{"id":19440,"date":"2025-11-11T15:26:39","date_gmt":"2025-11-11T14:26:39","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19440"},"modified":"2026-04-27T16:30:04","modified_gmt":"2026-04-27T14:30:04","slug":"wall-breakthrough","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough","title":{"rendered":"Wall breakthrough"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A wall breakthrough creates an opening in a wall made of brick, calcium silicate brick, natural stone, autoclaved aerated concrete, or reinforced concrete &#8211; for example for doors, windows, service shafts, or utility runs. In practice, the spectrum ranges from a small opening in fit-out to a precise opening in load-bearing masonry as part of conversion, refurbishment, or special demolition. For clean, low-vibration work, mechanical, hydraulic, and cutting methods are used depending on the material and boundary conditions. Tools such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crusher systems<\/a> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> allow controlled removal and splitting, often combined with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> and supplementary jaw or shear tools from Darda GmbH. A professionally executed opening delivers dimensional accuracy, protects adjacent structures, and meets specifications for emissions, safety, and structural performance.<\/p>\n<h2>Definition: What is meant by a wall breakthrough?<\/h2>\n<p>A wall breakthrough is the targeted creation of an opening in an existing wall structure. This can be a <em>wall breakthrough<\/em> for a new room connection, a <em>door opening<\/em>, a <em>window opening<\/em>, or an opening for service runs. The term covers both non-load-bearing and load-bearing walls. The aim is a geometrically defined opening that is compatible with structural and building physics requirements, with limited emissions (dust, noise, vibration) and the least possible impact on adjacent components. Depending on the construction type (clay brick, calcium silicate brick, natural stone, autoclaved aerated concrete, reinforced concrete, composite masonry), methods, tools, and work steps vary.<\/p>\n<ul>\n<li><strong>Objective:<\/strong> Create a stable, precisely dimensioned opening suitable for the intended use and finish.<\/li>\n<li><strong>Constraints:<\/strong> Maintain load paths, fire and acoustic ratings, moisture barriers, and thermal performance where required.<\/li>\n<li><strong>Execution quality:<\/strong> Clean edges, correct tolerances, reproducible process steps, verifiable documentation.<\/li>\n<li><strong>Low emissions:<\/strong> Minimize dust, noise, and vibration through method selection and process control.<\/li>\n<\/ul>\n<h2>Planning, structural analysis, and permits<\/h2>\n<p>Before a wall breakthrough, assess the structure: Is the wall load-bearing, bracing, or merely a partition? If loads are redistributed, a lintel, beam, or temporary shoring is required. Typically, such questions are evaluated in advance in design and structural analysis. Depending on the measure, notification or permitting obligations may apply. Requirements for fire protection, building acoustics, and moisture protection must be observed, as well as utility and cable locating. Precise dimensions, tolerances, edge quality, and the defined connection to existing components are decisive for execution.<\/p>\n<p>Where appropriate, conduct a building survey and material testing, and use non-destructive scanning (e.g., reinforcement detection, utility locating) to reduce uncertainties. Define deliverables early: scope, sequence, access, waste handling, and verification. Coordinate with adjacent trades to avoid rework.<\/p>\n<ul>\n<li><strong>Structural checks:<\/strong> Verify load paths, lintel sizing, bearing lengths, and shoring sequence.<\/li>\n<li><strong>Regulatory aspects:<\/strong> Clarify approvals, fire-separation requirements, and working hours or noise windows.<\/li>\n<li><strong>Site constraints:<\/strong> Access routes, floor load limits, clearances, and protection of finishes.<\/li>\n<li><strong>Measurement basis:<\/strong> Reference lines, benchmarks, and tolerances per project specifications.<\/li>\n<\/ul>\n<h2>Methods and tools for wall breakthroughs<\/h2>\n<p>The choice of method depends on material, wall thickness, edge distances, sensitivity to vibration, and accessibility. In principle, cutting, splitting, and crushing methods can be distinguished, often used in combination. Tools from Darda GmbH cover special requirements for precise, low-vibration work in existing structures.<\/p>\n<ul>\n<li><strong>Cutting and drilling:<\/strong> Define edges and openings with saw cuts and core holes for high accuracy and minimal spalling.<\/li>\n<li><strong>Splitting:<\/strong> Apply controlled forces within boreholes to crack the substrate with low vibration and low noise.<\/li>\n<li><strong>Crushing and shearing:<\/strong> Remove sections segment by segment and process reinforcement separately.<\/li>\n<li><strong>Selection criteria:<\/strong> Opening size, reinforcement density, target edge quality, emissions limits, and disposal logistics.<\/li>\n<\/ul>\n<h3>Concrete crushers for controlled removal<\/h3>\n<p><strong>Concrete crushers<\/strong> crush concrete and masonry powerfully with comparatively low vibration. In a wall breakthrough they are used to enlarge openings after pre-cutting or pre-drilling, to straighten edges, or to release built-ins. In reinforced concrete, concrete crushers break the concrete and expose reinforcement, which is then separated. The method is suitable for concrete demolition and special demolition, strip-out and cutting, as well as special deployments with high demands on emission control.<\/p>\n<ul>\n<li><strong>Suitable when:<\/strong> Limited access prohibits large saws, vibration control is critical, or selective removal is required.<\/li>\n<li><strong>Edge quality:<\/strong> Best in combination with a pre-cut or core-drilled perimeter.<\/li>\n<li><strong>Process control:<\/strong> Work in small increments to avoid free-standing webs and edge damage.<\/li>\n<\/ul>\n<h3>Stone and concrete splitters for low-vibration opening<\/h3>\n<p><strong>Stone and concrete splitters<\/strong> and <em>stone splitting cylinders<\/em> generate splitting forces in the borehole and crack the material in a controlled way &#8211; without explosives. They are suitable for thick masonry, natural stone, and reinforced concrete when vibration and noise must be minimized, for example in sensitive existing structures, in tunnel construction, or during night work. In combination with <em>hydraulic power packs<\/em> the result is a precise, reproducible method that frees the opening step by step. A consistent drilling pattern and appropriate spacing are decisive for predictable fracture lines.<\/p>\n<ul>\n<li><strong>Advantages:<\/strong> Low structure-borne noise, little dust, high controllability in confined conditions.<\/li>\n<li><strong>Application notes:<\/strong> Keep distances to edges adequate and sequence the splitting to steer crack propagation.<\/li>\n<\/ul>\n<h3>Combination shears, Multi Cutters, and other hydraulic tools<\/h3>\n<p><strong>Combination shears<\/strong> and <em>Multi Cutters<\/em> combine cutting and crushing &#8211; useful with composite masonry with inserts, along utility corridors, or when composite materials must be separated. <em>Steel shears<\/em> cut exposed reinforcement without the sparks of conventional cutting methods. <em>Tank cutters<\/em> are used on special hollow bodies or metal shells in the context of breakthroughs. All tools are typically powered by compact <strong>hydraulic power packs<\/strong> from Darda GmbH that combine performance and mobility in existing buildings. In mixed substrates or varying reinforcement, these tools ensure progress with minimal tool changes.<\/p>\n<h2>Areas of application and typical scenarios<\/h2>\n<p>Wall breakthroughs occur in many projects &#8211; from fit-out to special demolition. Relevant areas where the described tools and methods often come together include:<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Openings in reinforced concrete walls, step-by-step removal with concrete crushers and splitting methods.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Door and window openings in existing structures, technical breakthroughs during repurposing, combined cutting and crusher work.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Splitters for natural stone or overstrength concrete, controlled opening in sensitive environments.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Splitting and opening in massive stone with a defined fracture line, e.g., on historic components.<\/li>\n<li><strong>Special deployment:<\/strong> Work in confined conditions, in areas with strict emission limits, or in safety-critical zones.<\/li>\n<li><strong>Noise-sensitive environments:<\/strong> Hospitals, laboratories, and museums where vibration and dust must be tightly controlled.<\/li>\n<li><strong>Structural upgrades:<\/strong> Openings for stiffening elements or utility risers as part of seismic retrofits or refurbishments.<\/li>\n<\/ul>\n<h2>Process: step by step to a precise opening<\/h2>\n<ol>\n<li><strong>Investigation and utility clearance:<\/strong> Check drawings, locate utilities, identify construction materials.<\/li>\n<li><strong>Protection and site setup:<\/strong> Install dust containment, covers, and barriers; plan waste routes and water management.<\/li>\n<li><strong>Structural measures:<\/strong> Install required temporary shoring, prepare the lintel or beam.<\/li>\n<li><strong>Marking and preliminaries:<\/strong> Mark the opening precisely, optionally pre-drill or score edges to minimize spalling.<\/li>\n<li><strong>Pre-cutting\/pre-drilling:<\/strong> Define the perimeter, drill holes for splitting cylinders or make saw cuts.<\/li>\n<li><strong>Interim measurement and edge verification:<\/strong> Check plumb, level, and clearance before full removal; adjust as necessary.<\/li>\n<li><strong>Material removal:<\/strong> Open segment by segment with concrete crushers, combination shears, or stone and concrete splitters; cut reinforcement.<\/li>\n<li><strong>Finishing:<\/strong> Straighten edges, achieve tolerances, install inserts for lintel\/jambs.<\/li>\n<li><strong>Installation and securing:<\/strong> Install the lintel or frame, grout and anchor as designed.<\/li>\n<li><strong>Follow-up work:<\/strong> Close joints, blend surfaces, clean the site, and document.<\/li>\n<\/ol>\n<h2>Materials and building age: impact on the method<\/h2>\n<p>The material type determines tool choice and work tactics. Brick and calcium silicate masonry can be pre-cut and reduced effectively; hollow-core units require edge stability and short removal increments. Autoclaved aerated concrete is sensitive to point loads &#8211; here, small, well-controlled jaw strokes are advisable. Natural stone is heterogeneous; splitters with a defined drill-hole pattern deliver controlled fracture lines. In reinforced concrete, the concrete and reinforcement are separated in two steps: first hydraulically reduce the concrete (concrete crushers), then separate the steel (steel shears). Composite masonry and composite components benefit from combination shears or Multi Cutters that unite cutting and crushing.<\/p>\n<p>In older buildings, variable mortar strengths, hidden voids, and undocumented retrofits are common. Trial openings and on-site testing reduce risk. For heritage components, prioritize reversible or low-impact measures and coordinate with conservation requirements.<\/p>\n<ul>\n<li><strong>Edge stability:<\/strong> Short strokes and tight sequencing in brittle or perforated units.<\/li>\n<li><strong>Reinforcement management:<\/strong> Early exposure and clean cuts to avoid tension cracks at edges.<\/li>\n<li><strong>Moisture and salts:<\/strong> Consider remediation steps where damp or salt-laden masonry is present.<\/li>\n<\/ul>\n<h2>Emissions, environmental and occupational safety<\/h2>\n<p>Low-vibration methods are often crucial in existing buildings to avoid cracks, detachment, and disturbances. Compared to percussive methods, hydraulic tools generate less structure-borne sound and dust. <strong>Dust suppression<\/strong> (e.g., by misting or spot wetting), <strong>noise reduction measures<\/strong> (time scheduling, shielding), and <strong>vibration control<\/strong> (appropriate tool selection) are essential. Personal protective equipment, safe hose routing for hydraulics, secure standing surfaces, and a clear communication chain are basic prerequisites. Environmental aspects include separating concrete and steel fractions and orderly disposal.<\/p>\n<ul>\n<li><strong>Dust control:<\/strong> Wet cutting where suitable, local extraction with HEPA filtration, negative-pressure zones for sensitive areas.<\/li>\n<li><strong>Noise management:<\/strong> Temporary barriers, sequencing during low-occupancy periods, tool selection to limit peak levels.<\/li>\n<li><strong>Vibration monitoring:<\/strong> Thresholds and real-time checks in projects with sensitive adjacencies.<\/li>\n<li><strong>Water use and waste:<\/strong> Collect slurry, prevent ingress into drains, and dispose of residues per specification.<\/li>\n<\/ul>\n<h2>Quality assurance, tolerances, and edge control<\/h2>\n<p>Openings should be aligned, plumb, and within tolerance. This is achieved by a defined edge (pre-cut\/drill-hole row) and controlled material removal with crusher or splitting cylinder. <em>Jamb<\/em> and <em>lintel bearing<\/em> must be constructed to be compressive; spalling is limited by releasing small segments and avoiding free-standing webs. Boreholes near edges must be placed so that remaining cross-sections do not split. The final geometry is documented and checked against the design.<\/p>\n<ul>\n<li><strong>Measurement:<\/strong> Use reference lines and calibrated levels; verify clear opening at interim and final states.<\/li>\n<li><strong>Edge protection:<\/strong> Maintain a sacrificial strip or guide cut to keep finishes intact.<\/li>\n<li><strong>Acceptance:<\/strong> Record dimensions, bearing lengths, anchor types, and cure times where relevant.<\/li>\n<\/ul>\n<h2>Risks, damage patterns, and their avoidance<\/h2>\n<p>Typical risks include uncontrolled crack formation, edge spalling, damage to hidden utilities, settlement due to insufficient shoring, and dust and noise exposure. Mitigation measures include complete investigation, temporary shoring, edge-near pre-cuts, segmental work with concrete crushers, the use of stone and concrete splitters with moderate spacing, and a clear disposal logistics plan. In reinforced concrete, exposing reinforcement early reduces the risk of tension cracks in edge areas.<\/p>\n<ul>\n<li><strong>Early warning signs:<\/strong> Hairline cracks radiating from corners, increased vibration levels, or unexpected deflection.<\/li>\n<li><strong>Stop criteria:<\/strong> Pause work if utilities are suspected or if monitoring thresholds are exceeded.<\/li>\n<li><strong>Corner detailing:<\/strong> Drill relief holes or extend cuts to reduce stress concentrations at corners.<\/li>\n<\/ul>\n<h2>Alternatives and additions in the construction process<\/h2>\n<p>Some goals can be achieved by adjustments: using existing openings, changing the room sequence, or placing breakthroughs in non-load-bearing areas. If openings in load-bearing walls are unavoidable, combining a pre-cut edge with hydraulic removal can significantly reduce emissions. For very thick walls, staged splitting with several stone splitting cylinders in drill-hole patterns is a robust alternative to purely cutting methods.<\/p>\n<p>Depending on constraints, consider prefabricated frames or lintels to shorten on-site times, or staged openings with temporary supports to maintain serviceability during construction.<\/p>\n<h2>Documentation, handover, and verification<\/h2>\n<p>At the end, dimensions, edge quality, lintel and anchoring details, and the separation of material fractions are documented. For subsequent trades, a clean, load-bearing jamb is essential. In projects with elevated requirements (for example in special demolition or special deployments) a supplementary crack and vibration monitoring can be useful to keep the effects of the wall breakthrough traceable.<\/p>\n<ul>\n<li><strong>Records:<\/strong> As-built dimensions, photos of edges and bearings, and reinforcement handling.<\/li>\n<li><strong>Certificates:<\/strong> Disposal slips, material separation logs, and where relevant, test reports.<\/li>\n<li><strong>Handover:<\/strong> Clearances for follow-on trades, protection measures, and updated drawings or models.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A wall breakthrough creates an opening in a wall made of brick, calcium silicate brick, natural stone, autoclaved aerated concrete, or reinforced concrete &#8211; for example for doors, windows, service shafts, or utility runs. In practice, the spectrum ranges from a small opening in fit-out to a precise opening in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19440","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wall Breakthrough in Construction - Safe Methods<\/title>\n<meta name=\"description\" content=\"Learn how a wall breakthrough in construction creates openings in masonry &amp; concrete \u2713 Methods, planning &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wall Breakthrough in Construction - Safe Methods\" \/>\n<meta property=\"og:description\" content=\"Learn how a wall breakthrough in construction creates openings in masonry &amp; concrete \u2713 Methods, planning &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-27T14:30:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-breakthrough\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-breakthrough\",\"name\":\"Wall Breakthrough in Construction - Safe Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-11T14:26:39+00:00\",\"dateModified\":\"2026-04-27T14:30:04+00:00\",\"description\":\"Learn how a wall breakthrough in construction creates openings in masonry & concrete \u2713 Methods, planning & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-breakthrough#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-breakthrough\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-breakthrough#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wall breakthrough\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wall Breakthrough in Construction - Safe Methods","description":"Learn how a wall breakthrough in construction creates openings in masonry & concrete \u2713 Methods, planning & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough","og_locale":"en_US","og_type":"article","og_title":"Wall Breakthrough in Construction - Safe Methods","og_description":"Learn how a wall breakthrough in construction creates openings in masonry & concrete \u2713 Methods, planning & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-27T14:30:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough","url":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough","name":"Wall Breakthrough in Construction - Safe Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-11T14:26:39+00:00","dateModified":"2026-04-27T14:30:04+00:00","description":"Learn how a wall breakthrough in construction creates openings in masonry & concrete \u2713 Methods, planning & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-breakthrough#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wall breakthrough"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19440"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19440\/revisions"}],"predecessor-version":[{"id":26690,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19440\/revisions\/26690"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}