{"id":19421,"date":"2025-11-08T09:29:23","date_gmt":"2025-11-08T08:29:23","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19421"},"modified":"2026-04-25T13:16:03","modified_gmt":"2026-04-25T11:16:03","slug":"manual-demolition-shear","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear","title":{"rendered":"Manual demolition shear"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A manual demolition shear is a hand-held tool used for the controlled loosening, breaking, and removal of concrete, masonry, or component fragments during deconstruction and refurbishment works. It is used wherever <em>precise, low-vibration, and low-noise demolition<\/em> is required &#8211; such as during building strip-out, selective concrete demolition, or in sensitive areas. In practice, the term often refers to both purely mechanical shears with lever action and hand-held, hydraulically assisted shears. In professional projects, manual demolition shears are often combined with additional tools &#8211; for example, with <strong>concrete demolition shears<\/strong>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, or steel shears from the portfolio of Darda GmbH &#8211; to combine material separation, speed, and minimal damage to the structure. When deployed methodically, manual shears help preserve adjacent fabric, support clean material separation, and reduce secondary remediation costs.<\/p>\n<h2>Definition: What is meant by a manual demolition shear?<\/h2>\n<p>A manual demolition shear is a <em>hand-held shearing tool<\/em> that applies locally confined crushing or squeezing forces to mineral construction materials (concrete, brick, calcium silicate) in order to dismantle components piece by piece. A key characteristic is the <strong>targeted transfer of force onto a small contact area<\/strong>, enabling controlled breakout, nibbling of edges, and exposure of embedded materials (e.g., reinforcement). Depending on the design, force is provided purely mechanically (lever, eccentric, screw) or via compact hydraulic components supplied by a hand pump or a hydraulic power pack. In contrast to large-scale attachments, manual demolition shears work <em>close to the hand, without a carrier machine<\/em> and are therefore particularly suitable for interiors, hard-to-reach areas, and scenarios with strict emission limits. In selective demolition, they are used to separate materials in a controlled manner so that recycling routes remain open and interfaces for subsequent trades are cleanly prepared.<\/p>\n<h2>Design, drive types, and operating principles<\/h2>\n<p>The basic design consists of two jaws (fixed and moving), a force transmission system, and a hand or holding area. The jaw geometry (toothed, flat, with liner ribs) scores, crushes, or locally pre-damages the material until it breaks. Two drive types have become established:<\/p>\n<ul>\n<li><strong>Mechanical shear:<\/strong> Force via lever\/screw mechanics. Advantages: very light, independent of media, minimal setup time. Limits: restricted breaking force, higher physical effort for the operator, limited effectiveness in high-strength concrete. Typical use: fine adjustments, light masonry, finishing work around edges.<\/li>\n<li><strong>Hydraulically assisted shear:<\/strong> Force via an integrated cylinder; supplied by a hand pump or <em>hydraulic power pack<\/em>. Advantages: high, reproducible pressing forces; finely controllable; suitable for denser or more heavily reinforced components. Limits: slightly higher system weight; media handling (hose routing, couplings). In practice, pressure limitation and return control increase repeatability and protect the substrate.<\/li>\n<\/ul>\n<p>Interchangeable jaw sets and surface textures expand the application range, while robust bearings and protected hose routing contribute to durability and reliable force transmission.<\/p>\n<h2>Typical applications and limits<\/h2>\n<p>The strengths of the manual demolition shear are evident wherever <em>controlled, selective removal<\/em> takes precedence over mass output. Typical use cases:<\/p>\n<ul>\n<li><strong>Strip-out and cutting:<\/strong> Opening wall and slab areas, creating installation chases, nibbling edges in door\/window zones, removing damaged plaster\/brick layers without large-scale collateral damage.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>:<\/strong> Locally breaking concrete cover, setting fracture lines, exposing reinforcement in preparation for <em>steel shears<\/em>, <em>combination shears<\/em>, or <em>Multi Cutters<\/em> from Darda GmbH.<\/li>\n<li><strong>Rock work and tunneling:<\/strong> Limited scoring of breakout ridges or shells; for systematic rock removal, <strong>stone split cylinders<\/strong> and <strong>stone and concrete splitters<\/strong> are the practical choice.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Occasional application on already weakened joints; for planned extraction, splitting methods with split cylinders are often clearly superior.<\/li>\n<li><strong>Special applications:<\/strong> Work in sensitive zones (hospitals, laboratories, heritage sites) where <em>dust, noise, and vibration<\/em> must be minimized.<\/li>\n<li><strong>Structural repair interfaces:<\/strong> Finishing of break lines for patching systems, controlled exposure of substrates for bonding, and preparation of anchorage zones.<\/li>\n<\/ul>\n<p>Limits arise with very high concrete strengths, large component thicknesses, or dense reinforcement meshes. Here, combining with <strong>concrete demolition shears<\/strong> or pre-splitting with <strong>stone and concrete splitters<\/strong> is recommended to deliberately reduce component strength. Where emissions must be extremely low, staged sequences with breaks for dust extraction and cleaning maintain quality and compliance.<\/p>\n<h2>Differentiation and interplay with concrete demolition shears and stone and concrete splitters<\/h2>\n<p>The terminology overlaps in everyday usage. Practically speaking:<\/p>\n<ul>\n<li><strong>Manual demolition shear:<\/strong> Hand-held tool for localized, controlled work; highly flexible in existing structures; ideal for pre- and finishing tasks.<\/li>\n<li><strong>Concrete demolition shears (hand-held):<\/strong> Hydraulically acting shears with high pressing force for low-vibration, low-noise crushing of concrete components. They are central in deconstruction when performance and precision must come together.<\/li>\n<li><strong>Stone and concrete splitters:<\/strong> Generate defined splitting forces in a drill hole through hydraulic spreading; massive cross-sections can be separated <em>without explosives<\/em> &#8211; ideal for special deconstruction, tunneling, and rock work.<\/li>\n<\/ul>\n<p>In many projects, the <strong>interplay<\/strong> is decisive: The manual demolition shear sets the fracture line and opens the cover, the concrete demolition shear disassembles the component, and the splitter handles large or heavily reinforced areas. In addition, <em>steel shears<\/em> or <em>combination shears<\/em> separate metal components, while a <em>hydraulic power pack<\/em> can supply several of these tools. Clear sequencing and a documented drilling pattern for splitting accelerate progress and stabilize quality.<\/p>\n<h2>Selection criteria: sizing, jaw geometry, and ergonomics<\/h2>\n<ul>\n<li><strong>Material and strength:<\/strong> Lower pressures are sufficient for brick\/calcium silicate; for reinforced concrete, hydraulic assistance with high peak pressing force is advisable.<\/li>\n<li><strong>Jaw opening and depth:<\/strong> Must match component thickness; a larger opening expands the application range but often increases weight.<\/li>\n<li><strong>Jaw geometry:<\/strong> Toothed jaws for nibbling and crack initiation; flatter profiles for surface crushing and controlled removal along edges.<\/li>\n<li><strong>Weight and balance:<\/strong> Low system weight and well-balanced ergonomics reduce fatigue, especially for overhead and ladder work.<\/li>\n<li><strong>Hydraulic interface:<\/strong> Check compatibility with <em>hydraulic power packs<\/em>, couplings, hose lengths, and pressure ranges.<\/li>\n<li><strong>Environmental requirements:<\/strong> Noise, dust, and vibration limits from clients or authorities; manual methods score with low emissions.<\/li>\n<li><strong>Material separation:<\/strong> With a high metal fraction, combining with <em>steel shears<\/em>, <em>combination shears<\/em>, or <em>Multi Cutters<\/em> from Darda GmbH is appropriate.<\/li>\n<li><strong>Access and reach:<\/strong> Clearance, working height, and approach paths determine feasible tool sizes and hose lengths.<\/li>\n<li><strong>Changeover and accessories:<\/strong> Quick jaw change, protective covers, and suspension solutions improve uptime and handling.<\/li>\n<\/ul>\n<h2>Workflow: controlled removal step by step<\/h2>\n<ol>\n<li><strong>Component assessment:<\/strong> Check material, thickness, reinforcement, load paths, and adjacent components; note supports and service routing.<\/li>\n<li><strong>Preparation:<\/strong> Secure the work area, set up extraction\/dust suppression, provide personal protective equipment.<\/li>\n<li><strong>Setting the fracture line:<\/strong> Use the manual demolition shear to nibble edges or create local weakening; if required, pre-drill for splitting techniques. Mark the intended break path to guide crack propagation.<\/li>\n<li><strong>Incremental crushing:<\/strong> Work in small sections; observe crack propagation and steer its direction. Maintain stable body positioning and avoid twisting loads on the jaws.<\/li>\n<li><strong>Material separation:<\/strong> Cut exposed reinforcement with <em>steel shears<\/em> or <em>Multi Cutters<\/em>; for larger cross-sections, add a concrete demolition shear or a splitter. Keep cuts flush where subsequent coatings or reinforcements are planned.<\/li>\n<li><strong>Disposal\/logistics:<\/strong> Keep fractions (concrete, masonry, steel) separate; consider load capacities and transport routes.<\/li>\n<li><strong>Final inspection:<\/strong> Dress component edges, document surface condition, and clean the work area. Record key parameters for quality assurance and repeatability.<\/li>\n<\/ol>\n<h2>Safety, health, and environment<\/h2>\n<p>Manual demolition shears operate with low vibration and reduced noise emissions. Nevertheless, general protective measures must be observed: suitable protective equipment, a stable working position, controlled hose routing for hydraulics, and protection against pinch points. Dust must be minimized by extraction or wetting; good ventilation is especially useful indoors. Requirements regarding working hours, noise, and waste separation depend on the project context and vary locally; such regulations should be checked in advance and incorporated into the work plan. Observe manufacturer specifications for load capacity and tool limits; inspection intervals and visual checks increase operational safety. Attention to hand-arm vibration exposure, proper lifting techniques for system components, and spark-free separation methods support compliance with typical site requirements.<\/p>\n<h2>Rebar management and material separation<\/h2>\n<p>In reinforced concrete deconstruction, <em>exposing and cutting the reinforcement<\/em> is a key step. The manual demolition shear weakens the concrete cover; then <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/strong>, <strong>combination shears<\/strong>, or <strong>Multi Cutters<\/strong> from Darda GmbH cut the rebar. This enables clean material separation and improves recyclability. In plant deconstruction or tank openings, mineral portions are prepared with the shear; metallic components are processed with <em>steel shears<\/em>. For specialized tasks on tanks and vessels, a <strong>tank cutter<\/strong> is available depending on material and safety conditions. Smooth, burr-minimized cuts simplify subsequent handling, while avoiding uncontrolled bending reduces microcracking in adjacent concrete.<\/p>\n<h2>Cost-effectiveness and quality criteria<\/h2>\n<p>Cost-effectiveness results from <em>low setup time<\/em>, high maneuverability, and the ability to avoid damage to existing structures. Important for a quality outcome are:<\/p>\n<ul>\n<li>clean, directed fracture edges without uncontrolled collateral damage,<\/li>\n<li>a reproducible sequence with documented progress,<\/li>\n<li>appropriate pacing between breaking, separation, and removal,<\/li>\n<li>a suitable combination with <strong>concrete demolition shears<\/strong> and <strong>stone and concrete splitters<\/strong> to cover performance peaks.<\/li>\n<li>transparent performance tracking with defined sections and verifiable acceptance points.<\/li>\n<\/ul>\n<p>Limits appear with very tough, high-strength concretes, thick-walled components, or closely spaced reinforcement. Here, combining splitting and crushing techniques creates a robust, predictable performance chain. Early test sections reduce risk and help calibrate the chosen method to site constraints.<\/p>\n<h2>Maintenance, care, and service life<\/h2>\n<ul>\n<li><strong>Jaws and cutting edges:<\/strong> Regular visual checks for wear, cracks, and chipping; regrind or replace in good time.<\/li>\n<li><strong>Bearings and joints:<\/strong> Lubricate according to manufacturer specifications; check for play and wear.<\/li>\n<li><strong>Hydraulics (if present):<\/strong> Inspect hoses, seals, and couplings; ensure clean, strain-free routing; observe pressure range and oil quality; ensure suitable supply via <em>hydraulic power packs<\/em>.<\/li>\n<li><strong>Documentation:<\/strong> Record inspection and maintenance intervals; log stresses encountered during the project.<\/li>\n<li><strong>Fasteners and guards:<\/strong> Tighten screws\/bolts to specification and check protective covers for integrity.<\/li>\n<li><strong>Storage and corrosion protection:<\/strong> Clean after use, protect contact surfaces, and store dry to prevent corrosion and sticking of moving parts.<\/li>\n<\/ul>\n<h2>Practice and planning in deconstruction<\/h2>\n<p>In project planning, the manual demolition shear is scheduled wherever <strong>precise, localized intervention<\/strong> is required: exposing service routes, adjusting openings, finishing at connection details, or initiating splitting and crushing chains. For <em>concrete demolition and special deconstruction<\/em>, it forms the finely controllable start of a process chain, to which <strong>concrete demolition shears<\/strong>, <strong>stone and concrete splitters<\/strong>, and, if needed, <strong>steel shears<\/strong> or <strong>Multi Cutters<\/strong> are added. In <em>strip-out projects<\/em>, it supports low-noise site operations, while in <em>rock work and tunneling<\/em> it primarily covers preparatory tasks. The goal remains the same: <em>controlled separation<\/em> with high job safety, good material separation, and minimal impact on the surroundings. Method statements that define emissions, acceptance criteria, and interfaces with adjoining trades ensure predictable outcomes and streamlined handovers.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A manual demolition shear is a hand-held tool used for the controlled loosening, breaking, and removal of concrete, masonry, or component fragments during deconstruction and refurbishment works. It is used wherever precise, low-vibration, and low-noise demolition is required &#8211; such as during building strip-out, selective concrete demolition, or in sensitive <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19421","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Manual Demolition Shear | Concrete &amp; Masonry Tool<\/title>\n<meta name=\"description\" content=\"Achieve precise, low-vibration removal with a manual demolition shear \u2713 hand-held control for concrete &amp; masonry.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Manual Demolition Shear | Concrete &amp; Masonry Tool\" \/>\n<meta property=\"og:description\" content=\"Achieve precise, low-vibration removal with a manual demolition shear \u2713 hand-held control for concrete &amp; masonry.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T11:16:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/manual-demolition-shear\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/manual-demolition-shear\",\"name\":\"Manual Demolition Shear | Concrete & Masonry Tool\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-08T08:29:23+00:00\",\"dateModified\":\"2026-04-25T11:16:03+00:00\",\"description\":\"Achieve precise, low-vibration removal with a manual demolition shear \u2713 hand-held control for concrete & masonry.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/manual-demolition-shear#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/manual-demolition-shear\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/manual-demolition-shear#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Manual demolition shear\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Manual Demolition Shear | Concrete & Masonry Tool","description":"Achieve precise, low-vibration removal with a manual demolition shear \u2713 hand-held control for concrete & masonry.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear","og_locale":"en_US","og_type":"article","og_title":"Manual Demolition Shear | Concrete & Masonry Tool","og_description":"Achieve precise, low-vibration removal with a manual demolition shear \u2713 hand-held control for concrete & masonry.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T11:16:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear","url":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear","name":"Manual Demolition Shear | Concrete & Masonry Tool","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-08T08:29:23+00:00","dateModified":"2026-04-25T11:16:03+00:00","description":"Achieve precise, low-vibration removal with a manual demolition shear \u2713 hand-held control for concrete & masonry.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/manual-demolition-shear#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Manual demolition shear"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19421"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19421\/revisions"}],"predecessor-version":[{"id":26640,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19421\/revisions\/26640"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}