{"id":19445,"date":"2025-11-11T09:34:11","date_gmt":"2025-11-11T08:34:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19445"},"modified":"2026-04-28T14:10:03","modified_gmt":"2026-04-28T12:10:03","slug":"chisel-holder","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder","title":{"rendered":"Chisel holder"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The chisel holder is the mechanical interface between the demolition hammer and the chisel. It transmits impact energy, guides the tool precisely, and ensures a secure fit &#8211; during concrete demolition, in rock, and in tight deconstruction situations. In many projects, chiseling tools work together with other hydraulic methods: for example, edges are preworked, cracks are initiated, or components are opened before Darda GmbH concrete demolition shear or hydraulic wedge splitter (<a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>) <em>separates<\/em> material gently or <em>splits<\/em> it in a controlled manner. A suitable chisel holder is therefore a key factor for <strong>process reliability, efficiency, and component preservation<\/strong>. When selected and serviced correctly, it reduces rework, stabilizes vibration levels, and measurably extends the service life of both hammer and chisel.<\/p>\n<h2>Definition: What is meant by a chisel holder?<\/h2>\n<p>Chisel holder refers to the <strong>insertion interface<\/strong> of a demolition hammer into which the chisel, with its shank, is inserted, aligned, and locked. It combines guide bushings, locking elements, and sealing\/lubrication systems to transmit impact energy axially, control transverse forces, and enable tool changes. Terms such as tool holder, insertion end, shank profile, or insertion system essentially denote the same function: the positive and frictional connection between the impact mechanism and the chisel. In practice, the term also implicitly includes <em>tolerances and surface properties<\/em> defined by industry standards that govern fit, hardness, and interchangeability.<\/p>\n<h2>Design and function of the chisel holder<\/h2>\n<p>A chisel holder typically consists of a hardened guide, a locking mechanism (e.g., with pin or ring mechanics), a wear bushing, and sealing and lubrication points. The chisel shank is inserted axially, aligned, and secured by the lock. During operation, the holder transfers impact pulses to the tool tip, keeps lateral movement within tight tolerances, and dissipates friction and shock forces. <em>Its condition directly affects impact performance, vibration, noise emissions, and the service life of both chisel and hammer.<\/em> Robust guidance minimizes tilting moments and micro-movements, which in turn reduces notch effects at the shank transition.<\/p>\n<h2>Design types and dimensions<\/h2>\n<p>Chisel holders differ by shank profile, size, and type of locking. Common variants are:<\/p>\n<ul>\n<li><strong>Hex-shank holders<\/strong> (e.g., 22, 28, 30 or 32 mm): resistant to rotation, proven in heavy demolition work and in rock.<\/li>\n<li><strong>Round-shank holders<\/strong> with retaining grooves: good centering, quick tool changes, widespread in building and civil engineering.<\/li>\n<li><strong>Polygonal profiles<\/strong> for defined power transmission with limited rotational play.<\/li>\n<li><strong>Quick-change concepts<\/strong> with integrated locks: shorten setup times while maintaining guidance quality.<\/li>\n<\/ul>\n<p>Critical parameters include insertion length, shank diameter, groove geometry, and surface hardness and roughness. They determine how free of play and efficiently impact energy is transmitted and how well the connection withstands transverse forces. In addition, <em>case depth, edge radius design, and concentricity<\/em> influence wear of bushings and the long-term stability of the locking travel.<\/p>\n<h2>Compatibility and adapter solutions<\/h2>\n<p>Compatibility between hammer and chisel holder is crucial. Shank profile and dimensions must match; otherwise, increased play, edge pressures, crack formation, or failure may result. Adapters can bridge deviations but increase overall length, mass, and potentially the bending load. <strong>Recommendation:<\/strong> Use system-compatible combinations wherever possible and employ adapters only where this is structurally and in terms of safety justifiable. Pay particular attention to mixed dimensional systems (e.g., metric vs. inch dimensions), which can introduce hidden tolerance conflicts and amplify wear.<\/p>\n<h2>Fields of application: Concrete, rock, and deconstruction in combination<\/h2>\n<p>Chisel holders are used wherever impact energy is deliberately introduced into concrete or rock. Typical fields:<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Opening components, breaking overlays, removing local thickenings. In combination with Darda GmbH concrete demolition shear, components can subsequently be crushed in a controlled manner.<\/li>\n<li><strong>Building gutting and cutting:<\/strong> Local exposure of reinforcing steel, removing adherences prior to the separating action of multi cutters or hydraulic shear.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Creating predetermined breaking points, relieving edges. After that, Darda GmbH hydraulic wedge splitter can define cracks and split components. For method integration, see <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Preparing separation joints, wedging out blocks before splitting technology precisely controls the geometry.<\/li>\n<li><strong>Special operations:<\/strong> Selectively loosening seized components, local openings in sensitive areas where subsequent hydraulic shears work gently on the material.<\/li>\n<li><strong>Infrastructure rehabilitation:<\/strong> Targeted removal of damaged zones on bridges, abutments, or slabs to prepare defined interfaces for subsequent hydraulic processes.<\/li>\n<\/ul>\n<h2>Distinction and interaction with concrete demolition shear and hydraulic wedge splitter<\/h2>\n<p>Chisel holders are designed for impact work; in contrast, Darda GmbH concrete demolition shear and hydraulic wedge splitter act by cutting or spreading with controlled hydraulic forces. In deconstruction practice, these methods complement each other: chiseling for scoring, opening, and relieving; shears for gripping, crushing, and downsizing; splitters for controlled fracture separation. The interface is organizational and technical: <strong>Preparation by chiseling work<\/strong> reduces peak loads and favors low-noise, low-vibration levels for the subsequent hydraulic tools. Proper sequencing also limits uncontrolled crack propagation and facilitates clean, verifiable separation lines.<\/p>\n<h2>Selection criteria for a suitable chisel holder<\/h2>\n<ul>\n<li><strong>Hammer energy class:<\/strong> Holder and shank must withstand the impact forces.<\/li>\n<li><strong>Shank profile and tolerances:<\/strong> Accurate fit minimizes play and wear.<\/li>\n<li><strong>Material and heat treatment:<\/strong> Surface hardness against galling, sufficient toughness against cracking.<\/li>\n<li><strong>Lubrication and sealing:<\/strong> Grease supply paths, protection against dust and moisture.<\/li>\n<li><strong>Working environment:<\/strong> Dust, water mist, temperature; derive protective measures accordingly.<\/li>\n<li><strong>Tool change:<\/strong> Ergonomics, locking concept, prevention of mix-ups.<\/li>\n<li><strong>Process synergy:<\/strong> Plan combination with concrete demolition shear, hydraulic wedge splitter, or shear-controlled workflows.<\/li>\n<li><strong>Service accessibility:<\/strong> Replaceable bushings and locks, feasible inspection intervals, and documented wear limits.<\/li>\n<li><strong>Mass and geometry:<\/strong> Influence on center of gravity and handling, especially when adapters or extensions are used.<\/li>\n<\/ul>\n<h2>Maintenance, care, and service life<\/h2>\n<h3>Cleaning<\/h3>\n<p>Clean insertion end and holder daily from dust and abrasion. Foreign particles increase friction, cause scoring, and promote corrosion. Compressed air and lint-free cloths are suitable; avoid driving contaminants deeper into the guide zones.<\/p>\n<h3>Lubrication<\/h3>\n<p>Apply impact-resistant grease sparingly and regularly. Excessive lubrication binds dust; too little lubrication causes frictional heat and increased wear. Distribute grease over the shank contact area and refresh after extended idle times.<\/p>\n<h3>Wear inspection<\/h3>\n<p>Check play at the shank; inspect locking elements for edge wear; examine guide bushings for scoring and chipping. <em>Observe limit values according to the manufacturer\u2019s specifications.<\/em> Practical indicators include rising operating temperature, audible rattling, and visible ovalization at the insertion end.<\/p>\n<h3>Replacement<\/h3>\n<p>Replace worn bushings, seals, and locking parts in good time to prevent consequential damage to hammer and chisel. Use calibrated measuring tools for decision thresholds and document replacements to keep maintenance predictable.<\/p>\n<h3>Storage<\/h3>\n<p>Protect unused chisels and holders from moisture ingress and impact damage. Apply corrosion protection films or light oils to preserve contact surfaces during longer storage periods.<\/p>\n<h2>Safety and legal notes<\/h2>\n<ul>\n<li>Use only matching components; no improvised adaptations.<\/li>\n<li>Before changing tools, relieve pressure, secure energy sources, and secure the lock.<\/li>\n<li>Personal protective equipment: eye, hearing, and hand protection; suitable footwear.<\/li>\n<li>Minimize dust and noise; consider vibrations in the surroundings.<\/li>\n<li>Observe legal requirements regarding occupational safety, noise control, and dust exposure in general; specific measures must be defined on a project-specific basis.<\/li>\n<li>Beware of hot surfaces on the holder after continuous operation; allow cooling pauses where required.<\/li>\n<li>Transport and lift assemblies in accordance with weight and balance specifications to prevent unintentional release of the locking mechanism.<\/li>\n<\/ul>\n<h2>Common failure patterns and their causes<\/h2>\n<ul>\n<li><strong>Excessive play:<\/strong> Worn guide bushings or incorrect shank size.<\/li>\n<li><strong>Chisel seized in place:<\/strong> Material build-up, insufficient lubrication, ingress of particles.<\/li>\n<li><strong>Chatter marks and vibrations:<\/strong> Missing centering, mixed combinations, damaged locking mechanism.<\/li>\n<li><strong>Overheating of the holder:<\/strong> Friction due to dry running, wrong grease, excessively high blow rate without pauses.<\/li>\n<li><strong>Cracks at the shank:<\/strong> Notch effects from edge pressures, hard impacts, adapter chains.<\/li>\n<li><strong>Ovalization of the bore:<\/strong> Prolonged operation with incorrect tolerances or tilted load introduction.<\/li>\n<li><strong>Seal damage:<\/strong> Abrasive dust, chemical exposure, or improper assembly leading to grease loss.<\/li>\n<\/ul>\n<h2>Assembly and disassembly &#8211; step by step<\/h2>\n<ol>\n<li>Secure the tool area, relieve pressure, and switch the hammer to off\/no hydraulics.<\/li>\n<li>Clean the holder; check the condition of the locking mechanism.<\/li>\n<li>Lightly grease the chisel shank; check the insertion end for damage.<\/li>\n<li>Insert the chisel to the stop; align the rotational position.<\/li>\n<li>Close the lock completely; check seating with a pull\/rotation test.<\/li>\n<li>After a short trial load: observe tightness, noise, and temperature.<\/li>\n<li>For disassembly, open the lock, remove the chisel axially, and clean the holder immediately.<\/li>\n<\/ol>\n<p><em>Note: If unusual heat, noise, or play occurs during the trial load, stop work and inspect the lock and guide zones before continuing.<\/em><\/p>\n<h2>Quality assurance and tolerances<\/h2>\n<p>Dimensional, form, and positional tolerances of the shank and holder determine fit and service life. Important are uniform hardness across the surface layer, low surface roughness in the contact area, and reproducible locking travel. Regular visual and dimensional checks ensure functionality, especially in intensive use during concrete demolition, rock excavation, and tunnel construction. Where appropriate, supplementary tests (e.g., hardness checks on wear zones or crack detection on locking parts) can be used to verify integrity.<\/p>\n<h2>Practical relevance to Darda GmbH products and application areas<\/h2>\n<p>In complex deconstruction workflows, the chisel holder is often used in <strong>preparation<\/strong>: loosening edges, relieving stresses, creating openings. This is followed by Darda GmbH processes &#8211; such as concrete demolition shear for targeted breaking of reinforced components or hydraulic wedge splitter for low-vibration separation. In building gutting and cutting tasks, chiseling can expose fasteners before multi cutters, hydraulic shear, steel shear, or cutting torch make clean cuts. This coordinated sequence reduces noise, vibrations, and uncontrolled fractures, supporting safe, predictable execution in special demolition, natural stone extraction, and special operations. Clear handover criteria between steps shorten setup times and help maintain consistent quality.<\/p>\n<h2>Trends and developments<\/h2>\n<ul>\n<li><strong>Vibration- and noise-reducing holders:<\/strong> optimized fits and damping elements.<\/li>\n<li><strong>Low-lubrication systems:<\/strong> improved materials and surfaces for longer intervals.<\/li>\n<li><strong>Dust and water protection:<\/strong> robust sealing concepts for tunnel construction and interior demolition.<\/li>\n<li><strong>Condition monitoring:<\/strong> sensor-based control of temperature, play, and blow rate for preventive maintenance.<\/li>\n<li><strong>Modular wear interfaces:<\/strong> exchangeable bushings and lock modules to restore tolerance classes quickly.<\/li>\n<li><strong>Surface engineering:<\/strong> advanced coatings to reduce galling and fretting under high-frequency loads.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The chisel holder is the mechanical interface between the demolition hammer and the chisel. It transmits impact energy, guides the tool precisely, and ensures a secure fit &#8211; during concrete demolition, in rock, and in tight deconstruction situations. In many projects, chiseling tools work together with other hydraulic methods: for <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19445","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Chisel Holder for Demolition Hammers | Guide<\/title>\n<meta name=\"description\" content=\"Mechanical chisel holder for demolition hammers \u2713 Secure fit, guided shank, efficient impact energy transfer.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chisel Holder for Demolition Hammers | Guide\" \/>\n<meta property=\"og:description\" content=\"Mechanical chisel holder for demolition hammers \u2713 Secure fit, guided shank, efficient impact energy transfer.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T12:10:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-holder\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-holder\",\"name\":\"Chisel Holder for Demolition Hammers | Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-11T08:34:11+00:00\",\"dateModified\":\"2026-04-28T12:10:03+00:00\",\"description\":\"Mechanical chisel holder for demolition hammers \u2713 Secure fit, guided shank, efficient impact energy transfer.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-holder#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-holder\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chisel-holder#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Chisel holder\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chisel Holder for Demolition Hammers | Guide","description":"Mechanical chisel holder for demolition hammers \u2713 Secure fit, guided shank, efficient impact energy transfer.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder","og_locale":"en_US","og_type":"article","og_title":"Chisel Holder for Demolition Hammers | Guide","og_description":"Mechanical chisel holder for demolition hammers \u2713 Secure fit, guided shank, efficient impact energy transfer.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-28T12:10:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder","url":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder","name":"Chisel Holder for Demolition Hammers | Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-11T08:34:11+00:00","dateModified":"2026-04-28T12:10:03+00:00","description":"Mechanical chisel holder for demolition hammers \u2713 Secure fit, guided shank, efficient impact energy transfer.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/chisel-holder"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/chisel-holder#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Chisel holder"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19445","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19445"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19445\/revisions"}],"predecessor-version":[{"id":26718,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19445\/revisions\/26718"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}