{"id":19475,"date":"2025-11-14T08:36:56","date_gmt":"2025-11-14T07:36:56","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19475"},"modified":"2026-04-30T09:37:03","modified_gmt":"2026-04-30T07:37:03","slug":"stone-cutting-machine","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine","title":{"rendered":"Stone cutting machine"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A stone cutting machine is a central tool for the processing and separation of granite, marble, sandstone, basalt, and other rocks. It is used in <a href=\"https:\/\/www.darda.de\/en\/applications\/natural-stone-quarrying\">natural stone quarrying<\/a>, in fit-out and refurbishment, in rock excavation and tunnel construction, as well as in the deconstruction of natural stone components. In practice, it is often combined with hydraulic tools, such as <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong>, to prepare components appropriately, relieve stresses, or separate them gently. The following article classifies the term technically, explains technology and methods, and shows proper use along common workflows. <em>Stone cutting machines are also referred to as stone saws, diamond saws, or diamond wire systems, depending on the cutting medium and configuration.<\/em><\/p>\n<h2>Definition: What is a stone cutting machine?<\/h2>\n<p>A stone cutting machine is a machine or a hand-guided device that processes natural stone by chip-forming separation using diamond-equipped cutting media. Common types include cut-off saws with diamond cutting discs, bridge and block saws in stonemasonry, hand-guided table saws, joint cutters for paved walkways, and diamond wire saws for large-format and complex cuts. Depending on the method, work is carried out dry with dust extraction or preferably wet with cooling water in order to ensure tool life, cut quality, and occupational safety. Stone cutting machines differ from wood or metal circular saws by the use of diamond segments, lower specific feed, different speed ranges, and the need for effective cooling and slurry management. <em>Kerf width and achievable tolerances depend on tool diameter, segment geometry, machine rigidity, and guidance accuracy.<\/em><\/p>\n<h2>Technical design and operating principle of a stone cutting machine<\/h2>\n<p>A stone cutting machine typically consists of a drive unit (electric or hydraulic), spindle or roller guide, the cutting medium (diamond cutting disc or diamond wire), a rigid guide or bridge gantry, the workpiece support with bedding\/clamping means, and provisions for <em>cooling<\/em> and <em>dust reduction<\/em>. In disc cutting, a segmented diamond disc rotates; embedded industrial diamonds scrape the mineral matrix. In wire cutting, a diamond-coated wire circulates over deflection pulleys, enabling very long, straight cuts close to component edges. The operating principle is always the same: at a defined peripheral speed and under controlled contact pressure, the diamonds generate tiny fracture and abrasion events in the rock. Decisive for a reliable separation are the correct segment bond (hard or soft matched to rock hardness), even cooling water supply, precise guidance, and secure workpiece fixation. <strong>Variable-speed drives<\/strong>, vibration-damped frames, and <em>clean coolant routing with filtration<\/em> increase stability, reduce noise, and extend tool life.<\/p>\n<h2>Types and application range<\/h2>\n<p>Depending on component size, rock type, and site environment, different designs are used. The range extends from stationary systems to mobile jobsite solutions. <em>Selection criteria include cut depth, permissible tolerances, access conditions, emission limits, and the availability of water and power.<\/em><\/p>\n<h3>Stationary bridge and block saws<\/h3>\n<p>Bridge saws cut slabs and formats precisely with a traversing saw unit over a worktable. Block saws slice raw blocks into slabs. Advantages include high dimensional accuracy, repeatable miters, and reproducible cut quality &#8211; relevant for natural stone facades, steps, and floorings. Modern variants offer programmable feed, tilting heads for bevels, and optimized water curtains for uniform cooling and reduced overspray.<\/p>\n<h3>Mobile cut-off saws and joint cutters<\/h3>\n<p>Hand-guided table saws and walk-behind joint cutters are suitable for jobsite cuts in slabs, curbs, or pavement fields. Wet cutting with controlled water supply reduces dust and tool load. For sharp interfaces to existing components, cuts are often prepared and then the material is gently broken out with <strong>concrete demolition shears<\/strong>. Typical disc diameters and guides are selected to match the required cut depth; robust, flat supports and straightedges improve cut alignment on site.<\/p>\n<h3>Diamond wire saws and diamond chain saws<\/h3>\n<p>Diamond wire saws handle large cross-sections, complex geometries, and hard-to-reach areas, for example when releasing massive natural-stone ashlars or cutting in rock and tunnels. Diamond chains are suitable for short, deep openings. In combination with <strong>rock and concrete splitters<\/strong>, cut lengths can be reduced and stress cracks avoided. Correct wire tension, adequate bead spacing, and defined start and exit strategies minimize vibration, reduce wire wear, and keep edges intact.<\/p>\n<h2>Cutting media: diamond segments, bond, and grit<\/h2>\n<p>The heart of the stone cutting machine is the diamond tool. It consists of a steel core disc or a wire fitted with segments. The bond matrix holds the diamonds in a defined arrangement and releases them through controlled wear. Matching to the rock is important:<\/p>\n<ul>\n<li>Granite, gneiss, basalt: hard, dense rocks &#8211; prefer a softer bond so that dull diamonds are released in time.<\/li>\n<li>Marble, limestone, travertine: softer, often tough rocks &#8211; prefer a harder bond to extend service life.<\/li>\n<li>Sandstone, quartzite: select depending on grain bonding and quartz content; adjust cooling water quantity to abrasiveness.<\/li>\n<\/ul>\n<p>Segment height influences service life and cost per meter of cut. An <em>appropriate grit size<\/em> and the right segment geometry reduce chipping, improve edge quality, and lower thermal load. <strong>Silenced steel cores<\/strong> decrease noise, while <em>undercut protection<\/em> on segments prevents premature wear in abrasive aggregates or sandy matrices. As a rule of thumb, bond hardness is selected inversely to rock hardness.<\/p>\n<h2>Process parameters: speed, feed, and cut quality<\/h2>\n<p>Key variables are peripheral speed, feed rate, depth of cut, and coolant quantity. Typical targets lie within the cutting speeds specified by the tool manufacturer; too high a speed leads to glazing of the segments, too low a speed increases chatter marks.<\/p>\n<ul>\n<li>Peripheral speed: select to suit diameter and rock; keep constant.<\/li>\n<li>Feed rate: set so that a clean chip is produced; reduce feed or use a reverse cut to minimize breakout at the exit edge.<\/li>\n<li>Depth of cut: work in multiple passes; for thick sections, score the cut path first.<\/li>\n<li>Cooling: supply sufficient water evenly; remove slurry in a targeted manner.<\/li>\n<li>Workpiece fixation: ensure flat support, low vibration, protect edges.<\/li>\n<\/ul>\n<p>The cut kerf is wider than the core body. For visible edges, a <em>trial cut<\/em> is recommended to assess chipping and fine-tune parameters. Continuous monitoring of spindle load, sound, and coolant flow provides early indications of glazing, misalignment, or insufficient cooling. <strong>Stable entry and exit<\/strong> with reduced feed and supported edges limits micro-cracking on finished faces.<\/p>\n<h2>Water, dust, and environmental aspects<\/h2>\n<p>Wet cutting reduces dust and extends tool life. The resulting stone slurry must be collected in an orderly manner and disposed of properly. Dry cutting generates health-relevant dusts (particularly quartz-containing fine dust); effective extraction, point extraction, and respiratory protection are essential. Noise and vibration emissions can be limited by vibration-damped tools, clean bearings, and adjusted rotational speeds. <em>Water management<\/em> with recirculation, settling tanks, and filter presses reduces consumption and environmental load; discharge into drainage systems without prior separation of solids must be avoided. Work areas are to be kept slip-safe and regularly cleaned.<\/p>\n<h2>Safety and occupational protection when cutting natural stone<\/h2>\n<p>Fundamental are clear work organization, suitable personal protective equipment, and secure clamping of the workpiece. A guard hood, emergency stop, stable setup, and controlled feed are mandatory. Sharpen or dress dull segments only with suitable materials. Lay hoses and lines of the wet-cutting system without kinks; consider slip hazards due to slurry. Notes are to be understood as general information; specific measures are determined by applicable regulations and the on-site conditions. <strong>PPE typically includes<\/strong> eye and face protection, hearing protection, appropriate respiratory protection for fine dusts, safety footwear, and snug-fitting workwear. Avoid reach into the cutting area, prevent kickback by correct rotation direction and steady feed, and implement lockout or tagout for maintenance and tool changes.<\/p>\n<h2>Combination with hydraulic tools<\/h2>\n<p>In many workflows, the stone cutting machine complements hydraulic tools. <strong>Concrete demolition shears<\/strong> powerfully separate load-bearing components once the visible face has been defined by a cut. <strong>Rock and concrete splitters<\/strong> reduce tensile stresses, minimize cut lengths, and facilitate breaking along intended fracture joints. <em>Rock splitting cylinders<\/em> create controlled cracks in massive blocks so that shorter, precise saw cuts then suffice. Power is supplied by <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a><\/em>. This enables controlled separation sequences in concrete demolition and special deconstruction that detach components gently and preserve surfaces for subsequent work. Typical sequences are: define boundaries by sawing, weaken with splitting or shear access cuts, then perform the main separation with minimal vibration.<\/p>\n<h2>Fields of application in construction, deconstruction, and extraction<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>Although concrete is not natural stone, the separation methods are similar. When deconstructing natural stone elements bonded to concrete &#8211; such as stair flights, parapets, or facade panels &#8211; the saw creates precise boundaries. Subsequently, <strong>concrete demolition shears<\/strong> can open the bonded concrete without damaging the natural stone edge. For load-bearing components, structural aspects must be considered. Where anchors are present, short access cuts and targeted splitting expose fixation points for controlled release.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In interior fit-out, compact, low-emission saws are used for trimming window sills, steps, or floorings. Dry cutting only with effective extraction; wet cutting is generally preferred. For subsequent adjustments, hand-guided grinding and fine cutting help, while small hydraulic tools expose edges or open anchor areas. Clean edges and protective taping reduce rework on visible faces and minimize chip-out during final fitting.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In rock, diamond wire saws are used to create defined cut joints. In hard rock, initial pre-splitting with <em>rock splitting cylinders<\/em> is often performed to relieve stresses; the saw then sets exact boundaries for excavation cross-sections or niches. This combination reduces vibrations, protects the surroundings, and improves dimensional accuracy. Where required, drill holes are positioned to support stress relief and wire guidance, improving bead wear distribution.<\/p>\n<h3>Natural stone quarrying<\/h3>\n<p>In quarries, wire saws cut parallel slots to release blocks. Preparatory drilling and subsequent splitting with <strong>rock and concrete splitters<\/strong> shorten wire-cut paths and increase yield by exploiting natural joints. The quality of raw blocks benefits from low crack formation and flat surfaces. Orientation to natural rift and bed directions improves stability and reduces waste during downstream slab production.<\/p>\n<h3>Special applications<\/h3>\n<p>For work under confined or sensitive conditions &#8211; listed buildings, machine foundations, plant areas &#8211; combined, low-vibration methods are appropriate: short saw cuts for defined visible edges, supplemented by hydraulic splitting or controlled breaking. <em>Multi cutters<\/em>, <em>combination shears<\/em>, and <em>steel shears<\/em> can separate metal reinforcement or inserts depending on the installation situation before natural stone surfaces are sawn. Sequencing, shielding, and careful coolant management protect adjacent structures and equipment.<\/p>\n<h2>Work preparation: material analysis, cut planning, and clamping<\/h2>\n<p>Careful preparation determines quality and safety.<\/p>\n<ol>\n<li>Identify material: record density, grain structure, joints, inclusions (e.g., quartz veins).<\/li>\n<li>Plan the cut path: define entry and exit points, kerf width, direction of movement, and support.<\/li>\n<li>Select the tool: match segment bond and diameter to the rock and machine.<\/li>\n<li>Ensure cooling or extraction: provide water quantity, slurry management, filters or separation.<\/li>\n<li>Clamping: flat, non-slip support; protect edges; keep gripping areas clear for subsequent shear or splitting operations.<\/li>\n<li>Define tolerances: specify dimensional targets, surface finish, and permitted chip-out for visible edges.<\/li>\n<li>Logistics and safety: ensure access, power and water supply, waste handling, signage, and emergency routes.<\/li>\n<\/ol>\n<h2>Quality assurance: typical error patterns and remedies<\/h2>\n<p>Characteristic deviations can be corrected by adjusting parameters:<\/p>\n<ul>\n<li>Segment glazed, no cutting progress: bond too hard or peripheral speed too high &#8211; dress the segment, adjust parameters.<\/li>\n<li>Breakout at the exit edge: reduce feed, make a reverse cut, support or tape the edge.<\/li>\n<li>Heat discoloration or burn marks: increase cooling water, reduce depth of cut, check the tool.<\/li>\n<li>Chatter marks: isolate the machine, stabilize support, harmonize speed and feed.<\/li>\n<li>Inaccurate cut alignment: check guide, adjust wire tension (for wire saws), realign workpiece.<\/li>\n<li>Blade runout or wobble: inspect flange cleanliness and torque, check spindle bearings, and replace damaged cores.<\/li>\n<\/ul>\n<p>Document setpoints and outcomes for recurring materials. Use dressing stones matched to the bond to restore diamond exposure without overheating the segment.<\/p>\n<h2>Economics, maintenance, and service life<\/h2>\n<p>Cost per meter of cut is determined by diamond tool life, setup times, and rework. Regular cleaning, timely replacement of worn segments, and proper <em>dressing<\/em> increase service life. Keep bearings, spindles, and guide rails clean and free of play; check cooling systems for flow and tightness. Hydraulically powered systems require a reliable energy supply via suitable <em>hydraulic power packs<\/em>. In combined methods, pre- or post-processing with <strong>concrete demolition shears<\/strong> or <strong>rock and concrete splitters<\/strong> often saves cutting time, reduces tool wear, and improves edge quality because stress cracks are guided in a controlled manner.<\/p>\n<ul>\n<li>Daily: clean machine and water paths, inspect disc or wire condition, verify guards and emergency stops.<\/li>\n<li>Weekly: check alignment, runout, guide lubrication, hose integrity, and filtration efficiency.<\/li>\n<li>Per project: review parameter logs, tool selection, and achieved tolerances to refine future setups.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A stone cutting machine is a central tool for the processing and separation of granite, marble, sandstone, basalt, and other rocks. It is used in natural stone quarrying, in fit-out and refurbishment, in rock excavation and tunnel construction, as well as in the deconstruction of natural stone components. In practice, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19475","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stone Cutting Machine | Types, Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Guide to the stone cutting machine \u2713 types, diamond tools for granite &amp; marble, wet cutting, safety, key parameters.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stone Cutting Machine | Types, Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Guide to the stone cutting machine \u2713 types, diamond tools for granite &amp; marble, wet cutting, safety, key parameters.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T07:37:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-cutting-machine\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-cutting-machine\",\"name\":\"Stone Cutting Machine | Types, Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-14T07:36:56+00:00\",\"dateModified\":\"2026-04-30T07:37:03+00:00\",\"description\":\"Guide to the stone cutting machine \u2713 types, diamond tools for granite & marble, wet cutting, safety, key parameters.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-cutting-machine#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-cutting-machine\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-cutting-machine#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stone cutting machine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stone Cutting Machine | Types, Methods & Safety","description":"Guide to the stone cutting machine \u2713 types, diamond tools for granite & marble, wet cutting, safety, key parameters.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine","og_locale":"en_US","og_type":"article","og_title":"Stone Cutting Machine | Types, Methods & Safety","og_description":"Guide to the stone cutting machine \u2713 types, diamond tools for granite & marble, wet cutting, safety, key parameters.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-30T07:37:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine","url":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine","name":"Stone Cutting Machine | Types, Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-14T07:36:56+00:00","dateModified":"2026-04-30T07:37:03+00:00","description":"Guide to the stone cutting machine \u2713 types, diamond tools for granite & marble, wet cutting, safety, key parameters.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-cutting-machine#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stone cutting machine"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19475"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19475\/revisions"}],"predecessor-version":[{"id":26765,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19475\/revisions\/26765"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}