{"id":19411,"date":"2025-11-07T11:49:37","date_gmt":"2025-11-07T10:49:37","guid":{"rendered":"https:\/\/www.darda.de\/gap-closure-construction"},"modified":"2026-04-25T18:03:02","modified_gmt":"2026-04-25T16:03:02","slug":"gap-closure-construction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction","title":{"rendered":"Gap closure construction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Gap closure construction refers to the planning and construction needed to close missing links in existing infrastructure networks &#8211; such as in road and rail transport, at bridges, tunnels, or utility lines. It is characterized by the precise tie-in of new structures to the existing ones during live operation, in confined conditions, and with stringent requirements for <strong>dimensional accuracy<\/strong>, <strong>low vibration<\/strong>, and <strong>noise control<\/strong>. This often requires selective demolition and cutting, as well as <em>controlled demolition<\/em> of concrete and steel components before the actual connection is produced. Method selection is governed by access constraints, cross-section thickness, reinforcement density, allowable peak particle velocity, and environmental requirements. Meticulous interface planning, mock-ups or trial cuts, and clearly defined hold points reduce execution risks. Depending on the task, among others, <strong>concrete pulverizers<\/strong>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, hydraulic power packs, combination shears, Multi Cutters, steel shears, tank cutters, and rock wedge splitters from Darda GmbH are used.<\/p>\n<h2>Definition: What is meant by gap closure construction?<\/h2>\n<p>Gap closure construction is the engineering realization of a missing section that permanently and load-transferringly connects two existing structures or network parts. The spectrum ranges from closing route gaps in transportation infrastructure to bridge tie-ins and tunnel breakthrough sections, to utility crossings and the integration of new construction phases into inner-city existing structures. Essential is the <em>new-to-old<\/em> transition: it demands <em>precise separation cuts, deconstruction, and strengthening work<\/em> to introduce loads safely, create joints and rebar connections, and ensure structural functions such as <strong>watertightness<\/strong>, <strong>durability<\/strong>, and <strong>serviceability<\/strong>. Depending on the application, additional functional requirements can include fire protection of interfaces, corrosion protection, and stray-current control in rail environments. Clear as-built documentation of tie-in faces and reinforcement is part of the permanent record.<\/p>\n<h2>Construction sequence and typical work steps in gap closure construction<\/h2>\n<p>The gap closure starts with surveying the existing structure and defining tolerances, connection details, and construction states. Next, excavation pits and accesses are created, reinforcement is exposed, edges are defined, and anchor points are prepared. The next step is the selective deconstruction of concrete and steel components, strip-out and cutting, followed by creating the connection by post-casting, installing joint waterstops, shear dowels, and rebar connections. Finally, surfaces are finished, seals\/waterproofing are supplemented, and the transition is put into operation. Temporary works, monitoring, and inspection test plans are integrated from the outset to control interfaces and handovers.<\/p>\n<ol>\n<li>Survey and condition assessment: geometry capture, material tests, and definition of allowable deviations.<\/li>\n<li>Access and protection: working platforms, shielding, and media provision in confined spaces.<\/li>\n<li>Selective deconstruction and cutting: controlled removal with documented profiles and edge quality.<\/li>\n<li>Connection works: joints, rebar, shear transfer, and post-casting with controlled curing.<\/li>\n<li>Completion: sealing, finishing, commissioning, and verification against tolerances.<\/li>\n<\/ol>\n<p>To minimize vibration and noise, <strong>low-vibration, non-explosive rock removal methods<\/strong> are standard. <strong>Concrete pulverizers<\/strong> enable defined nibbling of component edges, while <strong>rock and concrete splitters<\/strong> as well as rock wedge splitters separate massive cross-sections by controlled expansion of boreholes without impact loads. Hydraulic power packs from Darda GmbH supply the tools with the required energy. For separating reinforcing steel, beams, rails, or sheets, combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, or steel shears are used depending on material thickness. In the course of remediating contaminated sites along future alignments, tank cutters can be employed in special operations to safely dissect vessels before the actual gap closure is realized. Tool selection and parameterization are aligned with component thickness, reinforcement ratio, and target roughness of connection faces to reduce rework and shorten shut-down windows.<\/p>\n<h2>Structural particulars when tying into existing structures<\/h2>\n<p>Tying into existing structures requires detailed understanding of load-carrying behavior, concrete strengths, reinforcement layouts, and structural expansions. Decisive are the tolerances at the connection joint, the quality of the bearing surfaces, and the safe introduction of new load paths. Additionally, compatibility of deformations due to creep, shrinkage, and temperature must be considered to avoid restraint forces, while corrosion protection and durability at the interface require special attention.<\/p>\n<ul>\n<li><strong>Geometry and tolerances:<\/strong> joint width, flatness, and bearing elevations with defined acceptance criteria.<\/li>\n<li><strong>Material properties:<\/strong> in-situ strengths, reinforcement cover, and potential chemical exposure at the transition.<\/li>\n<li><strong>Load path and robustness:<\/strong> verification of shear transfer, ductility, and redundancy for accidental actions.<\/li>\n<\/ul>\n<h3>Underpinning and protection of the existing structure<\/h3>\n<p>Existing foundations or abutments are underpinned as needed to avoid settlements. During these works, low-vibration removal methods are advantageous &#8211; such as with concrete pulverizers and non-explosive splitters &#8211; to prevent <em>crack formation<\/em> in the existing structure. Instrumentation, for example settlement points and inclinometers, enables real-time tracking with trigger levels and response plans.<\/p>\n<h3>Joints, bond, and durability<\/h3>\n<p>Transitions require defined joints (if applicable with waterstops) and reliable bond. Separation cuts must be made to produce a rough, load-transferring surface. Controlled removal profiles using concrete pulverizers and splitting of thick cross-sections without thermal influence assist here. Surface preparation targets a specified roughness and cleanliness; scabbling or bush hammering can enhance bond. Joint systems may include hydrophilic or PVC waterstops, injection hoses, and compatible sealants. Proper curing and protection of young concrete at the interface are essential for durability.<\/p>\n<h3>Rebar connections and shear transfer<\/h3>\n<p>Reinforcement is exposed, cleaned, and lap spliced or supplemented using approved systems. For exposing and cutting the steel, Multi Cutters and steel shears are suitable to cleanly cut mesh, reinforcement cages, or profiles. Hole drilling and cleaning procedures, embedment lengths, and curing times for post-installed bars are executed per specification, with marked bar IDs and as-built records to verify position and anchorage. Shear keys and dowels are dimensioned to maintain serviceability limits.<\/p>\n<h2>Precise deconstruction as part of gap closures<\/h2>\n<p>Selective deconstruction is a core step to create connection faces, bearings, and route alignments. The priority is control over removal volume, edge geometry, and cutting speed &#8211; especially in sensitive environments such as dense urban areas or under rail operations. Key performance indicators typically include cutting accuracy, peak particle velocity, airborne noise, and dust emissions.<\/p>\n<ul>\n<li><strong>Defined edge formation:<\/strong> concrete pulverizers for controlled nibbling and chamfering of edges.<\/li>\n<li><strong>Massive separations without vibration:<\/strong> rock and concrete splitters as well as rock wedge splitters for thick cross-sections, parapets, abutments, and portal areas.<\/li>\n<li><strong>Steel separation:<\/strong> steel shears, combination shears, and Multi Cutters for reinforcement, beams, rails, and sheets.<\/li>\n<li><strong>Hydraulic energy supply:<\/strong> <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> with suitable capacity and hose management for safe operation.<\/li>\n<li><strong>Fine profiling and tolerances:<\/strong> verification by survey and templates, with local refinements before formwork and rebar installation.<\/li>\n<li><strong>Slurry, dust, and water management:<\/strong> extraction, misting, and controlled collection to protect surroundings and maintain visibility.<\/li>\n<\/ul>\n<h2>Gap closure in tunnels and rock<\/h2>\n<p>In tunnel construction, gap closures occur during advance, at breakthrough, and at portal tie-ins. Rock removal in portal areas and in the crown or bench often requires <em>non-explosive<\/em>, controlled methods. Rock wedge splitters and rock and concrete splitters allow opening rock structures along borehole lines, guiding the breakout in a targeted manner. In combined sections with shotcrete and inner lining, clean end profiles are crucial; these can be produced precisely with concrete pulverizers on concrete starters and facing shells. Pre-splitting along designed borehole arrays limits overbreak, and groundwater management as well as watertight construction joints safeguard durability of the final lining.<\/p>\n<h2>Urban gap closure and works under live operation<\/h2>\n<p>Inner-city gap closures require particular consideration of noise control, dust, traffic management, and maintaining operations. <strong>Low-vibration demolition methods<\/strong> are advantageous. When tying in new bridges, ramps, or lines to existing structures, work proceeds in small cycles; strip-out and cutting are performed in phases. Concrete pulverizers reduce flying debris, while splitters open components quietly. This makes it easier to meet specified limits on vibration and noise. Work windows and partial closures are coordinated with operators, while real-time monitoring of vibration and noise supports compliance and swift adjustment of methods.<\/p>\n<h2>Construction logistics, safety, and environment<\/h2>\n<p>Logistics and occupational safety are closely interlinked in gap closure construction. Routing, load pick-up points, lifting operations, and media supply (hydraulics, power, water) must be adapted to confined space. Dust capture and water collection, protective enclosures and separation zones support environmental protection. Safety concepts consider access to existing structures, fall protection, hydraulic hose line routing, and emergency-stop structures. Information on limit values and procedures must always be interpreted project-specifically; legal requirements are of a general nature and can vary by location. Method-specific risk assessments, toolbox briefings, and clear exclusion zones reduce interface hazards.<\/p>\n<ul>\n<li><strong>Confined-space protocols:<\/strong> permits, ventilation, and continuous atmospheric monitoring where required.<\/li>\n<li><strong>Energy isolation:<\/strong> lockout-tagout for hydraulic and electrical systems and verification of zero-energy state.<\/li>\n<li><strong>Hose integrity:<\/strong> protection sleeves, pressure testing, and routing away from pinch or traffic points.<\/li>\n<li><strong>Emergency readiness:<\/strong> access planning, rescue means, and drills aligned with the construction sequence.<\/li>\n<\/ul>\n<h2>Material separation and recycling in gap closures<\/h2>\n<p>Sorted material separation is the basis for reuse and proper disposal. Concrete is crushed to be as free of rebar residues as possible, steel is collected separately, and asphalt and mastic asphalt are removed separately. Combination shears, Multi Cutters, and steel shears support the separation of steel and non-ferrous metals. During deconstruction along planned corridors &#8211; such as on former industrial sites &#8211; tank cutters in <em>special deployment<\/em> can enable the safe dismantling of vessels before the actual gap closure is executed. A selective demolition plan, contamination screening, and traceable documentation of waste streams support high recycling rates and compliance with environmental targets.<\/p>\n<h2>Quality assurance, surveying, and tolerances<\/h2>\n<p>Measurement concepts with pre-survey of connection faces, continuous monitoring, and final inspection ensure dimensional accuracy. Especially in gap closure construction, flatness, joint widths, elevation levels, and the position of bearings are critical. After deconstruction (e.g., using concrete pulverizers or splitters), fine profiling is carried out before reinforcement and formwork are installed. Documentation (records, photos, scans) serves as evidence of execution and quality. Modern surveying by total station or 3D scanning strengthens control of tolerances, while hold points for pre-pour and post-pour checks anchor quality in the sequence.<\/p>\n<h2>Typical challenges and solution approaches<\/h2>\n<ul>\n<li>Restricted access: use modular, compact hydraulic power packs and manually handled tools.<\/li>\n<li>Vibration-sensitive existing structures: prefer low-vibration splitting methods and controlled pulverizer work.<\/li>\n<li>Composite components: plan a combination of concrete pulverizers for concrete and steel shears for reinforcement and profiles.<\/li>\n<li>Tight scheduling: takt-controlled deconstruction with clear interfaces between strip-out, splitting, cutting, and post-casting.<\/li>\n<li>Environmental requirements: organize dust suppression, dewatering, noise control measures, and construction waste separation at an early stage.<\/li>\n<li>Groundwater or water ingress: implement pre-drainage, sealing measures, and staged pumping concepts.<\/li>\n<li>Unknown reinforcement or details: perform trial openings, adapt methods, and update as-built data promptly.<\/li>\n<\/ul>\n<h2>Planning interfaces and permitting<\/h2>\n<p>Gap closure projects often affect utility operators, transport providers, and residents\u2019 interests. Coordination and permitting should run in parallel with technical planning. Information on responsibilities, deadlines, and conditions must always be treated generally; binding assessments are project-specific and cannot be made in blanket form. Technical evidence (e.g., regarding vibration) is based on the chosen construction and demolition method &#8211; the use of concrete pulverizers as well as rock and concrete splitters can help achieve the required limits. Early interface mapping, method statements, and outage or possession plans accelerate approvals and reduce on-site conflicts.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Gap closure construction refers to the planning and construction needed to close missing links in existing infrastructure networks &#8211; such as in road and rail transport, at bridges, tunnels, or utility lines. It is characterized by the precise tie-in of new structures to the existing ones during live operation, in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19411","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gap Closure Construction in Civil Engineering<\/title>\n<meta name=\"description\" content=\"Engineered gap closure construction \u2713 precise, low vibration tie-ins for roads, rail, bridges &amp; tunnels.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gap Closure Construction in Civil Engineering\" \/>\n<meta property=\"og:description\" content=\"Engineered gap closure construction \u2713 precise, low vibration tie-ins for roads, rail, bridges &amp; tunnels.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T16:03:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gap-closure-construction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gap-closure-construction\",\"name\":\"Gap Closure Construction in Civil Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-07T10:49:37+00:00\",\"dateModified\":\"2026-04-25T16:03:02+00:00\",\"description\":\"Engineered gap closure construction \u2713 precise, low vibration tie-ins for roads, rail, bridges & tunnels.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gap-closure-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gap-closure-construction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/gap-closure-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Gap closure construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gap Closure Construction in Civil Engineering","description":"Engineered gap closure construction \u2713 precise, low vibration tie-ins for roads, rail, bridges & tunnels.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction","og_locale":"en_US","og_type":"article","og_title":"Gap Closure Construction in Civil Engineering","og_description":"Engineered gap closure construction \u2713 precise, low vibration tie-ins for roads, rail, bridges & tunnels.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T16:03:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction","url":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction","name":"Gap Closure Construction in Civil Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-07T10:49:37+00:00","dateModified":"2026-04-25T16:03:02+00:00","description":"Engineered gap closure construction \u2713 precise, low vibration tie-ins for roads, rail, bridges & tunnels.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/gap-closure-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Gap closure construction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19411","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19411"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19411\/revisions"}],"predecessor-version":[{"id":26656,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19411\/revisions\/26656"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19411"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}