{"id":19408,"date":"2025-11-07T12:36:38","date_gmt":"2025-11-07T11:36:38","guid":{"rendered":"https:\/\/www.darda.de\/propeller"},"modified":"2026-04-25T16:34:02","modified_gmt":"2026-04-25T14:34:02","slug":"propeller","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/propeller","title":{"rendered":"Propeller"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The propeller &#8211; often also called an airscrew &#8211; converts the rotary motion of a drive into straight-line thrust. It accelerates air rearwards, thereby generating a forward propulsive force. In fluid-dynamic terms, thrust results from increased mass flow and velocity change across the propeller disk. Propellers shape not only propeller-driven aircraft and crewed air vehicles, but also countless uncrewed systems such as drones as well as test stands and experimental facilities. In the planning, construction, maintenance, and deconstruction of such facilities, there is a direct link to construction and separation work: foundations of test stands, noise-control structures, enclosures, concrete ducts, or fixings often have to be modified, selectively demolished, or completely deconstructed &#8211; task areas in which tools such as <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> from Darda GmbH can play a practical role. For many of these activities, principles of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a> apply.<\/p>\n<h2>Definition: What is a propeller?<\/h2>\n<p>A propeller is a rotating thrust device whose profiled blades have graded pitch and twist along the radius. Each blade acts as an airfoil that generates force through inflow and angle of attack; the <em>axial<\/em> component of this force provides thrust, while the tangential component represents aerodynamic torque. Key parameters include diameter, pitch, blade count, solidity, advance ratio, rotational speed, and efficiency. Propellers are available as fixed- or variable-pitch units, including constant-speed and reversible versions, with feathering options for safety and drag reduction.<\/p>\n<h2>Historical development and contemporary configurations<\/h2>\n<p>Historically, laminated wooden propellers with coated protective leading edges dominated. Later, forged and milled metal propellers prevailed, especially aluminum alloys with steel hubs. Today, fiber composites (CFRP\/GFRP) are widespread: they combine low weight with high dimensional stability and enable optimized blade profiles. Contemporary blade shapes often feature swept tips or scimitar geometries to reduce compressibility losses and tonal noise. Configurations range from two-blade fixed-pitch propellers through multi-blade variable systems to large-diameter slow-flyer propellers for UAVs. In test environments, propellers are operated in single- and multi-engine configurations on massive concrete foundations, often in acoustic enclosures or wind tunnels whose deconstructable design should be planned for future repurposing.<\/p>\n<h2>Design, materials and manufacturing<\/h2>\n<p>A propeller consists of a hub, blades, and often a spinner. Along the radius, the blades exhibit varying profile thickness, chord length, and blade angle to deliver as uniform a lift contribution as possible at different circumferential speeds. The geometric twist and pitch distribution follow blade-element and momentum considerations to maintain efficient angles of attack over the span. Hub concepts range from simple fixed hubs to controllable, reversible, or featherable mechanisms with integrated pitch-change actuation.<\/p>\n<h3>Materials<\/h3>\n<p>Common materials are laminated hardwood, aluminum alloys, and fiber composites such as CFRP\/GFRP with protective leading edges made of metal or ceramic. While wood is comparatively tolerant of notch effects, metals and composites offer longer service life and precise geometry. During repair and end-of-life processing, material separation is relevant: metal parts can be cut with steel shears, while fiber composites require a low-dust, controlled approach and suitable extraction.<\/p>\n<ul>\n<li><strong>Wood:<\/strong> resilient to small impacts, easy to repair and seal, moisture protection required<\/li>\n<li><strong>Metals:<\/strong> high fatigue strength and accurate machining, corrosion protection essential<\/li>\n<li><strong>Composites:<\/strong> high stiffness-to-weight and tailored layups, sensitive to impact and heat, dust control critical<\/li>\n<\/ul>\n<h3>Manufacturing and balancing<\/h3>\n<p>Wooden propellers are glued, milled, and sealed; metal propellers are produced by forging, milling, and surface finishing; composite propellers by laminating in a tool and curing. Final steps include <em>balancing<\/em>, both static and dynamic. In test stands, foundation fixings, anchors, and supports are often made of reinforced concrete, whose later dismantling calls for selective separation techniques &#8211; such as controlled splitting with <strong>hydraulic splitters<\/strong> or biting off components with <strong>concrete pulverizers<\/strong>. Acceptable residual imbalance is defined by the application and specified balancing grades; documentation of balance correction and component traceability supports safe operation and maintenance cycles.<\/p>\n<h2>Aerodynamic fundamentals and operating modes<\/h2>\n<p>The operating principle is based on momentum theory and airfoil lift. As rotational speed increases, the blade tip approaches the speed of sound; limiting factors include tip Mach number, noise emissions, and structural loading. The helical wake, inflow angles, and induced velocities determine the effective angle of attack along the blade and thus overall efficiency.<\/p>\n<h3>Fixed and variable pitch<\/h3>\n<p>Fixed-pitch propellers are simple and robust but operate efficiently only over a limited speed range. Variable-pitch propellers adapt the blade angle to the flight phase (takeoff, climb, cruise). Constant-speed governors hold RPM while varying blade pitch. Reversible pitch supports thrust reversal on the ground or in test environments and can shorten spool-down distances when correctly integrated into safety procedures.<\/p>\n<h3>Efficiency, thrust and noise<\/h3>\n<p>Efficiency depends on blade count, airfoil, pitch, diameter, and operating condition. Larger diameter and lower RPM reduce noise emissions. In test stands or hangars, acoustic systems with massive concrete are often used, whose modification or deconstruction in existing structures requires precise cutting and splitting operations. Tonal noise components scale with blade pass frequency (blades times revolutions per second), while broadband noise is influenced by tip vortices, inflow turbulence, and compressibility effects. Disk loading and advance ratio jointly inform the trade-off between thrust, efficiency, and acoustic performance.<\/p>\n<h3>Advance ratio and disk loading<\/h3>\n<p>Performance is frequently characterized by the advance ratio J = V\/(nD), where V is forward speed, n is revolutions per second, and D is diameter. Low J values favor static thrust, higher J values reflect cruise regimes. In parallel, disk loading (thrust per unit disk area) guides diameter selection: low disk loading yields higher efficiency and lower noise at the expense of size and structural demand on hubs and mounts.<\/p>\n<h2>Applications and interfaces to built infrastructure<\/h2>\n<p>Propellers are encountered in airplanes, helicopters with auxiliary propellers, UAVs, ground test stands, engine test stands, wind tunnels, and noise-control installations. These facilities rely on load-bearing foundations, vibration isolation, concrete ducts, and anchorage points of reinforced concrete. During conversions or decommissioning, there is a need for selective deconstruction:<\/p>\n<ul>\n<li>Cutting and removing machine foundations, test stand platforms, and vibration blocks<\/li>\n<li>Opening cable and air ducts in concrete and adapting penetrations<\/li>\n<li>Deconstructing sound barriers, enclosures, and anchor groups<\/li>\n<li>Dismantling steel structures in built-ins, beams, and enclosures<\/li>\n<li>Selective exposure of embedded sensors, strain gauges, and cabling in slabs or plinths<\/li>\n<\/ul>\n<p>For such tasks, depending on structural analysis and constraints, <strong>concrete pulverizers<\/strong> are used to crush reinforced members in a controlled manner, or <strong>hydraulic splitters<\/strong> to split concrete bodies along defined drill-hole patterns with low vibration and without blasting. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> provide the required energy. Steel shears and multi cutters separate metallic built-ins, while tank cutters can be used for hollow bodies or thick-walled structures.<\/p>\n<h2>Planning and approach in a deconstruction environment<\/h2>\n<p>The deconstruction of propeller-related facilities requires a methodical approach to ensure safety, structural protection, and schedule adherence:<\/p>\n<ol>\n<li>As-built survey: record the structure, reinforcement layout, anchors, media lines, and interfering substances (e.g., composites, coatings)<\/li>\n<li>Method selection: splitting, shear-based demolition, cutting, drilling &#8211; depending on component thickness, reinforcement, and vibration limits<\/li>\n<li>Emissions control: noise and dust mitigation, extraction for fiber composites, protective measures for personnel and surroundings<\/li>\n<li>Selective separation: sort materials by type, selectively release steel from reinforcement or built-in parts<\/li>\n<li>Logistics: define component sizes, plan handling and transport routes, prepare disposal and reuse<\/li>\n<li>Permits and coordination: clarify approvals, lock-off procedures, and interfaces with ongoing operations in test facilities<\/li>\n<\/ol>\n<h3>Material separation in practice<\/h3>\n<p>Concrete and reinforced concrete are often processed using a combination of <strong>concrete pulverizers<\/strong> and splitting techniques: shears produce crushed fractions with rebar released, while splitters reduce cross-sections or separate massive blocks with low vibration. Metallic attachments can be cut with steel shears or multi cutters. Fiber composite components require low-dust cutting and appropriate capture of fibers; suitable procedures must be selected. Water-assisted cutting and localized extraction reduce airborne particulates without compromising electrical systems or measurement equipment where present.<\/p>\n<h2>Typical tasks around propellers and infrastructure<\/h2>\n<ul>\n<li>Selective demolition of concrete plinths for propeller test stands<\/li>\n<li>Creating openings in hangar floors for new utility runs<\/li>\n<li>Deconstruction of sound ducts and concrete guide bodies in test booths<\/li>\n<li>Cutting anchor plates, brackets, and mounts in reinforced concrete<\/li>\n<li>Dismantling steel frames, ventilation ducts, and enclosures<\/li>\n<li>Core drilling for sensor lines and condition monitoring upgrades<\/li>\n<\/ul>\n<p>The choice of separation method depends on component thickness, accessibility, environmental constraints, and reuse objectives. <strong>Hydraulic splitters<\/strong> are advantageous where vibration and dust limits are tight; <strong>concrete pulverizers<\/strong> are suitable for efficiently converting reinforced members into manageable fractions. Combining both methods in sequence often minimizes collateral damage and expedites sorting for recycling.<\/p>\n<h2>Key parameters, design and operation<\/h2>\n<p>Essential characteristics of a propeller include diameter, pitch, blade count, blade airfoil, rotational speed, and allowable tip speed. The design balances thrust requirement, noise, material loading, and efficiency. For operators of test stands, vibration isolation and foundation sizing are important; later repurposing benefits from modular constructions that can be readily adapted with shear or splitting techniques. Additional sizing metrics such as solidity, disk loading, and the permissible tip Mach number ensure that structural limits and acoustic targets are met across the operating envelope.<\/p>\n<h3>Maintenance, inspection and service life<\/h3>\n<p>Inspections include visual checks for nicks, delaminations, leading-edge erosion, corrosion protection, and hub mechanism condition. Balancing after repairs reduces vibration and protects bearings. During decommissioning or replacement, clear separation concepts enable safe dismantling and single-grade material recovery.<\/p>\n<ul>\n<li>Non-destructive testing as applicable: dye penetrant or eddy current on metals, tap test or ultrasonic methods on composites<\/li>\n<li>Periodic torque checks on bolts and hub fasteners, including corrosion-inhibiting treatments<\/li>\n<li>Documentation of repair limits, repainting or re-coating steps, and post-maintenance balance results<\/li>\n<\/ul>\n<h2>Terminology and classification<\/h2>\n<p>The propeller differs from the axial fan in operating range and installation context: fans move airflows within systems, propellers generate propulsion. It must also not be confused with a screw compressor or a screw conveyor. In construction and deconstruction projects, precise terminology is relevant to ensure that planning, structural analysis, and methods are unambiguous. Consistent use of terms in method statements, risk assessments, and tender documents reduces misinterpretation and rework.<\/p>\n<h2>Safety and environmental protection for work around propellers<\/h2>\n<p>Work near active or recently operated propellers requires exclusion zones, permits, and safeguarding against spin-down run-on. During deconstruction, dust, noise, and vibrations must be minimized. Fiber composite dust must be avoided and properly captured. Compliance with applicable regulations, hazard assessments, and coordinated work procedures is essential. Low-noise, low-vibration separation methods &#8211; splitting rather than percussive techniques &#8211; help protect personnel and existing structures. Isolation and lock-off procedures for drives, clear marking of propeller arcs, and defined handover between trades further enhance safety.<\/p>\n<h2>Material separation on propellers and attachments<\/h2>\n<p>During dismantling of propellers and installations, metal components (hubs, fasteners, pitch systems) are often separated mechanically, while composite blades must be carefully disassembled and separated by material. Steel built-ins, brackets, and mounts can be cut with steel shears or multi cutters; foundations and supports are, depending on constraints, crushed with <strong>concrete pulverizers<\/strong> or opened with <strong>hydraulic splitters<\/strong> with low vibration. Hydraulic power units provide the energy supply for the tools. Early separation planning supports high recycling rates, reduces secondary damage, and shortens downtimes in test or hangar environments.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The propeller &#8211; often also called an airscrew &#8211; converts the rotary motion of a drive into straight-line thrust. It accelerates air rearwards, thereby generating a forward propulsive force. In fluid-dynamic terms, thrust results from increased mass flow and velocity change across the propeller disk. Propellers shape not only propeller-driven <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/propeller\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19408","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Propeller - Aircraft Airscrew Design &amp; Operation<\/title>\n<meta name=\"description\" content=\"Discover aircraft and UAV propellers \u2713 design, aerodynamics, materials, efficiency &amp; noise, plus test stand insights.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/propeller\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Propeller - Aircraft Airscrew Design &amp; Operation\" \/>\n<meta property=\"og:description\" content=\"Discover aircraft and UAV propellers \u2713 design, aerodynamics, materials, efficiency &amp; noise, plus test stand insights.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/propeller\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-25T14:34:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/propeller\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/propeller\",\"name\":\"Propeller - Aircraft Airscrew Design & Operation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-07T11:36:38+00:00\",\"dateModified\":\"2026-04-25T14:34:02+00:00\",\"description\":\"Discover aircraft and UAV propellers \u2713 design, aerodynamics, materials, efficiency & noise, plus test stand insights.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/propeller#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/propeller\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/propeller#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Propeller\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Propeller - Aircraft Airscrew Design & Operation","description":"Discover aircraft and UAV propellers \u2713 design, aerodynamics, materials, efficiency & noise, plus test stand insights.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/propeller","og_locale":"en_US","og_type":"article","og_title":"Propeller - Aircraft Airscrew Design & Operation","og_description":"Discover aircraft and UAV propellers \u2713 design, aerodynamics, materials, efficiency & noise, plus test stand insights.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/propeller","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-25T14:34:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/propeller","url":"https:\/\/www.darda.de\/en\/knowledge\/propeller","name":"Propeller - Aircraft Airscrew Design & Operation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-07T11:36:38+00:00","dateModified":"2026-04-25T14:34:02+00:00","description":"Discover aircraft and UAV propellers \u2713 design, aerodynamics, materials, efficiency & noise, plus test stand insights.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/propeller#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/propeller"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/propeller#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Propeller"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19408"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19408\/revisions"}],"predecessor-version":[{"id":26646,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19408\/revisions\/26646"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}