{"id":19483,"date":"2025-11-15T12:07:47","date_gmt":"2025-11-15T11:07:47","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19483"},"modified":"2026-04-30T12:13:03","modified_gmt":"2026-04-30T10:13:03","slug":"utility-power-isolation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation","title":{"rendered":"Utility power isolation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Utility power isolation is a central safety and planning topic in concrete demolition, gutting works, and special demolition. It establishes the prerequisite for structures, components, and technical systems to be processed or deconstructed safely. Especially when separating reinforced concrete with <strong>concrete demolition shears<\/strong> or during controlled splitting with <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/strong>, consistent utility power isolation prevents unintended contact with live lines and reduces electrical hazards. This article combines fundamental knowledge with practical guidance from typical Darda GmbH application scenarios. In professional deconstruction, the procedure is also referred to as <em>electrical isolation<\/em>, <em>de-energization<\/em>, or <em>lockout-tagout<\/em> within the applicable framework rules.<\/p>\n<h2>Definition: What is meant by utility power isolation?<\/h2>\n<p>Utility power isolation is understood to be the targeted, traceable, and secured <em>isolation of electrical installations<\/em> or parts of installations from the supply network in order to establish a <strong>de-energized<\/strong> state. The goal is to protect people, equipment, and structures during activities such as drilling, sawing, cutting, crushing, or splitting from electric shock, arc faults, and consequential damage. Utility power isolation includes switching off, securing against re-energization, verifying absence of voltage, and supplementary protective measures. In deconstruction projects this applies to both building installations (low voltage) and project-specific construction power supply. It is part of work preparation and is usually planned and carried out by qualified electrical specialists. In combination with hydraulic demolition tools and power units, it forms the basis for a controlled, low-interference construction process.<\/p>\n<p><strong>Core objectives of utility power isolation<\/strong> include:<\/p>\n<ul>\n<li><em>Risk prevention:<\/em> Avoidance of electric shock, arc flash, and induced touch voltages in the work area.<\/li>\n<li><em>Process reliability:<\/em> Clear release of zones ensures predictable sequences for cutting, crushing, and splitting.<\/li>\n<li><em>Asset protection:<\/em> Minimization of damage to building services, control systems, and sensitive devices.<\/li>\n<\/ul>\n<h2>Practical guide: Steps for utility power isolation on the construction site<\/h2>\n<p>Utility power isolation follows established safety rules that are adapted to the project, the installation topology, and the hazard profile. A clear allocation of roles, seamless documentation, and visible labeling are crucial so that, after isolation, work can be carried out safely with concrete demolition shears, stone and concrete splitters, and other tools.<\/p>\n<p>Effective planning clarifies in advance:<\/p>\n<ul>\n<li><strong>System boundaries:<\/strong> Which feeders, sub-distributions, and circuits are affected.<\/li>\n<li><strong>Alternative sources:<\/strong> Emergency power, UPS, photovoltaic strings, and charging infrastructure that may backfeed.<\/li>\n<li><strong>Residual energies:<\/strong> Stored energy in capacitors or long cable runs and the need for discharge or earthing and short-circuiting where appropriate.<\/li>\n<li><strong>Communication:<\/strong> Switching authority, release procedure, and escalation paths for deviations on site.<\/li>\n<\/ul>\n<h2>Application areas in concrete demolition, gutting works, and tunnel construction<\/h2>\n<p>Utility power isolation is used wherever electrical lines, distribution boards, machine connections, or sensors are affected by deconstruction. This ranges from apartment remodeling to large-scale gutting works and extends to industrial plants, bridges, and underground structures. Depending on the construction state, isolation can be localized (e.g., individual riser) or comprehensive (building-side, sectionalized).<\/p>\n<p>Typical scenarios include:<\/p>\n<ul>\n<li>Removal of technical rooms and shafts with dense routing of cables and trays.<\/li>\n<li>Selective demolition in mixed-use buildings with simultaneously operating areas.<\/li>\n<li>Phased gutting with temporary power that must remain available to other trades.<\/li>\n<\/ul>\n<h3>Concrete demolition with concrete demolition shears<\/h3>\n<p>When separating slabs, beams, and walls with concrete demolition shears, reinforcement can carry current if concealed lines or cable trays are still energized. A <strong>complete isolation<\/strong> before the first cut prevents current transfer and arc formation, protects tool hydraulics, and minimizes collateral damage to adjacent systems (e.g., fire alarm systems, elevator equipment). In practice, continuity of reinforcement, conductive inserts, and metallic anchors should be considered as potential current paths and treated accordingly in the isolation concept.<\/p>\n<h3>Controlled splitting with stone and concrete splitters<\/h3>\n<p>Splitting generates cracks along zones of weakness. Lines that have not been isolated in chase or installation zones can be damaged unnoticed. Upfront isolation, making line routes visible, and securing against re-energization are therefore integral work steps. Where routing remains uncertain, small exposure openings or endoscopy can provide clarity before larger splitting sequences start.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel construction, temporary energy networks (lighting, ventilation, pumps) often exist. Here, utility power isolation must be planned <em>section by section<\/em> so that safety-relevant loads (such as escape route lighting) remain in service while the work area is specifically de-energized. This planning approach aligns with practices in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. Zoning, clear cable routing, and robust protection of temporary distributions reduce unplanned outages and allow coordinated shifts.<\/p>\n<h2>Technical means: isolation switches, main switches, and construction power supply<\/h2>\n<p>Isolation can be implemented via main switches, selective disconnectors, or project-specific temporary power distribution. Isolation switches, in the sense of switchable disconnecting devices, create a visible isolation point and enable securing against re-energization. Residual-current devices (RCDs) increase electrical safety but do <em>not replace<\/em> isolation. In existing buildings, multiple feed-in points (e.g., emergency power) are often present and must be included in the switching strategy.<\/p>\n<p>Good practice includes:<\/p>\n<ul>\n<li><strong>Visible break isolation:<\/strong> Use devices that provide an unmistakable open contact indication.<\/li>\n<li><strong>Lockable actuators:<\/strong> Provision for lockout with unique keys and individualized tags.<\/li>\n<li><strong>Selective protection:<\/strong> Coordination of overcurrent and RCD devices to avoid nuisance trips in unaffected sections.<\/li>\n<li><strong>Backfeed prevention:<\/strong> Mechanical interlocks or dedicated changeover devices where alternative supplies exist.<\/li>\n<\/ul>\n<h2>Hazards without consistent utility power isolation<\/h2>\n<p>Working without utility power isolation risks electric shock, arc flash, secondary fires, or uncontrolled system shutdowns. Tools such as concrete demolition shears, combination shears, or tank cutters can unintentionally contact lines with compromised insulation. In addition to personal hazards, costly repairs to building services and delays in the construction process are possible.<\/p>\n<p>Further risks include induced voltages in long parallel runs, damage to control loops with safety functions, and unintentional activation of security or building automation sequences. These effects can propagate beyond the immediate work zone and compromise adjacent sections.<\/p>\n<h2>Process and responsibilities in deconstruction<\/h2>\n<p>Planning typically lies with a qualified electrical specialist who issues approvals, performs switching operations, and verifies absence of voltage. Site management coordinates interfaces, defines work zones, and ensures unambiguous labeling. Execution teams work within the released areas and report changes or irregularities immediately.<\/p>\n<p>A robust assignment of tasks covers:<\/p>\n<ul>\n<li><em>Before isolation:<\/em> Assessment of drawings, on-site survey, and agreement on switching sequences and times.<\/li>\n<li><em>During isolation:<\/em> Lockout-tagout application, verification measurements, and controlled handover of areas.<\/li>\n<li><em>After completion:<\/em> Inspection of the work zone, removal of temporary measures, and documented re-energization.<\/li>\n<\/ul>\n<h2>Work steps at a glance<\/h2>\n<p>The following steps have proven effective in practice and are adapted to the project:<\/p>\n<ol>\n<li><strong>Isolate:<\/strong> Switch off affected parts of the installation and disconnect from the network.<\/li>\n<li><strong>Secure against re-energization:<\/strong> Lock out, tag, record switching authority.<\/li>\n<li><strong>Verify absence of voltage:<\/strong> Test appropriately, document, select measurement points.<\/li>\n<li><strong>Supplement protective measures:<\/strong> Cover adjacent live parts; if required, earth\/short-circuit (depending on the installation).<\/li>\n<li><strong>Hand over the work area:<\/strong> Mark visibly, regulate access, communicate release.<\/li>\n<\/ol>\n<p>Quality-assured implementation benefits from:<\/p>\n<ul>\n<li>Function testing of measuring instruments on a known source before and after verification of absence of voltage.<\/li>\n<li>Use of suitable PPE when opening enclosures or approaching potential live parts during the preparatory phase.<\/li>\n<li>Physical separation and cable protection in transitional areas between energized and de-energized zones.<\/li>\n<\/ul>\n<h2>Interaction with hydraulic demolition tools<\/h2>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Power units<\/a> on construction sites are often electric or engine-driven. With electric supply, a clean separation between construction power for the power unit and the building circuits being worked on is essential. A <em>separate, tested construction power supply<\/em> prevents backfeeding into existing networks. Tools such as concrete demolition shears, Multi Cutters, and steel shears benefit from stable, interference-free working conditions created by consistent utility power isolation in the work environment.<\/p>\n<p>Practical points for reliable operation include adequate cross-sections for start-up currents, protected routing of supply cables, avoidance of shared residual current devices with other trades, and regular inspection of plugs, connectors, and extensions for mechanical damage.<\/p>\n<h3>Signal and extra-low-voltage\/control circuits<\/h3>\n<p>Low-voltage and control lines (e.g., building automation) must also be considered. They can be damaged unnoticed during cutting or splitting and lead to system disturbances. Comprehensive utility power isolation therefore includes these circuits in the planning.<\/p>\n<p>Relevant examples are fire detection loops, access control, intercom, data cabling including PoE, and sensor networks. Mapping these circuits and coordinating bypass or temporary functions prevents follow-on faults in operating areas.<\/p>\n<h2>Particularities in existing buildings and industrial plants<\/h2>\n<p>In existing buildings, line routes, retrofits, and provisional feed-ins are not always fully documented. Additional sources such as emergency generators, UPS systems, photovoltaic strings, or charging stations can enable backfeeding. Extended tests, visual inspections, and, where appropriate, exploratory openings are advisable before working with concrete demolition shears or stone and concrete splitters.<\/p>\n<p>Further attention points include parallel routing with capacitive coupling, historical repairs with mixed conductor colors, and undocumented changes in protection concepts. In such environments, conservative switching margins and staged isolation reduce residual risk.<\/p>\n<h2>Documentation and labeling<\/h2>\n<p>Switching logs, plans with marked zones, and unambiguous signage in the work area increase safety and traceability. Visible barriers, lockout padlocks, and warning tags at switching points facilitate coordination. A clear, short communication chain shortens downtime and keeps the construction process stable.<\/p>\n<ul>\n<li>Switching logs record date, time, scope, responsible persons, measurement results, and release status.<\/li>\n<li>Site plans display isolation boundaries, residual live areas, and access routes for evacuation and logistics.<\/li>\n<li>Labels and tags use consistent identifiers matching plans and reports to avoid ambiguity.<\/li>\n<\/ul>\n<h2>Practice-oriented notes for use with concrete demolition shears and splitters<\/h2>\n<p>The following list supports work preparation and operations in the de-energized area:<\/p>\n<ul>\n<li>Perform line locating before starting and make the results visible to the team.<\/li>\n<li>Schedule utility power isolation early, allow buffer time for testing and handover.<\/li>\n<li>Set up construction power supply separately; provide evidence of protective measures (RCD, protective conductor test).<\/li>\n<li>Mark work zones with color codes and signs, especially at ceiling openings and shafts.<\/li>\n<li>Ongoing checks: When the construction state changes (demolition, rewiring), verify absence of voltage again.<\/li>\n<li>Select tool guidance so that potential installation zones (chases, riser zones) are avoided or worked only after release.<\/li>\n<li>When line routing is unclear, use viewing windows and trial chases before cutting or splitting large areas.<\/li>\n<li>Protect exposed ends of decommissioned cables against inadvertent reconnection and environmental influences.<\/li>\n<li>Coordinate start-up and shutdown times of temporary power with adjacent trades to prevent uncontrolled energization.<\/li>\n<\/ul>\n<h2>Qualification, rules, and cautious legal classification<\/h2>\n<p>Switching operations and verification of absence of voltage belong in the hands of qualified electrical specialists. Internal site instructions, hazard assessments, and release processes form the framework for safe procedures. Requirements may vary by country, network type, and installation type; the points described here are general guidance and do not replace project-specific planning.<\/p>\n<p>Competence management, briefings tailored to the task, and calibrated measuring equipment support reproducible quality. Where necessary, permits to work and cross-trade coordination ensure that isolation remains effective throughout changing construction phases.<\/p>\n<h2>Utility power isolation in the context of Darda GmbH application areas<\/h2>\n<p>Whether <strong>concrete demolition and special demolition<\/strong>, <strong>gutting works and cutting<\/strong>, <strong>rock excavation and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong> or <strong>special applications<\/strong>: Utility power isolation is a cross-cutting topic. It reduces disruptions, protects personnel and equipment, and contributes to cleanly planned interfaces between existing networks and construction power. Especially in combination with concrete demolition shears as well as stone and concrete splitters, it increases process reliability and the quality of execution. A structured isolation concept, consistent labeling, and disciplined verification are therefore integral elements of safe and efficient deconstruction workflows.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Utility power isolation is a central safety and planning topic in concrete demolition, gutting works, and special demolition. It establishes the prerequisite for structures, components, and technical systems to be processed or deconstructed safely. Especially when separating reinforced concrete with concrete demolition shears or during controlled splitting with stone and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19483","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Utility Power Isolation for Concrete Demolition<\/title>\n<meta name=\"description\" content=\"Master electrical safety in demolition and concrete cutting with utility power isolation \u2713 de-energize lines safely.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Utility Power Isolation for Concrete Demolition\" \/>\n<meta property=\"og:description\" content=\"Master electrical safety in demolition and concrete cutting with utility power isolation \u2713 de-energize lines safely.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T10:13:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-power-isolation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-power-isolation\",\"name\":\"Utility Power Isolation for Concrete Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-15T11:07:47+00:00\",\"dateModified\":\"2026-04-30T10:13:03+00:00\",\"description\":\"Master electrical safety in demolition and concrete cutting with utility power isolation \u2713 de-energize lines safely.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-power-isolation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-power-isolation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-power-isolation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Utility power isolation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Utility Power Isolation for Concrete Demolition","description":"Master electrical safety in demolition and concrete cutting with utility power isolation \u2713 de-energize lines safely.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation","og_locale":"en_US","og_type":"article","og_title":"Utility Power Isolation for Concrete Demolition","og_description":"Master electrical safety in demolition and concrete cutting with utility power isolation \u2713 de-energize lines safely.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-30T10:13:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation","url":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation","name":"Utility Power Isolation for Concrete Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-15T11:07:47+00:00","dateModified":"2026-04-30T10:13:03+00:00","description":"Master electrical safety in demolition and concrete cutting with utility power isolation \u2713 de-energize lines safely.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/utility-power-isolation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Utility power isolation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19483"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19483\/revisions"}],"predecessor-version":[{"id":26773,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19483\/revisions\/26773"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}