{"id":19474,"date":"2025-11-14T09:14:32","date_gmt":"2025-11-14T08:14:32","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19474"},"modified":"2026-04-29T11:16:02","modified_gmt":"2026-04-29T09:16:02","slug":"stone-extraction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction","title":{"rendered":"Stone extraction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Stone extraction combines geology, precise technique, and careful working practices. This article explains how hard rocks such as granite, limestone, sandstone, basalt, or marble are gently detached from the rock mass, shaped into blocks, and prepared for further use. It also examines methods, tools, and safety-related aspects, as well as interfaces to application areas such as <em>concrete demolition<\/em> and <em>special demolition<\/em>, <em>building gutting<\/em> and <em>concrete cutting<\/em>, <em>rock excavation<\/em> and <em>tunnel construction<\/em>. Particular focus is placed on low-vibration methods such as hydraulic splitting with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em> and <em>stone splitting cylinders<\/em>, which play a central role in sensitive environments and where high quality is required. Alongside technical execution, sustainability, monitoring, and compliance with permits are integral to modern quarrying practice.<\/p>\n<h2>Definition: What is meant by stone extraction?<\/h2>\n<p>Stone extraction is the planned loosening, recovery, and provisioning of solid rock from a stone quarry or rock outcrop. The goal is to obtain usable raw blocks or rubble stones in defined quality and dimensions. Depending on the intended use, a basic distinction is made between the extraction of <strong>dimension stone<\/strong> (e.g., facade panels, pavers, massive components) and <strong>aggregates or crushed stone<\/strong> for transport and civil engineering. Methods range from controlled blasting and the wire sawing method to <em>hydraulic splitting<\/em>, which works with low vibration and reduced crack formation. The choice of method depends on rock characteristics, geological discontinuities, environmental requirements, the desired product, and the regulatory framework for emissions and vibrations.<\/p>\n<h2>Methods and workflow in stone extraction<\/h2>\n<p>The typical sequence begins with exploration and planning, followed by development of the deposit, removal of overburden, and exposure of the extraction face. Primary separations along natural joints or artificially introduced separation planes then follow. Depending on the target product, secondary shaping into raw blocks, quality inspection, interim storage, and haulage come next. In addition to classical methods, low-emission techniques are gaining importance: <strong>stone and concrete splitters<\/strong> and <strong>stone splitting cylinders<\/strong>, supplied via <em>hydraulic power packs<\/em>, enable controlled separation cuts without significant blasting vibrations &#8211; an advantage in <em>stone extraction<\/em>, in <em>rock excavation and tunnel construction<\/em>, as well as for <em>special demolition<\/em> in vibration-sensitive areas.<\/p>\n<ol>\n<li><strong>Geospatial surveying and modeling:<\/strong> Mapping, 3D capture, and geological modeling define benches, access, and safety zones.<\/li>\n<li><strong>Deposit development:<\/strong> Clearing, drainage, and infrastructure set-up with attention to haul routes and staging areas.<\/li>\n<li><strong>Overburden removal:<\/strong> Selective stripping preserves intact faces and minimizes contamination of usable rock.<\/li>\n<li><strong>Drilling and separation plane preparation:<\/strong> Precision drilling establishes controlled lines for splitting or sawing.<\/li>\n<li><strong>Primary separation:<\/strong> Targeted detachment along joints or introduced planes with hydraulic splitting or complementary methods.<\/li>\n<li><strong>Secondary shaping and securing:<\/strong> Block trimming, stabilization, and safe block handling at the face.<\/li>\n<li><strong>Inspection and marking:<\/strong> Dimensional checks, defect screening, and traceability labeling.<\/li>\n<li><strong>Loading and haulage:<\/strong> Route-optimized transport to storage or processing with minimal handling damage.<\/li>\n<\/ol>\n<h2>Geological fundamentals and control of separation planes<\/h2>\n<p>Geology determines the extraction strategy. Rocks possess natural zones of weakness such as bedding, joint systems, and faults. These anisotropic properties define the economically viable block size and the orientation of separation cuts. Mechanical properties such as <em>uniaxial compressive strength<\/em>, <em>abrasivity<\/em>, and <em>degree of weathering<\/em>, together with groundwater conditions, influence drilling effort, achievable block sizes, and the suitability of low-vibration techniques.<\/p>\n<h3>Joint spacing, bedding, and block dimensions<\/h3>\n<p>Wide joint spacing favors large raw blocks; closely spaced joints limit dimensions. The orientation of cuts is ideally parallel to natural separation planes to minimize material losses and reduce residual stresses. In foliated or bedded rocks, cut orientation should also consider splitting behavior perpendicular and parallel to foliation to avoid hidden lamination failures during handling.<\/p>\n<h3>Drilling pattern and separation lines<\/h3>\n<p>Borehole spacing, diameters, and depths are matched to the rock type and desired separation line. A well-planned drilling pattern is the basis for efficient hydraulic splitting or the use of other separation techniques.<\/p>\n<ul>\n<li><strong>Hole diameter:<\/strong> Selected to match the splitting tool geometry and required separating force.<\/li>\n<li><strong>Hole spacing:<\/strong> Adapted to joint frequency, rock strength, and desired surface quality to guide crack propagation.<\/li>\n<li><strong>Hole depth and inclination:<\/strong> Tuned to bench height and target slab or block geometry for clean release.<\/li>\n<li><strong>Sequencing:<\/strong> Staggered activation controls energy input and limits edge damage.<\/li>\n<\/ul>\n<h2>Tools and machines: from borehole to split<\/h2>\n<p>The choice of equipment depends on the target geometry, rock strength, and environmental conditions. In practice, different tools are used that complement each other functionally.<\/p>\n<ul>\n<li><strong>Stone and concrete splitters<\/strong>: Hydraulically actuated systems inserted into boreholes that split along a separation line through controlled spreading pressure.<\/li>\n<li><strong>Stone splitting cylinders<\/strong>: Robust, compact splitting systems for borehole or surface applications, delivering high splitting pressure with low vibration.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: The energy source for hydraulic tools; design is based on pressure, flow rate, and duty cycle.<\/li>\n<li><strong>Combination shears<\/strong> and <strong>multi-cutters<\/strong>: For secondary work on fracture edges, trimming protrusions, or separating adherences; used more as a supplement in stone extraction.<\/li>\n<li><strong>Concrete pulverizers<\/strong>: Used primarily in <em>concrete demolition<\/em> and <em>special demolition<\/em> and for <em>building gutting<\/em> and <em>concrete cutting<\/em> of concrete components; relevant in the quarry environment for infrastructure measures (foundations, ramps, plant modifications).<\/li>\n<li><strong>Steel shears<\/strong> and <strong>tank cutters<\/strong>: For metallic installations, pipelines, or tank bodies in production and auxiliary facilities; typical <em>special demolition<\/em> at the periphery of extraction.<\/li>\n<li><strong>Drilling rigs and drilling tools<\/strong>: Rotary hammers or drill rigs with dust suppression and alignment aids provide accurate, repeatable boreholes for subsequent splitting.<\/li>\n<li><strong>Water and dust management equipment<\/strong>: Misting systems, vacuum extraction, and sediment control reduce emissions at source and support compliance.<\/li>\n<\/ul>\n<h2>Hydraulic splitting in stone extraction<\/h2>\n<p>Hydraulic splitting has become established as a precise, quiet, and material-friendly method when vibration, dust generation, and crack formation must be minimized.<\/p>\n<h3>Principle and procedure<\/h3>\n<p>After setting a suitable drilling pattern, <strong>stone and concrete splitters<\/strong> or <strong>stone splitting cylinders<\/strong> are positioned. The <em>hydraulic power pack<\/em> builds up splitting pressure that advances the separation step by step. The process enables very precise control of crack propagation, with sequential activation and pressure ramps guiding the split along the intended line while protecting edges and arrises.<\/p>\n<h3>Parameterization and performance<\/h3>\n<ul>\n<li><strong>Borehole fit:<\/strong> Choose diameter and depth to match tool wedges and achieve uniform contact.<\/li>\n<li><strong>Spacing strategy:<\/strong> Close spacing for high-strength or highly jointed rock, wider spacing where natural planes assist the split.<\/li>\n<li><strong>Pressure management:<\/strong> Apply moderate, rising pressure stages to limit microcracking and maintain block integrity.<\/li>\n<li><strong>Monitoring:<\/strong> Visual checks, feeler gauges at the split, and regular tool inspections maintain consistency and safety.<\/li>\n<\/ul>\n<h3>Advantages in sensitive environments<\/h3>\n<ul>\n<li>Low vibrations and reduced noise emissions<\/li>\n<li>Higher block yield due to minimized edge cracking<\/li>\n<li>Good controllability near buildings, historic structures, or geologically complex zones<\/li>\n<li>No flyrock and minimal dust generation compared with blasting<\/li>\n<li>High compatibility with vibration and noise monitoring requirements<\/li>\n<\/ul>\n<h2>Concrete pulverizers in the context of stone extraction<\/h2>\n<p><strong>Concrete pulverizers<\/strong> are not used to detach rock in stone extraction, but they play an important role around the quarry. During conversion or deconstruction of concrete foundations, silos, crusher buildings, and access ramps, they enable controlled removal in the application areas of <em>concrete demolition<\/em> and <em>special demolition<\/em> as well as <em>building gutting<\/em> and <em>concrete cutting<\/em>. This makes it possible to adapt production workflows, optimize traffic routes, and expand safety zones without impacting the extraction face. Reinforcement separation and size reduction of concrete debris streamline recycling and disposal logistics.<\/p>\n<h2>Quality assurance and block yield<\/h2>\n<p>Profitability depends on raw block quality and yield. Cracks, cavities, color changes, or foliations affect usability. Careful control of separation planes, short lever arms during detachment, and an appropriate drilling pattern increase the proportion of marketable blocks. Defined acceptance criteria, traceable block IDs, and continuous documentation of defect patterns ensure consistent product quality and enable feedback into planning and drilling strategies.<\/p>\n<h3>Practical measures<\/h3>\n<ul>\n<li>Careful geological mapping of joint systems<\/li>\n<li>Adjust borehole spacing and depth to rock anisotropy<\/li>\n<li>Stepwise splitting with moderate pressure stages for crack control<\/li>\n<li>Regular visual and sound checks and documented dimensional inspections<\/li>\n<li>Pilot fields and test splits to validate parameters before scaling up<\/li>\n<li>Selective trimming to remove stress concentrators and avoid propagation of minor defects<\/li>\n<\/ul>\n<h2>Emissions, occupational safety, and permits<\/h2>\n<p>Dust, noise, and vibration are central topics in stone extraction. Hydraulic splitting reduces these emissions but does not replace the obligation to implement organizational and technical protective measures.<\/p>\n<h3>Typical protective measures<\/h3>\n<ul>\n<li>Dust suppression using water mist and targeted extraction<\/li>\n<li>Noise reduction through encapsulated working methods and time control<\/li>\n<li>Vibration control through low-vibration procedures<\/li>\n<li>Personal protective equipment and secured work areas<\/li>\n<li>Access control, exclusion zones, and clear signaling for active faces<\/li>\n<\/ul>\n<h3>Environmental management<\/h3>\n<ul>\n<li>Closed-loop water circuits with sediment control to protect receiving waters<\/li>\n<li>Emission monitoring with sound level meters and, where applicable, seismographs at compliance points<\/li>\n<li>Timing of operations to respect biodiversity and community constraints<\/li>\n<li>Waste and by-product segregation to maximize recycling and minimize landfill<\/li>\n<\/ul>\n<p>Legal frameworks vary regionally. Permits, nature conservation requirements, and occupational safety regulations must always be observed; individual assessments and coordination with authorities are recommended.<\/p>\n<h2>Interfaces with rock excavation and tunnel construction<\/h2>\n<p>The principles of stone extraction can be transferred to <em>rock excavation<\/em> and <em>tunnel construction<\/em>: Pre- and post-cuts, relief splits, and targeted separation lines improve profile accuracy and reduce rework. Hydraulic splitting is used in vibration-critical areas, for example near sensitive infrastructure or in rocks with unfavorable stress states.<\/p>\n<p>In underground or near-structure contexts, controlled splitting reduces overbreak, limits disturbance zones, and supports precise excavation profiles, often in combination with drilling, diamond wire sawing, and mechanical scaling.<\/p>\n<h2>Further processing and logistics<\/h2>\n<p>After extraction, transport, storage, and processing follow (e.g., sawing, grinding, surface finishing). Gentle handling of raw blocks prevents prior damage. Infrastructural interventions in the quarry &#8211; such as adjustments to concrete structures &#8211; are often carried out with <strong>concrete pulverizers<\/strong> so that material flows and safety routes function optimally.<\/p>\n<ul>\n<li><strong>Block handling:<\/strong> Use cushioned lifting points and stable stacking to protect edges and faces.<\/li>\n<li><strong>Identification and tracking:<\/strong> Mark blocks with durable IDs to link quality data to processing steps.<\/li>\n<li><strong>Route optimization:<\/strong> Separate traffic flows for extraction, waste, and finished products to avoid congestion and incidents.<\/li>\n<\/ul>\n<h2>Best practices for planning and execution<\/h2>\n<ul>\n<li><strong>Planning:<\/strong> Geological models with realistic joint patterns, coordinated drilling and splitting concept<\/li>\n<li><strong>Technology:<\/strong> Match hydraulic performance to tool and rock; regularly check tightness and pressure holding<\/li>\n<li><strong>Process:<\/strong> Stepwise approach, monitor separation progress, implement adjustments immediately<\/li>\n<li><strong>Documentation:<\/strong> Systematic recording of yield, crack patterns, and emissions for continuous improvement<\/li>\n<li><strong>People and skills:<\/strong> Competence-based task assignment and periodic training for drilling and splitting crews<\/li>\n<li><strong>Maintenance:<\/strong> Preventive care of tools, hoses, and power packs to maintain consistent performance<\/li>\n<\/ul>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<ul>\n<li>Unsuitable drilling pattern: leads to uncontrolled crack propagation &#8211; remedy with geologically matched borehole parameters<\/li>\n<li>Excessive pressure stages: promote edge spalling &#8211; choose a gentle pressure ramp<\/li>\n<li>Ignoring joint orientation: reduces block yield &#8211; align cuts with natural separation planes<\/li>\n<li>Insufficient emission control: risk to people and the environment &#8211; actively manage dust, noise, and vibration<\/li>\n<li>Inadequate tool care: worn wedges or cylinders reduce accuracy &#8211; inspect and service at defined intervals<\/li>\n<\/ul>\n<h2>When which tool is appropriate<\/h2>\n<p>For large-format, low-crack blocks, low-vibration separations are suitable: <strong>stone and concrete splitters<\/strong> and <strong>stone splitting cylinders<\/strong> create predictable separation lines. In heterogeneous or closely jointed zones, a combination of splitting and mechanical removal with <em>combination shears<\/em> or <em>multi-cutters<\/em> can be useful. Work on concrete components of quarry infrastructure is efficiently performed with <strong>concrete pulverizers<\/strong>; metallic components are processed with <strong>steel shears<\/strong> and &#8211; in <em>special demolition<\/em> &#8211; with <strong>tank cutters<\/strong>. Where extremely clean faces are required, splitting may be complemented by sawing to minimize finishing effort.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Stone extraction combines geology, precise technique, and careful working practices. This article explains how hard rocks such as granite, limestone, sandstone, basalt, or marble are gently detached from the rock mass, shaped into blocks, and prepared for further use. It also examines methods, tools, and safety-related aspects, as well as <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19474","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stone Extraction in Quarries | Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Expert quarrying \u2713 guide to stone extraction with hydraulic splitting, low vibration methods, and higher block yield.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stone Extraction in Quarries | Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Expert quarrying \u2713 guide to stone extraction with hydraulic splitting, low vibration methods, and higher block yield.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-29T09:16:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-extraction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-extraction\",\"name\":\"Stone Extraction in Quarries | Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-14T08:14:32+00:00\",\"dateModified\":\"2026-04-29T09:16:02+00:00\",\"description\":\"Expert quarrying \u2713 guide to stone extraction with hydraulic splitting, low vibration methods, and higher block yield.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-extraction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-extraction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stone-extraction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stone extraction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stone Extraction in Quarries | Methods & Safety","description":"Expert quarrying \u2713 guide to stone extraction with hydraulic splitting, low vibration methods, and higher block yield.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction","og_locale":"en_US","og_type":"article","og_title":"Stone Extraction in Quarries | Methods & Safety","og_description":"Expert quarrying \u2713 guide to stone extraction with hydraulic splitting, low vibration methods, and higher block yield.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-29T09:16:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction","url":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction","name":"Stone Extraction in Quarries | Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-14T08:14:32+00:00","dateModified":"2026-04-29T09:16:02+00:00","description":"Expert quarrying \u2713 guide to stone extraction with hydraulic splitting, low vibration methods, and higher block yield.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stone-extraction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stone-extraction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stone extraction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19474","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19474"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19474\/revisions"}],"predecessor-version":[{"id":26744,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19474\/revisions\/26744"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}