{"id":19459,"date":"2025-11-12T16:32:14","date_gmt":"2025-11-12T15:32:14","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19459"},"modified":"2026-04-29T15:55:04","modified_gmt":"2026-04-29T13:55:04","slug":"mortar-stone","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone","title":{"rendered":"Mortar stone"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The term mortar stone in construction describes a composite body of stone or concrete that is permanently connected to adjacent components by one or more mortar layers. In deconstruction, it appears both as a single chunk of stone with firmly adhering mortar residues and as contiguous masonry. For planning, demolition, and refurbishment works, the key question is how this composite of mortar, rock, and any reinforcement can be separated or selectively preserved. Especially in selective applications &#8211; such as sensitive interior demolition or heritage refurbishment &#8211; tools like <strong>concrete pulverizer<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH are considered because they enable controlled, material-appropriate processing.<\/p>\n<h2>Definition: What is meant by mortar stone?<\/h2>\n<p>In craft and engineering usage, mortar stone denotes a stone, natural stone block, brick, or concrete block that has become a composite body with another component through joint or bedding mortar. In demolition and construction material processing, the term often also refers to individual pieces removed from masonry with firmly adhering mortar residues. Depending on the building material (calcium silicate brick, brick, autoclaved aerated concrete, natural stone) and type of mortar (cement mortar, lime mortar, trass or renovation mortar), adhesion between mortar and stone varies. These composite properties determine the choice of processing method &#8211; from splitting along the joint to biting off the edge with <strong>concrete pulverizer<\/strong>.<\/p>\n<h2>Composition, properties, and formation<\/h2>\n<p>A mortar stone is formed by introducing mortar as a bed or head joint between components. During setting, a <em>composite<\/em> develops from mechanical interlock, adhesion, and &#8211; on mineral substrates &#8211; microscopic embedding of the mortar matrix in pores and roughness. Key properties include compressive strength, tensile and shear bond, moisture balance, and abrasion resistance. Lime-rich mortars are often softer and more vapor-permeable; cement-bound variants are harder and more brittle. In deconstruction, this difference can be used: softer mortar joints can be selectively split or broken out without damaging the adjacent stone. Hard, thin, high-strength joints, on the other hand, require higher forces or preparatory sawing and drilling before wedges or shears work efficiently.<\/p>\n<h2>Mortar types and bond behavior in masonry<\/h2>\n<p>Joint mortar connects stones in bed and head joints, leveling mortar forms irregular bearings, and adhesive mortar is used in plane-element masonry (e.g., autoclaved aerated concrete). For the deconstruction of mortar stone, three factors are particularly decisive: the strength of the mortar, the surface characteristics of the stone, and the joint width.<\/p>\n<ul>\n<li><strong>Mortar strength and type:<\/strong> lime-rich and renovation mortars often allow gentler separation; high-strength cement mortars transmit higher forces into the stone.<\/li>\n<li><strong>Stone surface and porosity:<\/strong> rough, absorbent substrates promote mechanical keying; smooth faces tend to reduce bond.<\/li>\n<li><strong>Joint geometry:<\/strong> joint width, continuity, and bedding quality influence crack guidance and tool engagement.<\/li>\n<\/ul>\n<h3>Joint width and joint position<\/h3>\n<p>Wider joints provide starting points for splitting tools. Along the bed joint, the composite can often be released more controllably than in the head joint. In multi-leaf masonry, anchors and offset zones influence the separation line &#8211; preliminary probing is useful here.<\/p>\n<h3>Adhesive pull-off and roughness<\/h3>\n<p>Rough, absorbent stones (e.g., brick) form a high pull-off strength with cement mortar; smooth natural stone and soft lime mortar often exhibit a more easily separable bond behavior. This favors the use of <strong>concrete splitter and rock wedge splitter<\/strong> that work along the joint.<\/p>\n<h3>Moisture and age<\/h3>\n<p>Moist mortar areas can be softer, while old carbonated mortars can be very hard. Differences in hardness and brittleness determine whether splitting, biting with <strong>concrete pulverizer<\/strong>, or a combined approach is appropriate.<\/p>\n<h2>Separation and processing methods in the deconstruction of mortar stone<\/h2>\n<p>Separation of mortar stone ranges from gentle removal of whole stones to rapid downsizing for container service. The choice of method is guided by protection goals (preservation of substance, low vibration levels), construction constraints (accessibility, load-bearing capacity, proximity to sensitive areas), and emission requirements for dust and noise.<\/p>\n<ul>\n<li><strong>Target definition:<\/strong> preservation of units versus downsizing to grain size or transport pieces.<\/li>\n<li><strong>Environmental context:<\/strong> vibration limits, noise windows, and dust control in sensitive surroundings.<\/li>\n<li><strong>Structure and access:<\/strong> wall thickness, reinforcement, working space, and supply of power and water.<\/li>\n<li><strong>Quality objectives:<\/strong> clean separation surfaces for follow-on trades and reduced mixing for recycling.<\/li>\n<\/ul>\n<h3>Splitting along the joint<\/h3>\n<p>For load-bearing masonry or preservable substance, splitting along the joint is often the first choice. Hydraulically actuated concrete splitter and rock wedge splitter &#8211; such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock Splitters<\/a> &#8211; work with low vibration levels, produce no sparks, and &#8211; depending on the tool &#8211; require only drilling as starting points. With softer mortar joints, a near-surface drill pattern often suffices; for high-strength composites, staged setting of wedges is used to achieve controlled crack propagation.<\/p>\n<h3>Downsizing and biting<\/h3>\n<p><strong>Concrete pulverizer<\/strong> precisely separates edges, corners, and protruding mortar layers. It is suitable for selective biting of the joint, reworking of fracture edges, and downsizing mortar stone into manageable piece sizes. Through the geometric guidance of the jaw design, force is directed into the composite, facilitating separation of hard mortar lips.<\/p>\n<h3>Preparation: drilling, scoring, sawing<\/h3>\n<p>A fine saw cut along the joint reduces spalling on the stone. Localized borehole drilling can divert stresses and define the path of the separation joint. In combination with a hydraulic splitter or shears, this yields a reproducible, controlled separation &#8211; particularly useful in vibration-sensitive environments.<\/p>\n<h3>Hydraulic power packs and control<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> from Darda GmbH provide the necessary energy for split cylinders, combination shears, and <strong>concrete pulverizer<\/strong>. Decisive factors are a sensitive pressure ramp-up, reliable hydraulic control, and adaptation to the respective tool geometry. A gradual increase in operating pressure supports controlled opening of the composite without overloading the adjacent masonry.<\/p>\n<h2>Application areas in which mortar stone plays a role<\/h2>\n<p>In <strong>concrete demolition and special demolition<\/strong>, mortar stone appears at interfaces between concrete add-ons and masonry. Targeted separation with concrete pulverizer or splitting devices avoids unnecessary vibrations and protects adjacent components.<\/p>\n<p>During <strong>building gutting and cutting<\/strong>, mortar residues appear at old wall connections, lintels, and reveals. Biting off protruding joints enables planar follow-up work, for example for new connections.<\/p>\n<p>In <strong>rock excavation and tunnel construction<\/strong>, mortar composites exist on shotcrete shells or in the linings of historic galleries. Low-vibration splitting facilitates removal of the lining without damaging the rock.<\/p>\n<p>In <strong>natural stone extraction<\/strong>, mortar stone is mainly relevant during deconstruction and refurbishment works, for example when secondarily mortared natural stone walls must be selectively dismantled.<\/p>\n<p>For <strong>special demolition<\/strong> &#8211; for example in an ATEX zone or in assets with strict emission requirements &#8211; hydraulic splitting methods provide a <em>low-vibration and low-spark<\/em> alternative to conventional impact demolition.<\/p>\n<h2>Material analysis and planning the separation strategy<\/h2>\n<p>A purposeful approach begins with a survey: Which stone type is present? How hard is the mortar? Are there reinforcement, anchors, or inserts? This analysis informs tool selection, the sequence of work steps, and the definition of drilling or cutting patterns.<\/p>\n<h3>Visual inspection and probing<\/h3>\n<p>Fracture patterns, joint thicknesses, and material color provide clues to the mortar type. Small-scale probes show whether splitting along the joint is possible or whether mortar lips must first be bitten off.<\/p>\n<h3>Strength and moisture<\/h3>\n<p>The relative strength difference between stone and mortar defines the separation line. With high joint strength and low stone resistance, notching out with <strong>concrete pulverizer<\/strong> is recommended to avoid spalling. With soft mortar, splitting usually produces clean separation surfaces.<\/p>\n<h3>Drill and split pattern<\/h3>\n<p>The drill pattern depends on wall thickness, joint course, and desired crack control. Uniform spacing supports controlled stress distribution. Positions are chosen so that the crack runs along the mortar joint and does not enter the stone.<\/p>\n<h3>Documentation and marking<\/h3>\n<p>Marking the intended crack path, numbering work sections, and documenting test runs improve repeatability and support quality assurance, especially when multiple crews or shifts are involved.<\/p>\n<ul>\n<li><strong>Indicative tests:<\/strong> scratch tests on mortar, small wedge trials, and sample bores for joint mapping.<\/li>\n<li><strong>Non-destructive checks:<\/strong> simple rebound and moisture readings to estimate variability across the structure.<\/li>\n<li><strong>Recording:<\/strong> photographs of probe results, drill grids, and tool parameters for later optimization.<\/li>\n<\/ul>\n<h2>Low-emission working: dust, noise, and vibrations<\/h2>\n<p>Construction sites in sensitive environments require low-emission methods. Hydraulic splitting and targeted biting limit <strong>low vibration levels<\/strong> and reduce <strong>noise emission<\/strong> compared to percussive methods. Dust arises primarily during borehole drilling and dry sawing; it can be significantly reduced by wet cutting, localized <strong>dust extraction<\/strong>, and short, clean workflows. Requirements for dust protection and <strong>noise reduction measures<\/strong> must always be assessed project-specifically and integrated into work planning.<\/p>\n<ul>\n<li><strong>Dust control:<\/strong> wet coring, point extraction, and swift debris removal minimize airborne fines.<\/li>\n<li><strong>Noise control:<\/strong> temporary enclosures, tool maintenance, and phased work in defined time windows.<\/li>\n<li><strong>Vibration control:<\/strong> staged pressure ramp-up and shorter wedge spacing to guide cracks along the joint.<\/li>\n<li><strong>Logistics:<\/strong> segregated material flows and short transport routes reduce exposure and site time.<\/li>\n<\/ul>\n<h2>Sustainability and recycling of mortar stone<\/h2>\n<p>Clean separation of stone and mortar improves the quality of recycling material. Soft mortars can often be largely detached from the stone, while hard composites are reduced to a defined grain size. Clean fractions can &#8211; depending on regional regulations and suitability evidence &#8211; be used as recycled construction material. Selective deconstruction with splitting devices and <strong>concrete pulverizer<\/strong> supports this objective because it produces precise separation lines and less mixing.<\/p>\n<ul>\n<li><strong>Reuse:<\/strong> intact stones from gentle splitting can be reclaimed for refurbishment or matching repairs.<\/li>\n<li><strong>Recycling:<\/strong> graded aggregates from defined downsizing enable documented secondary use.<\/li>\n<li><strong>Waste reduction:<\/strong> minimized mixing lowers disposal volumes and tipping costs.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<h3>Unsuitable starting point<\/h3>\n<p>Starting on the stone surface instead of at the joint increases the risk of spalling. It is better to separate the composite along the weakest line &#8211; the mortar joint.<\/p>\n<h3>Excessive initial force<\/h3>\n<p>Immediate high pressure can create uncontrolled crack patterns. A stepwise pressure increase via the hydraulic power pack allows guided opening of the composite.<\/p>\n<h3>Lack of preparation<\/h3>\n<p>Without a saw cut or drill pattern, wedges and shears engage less effectively. Brief scoring or targeted pre-drilling increases process reliability and the quality of the separation surface.<\/p>\n<h2>Distinction and special constellations<\/h2>\n<p>Not every mortar build-up is a classic mortar stone. Thin-bed adhesive joints in plane elements behave differently from thick bed joints; spray mortars and renovation mortars exhibit different bond patterns. Mortar haze on the surface is not a structural composite and can usually be removed mechanically or chemically. In mixed masonry or later repairs, different mortar types meet &#8211; here a nuanced approach helps, for example biting off hard cement burrs with <strong>concrete pulverizer<\/strong> and splitting soft lime joints.<\/p>\n<h2>Practice-oriented selection of tools and procedures<\/h2>\n<p>For preserving individual stones, <strong>splitting along the joint<\/strong> with concrete splitter and rock wedge splitter is often ideal. If the composite is to be quickly reduced to transportable pieces, <strong>concrete pulverizer<\/strong> plays to its strengths. In confined areas, compact hydraulic solutions from Darda GmbH offer advantages in handling and control. The combination often leads to the goal: first pre-drill or score, then split, then rework edges with the pulverizer.<\/p>\n<ol>\n<li>Assess joint type and mortar strength, define protection goals.<\/li>\n<li>Prepare with scoring or drilling and plan a consistent split grid.<\/li>\n<li>Apply staged hydraulic pressure for controlled crack propagation.<\/li>\n<li>Rework edges selectively and sort fractions for reuse or recycling.<\/li>\n<li>Verify results and adapt patterns or pressures where needed.<\/li>\n<\/ol>\n<h2>Interfaces with further tasks in the construction workflow<\/h2>\n<p>After removing mortar stone, surface preparations usually follow, such as leveling, creating new bonding faces, or cleaning for a subsequent waterproofing layer. Careful deconstruction reduces effort in these subsequent steps, as flat, defined separation surfaces are easier to process further.<\/p>\n<h2>Practice takeaways for planning and execution<\/h2>\n<p>Mortar stone is not a uniform material but a composite with its own load-bearing and fracture behavior. Those who correctly classify joint type, mortar quality, and stone properties can select the method precisely: low-vibration splitting for substance protection, precise biting for crisp edges, and efficient downsizing. With hydraulically operated <strong>concrete pulverizer<\/strong> as well as concrete splitter and rock wedge splitter from Darda GmbH, these goals can be implemented in a controlled and reproducible manner &#8211; from building gutting and special demolition to tunnel and rock work.<\/p>\n<ul>\n<li><strong>Plan:<\/strong> survey materials, set protection and emission targets, and choose the sequence.<\/li>\n<li><strong>Prepare:<\/strong> clean markings, scoring, and tailored drill patterns.<\/li>\n<li><strong>Execute:<\/strong> apply staged forces and guide cracks along the mortar joint.<\/li>\n<li><strong>Assure quality:<\/strong> check surfaces, adjust parameters, and document outcomes.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The term mortar stone in construction describes a composite body of stone or concrete that is permanently connected to adjacent components by one or more mortar layers. In deconstruction, it appears both as a single chunk of stone with firmly adhering mortar residues and as contiguous masonry. For planning, demolition, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19459","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mortar Stone in Masonry - Definition &amp; Methods<\/title>\n<meta name=\"description\" content=\"Learn what mortar stone means in \u2713 construction masonry, with methods for low vibration splitting &amp; precise demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mortar Stone in Masonry - Definition &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Learn what mortar stone means in \u2713 construction masonry, with methods for low vibration splitting &amp; precise demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-29T13:55:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/mortar-stone\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/mortar-stone\",\"name\":\"Mortar Stone in Masonry - Definition & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-12T15:32:14+00:00\",\"dateModified\":\"2026-04-29T13:55:04+00:00\",\"description\":\"Learn what mortar stone means in \u2713 construction masonry, with methods for low vibration splitting & precise demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/mortar-stone#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/mortar-stone\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/mortar-stone#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mortar stone\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mortar Stone in Masonry - Definition & Methods","description":"Learn what mortar stone means in \u2713 construction masonry, with methods for low vibration splitting & precise demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone","og_locale":"en_US","og_type":"article","og_title":"Mortar Stone in Masonry - Definition & Methods","og_description":"Learn what mortar stone means in \u2713 construction masonry, with methods for low vibration splitting & precise demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-29T13:55:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone","url":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone","name":"Mortar Stone in Masonry - Definition & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-12T15:32:14+00:00","dateModified":"2026-04-29T13:55:04+00:00","description":"Learn what mortar stone means in \u2713 construction masonry, with methods for low vibration splitting & precise demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/mortar-stone"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/mortar-stone#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Mortar stone"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19459"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19459\/revisions"}],"predecessor-version":[{"id":26756,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19459\/revisions\/26756"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}