{"id":19484,"date":"2025-11-15T09:43:16","date_gmt":"2025-11-15T08:43:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19484"},"modified":"2026-04-30T07:34:02","modified_gmt":"2026-04-30T05:34:02","slug":"wetting-agent","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent","title":{"rendered":"Wetting agent"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wetting agents play a frequently underestimated role in construction, deconstruction and stone processing. They improve the wettability of surfaces, reduce the surface tension of water and thus support processes such as dust suppression, borehole flushing, cleaning and material separation. In combination with products such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> and concrete demolition shears from Darda GmbH, wetting agents help make workflows more controlled, cleaner and more ergonomic &#8211; without changing the mechanical mode of action of these tools. When matched to substrate and process, they can contribute to lower airborne dust loads, shorter cleaning cycles and more resource-efficient water use while supporting regulatory compliance on site.<\/p>\n<h2>Definition: What is meant by a wetting agent?<\/h2>\n<p>A wetting agent is a surface-active additive that reduces the surface tension of a liquid medium &#8211; usually water. As a result, the medium spreads more easily on solid surfaces, penetrates pores, cracks and capillaries faster, and better envelops fine particles. In practice, wetting agents provide improved dust binding, more efficient cleaning processes, more uniform wetting of mineral substrates and a more stable suspension of fines. Chemically, these are typically anionic, nonionic, cationic or amphoteric surfactants which, depending on the formulation, can also exhibit dispersing, emulsifying or foam-controlling properties. Key formulation parameters include the <em>critical micelle concentration (CMC)<\/em>, <em>dynamic surface tension<\/em> relevant for fast processes, and temperature stability, all of which determine effectiveness at very low dosages.<\/p>\n<h2>Mechanism and chemical fundamentals<\/h2>\n<p>The central physical variable is <em>surface tension<\/em>. Pure water has a high surface tension and beads up on hydrophobic or dusty surfaces. Wetting agents align at interfaces and lower this tension. This reduces contact angles and the liquid spreads more broadly. In fast, practical operations, <em>dynamic<\/em> rather than equilibrium surface tension is decisive, which is why short contact times still benefit from appropriately formulated surfactants. Beyond this, once the CMC is reached, additional effects like micelle formation support soil release and particle transport. Further effects:<\/p>\n<ul>\n<li><strong>Wetting:<\/strong> Increases spreading on concrete, natural stone, steel and mineral dust.<\/li>\n<li><strong>Dispersion:<\/strong> Fine particles remain suspended longer, improving flushing and cleaning performance.<\/li>\n<li><strong>Penetration:<\/strong> Faster permeation of pores and microcracks, useful in borehole preparation.<\/li>\n<li><strong>Foam control:<\/strong> Formulation and dosage determine whether low-foam (flushing) or foam-active (dust suppression) operation is favored.<\/li>\n<li><strong>Dynamic wetting:<\/strong> Lower dynamic surface tension supports rapid wetting at short residence times typical of spray applications.<\/li>\n<\/ul>\n<h2>Applications in concrete demolition and specialized deconstruction<\/h2>\n<p>On demolition sites, wetting agents are primarily used as an additive to spray and flushing water to bind fine dusts, prepare boreholes, and make materials and equipment surfaces easier to clean. In combination with concrete demolition shears and stone and concrete splitters from Darda GmbH, the following practice-relevant effects can be achieved. Proper droplet management and correct dosing can reduce water demand and post-cleaning effort without impairing tool performance.<\/p>\n<h3>Dust suppression with concrete demolition shears<\/h3>\n<p>Fine particles are generated when crushing concrete. A finely nebulized water film with a small addition of wetting agent wets fracture edges and debris more effectively, causing dust to agglomerate faster and settle. This improves visibility, reduces deposits on adjacent structural elements and supports occupational safety measures. Selecting a droplet spectrum that balances reach and evaporation &#8211; typically neither too coarse nor ultra-fine &#8211; increases capture efficiency for PM fractions while limiting drift.<\/p>\n<h3>Borehole preparation for stone and concrete splitters<\/h3>\n<p>Clean, uniformly moistened boreholes are helpful for hydraulic splitting. Wetting agents in the flush water reduce the adhesion of drill cuttings to the borehole wall, facilitate flushing, and ensure a homogeneous wetting profile. This promotes reproducible wedge guidance and supports precise crack formation in the component. Lower adhesion of fines can also reduce required flushing pressure and help maintain geometry over depth.<\/p>\n<h3>Cleaning of workpieces and surroundings<\/h3>\n<p>After use, fines settle on components, tool bodies and surrounding surfaces. Wetting agent-containing cleaning water releases mineral residues more effectively without high mechanical friction. This protects surfaces and reduces water consumption. Short dwell times with targeted rinsing often suffice; where appropriate, combine with mechanical support such as brushes or microfiber to remove compacted residues.<\/p>\n<h2>Wetting agents in rock demolition and tunnel construction<\/h2>\n<p>During drilling and flushing operations in rock, as encountered in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, wetting agents facilitate the removal of fine sediments. In confined areas, optimized wetting reduces dust and supports visibility. In controlled splitting operations &#8211; such as during heading or preparation of separation cuts &#8211; uniform moistening of contact surfaces promotes predictable load transfer between tool and rock. Low-foam wetting agent systems can also speed up wet cleaning of drilling equipment and cylinders, particularly when water hardness or temperature would otherwise impair cleaning efficiency.<\/p>\n<h2>Strip-out, cutting and selective deconstruction<\/h2>\n<p>When exposing reinforcement, selectively deconstructing walls, or chipping off attachments, localized fine dust is generated. Wetting agent-laden mists or spray films support uniform wetting of cut and fracture zones. In combination with concrete demolition shears and combination shears, this helps stabilize particle binding without affecting the mechanical work process. Even at low flow rates, improved spreading promotes edge coverage in recessed or rough geometries.<\/p>\n<h2>Natural stone extraction and gentle separation<\/h2>\n<p>In quarries and during natural stone extraction, improved wetting supports the clean flushing of drill cuttings and targeted dust suppression along separation joints. Wetting agents can keep surfaces cleaner, which benefits downstream quality steps such as sorting and visual inspection. More uniform moistening also reduces streaking and helps avoid re-deposition on high-value visible faces.<\/p>\n<h2>Special operations and specific applications<\/h2>\n<p>For special tasks &#8211; such as work on tanks, pipelines or contaminated sites &#8211; wetting agents serve to wet and carry off residual substances as part of aqueous cleaning. Depending on requirements, a lower-foam formulation may be useful to maintain visibility and workflow. As a rule, risk assessments, material compatibilities and applicable regulations must be observed. When using tank cutters from Darda GmbH, a wetting flush medium can help remove adherences on outer surfaces more easily; the tool itself remains unaffected, as it separates mechanically. In sensitive environments, neutral pH and low-conductivity formulations can support material protection and process reliability.<\/p>\n<h2>Selection criteria and dosing<\/h2>\n<p>The choice of a suitable wetting agent depends on the substrate, process and environmental requirements. Proven criteria:<\/p>\n<ul>\n<li><strong>Surfactant type:<\/strong> Nonionic systems are often material-friendly and low-foam; anionic variants wet strongly but may foam more.<\/li>\n<li><strong>Foam behavior:<\/strong> Dust suppression sometimes benefits from light foam; low-foam products are advantageous for borehole flushing.<\/li>\n<li><strong>Material compatibility:<\/strong> Consider compatibility with concrete, natural stone, steel and seals; avoid residues.<\/li>\n<li><strong>Water quality:<\/strong> Hardness, pH and temperature influence effectiveness; adjust dosage if necessary.<\/li>\n<li><strong>Environmental profile:<\/strong> Consider biodegradability and aquatic compatibility; plan for wastewater treatment.<\/li>\n<li><strong>Temperature stability:<\/strong> Check cloud point of nonionic systems and viscosity at low temperatures to ensure consistent spray behavior.<\/li>\n<li><strong>Regulatory fit:<\/strong> Verify labeling, local discharge limits and suitability for the intended work environment.<\/li>\n<\/ul>\n<p>The dosage should be as low as possible and as high as necessary. Very low concentrations are often used to sufficiently lower surface tension without causing foaming or residue issues. Typical starting points are in the range of approximately 0.01 &#8211; 0.2 percent for flushing and 0.05 &#8211; 0.3 percent for dust suppression, subject to adjustment based on water quality and nozzle setup. Observe manufacturers&#8217; instructions and safety data sheets, and validate settings with small-scale tests where boundary conditions are tight.<\/p>\n<h2>Interactions with concrete, steel and hydraulics<\/h2>\n<p>Wetting agents do not affect the mechanics of concrete demolition shears or splitters. Nevertheless, some points are relevant:<\/p>\n<ul>\n<li><strong>Concrete surfaces:<\/strong> Excess wetting agent residues on fresh fractures can temporarily affect the adhesion of coatings; rinse afterward.<\/li>\n<li><strong>Reinforcement:<\/strong> Prefer neutral to mildly formulated products; near-neutral pH is often gentle on materials. Corrosion protection measures must be considered independently.<\/li>\n<li><strong>Hydraulic power packs:<\/strong> Wetting agents do not belong in the hydraulic circuit. When cleaning external housings, ensure no liquid enters ports.<\/li>\n<li><strong>Seals and hoses:<\/strong> Minimize contact time and rinse afterward; observe manufacturer guidance on elastomer compatibility.<\/li>\n<li><strong>Fresh mixes:<\/strong> Do not introduce wetting agents into concrete or grout formulations unless expressly intended; avoid unintended admixture effects.<\/li>\n<\/ul>\n<h2>Practical guide for on-site application<\/h2>\n<ul>\n<li><strong>Make-up:<\/strong> Mix the wetting agent into clean water, preferably with circulation; add concentrate slowly under agitation and avoid overdosing.<\/li>\n<li><strong>Application:<\/strong> For concrete demolition shears, apply a fine mist to wet surfaces evenly; for borehole flushing, feed continuously.<\/li>\n<li><strong>Nozzle setup:<\/strong> Select spray nozzles according to the desired droplet size; inspect regularly for deposits.<\/li>\n<li><strong>Weather:<\/strong> Wind and temperature influence mist drift and evaporation; adjust application accordingly.<\/li>\n<li><strong>Post-treatment:<\/strong> Rinse residues with clear water, capture wastewater and treat it properly.<\/li>\n<li><strong>Monitoring:<\/strong> Visually check wetting uniformity and dust knockdown; document settings that achieve stable results.<\/li>\n<\/ul>\n<h2>Typical application errors and how to avoid them<\/h2>\n<ul>\n<li><strong>Excessive concentration:<\/strong> Leads to excessive foam or slippery surfaces; choose the minimally effective amount.<\/li>\n<li><strong>Unsuitable surfactant type:<\/strong> Causes material incompatibility or poor performance; consider application and substrate.<\/li>\n<li><strong>Insufficient rinsing:<\/strong> Leaves residues; rinse with clean water after work.<\/li>\n<li><strong>Ingress into power packs:<\/strong> Keep splash water away from hydraulic connections; use covers.<\/li>\n<li><strong>Hard water effects:<\/strong> Scaling or reduced performance in very hard water; use softening or adapted formulations.<\/li>\n<li><strong>Incorrect droplet spectrum:<\/strong> Too fine promotes drift, too coarse reduces capture; adjust pressure and nozzle design.<\/li>\n<\/ul>\n<h2>Occupational safety, environment and disposal<\/h2>\n<p>Wetting agents can be handled safely with standard protective measures. Avoid skin and eye contact, do not inhale aerosols and use appropriate personal protective equipment. Local regulations govern the collection, separation and disposal of wastewater containing wetting agents. Selecting products with favorable environmental profiles can facilitate downstream treatment. Prevent entry into stormwater systems, use suitable containment, and rely on sedimentation or filtration where solids load is elevated. Safety data sheets provide substance-specific guidance for storage, handling and first aid.<\/p>\n<h2>Distinction from related functional substances in construction<\/h2>\n<p>Wetting agents are often discussed alongside dispersants, emulsifiers, defoamers or plasticizers. While wetting agents primarily improve wetting and spreading, dispersants stabilize particles in suspension, emulsifiers unite immiscible liquids, defoamers reduce foam, and plasticizers steer the rheology of cement pastes. In demolition and splitting processes, controlled wetting takes priority; other additive classes can be used complementarily but serve different primary functions. Clear differentiation helps prevent unintended side effects, especially where several additives might be present on the same site.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>A simple yet effective routine includes documenting the product, make-up concentration, water quality and application parameters. Visual checks of wetting, dust reduction and flushing effect enable ongoing optimization. For sites with sensitive boundary conditions, prior small-scale trials are recommended. In addition, recording ambient conditions (temperature, wind), nozzle specifications and observed foam levels supports reproducibility and continuous improvement.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wetting agents play a frequently underestimated role in construction, deconstruction and stone processing. They improve the wettability of surfaces, reduce the surface tension of water and thus support processes such as dust suppression, borehole flushing, cleaning and material separation. In combination with products such as rock and concrete splitters and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19484","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wetting Agent for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Improve construction dust control and drilling with wetting agents that lower surface tension \u2713 for cleaner sites.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wetting Agent for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Improve construction dust control and drilling with wetting agents that lower surface tension \u2713 for cleaner sites.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T05:34:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wetting-agent\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wetting-agent\",\"name\":\"Wetting Agent for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-15T08:43:16+00:00\",\"dateModified\":\"2026-04-30T05:34:02+00:00\",\"description\":\"Improve construction dust control and drilling with wetting agents that lower surface tension \u2713 for cleaner sites.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wetting-agent#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wetting-agent\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wetting-agent#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wetting agent\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wetting Agent for Construction & Demolition","description":"Improve construction dust control and drilling with wetting agents that lower surface tension \u2713 for cleaner sites.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent","og_locale":"en_US","og_type":"article","og_title":"Wetting Agent for Construction & Demolition","og_description":"Improve construction dust control and drilling with wetting agents that lower surface tension \u2713 for cleaner sites.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-30T05:34:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent","url":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent","name":"Wetting Agent for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-15T08:43:16+00:00","dateModified":"2026-04-30T05:34:02+00:00","description":"Improve construction dust control and drilling with wetting agents that lower surface tension \u2713 for cleaner sites.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wetting-agent"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wetting-agent#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wetting agent"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19484"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19484\/revisions"}],"predecessor-version":[{"id":26760,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19484\/revisions\/26760"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}