{"id":19415,"date":"2025-11-07T15:36:33","date_gmt":"2025-11-07T14:36:33","guid":{"rendered":"https:\/\/www.darda.de\/lean-concrete"},"modified":"2026-04-25T17:17:03","modified_gmt":"2026-04-25T15:17:03","slug":"lean-concrete","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete","title":{"rendered":"Lean concrete"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Lean concrete is a comparatively low-cement concrete primarily used as a load-bearing, dimensionally stable, and economical sub-base layer &#8211; for example as a blinding layer, working surface, or bedding layer. In deconstruction, gutting works, and special demolition, lean concrete significantly influences the chosen approach: due to its low cement paste content and rough internal structure, it can often be efficiently loosened, separated, and removed in sections using <strong>concrete pulverizers<\/strong> or <strong>hydraulic wedge splitters<\/strong>. Where required, <em>hydraulic power packs<\/em> supply the necessary energy for controlled processes in sensitive environments. In practice, the term is also used for lean-mix concretes that are optimized for volume stability and predictable, brittle fracture behavior in sub-base applications.<\/p>\n<h2>Definition: What is meant by lean concrete?<\/h2>\n<p>Lean concrete refers to concrete with a reduced cement content and a correspondingly low binder fraction. It is designed to provide high bearing and edge stability, low deformations, and brittle fracture behavior, but not primarily to serve as a high load-bearing structural material. Typical applications include the <strong>blinding layer<\/strong> beneath foundations, working or assembly platforms, bedding for structures and pipelines, as well as fills and backfills where volumetric stability and frost resistance are more important than high compressive strengths. In practice, the consistency is often in the stiff range, the grading curve is usually broadly stepped (e.g., 0\/16 to 0\/32), and compressive strength classes lie in the lower range, adapted to the purpose of the layer. Depending on specification and logistics, lean concrete may be produced on site or delivered as ready-mix to ensure consistent quality and cycle times.<\/p>\n<ul>\n<li><strong>Design intent:<\/strong> maximize volumetric and edge stability while minimizing paste content and shrinkage.<\/li>\n<li><strong>Performance target:<\/strong> adequate stiffness, frost resistance, and compactability rather than high ultimate strength.<\/li>\n<li><strong>Execution focus:<\/strong> predictable brittle failure to facilitate later controlled removal when required.<\/li>\n<\/ul>\n<h2>Properties and composition of lean concrete<\/h2>\n<p>Lean concrete is characterized by a low cement paste content, low shrinkage tendency, and a brittle, well-predictable fracture behavior. The mix is oriented toward volumetric stability, compactability, and resistance to frost and de-icing salts, not maximum strength. The water content is adjusted to achieve a sufficiently stiff consistency; the water-cement ratio remains within applicable guidelines. Larger aggregates support dimensional stability and reduce cement demand. Depending on requirements, additions or admixtures can be included to influence workability, setting, or tightness without losing the \u201clean\u201d character of the concrete.<\/p>\n<ul>\n<li><strong>Cement and binders:<\/strong> reduced cement content with optional supplementary cementitious materials where standards permit.<\/li>\n<li><strong>Aggregates:<\/strong> broad, well-graded curve (e.g., 0\/16 to 0\/32) for compactability and reduced paste demand.<\/li>\n<li><strong>Water management:<\/strong> controlled water dosing to achieve stiff consistency within the specified w\/c range.<\/li>\n<li><strong>Optional air entrainment:<\/strong> used under frost and de-icing exposure to improve durability without increasing paste.<\/li>\n<\/ul>\n<h2>Areas of application for lean concrete in construction and deconstruction<\/h2>\n<p>Lean concrete is encountered by professionals from new construction to deconstruction in numerous situations. Its functional benefit derives from dimensional stability, compactability, and a controllable fracture pattern.<\/p>\n<h3>Sub-bases, blinding layers, and bedding<\/h3>\n<ul>\n<li>Beneath foundations as a blinding layer to create a level, clean, and capillary-breaking bearing surface.<\/li>\n<li>As a working or assembly platform in earthworks and civil engineering when robust, early walkability under moderate loads is required.<\/li>\n<li>As pipe and component bedding where uniform load transfer and fixation are necessary.<\/li>\n<li>As a leveling and separation layer beneath slabs-on-grade or industrial floors to provide a clean installation bed and limit contamination of structural concrete.<\/li>\n<li>Under precast elements or baseplates where a flat, compactable, and easily verifiable contact surface is needed.<\/li>\n<\/ul>\n<h3>Backfilling and stabilization<\/h3>\n<ul>\n<li>Backfills around retaining walls and excavation pits for volumetric stabilization.<\/li>\n<li>Temporary and permanent leveling layers in road and pathway construction, provided execution and loading are designed accordingly.<\/li>\n<li>In utility corridors and trenches to stabilize bedding zones and maintain defined slopes with limited deformation.<\/li>\n<\/ul>\n<h3>Deconstruction, gutting works, and special demolition<\/h3>\n<ul>\n<li>In <strong>gutting works and cutting<\/strong>, lean concrete can often be scored in a targeted manner and controlled fracture mechanics can be applied due to its brittle structure.<\/li>\n<li>During <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, <strong>concrete pulverizers<\/strong> enable fast, edge-near removal; <strong>hydraulic wedge splitters<\/strong> create defined split lines without vibrations.<\/li>\n<li>In <strong>rock excavation and tunnel construction<\/strong>, lean concrete is used as a temporary leveling or working layer and is later removed in sections during the construction process.<\/li>\n<li>Selective opening along construction joints and perimeter strips to create access openings with minimal secondary damage.<\/li>\n<\/ul>\n<h2>Workability: consistency, compaction, and curing<\/h2>\n<p>The processing of lean concrete aims for a dense, homogeneous internal structure with minimal voids. Stiff consistencies support precise profiling and edge stability. Compaction is adapted to the aggregate composition &#8211; mechanically, with care to avoid segregation. Short, controlled curing (protection from drying out and frost) reduces cracking without delaying the construction process. At low temperatures, attention must be paid to setting and hardening; in heat, ensure adequate moisture retention. Pumpability is limited depending on the mix and should be verified on a project basis.<\/p>\n<ul>\n<li><strong>Placement:<\/strong> strike-off and screeding to profile heights precisely, with minimal reworking to prevent water rise.<\/li>\n<li><strong>Compaction:<\/strong> use plates or rollers for thin layers; internal vibrators only where grading and moisture allow, avoiding over-vibration.<\/li>\n<li><strong>Curing:<\/strong> employ curing membranes or wet coverings; apply cold- and hot-weather measures per standard practice.<\/li>\n<li><strong>Feasibility checks:<\/strong> trial sections to validate pumpability, compaction energy, and achievable surface quality.<\/li>\n<\/ul>\n<h2>Lean concrete in deconstruction: workability with concrete pulverizers and splitting technology<\/h2>\n<p>The brittle fracture behavior of lean concrete favors mechanical separation. For controlled deconstruction, the following aspects are crucial:<\/p>\n<ul>\n<li><strong>Fracture mechanics:<\/strong> The low cement paste content often leads to clear crack surfaces along aggregate contacts. <em>Concrete pulverizers<\/em> engage these zones and produce defined breaks with limited secondary fracturing.<\/li>\n<li><strong>Split lines:<\/strong> <em>Hydraulic wedge splitters<\/em> apply forces locally and create low-noise, low-vibration separations &#8211; advantageous in sensitive areas with adjacent structures.<\/li>\n<li><strong>Aggregate size and moisture:<\/strong> Coarse aggregates and low moisture contents promote brittle split surfaces. Moist, finer mixes may respond more ductile locally.<\/li>\n<li><strong>Reinforcement:<\/strong> Lean concrete is often unreinforced. Where edge reinforcement, wire meshes, or inserts occur, these can be cut off after opening with jaw systems; complementary steel cutting tools are used as needed.<\/li>\n<li><strong>Debris control:<\/strong> Plan dust suppression, fragment retention, and sequencing to maintain visibility and reduce emissions during separation.<\/li>\n<\/ul>\n<h2>Planning and execution in special deconstruction<\/h2>\n<p>For precise processes in <strong>gutting works and cutting<\/strong> as well as in <strong>concrete demolition and special deconstruction<\/strong>, a coordinated approach that considers material properties and structural condition is recommended.<\/p>\n<h3>Pre-investigation and probing<\/h3>\n<ul>\n<li>Clarify build-up: layer thicknesses, potential separation layers, any foils or capillary barriers.<\/li>\n<li>Determine material condition: strength range, moisture, aggregate size, possible inserts.<\/li>\n<li>Environmental conditions: vibration tolerance, noise requirements, accessibility, load-bearing capacity of adjacent components.<\/li>\n<li>Locate embedded utilities and services using suitable detection methods and verify with current as-built documentation.<\/li>\n<\/ul>\n<h3>Tool selection and energy supply<\/h3>\n<ul>\n<li><strong>Concrete pulverizers<\/strong> for edge-near, controlled removal, especially for slabs, blinding layers, and upstands.<\/li>\n<li><strong>Hydraulic wedge splitters<\/strong> for low-vibration deconstruction in confined interior areas and where minimal secondary damage is required.<\/li>\n<li><strong>Hydraulic power packs<\/strong> as robust energy sources with application-specific pressure and flow adjustments for efficient cycle times.<\/li>\n<li>Match jaw opening, splitting force, and carrier interface to layer thickness, access, and required production rate.<\/li>\n<\/ul>\n<h3>Cutting and splitting strategy<\/h3>\n<ul>\n<li>Section-by-section approach with defined split points and break-off edges to avoid load redistributions.<\/li>\n<li>Pre-scoring or pre-drilling to guide split cracks when precise edges are required.<\/li>\n<li>Dust and fragment management through a coordinated sequence and targeted material placement.<\/li>\n<li>Plan waste logistics and separation of mineral fractions and metals for efficient removal and recycling.<\/li>\n<\/ul>\n<h2>Lean concrete in tunnel and infrastructure construction<\/h2>\n<p>In <strong>rock excavation and tunnel construction<\/strong>, lean concrete often serves as a leveling layer, as temporary under-concrete beneath formwork elements, or as securing for service routes. In conversions or deconstruction, these layers can be separated using splitting techniques without excessively stressing surrounding rock or installed works. The ability to introduce splitting forces in a controlled manner is a decisive advantage over percussive methods. Additional use cases include invert leveling, temporary track slab build-ups, and construction stage platforms with predictable removal behavior.<\/p>\n<h2>Quality assurance, standards, and execution notes<\/h2>\n<p>The selection of raw materials, specification of cement content, and water content are project-specific and aligned with the relevant technical standards. Tests for consistency, density, and compressive-strength-related parameters ensure suitability for the intended purpose. Under frost and de-icing exposure, aggregate, air-void content, and curing should be selected accordingly. For later separation, a uniform aggregate distribution without soft inclusions is beneficial to promote a predictable fracture pattern.<\/p>\n<ul>\n<li><strong>Sampling and testing:<\/strong> document fresh concrete properties and strength development aligned with the specification.<\/li>\n<li><strong>In-situ verification:<\/strong> where relevant, verify bearing behavior or compaction quality with suitable field methods.<\/li>\n<li><strong>Documentation:<\/strong> record mix design, placement conditions, curing measures, and any deviations for traceability.<\/li>\n<\/ul>\n<h2>Environment, resource conservation, and recycling<\/h2>\n<p>When properly produced and applied, lean concrete can contribute to resource conservation by reducing cement demand. In deconstruction, the material can typically be processed into recycled aggregate if no harmful contaminants are present. Dust and noise protection must always be planned for demolition work; low-vibration splitting methods support the protection of sensitive neighboring structures and reduce emissions. A project-specific choice of methods contributes to safety, sustainability, and cost-effectiveness.<\/p>\n<ul>\n<li><strong>Lower binder content:<\/strong> reduces clinker-related emissions without compromising the intended function.<\/li>\n<li><strong>Recycled aggregates:<\/strong> may be used subject to local standards and contaminant control to close material loops.<\/li>\n<li><strong>Water and transport:<\/strong> plan water usage for curing and dust suppression efficiently and optimize logistics to minimize haul distances.<\/li>\n<\/ul>\n<h2>Typical issues and how to avoid them<\/h2>\n<ul>\n<li><strong>Excessive moisture:<\/strong> Leads to segregation, reduced edge stability, and an irregular fracture pattern during deconstruction. Remedy: control water addition, adjust compaction.<\/li>\n<li><strong>Unsuitable aggregate grading:<\/strong> A grading curve that is too fine can cause deformations; excessively coarse grading without fines complicates compaction. Remedy: balanced aggregate composition.<\/li>\n<li><strong>Insufficient curing:<\/strong> Early drying promotes surface cracking. Remedy: brief moisture retention adapted to the intended use.<\/li>\n<li><strong>Unclear layer separation:<\/strong> Missing separation layers complicate later deconstruction. Remedy: deliberately provide a separation or slip layer when later removal is planned.<\/li>\n<li><strong>Excess binder content:<\/strong> Increases strength and tenacity unnecessarily, complicating splitting and removal. Remedy: adhere to lean targets.<\/li>\n<li><strong>Inadequate subgrade preparation:<\/strong> Weak or pumping subgrades cause settlements. Remedy: verify bearing capacity and install capillary breaks where needed.<\/li>\n<\/ul>\n<h2>Practical benefits for tools and workflows<\/h2>\n<p>When blinding layers, bedding, or leveling layers made of lean concrete are considered early in planning, later construction phases benefit: a level, stable base accelerates installation &#8211; and in deconstruction the brittle material behavior facilitates targeted opening. <strong>Concrete pulverizers<\/strong> produce clean edges at upstands and perimeters, <strong>hydraulic wedge splitters<\/strong> enable quiet separations in sensitive areas. For combined deconstruction where reinforcement or embedded parts must also be cut, complementary steel cutting tools are used; the energy supply is provided as required by <em>hydraulic power packs<\/em>.<\/p>\n<ul>\n<li><strong>Efficient sequencing:<\/strong> short mobilization times and defined split lines keep interfaces tidy for subsequent trades.<\/li>\n<li><strong>Controlled impacts:<\/strong> low-vibration methods protect adjacent structures and installed systems.<\/li>\n<li><strong>Predictable results:<\/strong> brittle fracture behavior and clear crack paths support safe, sectional removal.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Lean concrete is a comparatively low-cement concrete primarily used as a load-bearing, dimensionally stable, and economical sub-base layer &#8211; for example as a blinding layer, working surface, or bedding layer. In deconstruction, gutting works, and special demolition, lean concrete significantly influences the chosen approach: due to its low cement paste <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19415","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lean Concrete - Properties, Uses &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Discover lean concrete \u2713 low-cement mix for sub-bases &amp; blinding layers, enabling precise low-vibration demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lean Concrete - Properties, Uses &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Discover lean concrete \u2713 low-cement mix for sub-bases &amp; blinding layers, enabling precise low-vibration demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T15:17:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-concrete\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-concrete\",\"name\":\"Lean Concrete - Properties, Uses & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-07T14:36:33+00:00\",\"dateModified\":\"2026-04-25T15:17:03+00:00\",\"description\":\"Discover lean concrete \u2713 low-cement mix for sub-bases & blinding layers, enabling precise low-vibration demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-concrete#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-concrete\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lean-concrete#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lean concrete\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lean Concrete - Properties, Uses & Demolition","description":"Discover lean concrete \u2713 low-cement mix for sub-bases & blinding layers, enabling precise low-vibration demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete","og_locale":"en_US","og_type":"article","og_title":"Lean Concrete - Properties, Uses & Demolition","og_description":"Discover lean concrete \u2713 low-cement mix for sub-bases & blinding layers, enabling precise low-vibration demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T15:17:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete","url":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete","name":"Lean Concrete - Properties, Uses & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-07T14:36:33+00:00","dateModified":"2026-04-25T15:17:03+00:00","description":"Discover lean concrete \u2713 low-cement mix for sub-bases & blinding layers, enabling precise low-vibration demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/lean-concrete"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/lean-concrete#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Lean concrete"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19415"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19415\/revisions"}],"predecessor-version":[{"id":26654,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19415\/revisions\/26654"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}