{"id":19446,"date":"2025-11-11T12:13:41","date_gmt":"2025-11-11T11:13:41","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19446"},"modified":"2026-04-28T12:06:03","modified_gmt":"2026-04-28T10:06:03","slug":"chisel-machine","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine","title":{"rendered":"Chisel machine"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A chisel machine is a percussive tool for breaking up, removing, and texturing concrete, masonry, screed, or natural stone. In deconstruction, during strip-out, and in rock demolition it is a frequently used work tool that can be precisely controlled &#8211; from plaster removal to working high-strength concretes. In many projects the chisel machine is used in a methodological combination, for example with <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> from Darda GmbH, to release components in a controlled manner, expose reinforcement, or create starting points for hydraulic tools. As a <em>demolition hammer<\/em> or <em>breaker<\/em>, it enables targeted intervention with minimized collateral damage and controlled crack propagation.<\/p>\n<h2>Definition: What is meant by a chisel machine?<\/h2>\n<p>A chisel machine is a percussive drive device that propels a chisel bit with high impact energy. This includes hand-held breaker and chisel hammers (electric, pneumatic, or hydraulic) as well as mounted hydraulic breakers on carrier machines. Characteristic parameters are blow rate (strokes per minute), single-impact energy (joules), tool holder, and the interplay of hammer mass, damping, and chisel shape. Typical applications are opening concrete surfaces, creating openings, removing coatings, exposing rebar, and roughening surfaces for bonded work. In practice, the choice of <strong>power-to-weight ratio<\/strong> and suitable <em>tool bits<\/em> strongly influences production rate, edge quality, and component preservation.<\/p>\n<h2>Operating principle and design types of the chisel machine<\/h2>\n<p>Chisel machines work with periodic blows that are transmitted via pistons, valves, and guide systems to the chisel shank. Depending on the design, energy input is provided by:<\/p>\n<ul>\n<li><strong>Electric:<\/strong> hand-held chisel and breaker hammers, often with SDS-max or hex shank, variable output, and integrated vibration damping; corded and battery-powered variants allow flexible site logistics.<\/li>\n<li><strong>Pneumatic:<\/strong> robust hammers for continuous duty, suitable in explosion-hazard or wet environments, provided compressed air is available; simple architecture and high reliability.<\/li>\n<li><strong>Hydraulic:<\/strong> hand-held or as an attachment; high power density, finely controllable, commonly used in professional deconstruction; scalable from compact devices to carrier-mounted breakers.<\/li>\n<\/ul>\n<p>Key performance data include impact energy (joules), blow rate (1\/min), tool holder, weight, vibration emission value, sound power level, and dust management. The right combination of chisel machine and <em>tool bits<\/em> (pointed, flat, wide, or spade chisels) determines quality, speed, and preservation of the component. For reinforced structures, matching the penetration strategy to reinforcement layout and aggregate hardness reduces tool wear and avoids uncontrolled spalling.<\/p>\n<h2>Fields of application in concrete demolition and specialized deconstruction<\/h2>\n<p>In <strong>concrete demolition and specialized deconstruction<\/strong> the chisel machine enables controlled opening and edge removal without unnecessarily affecting the structural behavior of adjacent components. For massive cross-sections or heavily reinforced areas, combining with Darda GmbH\u2019s <strong>concrete demolition shears<\/strong> is advisable to remove larger volumes efficiently and with low vibration, while the chisel machine handles local adjustments, recesses, or initiation of starter cracks. On vibration-sensitive structures, low-energy chipping and short work cycles help meet protection targets.<\/p>\n<h3>Selective deconstruction in existing structures<\/h3>\n<p>During <strong>strip-out and cutting<\/strong>, chisel machines can release non-load-bearing layers, remove tile adhesive, and strip plaster. For load-bearing concrete members, the chisel machine creates starting points, relieves edges, or exposes rebar, which is then cut or broken with Darda GmbH <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/em>, <em>steel shears<\/em>, or <em>concrete demolition shears<\/em>. Protective interlayers and sacrificial edge strips reduce damage to adjacent finishes and fixtures.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In <strong>rock excavation and tunnel construction<\/strong> the chisel machine is used to even out disturbing breakouts or to open joints. Where minimal vibrations are required, <strong>stone and concrete splitters<\/strong> as well as Darda GmbH <em>rock wedge splitter<\/em> can widen cracks in a controlled manner, while the chisel machine provides fine finishing and profile optimization. As a scaling tool, it removes loose material and optimizes bonding faces for sprayed concrete.<\/p>\n<h3>Natural stone extraction and special applications<\/h3>\n<p>In <strong>natural stone extraction<\/strong> the chisel machine helps remove protrusions, shape workpieces, and rework separation planes. In <strong>special applications<\/strong> &#8211; for example in noise-sensitive areas or with contaminated construction materials &#8211; chiseling is often reduced and combined with hydraulic methods from Darda GmbH to minimize emissions. Short impact sequences and appropriately dressed chisels further limit dust and airborne fibers.<\/p>\n<h2>Technical features and selection criteria<\/h2>\n<p>The suitable chisel machine is selected based on material, component thickness, desired surface quality, and environmental conditions. Important criteria include:<\/p>\n<ul>\n<li><strong>Impact energy and blow rate:<\/strong> sufficient for the material but not oversized to limit spalling; adjustable output supports sensitive work steps.<\/li>\n<li><strong>Weight class:<\/strong> manageable for the intended position (overhead, wall, floor) and duration of work.<\/li>\n<li><strong>Vibration and damping:<\/strong> low vibrations improve execution quality and reduce fatigue.<\/li>\n<li><strong>Sound power level:<\/strong> observe noise control requirements indoors and outdoors.<\/li>\n<li><strong>Dust management:<\/strong> plan wet processing, extraction, or low-dust procedures; ensure compatibility with shrouds and extraction adapters.<\/li>\n<li><strong>Energy source:<\/strong> electric (including battery-powered), pneumatic, or hydraulic &#8211; suited to site logistics and boundary conditions.<\/li>\n<li><strong>Tool holder:<\/strong> compatible with required chisel types and lengths; consider quick-change systems for frequent bit swaps.<\/li>\n<\/ul>\n<p>Durable results depend on <strong>chisel maintenance<\/strong>: regrinding or replacing worn tips, avoiding overheating, and using suitable lubricants for tool holders preserve performance and reduce recoil.<\/p>\n<h3>Chisel types and their strengths<\/h3>\n<ul>\n<li><strong>Pointed chisel:<\/strong> create starter cracks, localized breaking, starting points for <em>concrete demolition shears<\/em>.<\/li>\n<li><strong>Flat\/wide chisel:<\/strong> remove edges, level surfaces, widen joints.<\/li>\n<li><strong>Spade chisel:<\/strong> remove coverings, screeds, asphalt, bitumen.<\/li>\n<li><strong>Joint chisel:<\/strong> rework defined cut joints, remove mortar.<\/li>\n<\/ul>\n<p>In combination with <strong>stone and concrete splitters<\/strong>, pointed chisels can create defined predetermined breaking lines that are then widened hydraulically and in a controlled manner. Self-sharpening geometries sustain penetration efficiency and reduce downtime on abrasive substrates.<\/p>\n<h2>Work methodology: from scoring to selective deconstruction<\/h2>\n<ol>\n<li><strong>Structure assessment:<\/strong> clarify material, thickness, reinforcement ratio, utilities, and support conditions; define vibration and noise limits. Non-destructive testing and rebar location mapping reduce surprises during opening.<\/li>\n<li><strong>Work preparation:<\/strong> mark areas, plan protective measures (dust, noise, fall protection, sparks); coordinate <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em> and energy supply. Prepare tool sets and backup bits to maintain cycle efficiency.<\/li>\n<li><strong>Chiseling strategy:<\/strong> relieve edges, set predetermined breaking lines, work from free edges toward the field; avoid overloading. Alternate between penetration and clearing to maintain sight on reinforcement and crack behavior.<\/li>\n<li><strong>Combination methods:<\/strong> release volume with Darda GmbH <em>concrete demolition shears<\/em> or <em>stone and concrete splitters<\/em>; use the chisel machine for detailing and fine profiling. Sequencing coarse and fine steps limits microcracking and rework.<\/li>\n<li><strong>Cut reinforcement:<\/strong> expose rebar, then cut with Darda GmbH <em>Multi Cutters<\/em> or <em>steel shears<\/em>; large-format steel components can be processed with a <em>tank cutter<\/em> if necessary.<\/li>\n<li><strong>Rework:<\/strong> achieve the required surface quality, protect edges, sort materials by type, and transport away. Document dimensions and profiles for follow-on trades.<\/li>\n<\/ol>\n<h2>Combination with hydraulic solutions from Darda GmbH<\/h2>\n<p>The chisel machine unfolds its potential particularly in conjunction with hydraulic tools. <strong>Stone and concrete splitters<\/strong> generate controlled cracks with minimal vibration; the chisel machine defines joints, openings, and starting points. <strong>Concrete demolition shears<\/strong> then grip components powerfully and fracture-safely, while the chisel machine performs local adjustments. <em>Power units<\/em> reliably supply the tools; <em>steel shears<\/em>, <em>Multi Cutters<\/em>, and <em>tank cutter<\/em> take over the clean separation of metallic inserts. This coordinated sequence increases precision, reduces noise and dust emissions, and supports the requirements of specialized deconstruction. Clearly defined interfaces between methods shorten cycles and reduce wear on individual tools.<\/p>\n<h2>Occupational safety, emissions, and environmental protection<\/h2>\n<p>In chiseling, safety and emission reduction take priority. Depending on the environment, different limits and guidelines apply; measures must be planned on a project-specific basis:<\/p>\n<ul>\n<li><strong>Vibration:<\/strong> low-emission equipment, vibration-damped handles, adherence to work-time limits and breaks.<\/li>\n<li><strong>Noise:<\/strong> hearing protection, noise barriers, work windows with low public traffic; complement with quieter methods (e.g., splitting, shears).<\/li>\n<li><strong>Dust:<\/strong> wet processing, extraction, suitable filters; pay particular attention to quartz-containing dust; maintain negative pressure where appropriate.<\/li>\n<li><strong>Safe footing:<\/strong> non-slip bases, ergonomic working heights, safe cable and hose management.<\/li>\n<li><strong>Personal protective equipment:<\/strong> safety glasses, gloves, helmet, respiratory protection depending on dust load.<\/li>\n<li><strong>Component protection:<\/strong> dose impact energy, observe shoring and load redistribution, minimize feedback into the structure.<\/li>\n<\/ul>\n<p>Legal requirements are general in nature and must be carefully considered for each project, region, and application. Continuous monitoring of noise and dust values helps verify compliance and adjust processes promptly.<\/p>\n<h2>Surface quality and rework<\/h2>\n<p>Chiseling typically produces rough, grippy surfaces that may be suitable for bonding mortars or subsequent coatings. If a defined edge is required, prior cutting followed by controlled chiseling is recommended. For fair-faced concrete, alternative methods (splitting, shears, sawing) are often advantageous. For fixings and anchor points, recesses can be produced precisely with the chisel machine and then brought to size with <em>concrete demolition shears<\/em>. Surface profiles comparable to common concrete surface profile classes (e.g., CSP) can be achieved reproducibly with consistent tooling and impact energy.<\/p>\n<h2>Common sources of error and how to avoid them<\/h2>\n<ul>\n<li><strong>Oversized machine:<\/strong> leads to uncontrolled spalling; proceed in graduated steps.<\/li>\n<li><strong>Wrong chisel type:<\/strong> use pointed chisels for localized initiation, flat\/wide chisels for surfaces &#8211; not the other way around.<\/li>\n<li><strong>Chiseling without relief cuts:<\/strong> missing predetermined breaking lines increase crack propagation; pre-cut or weaken edges.<\/li>\n<li><strong>Ignoring reinforcement:<\/strong> locate steel early, cut with <em>Multi Cutters<\/em> or <em>steel shears<\/em>.<\/li>\n<li><strong>Inadequate dust and noise management:<\/strong> plan wet guidance\/extraction and noise control early.<\/li>\n<li><strong>Lack of combination strategy:<\/strong> release volume sensibly with <strong>stone and concrete splitters<\/strong> or <strong>concrete demolition shears<\/strong>, reserve the chisel machine for fine work.<\/li>\n<li><strong>Continuous hammering at one point:<\/strong> causes glazing and overheating; work in passes and cool bits as required.<\/li>\n<\/ul>\n<h2>Cost-effectiveness and project planning<\/h2>\n<p>The productivity of a chiseling operation depends on component thickness, reinforcement ratio, accessibility, and the chosen method. An efficient approach is staged: coarse separation and volume reduction with hydraulic methods, followed by targeted chiseling for details. This reduces rework, emissions, and subsequent costs. A realistic cycle plan accounts for tool changes, chisel wear, disposal routes, and the logistical connection of the <em>power units<\/em>. Transparent performance metrics &#8211; such as area per hour, bits per shift, and noise windows &#8211; facilitate accurate scheduling and cost control.<\/p>\n<h2>Relation to Darda GmbH\u2019s fields of application<\/h2>\n<ul>\n<li><strong>Concrete demolition and specialized deconstruction:<\/strong> chiseling for edges, starter cracks, and openings; supplement with <em>concrete demolition shears<\/em> for large-volume separation.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> removal of coverings and fine finishing with the chisel machine, combined with sawing and shearing.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> chisel profile corrections, couple with <em>rock wedge splitter<\/em> for controlled splitting.<\/li>\n<li><strong>Natural stone extraction:<\/strong> rework on separation and split planes, shaping and edge finishing.<\/li>\n<li><strong>Special applications:<\/strong> plan low-emission sequences; reduce the share of chiseling and prioritize Darda GmbH\u2019s hydraulic solutions for sensitive areas.<\/li>\n<\/ul>\n<p>Method combinations tailored to each field increase safety, shorten execution times, and stabilize result quality across changing boundary conditions.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A chisel machine is a percussive tool for breaking up, removing, and texturing concrete, masonry, screed, or natural stone. In deconstruction, during strip-out, and in rock demolition it is a frequently used work tool that can be precisely controlled &#8211; from plaster removal to working high-strength concretes. In many projects <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19446","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Chisel Machine - Concrete and Masonry Demolition<\/title>\n<meta name=\"description\" content=\"Discover the chisel machine as a percussive tool for concrete, masonry &amp; rock demolition \u27a4 uses, types &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chisel Machine - Concrete and Masonry Demolition\" \/>\n<meta property=\"og:description\" content=\"Discover the chisel machine as a percussive tool for concrete, masonry &amp; rock demolition \u27a4 uses, types &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T10:06:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-machine\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-machine\",\"name\":\"Chisel Machine - Concrete and Masonry Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-11T11:13:41+00:00\",\"dateModified\":\"2026-04-28T10:06:03+00:00\",\"description\":\"Discover the chisel machine as a percussive tool for concrete, masonry & rock demolition \u27a4 uses, types & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-machine#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-machine\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-machine#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Chisel machine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chisel Machine - Concrete and Masonry Demolition","description":"Discover the chisel machine as a percussive tool for concrete, masonry & rock demolition \u27a4 uses, types & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine","og_locale":"en_US","og_type":"article","og_title":"Chisel Machine - Concrete and Masonry Demolition","og_description":"Discover the chisel machine as a percussive tool for concrete, masonry & rock demolition \u27a4 uses, types & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-28T10:06:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine","url":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine","name":"Chisel Machine - Concrete and Masonry Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-11T11:13:41+00:00","dateModified":"2026-04-28T10:06:03+00:00","description":"Discover the chisel machine as a percussive tool for concrete, masonry & rock demolition \u27a4 uses, types & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/chisel-machine"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/chisel-machine#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Chisel machine"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19446"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19446\/revisions"}],"predecessor-version":[{"id":26714,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19446\/revisions\/26714"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}