{"id":19413,"date":"2025-11-07T09:33:47","date_gmt":"2025-11-07T08:33:47","guid":{"rendered":"https:\/\/www.darda.de\/ventilation-opening"},"modified":"2026-04-25T08:25:03","modified_gmt":"2026-04-25T06:25:03","slug":"ventilation-opening","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening","title":{"rendered":"Ventilation opening"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A ventilation opening is a structural opening that enables targeted air exchange &#8211; in buildings, facilities, shafts, tunnels, and temporary enclosures on construction sites. In the context of concrete demolition, special demolition, rock breakout, and tunnel construction, ventilation openings are essential to discharge dust, moisture, and gases, introduce fresh air, and keep work areas safe. When creating such openings in concrete, masonry, or rock, controlled, low-vibration methods are often used, in which Darda GmbH tools such as <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> play an important role in practice. In practice, a ventilation opening may also be referred to as an <em>air intake\/outlet<\/em> or <em>vent aperture<\/em>, provided the function is identical.<\/p>\n<h2>Definition: What is meant by a ventilation opening?<\/h2>\n<p>A ventilation opening is a deliberately positioned opening in an envelope &#8211; such as in a wall, ceiling\/slab, shaft wall, a lining, or in a rock\/shotcrete shell &#8211; through which air can flow. It serves natural or assisted supply and exhaust ventilation and can be permanent (e.g., as a supply\/exhaust opening) or temporary (e.g., for construction states during concrete deconstruction, during strip-out, or in tunnels). Typical geometries are round (core-drilled), rectangular (sawn, nibbled with a pulverizer), or slot-shaped. The decisive factor is the <em>free cross-section<\/em> and the aerodynamically favorable shaping of the edges, so that the required air change is achieved with low pressure loss.<\/p>\n<ul>\n<li><strong>Free area ratio:<\/strong> Ensure that grilles or fittings do not unduly reduce the effective opening area compared to the structural opening.<\/li>\n<li><strong>Edge design:<\/strong> Slight rounding or chamfering of edges promotes smoother flow, lowers turbulence, and reduces noise.<\/li>\n<\/ul>\n<h2>Importance in concrete demolition, special demolition and tunnel construction<\/h2>\n<p>In deconstruction and underground contexts, ventilation openings control the air path: they establish cross ventilation, relieve fumes from fire and welding, reduce <em>CO\/NOx<\/em> concentrations from machine exhaust, and lower dust exposure during cutting and demolition work. Especially in massive members and shotcrete shells, openings often have to be created first. Methods using <strong>concrete pulverizers<\/strong> allow controlled removal of edges and recesses without excessive vibration. <strong>Rock and concrete splitters<\/strong> generate defined crack lines to gently enlarge openings &#8211; advantageous near sensitive structures, utilities, or vibration-critical equipment.<\/p>\n<p>Well-placed openings also stabilize process quality: visibility improves, drying periods shorten, and emissions can be guided towards extraction and filtration units. This supports compliance with limit values and reduces rework due to dust deposition.<\/p>\n<h2>Planning fundamentals and sizing of the free cross-section<\/h2>\n<p>The size and location of a ventilation opening result from the required air volume flow, the flow direction, and the boundary conditions of the structure. The following points are decisive for practice:<\/p>\n<ul>\n<li><strong>Air change and volume flow:<\/strong> The volume flow results from room volume and target air change. The necessary free cross-section A can be estimated with <em>Q = A \u00b7 v<\/em> (Q: volume flow, v: flow velocity). Moderate velocities v reduce noise and pressure losses.<\/li>\n<li><strong>Flow path:<\/strong> Minimal deflections, smooth opening edges, and sufficient distance from obstacles improve throughput. Several smaller openings can be more favorable aerodynamically than a single large opening.<\/li>\n<li><strong>Material and wall thickness:<\/strong> Thick concrete plates, reinforced zones, and composite systems influence the production method and edge quality.<\/li>\n<li><strong>Climate, moisture, condensate:<\/strong> Consider weather and condensation effects; plan drip edges or slopes if required.<\/li>\n<li><strong>Acoustics and fire:<\/strong> Requirements for sound insulation or fire-rated components must be coordinated with specialist planning; fittings follow the applicable regulations.<\/li>\n<li><strong>Pressure drop and fans:<\/strong> Account for pressure losses across openings and fittings when selecting fans or extraction units so that the duty point remains within the efficient range.<\/li>\n<li><strong>Access and maintenance:<\/strong> Position openings so that protective devices, grilles, and seals remain inspectable and cleanable.<\/li>\n<\/ul>\n<p><strong>Example sizing:<\/strong> For a target flow of 1,500 m\u00b3\/h and a planned velocity of 2.5 m\/s, the free cross-section A should be about 0.17 m\u00b2. Practical allowances are recommended for grille losses and later tolerances.<\/p>\n<h2>Materials and components: concrete, masonry, rock<\/h2>\n<p>The configuration of a ventilation opening strongly depends on the substrate. In reinforced concrete, prior detection (scanning) of reinforcement layers and inserts is advisable. In masonry, bond and bed joints can influence the cut path. In rock and shotcrete composites, crack propagation plays a central role &#8211; here, <strong>rock and concrete splitters<\/strong> contribute to controlled geometry of the opening through directed splitting.<\/p>\n<ul>\n<li><strong>Concrete:<\/strong> Pay attention to cover depth and potential prestressing; cut or expose reinforcement in a controlled sequence.<\/li>\n<li><strong>Masonry:<\/strong> Stabilize edges in weak joints to avoid local spalling at reveals.<\/li>\n<li><strong>Rock\/shotcrete:<\/strong> Guide cracks with borehole spacing and alignments; re-profile with low-vibration tools to protect the lining.<\/li>\n<\/ul>\n<h2>Production methods for ventilation openings in concrete and rock<\/h2>\n<h3>Method selection<\/h3>\n<p>The selection is based on member thickness, reinforcement content, edge distances, environmental requirements (noise, dust, vibration), and the required edge quality. Combinations are common to combine precision and productivity. Night work windows, neighboring occupancy, and permissible emissions often determine the feasible sequence.<\/p>\n<h3>Low-vibration: rock and concrete splitters<\/h3>\n<p>To initiate and enlarge openings, hydraulic splitting cylinders generate controlled cracks in concrete and rock. This allows opening contours to be produced with low vibration &#8211; advantageous for sensitive neighboring components and in tunnels. Via <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a> from Darda GmbH, the power supply is provided safely and mobilly. Typical practice includes pilot drilling for the splitter cylinders, adapted borehole spacing, and a stepwise enlargement to the final contour.<\/p>\n<h3>Controlled deconstruction: concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> enable sectional biting and crushing of concrete, including exposing reinforcement. This allows opening edges to be produced, re-profiled, or enlarged. For slab and wall openings, the pulverizer method enables precise work with well-controlled fracture edges. When dust exposure is critical, dust suppression or extraction should be integrated into the workflow.<\/p>\n<h3>Further hydraulic tools in detail<\/h3>\n<ul>\n<li><strong>Combination shears<\/strong> and <strong>Multi Cutters<\/strong>: For hybrid components where, in addition to concrete, profiles, meshes, or light steel sheets in the area of the ventilation opening must be cut.<\/li>\n<li><strong>Steel shears<\/strong>: When rebars, beams, or embedded parts within the opening must be cleanly severed.<\/li>\n<li><strong>Tank cutters<\/strong>: For special operations, e.g., during deconstruction of containers with required ventilation openings, where controlled cutting in metallic walls is needed.<\/li>\n<\/ul>\n<p>Sequencing the interventions &#8211; splitting, cutting, and profiling &#8211; reduces unintended cracking and improves edge durability for subsequent fittings.<\/p>\n<h2>Practical sequence: from investigation to acceptance<\/h2>\n<ol>\n<li><strong>Investigation:<\/strong> Structural analysis, material identification, reinforcement\/utility locating, define opening size and position.<\/li>\n<li><strong>Work and ventilation concept:<\/strong> Define flow direction, supply\/exhaust paths, dust management, emission limits.<\/li>\n<li><strong>Method selection:<\/strong> Specify a combination of splitting, pulverizing, and cutting; select suitable power packs from Darda GmbH.<\/li>\n<li><strong>Pre-marking and pilot drilling:<\/strong> Scribe the contour, perform pilot holes if necessary to set wedges or cylinders.<\/li>\n<li><strong>Production:<\/strong> Create the opening with low vibration; cut reinforcement properly; rework edges.<\/li>\n<li><strong>Post-treatment:<\/strong> Smooth edges, apply corrosion protection to exposed steel, install fittings or grilles if required.<\/li>\n<li><strong>Documentation:<\/strong> Record dimensions, location, methods, emission values, and verifications.<\/li>\n<\/ol>\n<p>Acceptance typically includes checking free cross-section, edge quality, and airflow performance. If required, measurements of differential pressure and capture efficiency are documented for verification.<\/p>\n<h2>Safety, emissions and post-treatment<\/h2>\n<p>Occupational safety is paramount. Adequate fresh-air supply must be ensured continuously; dust must be effectively captured and removed. In areas with gases or solvents, measurements with appropriate monitoring are advisable. Low-vibration methods, such as splitting and pulverizing, minimize risks to neighboring components. Finally, edges must be cleanly profiled; exposed reinforcement is protected. Legal issues and permits depend on the individual case and should be coordinated with the relevant authorities.<\/p>\n<ul>\n<li><strong>Emission control:<\/strong> Combine source extraction, enclosure where feasible, and wet methods to reduce particulate load.<\/li>\n<li><strong>Atmospheric monitoring:<\/strong> Track oxygen, CO, and other relevant gases; define alarm thresholds and response measures.<\/li>\n<li><strong>Noise and vibration:<\/strong> Observe project-specific limits; document compliance during critical operations.<\/li>\n<li><strong>Residual risks:<\/strong> Ensure secure fixing of grilles or covers and verify that no sharp edges remain.<\/li>\n<\/ul>\n<h2>Typical pitfalls and how to avoid them<\/h2>\n<ul>\n<li><strong>Underestimated flow resistance:<\/strong> Plan for radii, chamfers, and adequate opening area.<\/li>\n<li><strong>Unplanned cracking:<\/strong> Control crack propagation with <strong>rock and concrete splitters<\/strong>; observe edge distances.<\/li>\n<li><strong>Damaged utilities:<\/strong> Locate in advance; create the opening step by step with <strong>concrete pulverizers<\/strong> instead of extensive percussive breaking.<\/li>\n<li><strong>Excessive vibration:<\/strong> Rely on low-vibration methods and appropriate tool selection.<\/li>\n<li><strong>Insufficient debris removal:<\/strong> Consider piece size during fragmentation; keep removal routes clear.<\/li>\n<li><strong>Too high velocities:<\/strong> Avoid whistling and increased pressure drop by limiting face velocity at the opening.<\/li>\n<li><strong>Unsealed interfaces:<\/strong> Seal reveals where required to prevent bypass flows and performance losses.<\/li>\n<\/ul>\n<h2>Specifics in tunnel and underground construction<\/h2>\n<p>In tunnels, galleries, and shafts, ventilation openings ensure the supply of fresh air, relieve exhaust gases, and remove moisture. Production in shotcrete and rock is preferably carried out with low-vibration methods. <strong>Rock and concrete splitters<\/strong> help to initiate openings in a controlled way; <strong>concrete pulverizers<\/strong> profile the contour without weakening the lining. Due to confined space, compact hydraulic solutions and short setup times are advantageous. Ventilation measures should also consider evacuation concepts and the layering of pollutants in inclined or stratified airflows.<\/p>\n<h2>Natural stone extraction and special applications<\/h2>\n<p>In natural stone extraction, ventilation openings may be required in temporary enclosures, machine rooms, or in connection with smaller adit sections. Robust, precise methods that do not impair stability are important. In special operations &#8211; such as inside containers or segregated areas &#8211; openings are often part of a venting and clearance-measurement concept; metal cutting can be combined with shears or cutting tools from Darda GmbH. Where openings are temporary, plan reintegration or safe closure at the end of works.<\/p>\n<h2>Terminology and interfaces<\/h2>\n<p>Ventilation openings must be distinguished from installation and inspection openings, though they often follow similar design principles: adequate free cross-section, defined edges, and safe formation of the reveals. Interfaces with building services (e.g., later connection to ducts or grilles) should be coordinated early. Where fire or acoustic requirements apply, building code provisions must be observed; implementation is coordinated with specialist planners. In documentation and drawings, consistent terminology avoids confusion with shafts, louvers, or service penetrations.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Dimensional accuracy, edge quality, free cross-section, and the position within the component are checked and documented. In the deconstruction environment, compliance with emission and vibration targets must also be demonstrated. Traceable documentation facilitates subsequent acceptances and handover to follow-on trades.<\/p>\n<ul>\n<li><strong>Records:<\/strong> As-built dimensions, photos of edges and reinforcement treatment, measurement logs for airflow and emissions.<\/li>\n<li><strong>Verification:<\/strong> Confirmation of substrate integrity and stability around the opening after production.<\/li>\n<li><strong>Handover:<\/strong> Clear marking and protection of the opening until permanent fittings are installed.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A ventilation opening is a structural opening that enables targeted air exchange &#8211; in buildings, facilities, shafts, tunnels, and temporary enclosures on construction sites. In the context of concrete demolition, special demolition, rock breakout, and tunnel construction, ventilation openings are essential to discharge dust, moisture, and gases, introduce fresh air, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19413","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ventilation Opening for Concrete, Masonry &amp; Rock<\/title>\n<meta name=\"description\" content=\"Learn about ventilation openings for construction airflow in concrete and tunnels \u2713 sizing, low vibration, dust control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ventilation Opening for Concrete, Masonry &amp; Rock\" \/>\n<meta property=\"og:description\" content=\"Learn about ventilation openings for construction airflow in concrete and tunnels \u2713 sizing, low vibration, dust control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T06:25:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ventilation-opening\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ventilation-opening\",\"name\":\"Ventilation Opening for Concrete, Masonry & Rock\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-07T08:33:47+00:00\",\"dateModified\":\"2026-04-25T06:25:03+00:00\",\"description\":\"Learn about ventilation openings for construction airflow in concrete and tunnels \u2713 sizing, low vibration, dust control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ventilation-opening#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ventilation-opening\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/ventilation-opening#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ventilation opening\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ventilation Opening for Concrete, Masonry & Rock","description":"Learn about ventilation openings for construction airflow in concrete and tunnels \u2713 sizing, low vibration, dust control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening","og_locale":"en_US","og_type":"article","og_title":"Ventilation Opening for Concrete, Masonry & Rock","og_description":"Learn about ventilation openings for construction airflow in concrete and tunnels \u2713 sizing, low vibration, dust control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T06:25:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening","url":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening","name":"Ventilation Opening for Concrete, Masonry & Rock","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-07T08:33:47+00:00","dateModified":"2026-04-25T06:25:03+00:00","description":"Learn about ventilation openings for construction airflow in concrete and tunnels \u2713 sizing, low vibration, dust control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/ventilation-opening#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Ventilation opening"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19413"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19413\/revisions"}],"predecessor-version":[{"id":26628,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19413\/revisions\/26628"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}