{"id":19424,"date":"2025-11-08T15:49:13","date_gmt":"2025-11-08T14:49:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19424"},"modified":"2026-04-27T08:23:03","modified_gmt":"2026-04-27T06:23:03","slug":"machine-hall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall","title":{"rendered":"Machine hall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A machine hall is the central place where heavy equipment is safely stored, serviced, prepared, and made ready for deployment. In the context of demolition, deconstruction, rock cutting\/processing, and natural stone processing, it serves simultaneously as a workspace, shelter, and logistics hub. Here, hydraulic tools such as <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> are inspected, components are repaired, materials are sorted, and resources are organized. A well-planned machine hall increases occupational safety, efficiency, and equipment availability &#8211; from power units to specialized shears. Clear zoning, robust workflows, and documented procedures reduce changeover times and error rates; lighting, drainage, and media routing designed for service access further raise uptime.<\/p>\n<h2>Definition: What is meant by a machine hall?<\/h2>\n<p>A machine hall is a covered, permanent structure with sufficient load-bearing capacity, utilities, and protective functions, designed to accommodate, operate in stationary mode (e.g., test bench), maintain, and store machines and tools. In demolition-related trades, this includes areas for heavy carrier machines as well as zones for hydraulics, cutting and splitting technology, lifting devices, spare parts, and hazardous material storage. Core elements include the load-bearing structure, floor slab, crane and lifting equipment, ventilation, fire protection, energy and hydraulic connection, and regulated traffic routes. Typical baseline parameters include adequate clear height for crane hook travel, floor load classes suited to concentrated loads, weather-protected media connections, and secondary containment for oils and chemicals.<\/p>\n<h2>Structure and functions of a machine hall for demolition technology<\/h2>\n<p>Machine halls in demolition and deconstruction combine requirements from mechanics, hydraulics, occupational safety, and logistics. They must safely absorb loads, reliably provide utilities, and support job preparation &#8211; from <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition \u2013 deconstruction<\/a> with concrete demolition shears to controlled splitting with stone splitters. Signage, visual management, and standardized tool staging ensure fast, error-robust setups and consistent quality at test benches and workstations.<\/p>\n<h3>Typical functional areas<\/h3>\n<ul>\n<li>Maintenance and assembly zone for hydraulic tools (e.g., changing cutting jaws, seals, wedge bodies)<\/li>\n<li>Testing area for cylinders and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">testing of hydraulic power units<\/a> with defined pressure and leakage tests<\/li>\n<li>Storage and setup areas for attachments such as combination shears, Multi Cutters, steel shears, and tank cutters<\/li>\n<li>Material zones for consumables and spare parts (bolts, hoses, couplings, lubricants)<\/li>\n<li>Logistics areas for incoming and outgoing components, recycling fractions, and tools<\/li>\n<li>Safety and cleaning areas for dust suppression, noise reduction measures, and decontamination<\/li>\n<li>Calibration and metrology corner for pressure gauges, torque tools, and measuring sensors<\/li>\n<li>Hose management with clean assemblies, flushing, and contamination control<\/li>\n<\/ul>\n<h2>Construction types and load-bearing structures<\/h2>\n<p>The construction method influences load reserves, installation speed, and later adaptability. Steel halls with rafter and purlin systems are common, as are hybrid constructions of steel and concrete. Decisive is the predictable absorption of point and line loads, for example via crane runway or machine foundation. Envelope and roof choices should consider wind and snow loads, daylight admission with glare control, and corrosion-resistant surfaces in dust- and moisture-laden areas.<\/p>\n<h3>Planning aspects of the load-bearing structure<\/h3>\n<ul>\n<li>Design for crane and lifting loads (bridge cranes, pillar jib cranes, rigging)<\/li>\n<li>Low vibration levels for assembly work with intensive testing<\/li>\n<li>Reserve for future expansions (additional crane girders, media bridges, mezzanines)<\/li>\n<li>Weather and corrosion protection in dust- and moisture-laden areas<\/li>\n<li>Clear span width and hook height aligned with the largest attachments<\/li>\n<li>Anchorage points for fall protection and temporary lifting aids<\/li>\n<\/ul>\n<h2>Hall floor, foundations and load transfer<\/h2>\n<p>Hall floors must withstand high point loads, maneuvering forces, and local impact loads. This applies especially when setting down concrete demolition shears, stone splitting cylinders, or heavy power units. Surface texture, chemical resistance to oils and coolants, and protected edge zones contribute to durability and safety.<\/p>\n<h3>Structural requirements<\/h3>\n<ul>\n<li>High compressive strength and abrasion resistance, with hard wear zones if necessary<\/li>\n<li>Cast-in anchors for test benches and assembly fixtures<\/li>\n<li>Flat, low-joint traffic surfaces for safe equipment guidance<\/li>\n<li>Clean drainage with containment (sumps, edge zones)<\/li>\n<li>Chemical-resistant coatings and impact protection in loading areas<\/li>\n<\/ul>\n<h2>Crane systems, lifting equipment and in-plant logistics<\/h2>\n<p>Safe handling of heavy attachments requires suitable lifting systems. Cranes enable millimeter-precise positioning of cutting and splitting tools at test benches and work stands. Radio remote control, anti-sway functions, and anti-collision monitoring increase precision and reduce near-miss incidents.<\/p>\n<h3>Selection criteria<\/h3>\n<ul>\n<li>Load capacities with reserve for unusual centers of gravity<\/li>\n<li>Fine positioning for assembly work on hydraulic components<\/li>\n<li>Compatibility with lifting accessories and rigging<\/li>\n<li>Clear travel paths and designated staging areas for tool changes<\/li>\n<li>Service access, inspection schedules, and documented maintenance routines<\/li>\n<\/ul>\n<h2>Power and media supply<\/h2>\n<p>Hydraulics, power supply, and compressed air supply are the backbone of the machine hall. Clear media concepts are needed to safely test stone and concrete splitters and operate test benches. Energy monitoring, leak detection, and spill-safe distribution improve both availability and environmental protection.<\/p>\n<h3>Media concept<\/h3>\n<ul>\n<li>Power supply with adequate capacity and distribution close to workstations<\/li>\n<li>Hydraulic connection with secure couplings, pressure relief, and drip containment<\/li>\n<li>Compressed air supply for cleaning, pneumatic tool operation, and controls<\/li>\n<li>Fluid management: oil, emulsions, water &#8211; separate circuits and containment systems<\/li>\n<li>Color coding and labeling of media points for error-proof connections<\/li>\n<li>Hose reels, quick-coupling panels, and local drip trays at test stands<\/li>\n<\/ul>\n<h2>Occupational safety, environmental protection, and fire protection<\/h2>\n<p>Cutting, splitting, and separating generate noise, dust, and potential ignition sources. A coordinated protection concept is mandatory. The information provided is general and does not replace an individual assessment by authorized bodies. Risk assessments, lockout procedures, and permit-to-work regimes for hot work and cleaning chemicals form the procedural backbone.<\/p>\n<h3>Key protection goals<\/h3>\n<ul>\n<li>Noise reduction measures through structural means and work organization<\/li>\n<li>Dust suppression and dust extraction at workplaces with fine particles<\/li>\n<li>Fire protection with suitable extinguishing agents and clear escape routes<\/li>\n<li>Safe storage of oils, cleaners, and auxiliary materials<\/li>\n<li>Lockout-tagout for hydraulic and electrical energy sources<\/li>\n<li>Explosion protection measures in zones with potential flammable atmospheres as required<\/li>\n<\/ul>\n<h2>Processes: setup, testing, documentation<\/h2>\n<p>Quality arises from defined processes. For concrete demolition shears, stone splitting cylinders, or Multi Cutters, recurring steps apply from visual inspection to pressure testing. Acceptance criteria, torque specifications, and release thresholds should be defined and version-controlled.<\/p>\n<h3>Example sequence at the test bench<\/h3>\n<ol>\n<li>Cleaning and visual inspection (jaws, blades, wedge and piston surfaces)<\/li>\n<li>Hydraulic check: tightness, pressure behavior, temperature development<\/li>\n<li>Functional test of movements, end positions, safety valves<\/li>\n<li>Documentation: measurement results, parts replaced, release or hold note<\/li>\n<li>Final sign-off with traceable identifier and scheduling of next inspection<\/li>\n<\/ol>\n<h2>Material flow, storage, and labeling<\/h2>\n<p>Clear storage logistics save time, reduce search effort, and increase safety. Labeling and clearly defined staging zones are essential. Barcode or QR labeling for tools and components supports traceability and reduces picking errors.<\/p>\n<h3>Recommendations for the hall layout<\/h3>\n<ul>\n<li>Arrange equipment storage zones by weight, frequency, and compatibility<\/li>\n<li>Position setup stations close to media connections<\/li>\n<li>Structure spare parts by assemblies (hydraulics, mechanics, electrics)<\/li>\n<li>Separate sorting areas for deconstruction material from assembly zones<\/li>\n<li>Visual management boards and kanban bins for consumables<\/li>\n<\/ul>\n<h2>Maintenance and life cycle<\/h2>\n<p>Regular care preserves readiness for deployment. Especially with concrete demolition shears and stone and concrete splitters, clean sealing surfaces, proper oil management, and timely replacement of wear parts extend service life. Condition monitoring and periodic oil analysis enable predictive interventions and shorten downtime.<\/p>\n<h3>Key measures<\/h3>\n<ul>\n<li>Inspection plans with intervals for mechanical and hydraulic checks<\/li>\n<li>Calibrated measuring equipment for pressure and displacement<\/li>\n<li>Clean, dry storage of sensitive components<\/li>\n<li>Training for rigging and assembly work<\/li>\n<li>Oil analysis and particle counting to monitor cleanliness classes<\/li>\n<\/ul>\n<h2>Special requirements by field of application<\/h2>\n<p>Depending on the field of work, priorities in hall organization and equipment vary. The following points show typical real-world patterns.<\/p>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<ul>\n<li>Focus on jaw and blade changes on concrete demolition shears<\/li>\n<li>Test stations for power units with load simulation<\/li>\n<li>Dust protection concept for fine concrete dust<\/li>\n<li>Spare blade and jaw storage with protective packaging and labeling<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<ul>\n<li>Fine tools and precise clamping fixtures for combination shears and Multi Cutters<\/li>\n<li>Separate areas for sparks and sensitive storage<\/li>\n<li>Clean separation of metal, plastic, and composite fractions<\/li>\n<li>Non-sparking tools and covers in sensitive areas where required<\/li>\n<\/ul>\n<h3>Rock excavation and tunnel construction<\/h3>\n<ul>\n<li>Robust floors for impact-loaded parts and split wedges<\/li>\n<li>Moisture management and corrosion protection<\/li>\n<li>Test benches for stone splitting cylinders with high pressure stability<\/li>\n<li>Enhanced lighting and drainage for wet or muddy operations<\/li>\n<\/ul>\n<h3>Natural stone extraction<\/h3>\n<ul>\n<li>Generous open areas for block manipulation<\/li>\n<li>Tool care for edge and split accuracy<\/li>\n<li>Protective storage aids to avoid surface damage<\/li>\n<li>Low-dust cleaning methods to protect sensitive surfaces<\/li>\n<\/ul>\n<h3>Special operations<\/h3>\n<ul>\n<li>Flexible setup for tank cutters and specialized shears<\/li>\n<li>Expanded safety zones where residual hazardous substances may be present<\/li>\n<li>Additional clearance measurement and cleaning procedures<\/li>\n<li>Dedicated containment and ventilation during work on residues<\/li>\n<\/ul>\n<h2>Ergonomics and work organization<\/h2>\n<p>Well-designed workplaces reduce absenteeism and increase quality. Ergonomic working heights and short walking distances are the most effective levers. Tool kitting, standardized fixtures, and clear reach zones minimize strain and setup time.<\/p>\n<h3>Design principles<\/h3>\n<ul>\n<li>Height-adjustable assembly stands and rotatable mounts<\/li>\n<li>Lighting with glare-free, uniform illumination<\/li>\n<li>Color coding for routes, hazard spots, and media points<\/li>\n<li>Standardized tool kits for each equipment type<\/li>\n<li>Anti-fatigue flooring and assistive lifting devices for repetitive tasks<\/li>\n<\/ul>\n<h2>Sustainability and resources<\/h2>\n<p>Resource conservation starts in the machine hall: through durable tools, clean media circuits, and thoughtful waste logistics. Waste heat utilization from compressors and heat recovery from ventilation reduce energy demand; controlled cleaning processes lower media consumption.<\/p>\n<h3>Practical levers<\/h3>\n<ul>\n<li>Filter systems to extend oil service life<\/li>\n<li>Remanufacturing of suitable components with documented history<\/li>\n<li>Separate collection systems for metal, mineral material, and plastics<\/li>\n<li>Energy-efficient drives and lighting<\/li>\n<li>Rainwater use for cleaning and non-potable processes where appropriate<\/li>\n<\/ul>\n<h2>Planning and permitting notes<\/h2>\n<p>Building regulations, occupational safety, and environmental protection set the framework for using a machine hall. These aspects are general and do not replace case-by-case review by authorized authorities. Early coordination with responsible bodies shortens approval cycles and avoids costly redesigns.<\/p>\n<h3>What to focus on in practice<\/h3>\n<ul>\n<li>Proof of load-bearing capacity and fire protection, escape and rescue routes<\/li>\n<li>Evidence of containment and drainage<\/li>\n<li>Noise control toward neighbors and employees<\/li>\n<li>Hazardous material storage with appropriate containers and labeling<\/li>\n<li>Stormwater and spill management concepts with defined response procedures<\/li>\n<\/ul>\n<h2>Practice-oriented checklist for hall equipment<\/h2>\n<p>The following list supports the structured outfitting of a machine hall for demolition and splitting technology.<\/p>\n<ol>\n<li>Structure and floor: load reserves, anchor points, low vibration levels<\/li>\n<li>Lifting equipment: crane runway, rigging, certified load attachments<\/li>\n<li>Media: power supply, hydraulics, compressed air supply, water &#8211; safe and clearly arranged<\/li>\n<li>Test benches: pressure ranges, barriers, measuring equipment, documentation<\/li>\n<li>Safety: extinguishing agents, dust extraction, safety equipment provision, route guidance<\/li>\n<li>Logistics: staging areas, shelving, labeling, material separation<\/li>\n<li>Maintenance: cleaning station, parts washing, lubrication station, spare parts<\/li>\n<li>Organization: training materials, operating instructions, inspection plans<\/li>\n<li>Digital infrastructure: network access at workstations, asset IDs, and data capture<\/li>\n<li>Access control: zoning, visitor guidance, and lock management<\/li>\n<\/ol>\n<h2>Interfaces to equipment and tools<\/h2>\n<p>Device-specific requirements are incorporated during hall planning. For <em>concrete demolition shears<\/em>, stable setup stations and jaw holders are useful. For <em>stone and concrete splitters<\/em>, pressure-stable test connections, secure mounts, and shielding are important. Power units benefit from quiet, low-vibration locations with good accessibility. For steel shears, combination shears, Multi Cutters, and tank cutters, dedicated mounting fixtures enable safe and ergonomic work. Standardized adapter plates and quick-change fixtures reduce setup times and error potential across tool families.<\/p>\n<h2>Quality assurance and traceability<\/h2>\n<p>Traceable maintenance and clear approvals increase operational safety. Digital test records, serial number management, and visual inspection checklists help keep conditions transparent and support decision-making. Turnaround time, first-pass yield at the test bench, and repeat-failure rates serve as practical KPIs for continuous improvement.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A machine hall is the central place where heavy equipment is safely stored, serviced, prepared, and made ready for deployment. In the context of demolition, deconstruction, rock cutting\/processing, and natural stone processing, it serves simultaneously as a workspace, shelter, and logistics hub. Here, hydraulic tools such as concrete demolition shears <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/machine-hall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19424","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Machine Hall for Demolition Equipment &amp; Testing<\/title>\n<meta name=\"description\" content=\"Explore the machine hall \u2713 a hub for heavy equipment storage, maintenance &amp; testing in demolition and deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/machine-hall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Machine Hall for Demolition Equipment &amp; Testing\" \/>\n<meta property=\"og:description\" content=\"Explore the machine hall \u2713 a hub for heavy equipment storage, maintenance &amp; testing in demolition and deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/machine-hall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-27T06:23:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/machine-hall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/machine-hall\",\"name\":\"Machine Hall for Demolition Equipment & Testing\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-08T14:49:13+00:00\",\"dateModified\":\"2026-04-27T06:23:03+00:00\",\"description\":\"Explore the machine hall \u2713 a hub for heavy equipment storage, maintenance & testing in demolition and deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/machine-hall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/machine-hall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/machine-hall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Machine hall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Machine Hall for Demolition Equipment & Testing","description":"Explore the machine hall \u2713 a hub for heavy equipment storage, maintenance & testing in demolition and deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall","og_locale":"en_US","og_type":"article","og_title":"Machine Hall for Demolition Equipment & Testing","og_description":"Explore the machine hall \u2713 a hub for heavy equipment storage, maintenance & testing in demolition and deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-27T06:23:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall","url":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall","name":"Machine Hall for Demolition Equipment & Testing","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-08T14:49:13+00:00","dateModified":"2026-04-27T06:23:03+00:00","description":"Explore the machine hall \u2713 a hub for heavy equipment storage, maintenance & testing in demolition and deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/machine-hall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/machine-hall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Machine hall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19424"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19424\/revisions"}],"predecessor-version":[{"id":26660,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19424\/revisions\/26660"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}