{"id":19418,"date":"2025-11-08T16:08:18","date_gmt":"2025-11-08T15:08:18","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19418"},"modified":"2026-04-25T08:45:03","modified_gmt":"2026-04-25T06:45:03","slug":"lean-mixture-additive","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive","title":{"rendered":"Lean mixture additive"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Lean mixture additives are aggregates that deliberately &#8220;lean out&#8221; plastic binders and building materials, reducing their plasticity and tendency to shrink while controlling the internal structure. The topic is relevant to deconstruction, natural stone processing, and special foundation engineering because the degree of leanness, particle shape, and grading curve influence fracture paths, crack propagation, and tool loading. When working with concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a> from Darda GmbH, the right understanding of lean mixture additives leads to more precise planning, more efficient work steps, and more predictable member behavior. In practice, a well-characterized level of leanness supports safer sequencing, lower tool wear, and cleaner separation joints.<\/p>\n<h2>Definition: What is meant by a lean mixture additive?<\/h2>\n<p>A lean mixture additive is a mineral or ceramic aggregate (e.g., sand, chippings, crusher sand, chamotte\/grog) that is mixed into a binder or composite material to <em>&#8220;de-fat&#8221; excess binder<\/em>. The goal is to reduce shrinkage, internal stresses, and water demand, while purposefully adjusting porosity and strength. This is common in ceramic material systems (clay, loam, chamotte), in mortars (lime, cement, and clay plasters), and in lean concretes. In contrast to general aggregates, lean mixture additives focus on the <strong>reduction of plasticity<\/strong> and the stabilization of the drying and setting process. For demolition, this means: materials with a high proportion of lean mixture additives often exhibit more brittle fracture patterns and more defined crack paths, which influences the selection of hydraulic tools.<\/p>\n<p>In materials science, <em>lean<\/em> mixtures contrast with <em>rich<\/em> mixes that contain high binder content and display greater cohesiveness. In ceramics, comparable additives are also known as <em>tempers<\/em>. The objective is a controlled matrix-aggregate interaction that limits shrinkage and warping while achieving the required strength, durability, and predictable failure behavior.<\/p>\n<h2>Material groups and mechanisms of lean mixture additives<\/h2>\n<p>Lean mixture additives act via particle geometry, surface texture, and grading curve. They regulate contact areas in the matrix, reduce capillary forces, and redistribute stresses. Key groups:<\/p>\n<ul>\n<li>Mineral: natural or crushed sand, chippings, grit, lightweight sands. Effect: reduced plasticity, lower water demand, controlled pore structure.<\/li>\n<li>Ceramic: chamotte (fired, ground clay), grog. Effect: low shrinkage, thermal stability, brittle fracture behavior.<\/li>\n<li>Recyclates: crusher sand from masonry, finely ground brick or concrete powder. Effect: resource conservation; depending on fineness, potential pozzolanic side reactions.<\/li>\n<li>Special fillers: rock flours (basalt flour, limestone flour). Effect: filler action, grading curve adjustment, surface densification.<\/li>\n<\/ul>\n<p>Selection criteria typically include <strong>hardness and abrasiveness<\/strong> of the additive mineral, <strong>particle angularity<\/strong> and surface roughness, <strong>absorption capacity<\/strong> that influences water demand, and <strong>compatibility<\/strong> with the binder chemistry and any supplementary cementitious reactions.<\/p>\n<h2>Influence on material properties and member behavior<\/h2>\n<p>The dosage and grading of lean mixture additives change how members behave under load and during mechanical intervention. Two practical consequences are increased <em>notch sensitivity<\/em> and reduced <em>energy absorption<\/em> under impact, both of which favor faster crack initiation under concentrated loads.<\/p>\n<h3>Plasticity, shrinkage, and crack tendency<\/h3>\n<p>Higher leanness reduces water demand and shrinkage during drying or setting. This decreases uncontrolled hairline cracking but can promote a <em>more brittle<\/em> behavior: cracks initiate more easily, yet run in a more directed manner, often along particle contacts. Temperature and moisture gradients amplify these effects, making curing history and current moisture state relevant unknowns in deconstruction.<\/p>\n<h3>Compressive, flexural tensile, and shear strength<\/h3>\n<p>With increasing leanness, the strength of the binder matrix decreases while the load transfer through the aggregate skeleton increases. The result is often higher compressive load capacity with good interlock, but lower flexural tensile and shear strengths. For demolition methods this means splitting and cutting forces trigger cracks more easily, but fracture edges may spall. Additionally, higher leanness typically increases <strong>rate sensitivity<\/strong> and <strong>notch severity<\/strong>, so slow, controlled loading can reduce undesirable secondary fractures.<\/p>\n<h3>Microstructure, porosity, and water uptake<\/h3>\n<p>Well-graded curves close pores; coarse, uniform gradings increase porosity. Porous, highly lean systems do not dissipate stress peaks as well and fail more locally. This affects the initiation strategy for concrete demolition shears and the wedge positioning for stone and concrete splitters. Saturated vs. dry conditions change friction at grain contacts, influencing tool response, dust generation, and crack cleanliness.<\/p>\n<h2>Relevance for demolition and deconstruction with hydraulic tools<\/h2>\n<p>The degree of leanness is a planning parameter for selecting the tool, initiation points, and cut sequence. It determines how quickly a crack initiates, how it runs, and what remaining cross-sections require rework.<\/p>\n<ul>\n<li><strong>Tool choice<\/strong>: preference for splitting or shearing strategies where brittle, directed cracks can be exploited.<\/li>\n<li><strong>Initiation strategy<\/strong>: use of notches, pilot cuts, and pre-drilled holes to guide fractures along desired planes.<\/li>\n<li><strong>Process parameters<\/strong>: calibration of hydraulic pressure, stroke rate, and hold times to match brittleness and aggregate hardness.<\/li>\n<\/ul>\n<h3>Concrete demolition shears: crack initiation and reinforcement influence<\/h3>\n<p>In lean, weakly bound concretes or masonry, concrete demolition shears quickly create initial cracks. Coarser, harder aggregates (e.g., quartzitic chippings) can increase wear on cutting edges and influence the local crack path. In reinforced sections, reinforcement bridges brittle fractures promoted by leanness; the shear must therefore be positioned so that the steel load-bearing behavior is addressed in a controlled way. Hydraulic power units provide constant working pressure; the stroke speed must be tuned to the microstructure to minimize spalling. Consistent jaw alignment, staged penetration, and temporary unloading reduce secondary chipping and extend edge life.<\/p>\n<h3>Stone and concrete splitters: wedge technique in a lean matrix<\/h3>\n<p>Splitters apply wedge forces into members or rock. In highly lean masonry or lean concrete foundations, splits preferentially follow weaker particle-bond zones. This enables predictable separation joints, provided the drilling pattern, wedge direction, and edge distances are aligned with particle shape and grading curve. Stone splitting cylinders benefit from defined porosity because energy flows into directed crack paths rather than plastic deformation. Maintaining adequate hole spacing and sufficient back cover minimizes uncontrolled edge blow-out.<\/p>\n<h3>Combination shears, multi cutters, and steel shears<\/h3>\n<p>In composite constructions alternating between lean masonry, concrete, and steel sections, versatile tools are advantageous. Leanness facilitates detachment of mineral layers; steel remains as a continuous structure for steel shears or multi cutters. Cut sequence and transfer points should be chosen so that brittle spalling proceeds in a controlled manner. A stepwise approach from brittle to ductile elements with intermediate securing reduces load reversals and unexpected releases.<\/p>\n<h3>Tank cutters and special operations<\/h3>\n<p>For linings made of refractory bricks with a chamotte content, leanness results in high thermal cycling resistance and brittle fracture. During the deconstruction of such linings, <strong>crack control<\/strong> via targeted notches, starter cuts, and moderately applied wedge forces is sensible before metallic components are separated with tank cutters. Dust from refractory materials should be managed with extraction and wetting compatible with the site requirements.<\/p>\n<h2>Practice: identifying and assessing the degree of leanness on site<\/h2>\n<p>A quick assessment helps adapt tools and parameters without waiting for lab results:<\/p>\n<ol>\n<li>Visual inspection: aggregate content, particle shape (rounded vs. crushed), visible pores, binder films.<\/li>\n<li>Surface test: draw a scratch awl or trowel across the surface &#8211; mealy, sandy detachment indicates higher leanness.<\/li>\n<li>Sound and hammer test: a brittle, clearer sound suggests a dense aggregate skeleton with lower plasticity.<\/li>\n<li>Observe drilling dust: coarse, dry cuttings indicate pronounced leanness; fine, &#8220;smearing&#8221; dust points to binder-rich material.<\/li>\n<li>Trial cut with a concrete demolition shear: crack propagation, edge spalling, and breakout depth provide clues about brittleness and aggregate interlock.<\/li>\n<li>Moisture response: light misting on a fresh fracture face &#8211; rapid uptake with little darkening indicates open porosity typical of lean systems.<\/li>\n<li>Hand specimen break: controlled bending or splitting of small fragments reveals notch sensitivity and preferred crack planes along grain contacts.<\/li>\n<\/ol>\n<h2>Grading, grading curve, and dosage<\/h2>\n<p>The grading curve governs packing density and pore structure. Multi-stage grading reduces voids and allows for lower binder and water contents. Dosage principles must be defined project-specifically; in deconstruction the primary goal is to understand existing mixes:<\/p>\n<ul>\n<li>Loam and clay building materials: higher chamotte or sand contents reduce shrinkage cracks but produce more brittle fractures.<\/li>\n<li>Masonry and plaster mortars: fine to medium sands lower plasticity, influence adhesive tensile bond strength, and can be worked with lower water demand.<\/li>\n<li>Lean concrete: higher aggregate-to-binder ratios result in thinner binder films at grain boundaries, which can facilitate crack initiation with splitting or shear tools.<\/li>\n<\/ul>\n<p>Typical pitfalls include <em>over-sanded<\/em> mixes with insufficient fines that loosen bond at grain contacts, <em>gap-graded<\/em> blends that raise porosity, and <em>highly absorptive<\/em> fines that unexpectedly increase water demand. Field proxies such as unit weight, rebound behavior, and drilling resistance trends help triangulate the effective grading and leanness.<\/p>\n<h2>Impact on process planning in the application areas<\/h2>\n<p>The degree of leanness affects cycle time, sequence, and tool selection in typical applications.<\/p>\n<ul>\n<li><strong>Pre-weakening<\/strong>: scoring, shallow kerfs, or small diameter holes to steer crack paths.<\/li>\n<li><strong>Staging<\/strong>: alternating load application and short dwell phases for clean propagation with fewer micro-spalls.<\/li>\n<li><strong>Temporary support<\/strong>: shoring where brittle detachment could transfer loads abruptly.<\/li>\n<li><strong>Waste handling<\/strong>: planning for fragment size distribution typical of brittle failure to optimize logistics.<\/li>\n<\/ul>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In lean concretes with hard aggregates, the crack initiation phase with concrete demolition shears is often short, but rework on remaining cross-sections must be carefully planned to avoid unintended spalling. Splitters benefit from defined drilling patterns that guide crack paths along particle contacts. Where edge integrity is required, pre-cutting or isolating stress concentrators reduces secondary damage.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In masonry with high sand or brick powder content, plaster and facing layers break off in a brittle manner. Cut edges at openings should be pre-scored so that concrete demolition shears or combination shears work in a controlled way and edge spalling remains low. Small relief holes at corner radii can further reduce tension concentrations.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In rock, there is no &#8220;leanness&#8221; in the construction-chemical sense, yet fabric, particle bonding, and matrix content act similarly. In clastic, weakly cemented rocks (analogous to a &#8220;lean&#8221; composite), splitting forces are efficiently converted into directed cracks. Stone and concrete splitters can then be positioned with lower wedge pressure. Bedding, joints, and moisture conditions should be mapped to avoid off-plane propagation.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In sedimentary natural stones with pronounced particle\/matrix structures, fractures preferentially follow weaker binder zones. Wedge direction should utilize the natural bedding to produce smooth separation faces and minimize rework with stone splitting cylinders. Short test splits on offcuts help confirm the intended crack plane and needed wedge force.<\/p>\n<h3>Special operations<\/h3>\n<p>Refractory linings with a chamotte fraction require moderate energy input because brittle fractures can occur abruptly. A combination of pre-scoring, low wedge progression, and subsequent shear work provides control over removal.<\/p>\n<h2>Tool loading and wear<\/h2>\n<p>Hard, angular aggregates (e.g., quartz, basalt) increase wear on cutting edges and wedge faces. Adjusted hydraulic pressures, wedge lubrication, and controlled stroke sequences protect components. For concrete demolition shears, an inspection of the cutting edges is advisable after interventions in lean, quartzitic mixes.<\/p>\n<ul>\n<li><strong>Edge geometry<\/strong>: maintain appropriate cutting angles to limit ploughing in abrasive aggregates.<\/li>\n<li><strong>Inspection intervals<\/strong>: shorten checks when working in highly lean, hard-aggregate matrices; repair minor nicks early.<\/li>\n<li><strong>Friction control<\/strong>: keep holes clean and wedges lubricated to prevent galling and reduce energy loss.<\/li>\n<\/ul>\n<h2>Raw materials and environmental topics<\/h2>\n<p>Recycled lean mixture additives such as crusher sands from brick or concrete demolition support closed-loop recycling. During deconstruction, watch for possible contaminants. Dust emissions must be reduced by appropriate measures; this should be planned in general and adapted to local requirements. Selective separation of mineral streams and documentation of suspected impurities improve downstream recycling and reduce disposal costs.<\/p>\n<h2>Occupational safety and general notes<\/h2>\n<p>Brittle, lean systems can fail suddenly. Safety distances, shoring, and an orderly cut sequence must be observed. Statements regarding standards and limit values must always be verified for the specific project; the information presented here is general in nature.<\/p>\n<ul>\n<li>Use appropriate PPE including eye, respiratory, and hand protection matched to dust and fragment risk.<\/li>\n<li>Establish exclusion zones and shields against projectile fragments along intended crack paths.<\/li>\n<li>Verify hydraulic line integrity and attachments; control stored energy and pinch points during staging.<\/li>\n<li>Coordinate wet methods and extraction to balance dust control and structural visibility.<\/li>\n<\/ul>\n<h2>Documentation and quality assurance in the project<\/h2>\n<p>Recording the degree of leanness, aggregate type, and visual findings facilitates the choice of concrete demolition shears or stone and concrete splitters as well as the coordination of hydraulic power units. Photos of fracture faces, notes on crack propagation, and details of drilling and wedge geometry improve reproducibility and support planning for subsequent cycles.<\/p>\n<ul>\n<li>Describe aggregate mineralogy, angularity, and apparent grading; note moisture condition.<\/li>\n<li>Classify observed brittleness and notch sensitivity with consistent terminology.<\/li>\n<li>Log tool parameters: pressures, stroke rates, wedge sizes, hole spacing, and dwell times.<\/li>\n<li>Capture environmental controls used and any wear events for continuous optimization.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Lean mixture additives are aggregates that deliberately &#8220;lean out&#8221; plastic binders and building materials, reducing their plasticity and tendency to shrink while controlling the internal structure. The topic is relevant to deconstruction, natural stone processing, and special foundation engineering because the degree of leanness, particle shape, and grading curve influence <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19418","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lean Mixture Additive for Concrete, Mortars &amp; Clay<\/title>\n<meta name=\"description\" content=\"Guide to lean mixture additive in construction materials &amp; demolition \u2713 reduce shrinkage, control cracks, choose tools.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lean Mixture Additive for Concrete, Mortars &amp; Clay\" \/>\n<meta property=\"og:description\" content=\"Guide to lean mixture additive in construction materials &amp; demolition \u2713 reduce shrinkage, control cracks, choose tools.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T06:45:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-mixture-additive\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-mixture-additive\",\"name\":\"Lean Mixture Additive for Concrete, Mortars & Clay\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-08T15:08:18+00:00\",\"dateModified\":\"2026-04-25T06:45:03+00:00\",\"description\":\"Guide to lean mixture additive in construction materials & demolition \u2713 reduce shrinkage, control cracks, choose tools.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-mixture-additive#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-mixture-additive\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-mixture-additive#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lean mixture additive\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lean Mixture Additive for Concrete, Mortars & Clay","description":"Guide to lean mixture additive in construction materials & demolition \u2713 reduce shrinkage, control cracks, choose tools.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive","og_locale":"en_US","og_type":"article","og_title":"Lean Mixture Additive for Concrete, Mortars & Clay","og_description":"Guide to lean mixture additive in construction materials & demolition \u2713 reduce shrinkage, control cracks, choose tools.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T06:45:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive","url":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive","name":"Lean Mixture Additive for Concrete, Mortars & Clay","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-08T15:08:18+00:00","dateModified":"2026-04-25T06:45:03+00:00","description":"Guide to lean mixture additive in construction materials & demolition \u2713 reduce shrinkage, control cracks, choose tools.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-mixture-additive#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Lean mixture additive"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19418","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19418"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19418\/revisions"}],"predecessor-version":[{"id":26630,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19418\/revisions\/26630"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}