<\/li>\n<li><strong>Hydraulic power packs and hose runs<\/strong>: clearly mark cable and hose crossings, avoid tripping hazards.<\/li>\n<li><strong>Temporary barriers and detours<\/strong>: illuminate rerouted passages and mark dead ends to prevent misguidance.<\/li>\n<\/ul>\n<h3>Safely surrounding stone and concrete splitters<\/h3>\n<p>When splitting concrete or natural stone, stone and concrete splitters as well as hydraulic splitting cylinders create radial crack propagation and material movement. In the emergency lighting layout, ensure that luminaires are arranged so that <em>clearances<\/em> remain visible and people can quickly find secured routes in the event of a fault. A combination of clear emergency exit sign luminaires and anti-panic lighting that evenly brightens open areas is particularly effective. Maintain sufficient distance to potential breakout cones and shield luminaires from flying fragments.<\/p>\n<h2>Planning, risk assessment, and sizing<\/h2>\n<p>Planning starts with a hazard analysis: Which scenarios lead to darkness or loss of visibility? How do demolition and cutting operations change the topography? Where are assembly points, first-aid equipment, and interfaces to escape routes located?<\/p>\n<ol>\n<li><strong>Define escape routes<\/strong>: Set primary and alternative routes, plan intermediate and assembly points.<\/li>\n<li><strong>Set illuminance levels<\/strong>: Typical reference values from common standards help: along escape routes, low but uniform illuminance; in open areas (anti-panic), sufficient base brightness for orientation. For example, at least around 1 lx on the center line of escape routes and around 5 lx in anti-panic zones are widely used reference magnitudes.<\/li>\n<li><strong>Ensure uniformity<\/strong>: Avoid dark zones and hard shadows, especially next to machines, material stacks, and demolition edges.<\/li>\n<li><strong>Limit glare<\/strong>: Aim luminaires so they do not dazzle operators or ground personnel.<\/li>\n<li><strong>Provide redundancy<\/strong>: At least two independent escape routes and spatially separated lighting circuits so individual failures can be compensated.<\/li>\n<\/ol>\n<h3>Illuminance and visibility quality<\/h3>\n<ul>\n<li><strong>Uniformity<\/strong>: Favor even distribution to prevent visual adaptation stress when passing bright and dark patches.<\/li>\n<li><strong>Color rendering and contrast<\/strong>: Neutral white light supports reading of signage and hazard markings on dusted or wet surfaces.<\/li>\n<li><strong>Photometric control<\/strong>: Use optics that limit uplight and glare while keeping edges, stairs, and trenches clearly modeled.<\/li>\n<\/ul>\n<h2>Positioning in areas with concrete demolition shears and splitting technology<\/h2>\n<p>In the vicinity of concrete demolition shears and stone and concrete splitters, dynamics are particularly high. Materials can tip, swing, or break loose unpredictably. Therefore, the emergency lighting should:<\/p>\n<ul>\n<li><strong>be mounted outside potential drop and shear zones<\/strong> and be built with shock-resistant housings,<\/li>\n<li><strong>keep the tools\u00e2\u0080\u0099 working radius<\/strong> recognizable through uniform base brightness,<\/li>\n<li><strong>additionally mark nodes<\/strong> such as access points, stairs, and platforms,<\/li>\n<li><strong>separate power paths<\/strong>: do not feed emergency lighting from the same distribution boards that supply machines and hydraulic power packs, to avoid cascading effects during shutdowns.<\/li>\n<li><strong>respect mounting height and protection<\/strong>: route and protect cabling overhead or along protected edges and use guards against mechanical impact.<\/li>\n<\/ul>\n<h2>Power supply, redundancy, and environmental conditions<\/h2>\n<p>Construction sites are harsh: dust, moisture, vibration, temperature extremes, and mechanical impacts are part of everyday operations. Emergency lighting must therefore be planned with suitable protection ratings (e.g., against dust and splash water), impact-resistant construction, and appropriate battery technologies. An independent supply &#8211; such as with self-contained luminaires &#8211; reduces dependency on the site power supply. Where a central emergency power supply is available, clear separation and protection of emergency lighting circuits and easily accessible test equipment are recommended.<\/p>\n<h3>Self-sufficient zoning<\/h3>\n<p>For large-scale deconstruction projects, <strong>zoning<\/strong> has proven effective: Each zone (e.g., cutting area, sorting area, haul route) receives its own emergency lighting supply. This way, other zones remain functional if a disturbance occurs in one section. Clearly identified distribution points and cable routes support rapid fault isolation.<\/p>\n<h3>Battery and temperature considerations<\/h3>\n<ul>\n<li><strong>Battery chemistry<\/strong>: Choose batteries with stable behavior across the expected temperature range and predictable aging for reliable autonomy.<\/li>\n<li><strong>Ambient conditions<\/strong>: Consider charging performance and capacity at low temperatures and provide ventilation where heat build-up is likely.<\/li>\n<li><strong>Serviceability<\/strong>: Use designs with accessible test switches and status indicators to reduce inspection effort.<\/li>\n<\/ul>\n<h2>Special operating environments: tunnel construction, rock excavation, and natural stone<\/h2>\n<p>In long, winding, or underground areas, escape routes are longer and orientation points are scarce. Continuous, easy-to-understand emergency signage guidance, regular markers within line of sight, and anti-panic lighting at widenings increase safety. For rock excavation and natural stone extraction, glare-free lighting, robust fixings, and protection against vibration are important. In dusty zones, closed optics and regular cleaning improve pictogram legibility and light output. Reflective or photoluminescent supplementary markings can assist wayfinding, but do not replace powered emergency lighting.<\/p>\n<h2>Safety signage and recognition distance<\/h2>\n<p>Emergency exit sign luminaires should be arranged so that directional arrows and pictograms are recognized early. Uniform pictograms and consistent arrow guidance prevent misinterpretation. In complex deconstruction projects, additional, uniform base brightness helps to detect obstacles, stored components, or hydraulic hose bridges in time. Determine recognition distance based on pictogram height according to commonly used calculation approaches; for internally illuminated signs, a higher distance factor typically applies than for externally illuminated signs.<\/p>\n<h2>Operation, testing, and documentation<\/h2>\n<p>Regular testing is essential. In practice, short functional tests at short intervals (e.g., weekly) and longer duration tests at longer intervals (e.g., monthly or quarterly) have become established. All tests should be recorded, including date, result, identified defects, and corrective actions taken. With frequent layout changes &#8211; such as when concrete demolition shears create new openings or stone and concrete splitters move concrete bodies &#8211; <strong>updates to the emergency lighting concept<\/strong> are required: relocate luminaires, add new emergency signs, and mark new fall edges. Central supervision systems, clear labeling, and versioned plans simplify audits and ensure traceability.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li><strong>Relying only on floodlights<\/strong>: Work lights are not construction site emergency lighting. Always provide an independent emergency lighting supply.<\/li>\n<li><strong>Glare and hard shadows<\/strong>: Aim luminaires correctly and distribute light points sensibly.<\/li>\n<li><strong>Unclear escape route guidance<\/strong>: Use pictograms consistently, clearly mark alternative routes.<\/li>\n<li><strong>Dependence on machine power<\/strong>: Electrically decouple emergency lighting so shutdowns of hydraulic power packs do not switch off the emergency lights.<\/li>\n<li><strong>Lack of updates<\/strong>: After structural changes, review and adjust the emergency lighting plan.<\/li>\n<li><strong>Neglected batteries and optics<\/strong>: Replace aged batteries on schedule and keep lenses and signs clean to maintain output and legibility.<\/li>\n<\/ul>\n<h2>Material and equipment characteristics for site use<\/h2>\n<p>For construction sites, impact-resistant housings, durable fixings, protected cable routing, and batteries with reliable behavior across changing temperatures have proven effective. Low-glare optics and uniform light distribution are important so operators &#8211; such as when handling concrete demolition shears &#8211; are not distracted. In outdoor areas, weather-resistant construction supports reliable operation.<\/p>\n<ul>\n<li><strong>Mechanical robustness<\/strong>: Shock and vibration resistance reduce failures near heavy equipment.<\/li>\n<li><strong>Ingress protection<\/strong>: Sealed enclosures and suitable cable glands limit dust and moisture ingress.<\/li>\n<li><strong>Mounting systems<\/strong>: Quick-release brackets and coded positions speed up safe relocation when the site layout changes.<\/li>\n<\/ul>\n<h2>Practice-oriented checklist for implementation<\/h2>\n<ol>\n<li>Create a hazard analysis, define escape route lengths and assembly points.<\/li>\n<li>Provide emergency exit sign luminaires at all direction changes, doors, stairs, and exits.<\/li>\n<li>Plan anti-panic lighting for open areas, avoid shadow zones.<\/li>\n<li>Select the supply concept: self-contained, central battery, or a combination; ensure redundancy.<\/li>\n<li>Mount luminaires robustly and position them outside impact and shear zones (concrete demolition shears, steel shears, multi cutters).<\/li>\n<li>Implement electrical separation of machine and emergency lighting circuits.<\/li>\n<li>Perform regular functional and duration tests, document the results.<\/li>\n<li>Review the emergency lighting plan after every change in construction state and adjust if necessary.<\/li>\n<li>Label circuits, test points, and luminaires consistently and maintain a change log with date and responsible person.<\/li>\n<li>Schedule cleaning of optics and signs and verify recognition distances after relocations.<\/li>\n<\/ol>\n<h2>Best practices for dynamic construction sites<\/h2>\n<p>Where construction states change daily, a modular emergency lighting setup with quickly relocatable luminaires, clear zoning, and defined standard positions helps. In areas where stone and concrete splitters or concrete demolition shears alter structural elements, the emergency lighting should be designed in advance so that <em>temporary alternate routes<\/em> can be activated immediately. Highly visible, redundant emergency signs, regular team briefings, and short testing intervals increase the robustness of the overall system. Clear ownership for inspections and immediate corrective action after findings keeps the system dependable under real site conditions.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction site emergency lighting is a central element of occupational safety. It ensures that employees and first responders remain oriented, find escape routes safely, and avoid hazardous areas in the event of a power failure, smoke development, or unexpected incidents. This is especially true for high-risk activities such as concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19488","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Site Emergency Lighting Safety Guide<\/title>\n<meta name=\"description\" content=\"Stay safe on construction sites with emergency lighting \u2713 Guide escape routes and ensure evacuation during power loss.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Site Emergency Lighting Safety Guide\" \/>\n<meta property=\"og:description\" content=\"Stay safe on construction sites with emergency lighting \u2713 Guide escape routes and ensure evacuation during power loss.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T13:57:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-emergency-lighting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-emergency-lighting\",\"name\":\"Construction Site Emergency Lighting Safety Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-15T14:39:06+00:00\",\"dateModified\":\"2026-04-30T13:57:02+00:00\",\"description\":\"Stay safe on construction sites with emergency lighting \u2713 Guide escape routes and ensure evacuation during power loss.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-emergency-lighting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-emergency-lighting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-emergency-lighting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction site emergency lighting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Site Emergency Lighting Safety Guide","description":"Stay safe on construction sites with emergency lighting \u2713 Guide escape routes and ensure evacuation during power loss.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting","og_locale":"en_US","og_type":"article","og_title":"Construction Site Emergency Lighting Safety Guide","og_description":"Stay safe on construction sites with emergency lighting \u2713 Guide escape routes and ensure evacuation during power loss.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-30T13:57:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting","url":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting","name":"Construction Site Emergency Lighting Safety Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-15T14:39:06+00:00","dateModified":"2026-04-30T13:57:02+00:00","description":"Stay safe on construction sites with emergency lighting \u2713 Guide escape routes and ensure evacuation during power loss.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-emergency-lighting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Construction site emergency lighting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19488","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19488"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19488\/revisions"}],"predecessor-version":[{"id":26785,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19488\/revisions\/26785"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}