{"id":19416,"date":"2025-11-07T13:32:21","date_gmt":"2025-11-07T12:32:21","guid":{"rendered":"https:\/\/www.darda.de\/lean-channel"},"modified":"2026-04-25T15:49:03","modified_gmt":"2026-04-25T13:49:03","slug":"lean-channel","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel","title":{"rendered":"Lean channel"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The <strong>lean channel<\/strong> is a proven drainage and stabilization element in road and civil engineering. It is produced on site from lean concrete, ensures the safe conveyance of surface and percolation water, and stabilizes adjacent pavements, curbs, or slopes. In existing facilities, lean channels are frequently rehabilitated or deconstructed &#8211; for example as part of <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a><\/em> as well as during the renewal of surfacings. Controlled, low-vibration processing of concrete is central here; in professional practice, <strong>concrete demolition shears<\/strong> as well as <strong>hydraulic wedge splitters<\/strong> from Darda GmbH are used. In technical literature and practice, lean channels are also referred to as cast-in-place drainage channels or side ditches when arranged longitudinally along traffic areas.<\/p>\n<h2>Definition: What is meant by a lean channel?<\/h2>\n<p>A lean channel is a channel or bedding produced in cast-in-place construction from <em>lean concrete<\/em> (low cement content, relatively dry consistency). It forms a water-conveying profile &#8211; usually a trough or trapezoid &#8211; and is arranged along roadway edges, at the toe of slopes, next to support structures, or as backfill behind curbs. The aim is the orderly collection and discharge of stormwater, the reduction of erosion, and the distribution of loads under adjacent layers. Lean channels are used in road and pathway construction, on industrial areas, on slopes, and in tunnel structures as side ditches. Unlike open earth ditches or prefabricated gutters, the geometry and bearing function are created in situ and can be adapted to the available corridor and hydraulic demand.<\/p>\n<h2>Configuration and cross-sectional shapes<\/h2>\n<p>Lean channels are installed to the correct position and grade into a prepared formation. The channel profile depends on hydraulic loading, construction width, and the adjacent structure. Surface texture and joint layout influence roughness and self-cleaning; connections to inlets and curb units must be detailed to avoid turbulence and local erosion.<\/p>\n<ul>\n<li>Trapezoidal channel: universal, easy to produce, insensitive to edge spalling.<\/li>\n<li>Triangular\/fillet profile: space-saving along curbs or walls.<\/li>\n<li>Semi-circular profile: favorable for self-cleaning with low dirt loads.<\/li>\n<li>Trough-shaped design: wide, shallow conveyance on yards and industrial areas.<\/li>\n<\/ul>\n<h2>Materials: Lean concrete for channels<\/h2>\n<p>Lean concrete is a concrete-like construction material with a reduced binder content and a well-graded aggregate. It can be placed earth-moist, compacted in layers, and hardens into a sufficiently compression-resistant, water-resistant body. For durability, a grading curve with low voids and adequate fines is advantageous; entrained air may be specified under freeze-thaw exposure with de-icing salts.<\/p>\n<h3>Key requirements<\/h3>\n<ul>\n<li>Sufficient compressive strength and abrasion resistance for the intended use.<\/li>\n<li>Frost and de-icing salt resistance under exposure to weather.<\/li>\n<li>Dimensionally stable, low-cracking surface through suitable grading curve and compaction.<\/li>\n<li>Functional connection to base layers, curb restraint, and inlets.<\/li>\n<li>If necessary, a capillary break layer or geotextile to separate from the subgrade.<\/li>\n<\/ul>\n<h3>Mix design considerations<\/h3>\n<ul>\n<li>Target water-cement ratio in the low range appropriate for earth-moist placement; avoid segregation while ensuring compactability.<\/li>\n<li>Maximum aggregate size coordinated with the smallest cross-sectional radius and cover to embedded parts.<\/li>\n<li>Air-entrainment and supplementary cementitious materials as required by exposure; verify compatibility with local aggregates.<\/li>\n<li>Use of moisture-adjusted batching and on-site re-checks to maintain consistent workability and density.<\/li>\n<\/ul>\n<h2>Planning and design in road and pathway construction<\/h2>\n<p>The hydraulic performance of a lean channel is determined by its cross-section, surface roughness, and longitudinal slope. A continuous gradient, short flow paths to inlets, and carefully designed transitions are essential. With adjacent pavements (pavers, asphalt, concrete slabs), the channel also provides edge stability and reduces washout. Typical design slopes range from approximately 0.5% to 2% depending on the expected runoff and permissible ponding; where gradients flatten, local deepening or additional inlets help maintain conveyance.<\/p>\n<h3>Typical installation locations<\/h3>\n<ul>\n<li>Roadway edges and medians with limited installation depth.<\/li>\n<li>Slope toes in cut sections for erosion control.<\/li>\n<li>Backfill and restraint for curbs within paved areas.<\/li>\n<li>Industrial and storage areas for linear drainage.<\/li>\n<li>Side ditches in tunnels for collecting and guiding water.<\/li>\n<\/ul>\n<h3>Hydraulic and geometric design tips<\/h3>\n<ul>\n<li>Coordinate cross-section and roughness with anticipated runoff, debris load, and maintenance strategy to support self-cleaning.<\/li>\n<li>Limit backwater effects at inlets by providing smooth, aligned transitions and adequate freeboard.<\/li>\n<li>Use consistent longitudinal gradients; avoid reverse slopes and kinks that cause ponding.<\/li>\n<li>Define joint spacing and crack inducers to control shrinkage while preserving hydraulic function.<\/li>\n<li>Detail interfaces to pavements and curbs with load transfer or restraint where edge stability is required.<\/li>\n<\/ul>\n<h2>Construction: steps on site<\/h2>\n<ol>\n<li>Setting out and elevation control: define alignment, cross-section, and gradient.<\/li>\n<li>Earthworks and formation: load-bearing, true-to-profile subgrade without soft spots.<\/li>\n<li>Base layer: if required frost protection or crushed stone base, even and compacted.<\/li>\n<li>Formwork\/profiling: gauges or formwork to achieve the target profile.<\/li>\n<li>Placing lean concrete: earth-moist, in layers, with uniform compaction.<\/li>\n<li>Gradient and profile control: immediate correction in case of deviations.<\/li>\n<li>Surface finishing: smooth or lightly roughen depending on use.<\/li>\n<li>Curing: keep moist to protect against early shrinkage and cracking.<\/li>\n<li>Joints\/connections: orderly transitions to inlets, grates, and curbs.<\/li>\n<\/ol>\n<h3>Quality assurance<\/h3>\n<ul>\n<li>Measurement of longitudinal gradient and cross-sectional geometry.<\/li>\n<li>Verification of evenness and channel alignment without water ponding.<\/li>\n<li>Documentation of placement conditions and curing.<\/li>\n<li>Compressive strength checks using specimens if required.<\/li>\n<\/ul>\n<h3>Execution tips<\/h3>\n<ul>\n<li>Protect fresh work from precipitation, direct sun, and frost; adapt curing to weather.<\/li>\n<li>Compact in lifts coordinated with the cross-section to avoid honeycombing at edges.<\/li>\n<li>Predefine interfaces to existing structures to prevent uncontrolled cracking and leakage paths.<\/li>\n<li>Confirm compatibility of release agents and curing compounds with subsequent surfacing or sealing.<\/li>\n<\/ul>\n<h2>Maintenance and typical damage patterns<\/h2>\n<p>Weathering, freeze-thaw cycles, traffic loads, and sediment ingress can cause damage. Frequent issues include edge spalling, settlements due to undermining, shrinkage cracks, or vegetation growth that impairs discharge. Regular cleaning, vegetation removal, and re-profiling of local defects ensure functionality. For structural damage or changed usage, sectional deconstruction and reconstruction is often the most economical solution. Where chronic sedimentation occurs, upstream grit capture or adjustments to slope and surface texture can reduce maintenance effort.<\/p>\n<h3>Inspection routines<\/h3>\n<ul>\n<li>Visual checks after major rainfall to identify ponding, scouring, or blockage.<\/li>\n<li>Periodic verification of joints and transitions to inlets and curbs for tightness and integrity.<\/li>\n<li>Documentation of defects with georeferenced photos to support targeted repairs.<\/li>\n<li>Scheduled removal of vegetation and debris before seasonal peak precipitation.<\/li>\n<\/ul>\n<h2>Deconstruction, rehabilitation, and selective work on lean channels<\/h2>\n<p>As part of <strong>concrete demolition and special demolition<\/strong> as well as during <em>building gutting and concrete cutting<\/em>, the orderly deconstruction of lean channels is part of many construction workflows: when replacing curbs, reorganizing drainage, or repurposing areas. In practice, hydraulic handheld tools that enable precise, low-vibration and low-noise work have proven effective. <strong>Concrete demolition shears<\/strong> allow controlled nibbling and breaking of the channel in compact sections. <strong>Hydraulic wedge splitters<\/strong> create sharp separation cracks with minimal edge damage via wedge or cylinder splitting &#8211; helpful near sensitive infrastructure such as utility lines or cable routes. For existing channel grates, frames, or inlet components, combination shears or a steel shear can be used to cut metallic parts. The tools are powered by <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">mobile hydraulic power units<\/a><\/em> from Darda GmbH, enabling mobile use even in confined areas. Dust control, water management, and material separation by type shorten follow-on processes and support compliant disposal or recycling.<\/p>\n<h3>Typical deconstruction steps<\/h3>\n<ol>\n<li>Expose and clean the channel alignment; locate adjacent utilities.<\/li>\n<li>Separate connections to pavers\/surfaces along defined cut lines.<\/li>\n<li>Dismantle grates and frames; sort materials by type.<\/li>\n<li>Controlled breaking or splitting of channel sections with suitable tools.<\/li>\n<li>Lifting out, intermediate storage, and haul-off with minimal dust and vibration.<\/li>\n<li>Profile-accurate preparation of the subgrade for reconstruction or alternative systems.<\/li>\n<\/ol>\n<h3>Special boundary conditions<\/h3>\n<ul>\n<li>Protect existing surfaces and curb edges against edge spalling.<\/li>\n<li>Minimize fines entering the sewer; divert water if necessary.<\/li>\n<li>Observe noise, dust, and vibration requirements in urban settings.<\/li>\n<li>Work in sections to maintain drainage function.<\/li>\n<\/ul>\n<h2>Applications in tunnel and structural engineering<\/h2>\n<p>In tunnels and galleries, lean channels act as side ditches to collect infiltration and cleaning water, often with a gradient toward shafts. During the construction phase, temporary channels made of lean concrete or shotcrete profiles are installed and later removed or built permanently. Due to restricted space and strict regulations, tools with low emission profiles are advantageous. <strong>Hydraulic wedge splitters<\/strong> and <strong>concrete demolition shears<\/strong> from Darda GmbH are used here for selective channel adjustments or the removal of existing sections &#8211; particularly in <em>rock excavation and tunnel construction<\/em>, when vibrations must be minimized.<\/p>\n<h2>Interfaces with paving and curb construction<\/h2>\n<p>Lean channels often serve as restraint and bedding behind curbs and as connection elements to paved surfaces. In the rehabilitation of paved areas, partial removal of channel bodies is common to correct settlements or reorganize the watercourse. <strong>Concrete demolition shears<\/strong> enable pinpoint spalling without loosening the adjacent paving. Smaller metallic embedded parts can be released with handheld shears. A precise reconstruction of the channel is crucial for the durability of the entire area.<\/p>\n<h3>Tolerances and detailing<\/h3>\n<ul>\n<li>Define height tolerances at the channel edge to control runoff and prevent lip formation.<\/li>\n<li>Provide controlled joints at interfaces to curbs and pavements; seal where required by exposure.<\/li>\n<li>Ensure adequate bearing to prevent rocking or settlement of adjacent curb units.<\/li>\n<li>Coordinate inlet spacing and grate seating to avoid rattling and localized wear.<\/li>\n<\/ul>\n<h2>Sustainability and circular economy<\/h2>\n<p>Lean concrete reduces cement demand and associated emissions. During deconstruction, the concrete can usually be collected by type and reused as a recycled construction material. Selective, controlled methods &#8211; such as splitting instead of extensive crushing &#8211; improve the quality of the recycled material and reduce noise and dust emissions. This is advantageous in sensitive areas and supports the objectives in <em>special demolition<\/em>. Recycled concrete aggregates from lean channels are commonly suitable for unbound or hydraulically bound base layers when processed and tested in accordance with local requirements.<\/p>\n<h2>Safety and environmental protection<\/h2>\n<p>During construction, operation, and deconstruction of lean channels, general occupational safety and environmental protection requirements must be observed: safe site logistics, dust control, protection against concrete slurry near bodies of water, and avoidance of trip hazards. Project-specific verification of execution and design is required; legal requirements and standards may vary by region and must always be observed.<\/p>\n<h3>Key safeguards<\/h3>\n<ul>\n<li>Plan access and egress, lifting points, and confined-space measures where applicable.<\/li>\n<li>Control respirable dust and slurry; apply wet methods and collection where feasible.<\/li>\n<li>Limit vibration and noise through tool selection and staged execution.<\/li>\n<li>Implement utility detection and exclusion zones to protect subsurface services.<\/li>\n<li>Provide edge protection and traffic management on active sites.<\/li>\n<\/ul>\n<h2>Terminology and variants<\/h2>\n<p>Lean channels differ from prefabricated channel systems (e.g., polymer concrete or reinforced concrete) through on-site production and flexible profiling. Depending on the application, alternative drainage solutions such as swales or infiltration trenches may be used. The choice depends on hydraulic requirements, construction time, subgrade, maintenance strategy, and interfaces with adjacent components. When replacing existing lean channels with other systems, careful deconstruction is essential to keep construction time short and protect the existing works &#8211; an application in which <strong>concrete demolition shears<\/strong> and <strong>hydraulic wedge splitters<\/strong> from Darda GmbH support a precise approach.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The lean channel is a proven drainage and stabilization element in road and civil engineering. It is produced on site from lean concrete, ensures the safe conveyance of surface and percolation water, and stabilizes adjacent pavements, curbs, or slopes. In existing facilities, lean channels are frequently rehabilitated or deconstructed &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lean-channel\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19416","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lean Channel - Lean Concrete Drainage for Roads<\/title>\n<meta name=\"description\" content=\"Guide to the lean channel in civil engineering \u2713 lean concrete drainage for roads, erosion control &amp; precise removal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lean-channel\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lean Channel - Lean Concrete Drainage for Roads\" \/>\n<meta property=\"og:description\" content=\"Guide to the lean channel in civil engineering \u2713 lean concrete drainage for roads, erosion control &amp; precise removal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/lean-channel\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T13:49:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-channel\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-channel\",\"name\":\"Lean Channel - Lean Concrete Drainage for Roads\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-07T12:32:21+00:00\",\"dateModified\":\"2026-04-25T13:49:03+00:00\",\"description\":\"Guide to the lean channel in civil engineering \u2713 lean concrete drainage for roads, erosion control & precise removal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-channel#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-channel\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-channel#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lean channel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lean Channel - Lean Concrete Drainage for Roads","description":"Guide to the lean channel in civil engineering \u2713 lean concrete drainage for roads, erosion control & precise removal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel","og_locale":"en_US","og_type":"article","og_title":"Lean Channel - Lean Concrete Drainage for Roads","og_description":"Guide to the lean channel in civil engineering \u2713 lean concrete drainage for roads, erosion control & precise removal.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T13:49:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel","url":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel","name":"Lean Channel - Lean Concrete Drainage for Roads","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-07T12:32:21+00:00","dateModified":"2026-04-25T13:49:03+00:00","description":"Guide to the lean channel in civil engineering \u2713 lean concrete drainage for roads, erosion control & precise removal.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/lean-channel"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-channel#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Lean channel"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19416"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19416\/revisions"}],"predecessor-version":[{"id":26644,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19416\/revisions\/26644"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}