{"id":19406,"date":"2025-11-06T11:22:08","date_gmt":"2025-11-06T10:22:08","guid":{"rendered":"https:\/\/www.darda.de\/air-duct"},"modified":"2026-11-06T13:13:03","modified_gmt":"2026-11-06T12:13:03","slug":"air-duct","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/air-duct","title":{"rendered":"Air duct"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Air ducts are central elements of building services engineering and of ventilation in underground and tunnel construction. They carry supply air and exhaust air, ensure the exchange of spent air, and serve smoke extraction in the event of fire. For planning, construction, operation as well as for strip-out, concrete demolition and special deconstruction, a precise understanding of configuration, materials, installation locations, and separation methods is crucial. In deconstruction, the focus is also on safely exposing them from concrete components, the controlled separation of duct sections, and the clean separation of materials &#8211; often under confined space conditions where low-vibration, hydraulic methods offer advantages. In the wider context of HVAC and MEP systems, coordination with load-bearing structures, fire protection, and building operation ensures compliant and energy-efficient outcomes across the whole life cycle.<\/p>\n<h2>Definition: What is an air duct?<\/h2>\n<p>An air duct (also ventilation duct, air line, or ventilation channel) is a closed conduit for the orderly routing of airflow in buildings, industrial plants, and underground facilities. Air ducts are used for supply air, exhaust air, recirculated air, or smoke extraction and consist of straight runs, fittings (bends, branches, reducers), and internal components such as volume flow controllers, silencers, or fire dampers. Typical cross-sections are rectangular, round, or oval; materials range from galvanized sheet steel to stainless steel and to plastic and mineral variants. The design takes into account air volume flows, pressure losses, airtightness, and sound insulation as well as structural fire protection at penetrations and in shafts. Beyond geometry and materials, the specification addresses pressure and temperature classes, corrosion resistance, and accessibility for inspection and cleaning.<\/p>\n<h2>Construction, materials and typical variants<\/h2>\n<p>Air ducts are manufactured in the factory or on site and assembled using flange or seam connections. The inner surface should be flow-optimized, and the joining technique must permanently ensure the required airtightness class. Depending on use, outer surfaces are thermally insulated or protected against condensation; smoke extraction ducts are additionally clad for fire resistance. Gaskets, sealants, and insulation systems should be compatible with the medium and temperature, emit low VOCs, and maintain performance over service life; quality control includes visual checks, dimensional tolerances, and sample leak tests at defined stages.<\/p>\n<h3>Cross-sections and shapes<\/h3>\n<ul>\n<li>Rectangular ducts: space-saving in suspended ceilings and shafts, high variety of fittings, easier integration of access doors.<\/li>\n<li>Round ducts (spiral-seam, smooth): flow-optimized, good airtightness, often used for long main runs, favorable surface-to-volume ratio.<\/li>\n<li>Oval ducts: a compromise between overall height and flow quality where space is limited.<\/li>\n<li>Transitions and special pieces: tailored adapters, nozzles, and tap-ins for compact plant layouts with minimized pressure loss.<\/li>\n<\/ul>\n<h3>Materials<\/h3>\n<ul>\n<li>Galvanized sheet steel and stainless steel: robust, temperature resistant, easy to cut and recyclable.<\/li>\n<li>Aluminum: low weight, used in corrosive environments.<\/li>\n<li>Plastics (e.g., PE, PVC): chemical resistance, low weight, limited temperature and fire protection performance.<\/li>\n<li>Mineral air ducts: fire-resistant special solutions, including for smoke extraction.<\/li>\n<li>Flexible hoses: temporary air routing, e.g., during construction phases or in tunnel advance.<\/li>\n<\/ul>\n<p>Material selection is guided by exposure to humidity and chemicals, hygiene requirements, noise control, and end-of-life recyclability; surface treatments and coatings complement corrosion protection and cleaning needs.<\/p>\n<h3>Structural integration<\/h3>\n<p>Air ducts run in suspended ceilings, shafts, plant rooms, and suspension systems. In solid structures, openings and penetrations in walls and slabs must be created and closed with fire-protection measures. In tunnel construction, temporary and permanent air ducts ensure the supply of fresh air and the removal of dust at the tunnel face. Support systems require verified load paths, appropriate hanger spacing, vibration isolation where necessary, and corrosion protection; interfaces with structural and fire-stopping trades must be coordinated early.<\/p>\n<h2>Design fundamentals: air volumes, pressure losses and acoustics<\/h2>\n<p>The sizing of air ducts is based on required air volume flows, permissible flow velocities, and pressure losses. Smooth internal surfaces, suitable cross-section selection, and moderate deflections reduce energy demand and noise emissions. Airtightness and neatly executed joints minimize leakage and prevent unwanted flow noise. Access openings allow inspection and cleaning, especially in hygiene-sensitive areas. For variable air volume operation, stable control ranges and sufficiently straight inlet sections upstream of control devices are essential; acoustic measures combine low turbulence design with silencers selected for the frequency spectrum at hand.<\/p>\n<h2>Air ducts in concrete construction, strip-out and special deconstruction<\/h2>\n<p>In repurposing, partial demolition, or complete deconstruction, air ducts must be identified, exposed, separated, and removed with clean material separation. In buildings, ducts are often concealed behind cladding or in shafts, connected to concrete components, and suspended from beams. <strong>Low dust, low vibration, and controlled cut guidance<\/strong> are key objectives to protect adjacent components and uses. Prior hazard assessments, scheduling of shutdown windows, and dust and noise management plans support safe and efficient execution under ongoing operations.<\/p>\n<h3>Investigation and separation in practice<\/h3>\n<ol>\n<li>Review documents: as-built drawings, fire protection concept, services register.<\/li>\n<li>Shut down systems: isolate plant sections, avoid residual pressures, secure electrical components.<\/li>\n<li>Identify materials and internal components: duct material, insulation materials, fire dampers, silencers.<\/li>\n<li>Expose: remove claddings and casings, provide access to hangers.<\/li>\n<li>Separate and dismantle in sections: establish load-free conditions, minimize vibration and sparking.<\/li>\n<li>Sort: record metals, insulation, and fastening materials separately.<\/li>\n<li>Provide permits and notifications: hot work permits if applicable, coordination with building operation and safety officers.<\/li>\n<li>Seal and make safe: close temporary openings, secure remaining services, and document reinstatements.<\/li>\n<\/ol>\n<h3>Tools and methods in deconstruction<\/h3>\n<p>Hydraulic cutting and splitting methods are used for exposing from reinforced concrete and for cutting metal ducts. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Concrete Crushers<\/a> from Darda GmbH are suitable for low-vibration enlargement of shafts and slab openings or for removing concrete enclosures. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH enable the controlled opening of massive components without impact or blasting effects. For cutting duct sheet, flanges, hangers, and sections, steel shears, combi-shears, and Multi Cutters from Darda GmbH are used; they also cut reinforcement sections or trapezoidal sheet with a precise cut edge. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a> from Darda GmbH supply these tools in a mobile and reliable manner. Selection is based on material thickness, access conditions, and the permissible vibration and spark level of the environment.<\/p>\n<ul>\n<li>Exposing in reinforced concrete: concrete crushers from Darda GmbH for removing casings, shotcrete, or shell penetrations.<\/li>\n<li>Opening shafts and wall penetrations: stone and concrete splitters from Darda GmbH for controlled, low-crack enlargements.<\/li>\n<li>Detaching air ducts and hangers: steel shears, combi-shears, and Multi Cutters from Darda GmbH for sheet, angles, and threaded rods.<\/li>\n<li>Cutting to size for transport and recycling: produce short, manageable segments with defined cut edges.<\/li>\n<\/ul>\n<h2>Air ducts in rock excavation and tunnel construction<\/h2>\n<p>In tunnel construction, provisional and permanent air ducts ensure the ventilation of the heading. Flexible hoses or robust steel ducts bring fresh air to the tunnel face and transport dust and exhaust gases away. When constructing or enlarging ventilation shafts and when modifying cross passages, low vibrations and controlled fracture patterns are important. Rock split cylinders and stone and concrete splitters from Darda GmbH are practical for creating or adapting openings in rock and shotcrete; concrete crushers help remove concrete casings and expose steel sections without excessively stressing the surroundings. Reliable ventilation under changing advance rates requires robust fixings, redundancy concepts, and routine inspections.<\/p>\n<h2>Fire protection and smoke extraction<\/h2>\n<p>Smoke extraction lines and fire-resistant air ducts meet special requirements regarding temperature resistance, airtightness, and fixings. Fire dampers, seals, and claddings must not be impaired in operation. In deconstruction, changes to such components must be planned with particular care; temporary protective measures are to be provided where necessary. Legal requirements may vary by project and region; implementation is generally based on the applicable fire protection concept.<\/p>\n<ul>\n<li>Define system classification: fire resistance period, temperature curve, and smoke tightness requirements.<\/li>\n<li>Detail penetrations and supports: maintain fire-stopping integrity and bearing capacity under fire exposure.<\/li>\n<li>Plan maintenance access: ensure inspection points at dampers and critical junctions remain reachable.<\/li>\n<\/ul>\n<h2>Hygiene, cleaning and potential contamination<\/h2>\n<p>Dust, biofilms, and potential contaminants can accumulate in air ducts. In older installations, problematic fibers or ingredients may be present in insulation or sealing materials. Work on contaminated sections should be planned by competent personnel; appropriate protective measures (dust limitation, negative pressure, PPE) and proper packaging and disposal of materials must be provided. For hygiene-sensitive systems, cleaning concepts, inspection intervals, and the positioning of access doors are to be defined during design, including provisions for safe wastewater capture during wet cleaning.<\/p>\n<h2>Airtightness, testing and documentation<\/h2>\n<p>Airtightness requirements target low leakage rates, energy efficiency, and acoustic quality. In construction practice, airtightness classes are defined project-specifically and verified by tests. In deconstruction, exposing, separating, and decommissioning must be documented in a traceable manner. This particularly concerns the removal of fire protection components, the sealing of temporary openings, and handover to subsequent trades. Pressure testing with calibrated equipment, designated test ports, and photo documentation of critical details underpin verifiable quality; deviations and corrective actions are to be recorded transparently.<\/p>\n<h2>Recycling and disposal<\/h2>\n<p>Clean separation by material increases the recovery rate and lowers disposal costs. Metallic duct components are well suited for recycling; insulation materials, sealing tapes, and coatings must be handled separately. The following approach has proven itself:<\/p>\n<ul>\n<li>Separate duct segments from insulation and cladding; clean cut edges facilitate sorting.<\/li>\n<li>Record flanges, bolts, and steel hangers separately.<\/li>\n<li>Package and remove insulation materials and any claddings in accordance with their classification.<\/li>\n<li>Document material flows (quantity, type, destination).<\/li>\n<li>Remove residual sealants and adhesive layers from metals where feasible to improve recyclate quality.<\/li>\n<\/ul>\n<h2>Typical mistakes and proven practices<\/h2>\n<ul>\n<li>Avoid inadequate investigation: identify concealed fire dampers or electric actuators at an early stage.<\/li>\n<li>Establish load-free conditions: release hangers selectively and secure ducts against slipping.<\/li>\n<li>Minimize sparking and vibration: separate hydraulically, work <em>wet or low-dust<\/em>, use extraction.<\/li>\n<li>Observe fire protection: open seals only after approval, provide temporary closures.<\/li>\n<li>Plan logistics: choose cut lengths, carry routes, and interim storage so that bottlenecks remain passable.<\/li>\n<li>Respect residual hazards: check for sharp edges, trapped energy, and unexpected loads before each cut.<\/li>\n<li>Coordinate interfaces: agree on sealing of penetrations and final closures with subsequent trades prior to dismantling.<\/li>\n<\/ul>\n<h2>Safety and health protection<\/h2>\n<p>Cut edges, falling parts, noise, and dust are the main risks. Personal protective equipment, low-dust methods, suitable lifting gear, and clear cutting plans increase occupational safety. Where material qualities or potential contaminants are unclear, a cautious, step-by-step approach should be chosen. Lockout-tagout for drives and controls, defined exclusion zones, suitable lighting and communication in shafts, and monitored air quality in confined spaces support safe execution.<\/p>\n<h2>Interfaces with products and application areas of Darda GmbH<\/h2>\n<p>In the context of air ducts, several application areas intersect: <strong>strip-out and cutting<\/strong> (exposing, dismantling), <strong>concrete demolition and special deconstruction<\/strong> (shaft openings, slab penetrations), <strong>rock excavation and tunnel construction<\/strong> (shaft and cross-passage connections), as well as <strong>special operations<\/strong> in tight, sensitive areas. Concrete crushers and stone and concrete splitters from Darda GmbH provide low-vibration, controlled support in removing mineral surrounding structures. Steel shears, combi-shears, and Multi Cutters from Darda GmbH efficiently cut metal ducts, hangers, and frame components; hydraulic power packs provide the necessary energy supply &#8211; mobile on the construction site or within existing buildings. Tool selection and method statements should demonstrate compatibility with site constraints, required cut quality, and documentation needs.<\/p>\n<\/div>\n\n<h2 class=\"wissen-faq\">Frequently asked questions and answers<\/h2>\n\n<div class=\"schema-faq wp-block-yoast-faq-block wissen-faq\">\n<div class=\"schema-faq-section\" id=\"faq-question-darda-en-b001-19406-1\"><strong class=\"schema-faq-question\">What is an air duct and what functions can it perform?<\/strong> <p class=\"schema-faq-answer\">An air duct is a closed conduit that routes airflow in buildings, industrial plants, and underground facilities. It can carry supply, exhaust, or recirculated air and can also serve smoke extraction.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-darda-en-b001-19406-2\"><strong class=\"schema-faq-question\">How are air duct shape and material selected?<\/strong> <p class=\"schema-faq-answer\">Cross-section selection reflects available space, airflow needs, and the required fittings. Material selection considers humidity, chemicals, hygiene, noise control, temperature and fire performance, corrosion resistance, and access for inspection and cleaning.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-darda-en-b001-19406-3\"><strong class=\"schema-faq-question\">Which factors guide air duct sizing and acoustic design?<\/strong> <p class=\"schema-faq-answer\">Sizing is based on required air volume, permissible flow velocity, and pressure loss. Acoustic design combines smooth internal surfaces, suitable cross-sections, moderate deflections, airtight joints, low-turbulence routing, and silencers selected for the relevant frequency spectrum.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-darda-en-b001-19406-4\"><strong class=\"schema-faq-question\">What should be planned before air ducts are dismantled?<\/strong> <p class=\"schema-faq-answer\">Planning starts with reviewing drawings, the fire protection concept, and the services register. Relevant sections should be isolated, materials and internal components identified, and ducts made load-free before sectional dismantling. Access, permits, dust and noise management, temporary closures, and documentation also require coordination.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-darda-en-b001-19406-5\"><strong class=\"schema-faq-question\">Which Darda GmbH tools are used when exposing or separating air ducts?<\/strong> <p class=\"schema-faq-answer\">Concrete Crushers from Darda GmbH remove concrete enclosures and enlarge openings, while rock and concrete splitters open massive components. Steel shears, combi-shears, and Multi Cutters separate ducts, flanges, hangers, and sections. Hydraulic Power Units supply these tools.<\/p> <\/div> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Air ducts are central elements of building services engineering and of ventilation in underground and tunnel construction. They carry supply air and exhaust air, ensure the exchange of spent air, and serve smoke extraction in the event of fire. For planning, construction, operation as well as for strip-out, concrete demolition <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/air-duct\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19406","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Air Duct | Building &amp; Tunnel Ventilation<\/title>\n<meta name=\"description\" content=\"Expert guide to air duct systems for HVAC ventilation in buildings and tunnels \u2713 design, fire safety &amp; deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/air-duct\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Air Duct | Building &amp; Tunnel Ventilation\" \/>\n<meta property=\"og:description\" content=\"Expert guide to air duct systems for HVAC ventilation in buildings and tunnels \u2713 design, fire safety &amp; deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/air-duct\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-06T12:13:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct\",\"name\":\"Air Duct | Building & Tunnel Ventilation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-06T10:22:08+00:00\",\"dateModified\":\"2026-11-06T12:13:03+00:00\",\"description\":\"Expert guide to air duct systems for HVAC ventilation in buildings and tunnels \u2713 design, fire safety & deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-1\"},{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-2\"},{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-3\"},{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-4\"},{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-5\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Air duct\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-1\",\"position\":1,\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-1\",\"name\":\"What is an air duct and what functions can it perform?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"An air duct is a closed conduit that routes airflow in buildings, industrial plants, and underground facilities. It can carry supply, exhaust, or recirculated air and can also serve smoke extraction.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-2\",\"position\":2,\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-2\",\"name\":\"How are air duct shape and material selected?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Cross-section selection reflects available space, airflow needs, and the required fittings. Material selection considers humidity, chemicals, hygiene, noise control, temperature and fire performance, corrosion resistance, and access for inspection and cleaning.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-3\",\"position\":3,\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-3\",\"name\":\"Which factors guide air duct sizing and acoustic design?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Sizing is based on required air volume, permissible flow velocity, and pressure loss. Acoustic design combines smooth internal surfaces, suitable cross-sections, moderate deflections, airtight joints, low-turbulence routing, and silencers selected for the relevant frequency spectrum.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-4\",\"position\":4,\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-4\",\"name\":\"What should be planned before air ducts are dismantled?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Planning starts with reviewing drawings, the fire protection concept, and the services register. Relevant sections should be isolated, materials and internal components identified, and ducts made load-free before sectional dismantling. Access, permits, dust and noise management, temporary closures, and documentation also require coordination.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-5\",\"position\":5,\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/air-duct#faq-question-darda-en-b001-19406-5\",\"name\":\"Which Darda GmbH tools are used when exposing or separating air ducts?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Concrete Crushers from Darda GmbH remove concrete enclosures and enlarge openings, while rock and concrete splitters open massive components. Steel shears, combi-shears, and Multi Cutters separate ducts, flanges, hangers, and sections. Hydraulic Power Units supply these tools.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Air Duct | Building & Tunnel Ventilation","description":"Expert guide to air duct systems for HVAC ventilation in buildings and tunnels \u2713 design, fire safety & deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/air-duct","og_locale":"en_US","og_type":"article","og_title":"Air Duct | Building & Tunnel Ventilation","og_description":"Expert guide to air duct systems for HVAC ventilation in buildings and tunnels \u2713 design, fire safety & deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-11-06T12:13:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["WebPage","FAQPage"],"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct","url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct","name":"Air Duct | Building & Tunnel Ventilation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-06T10:22:08+00:00","dateModified":"2026-11-06T12:13:03+00:00","description":"Expert guide to air duct systems for HVAC ventilation in buildings and tunnels \u2713 design, fire safety & deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#breadcrumb"},"mainEntity":[{"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-1"},{"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-2"},{"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-3"},{"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-4"},{"@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-5"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/air-duct"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Air duct"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]},{"@type":"Question","@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-1","position":1,"url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-1","name":"What is an air duct and what functions can it perform?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"An air duct is a closed conduit that routes airflow in buildings, industrial plants, and underground facilities. It can carry supply, exhaust, or recirculated air and can also serve smoke extraction.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-2","position":2,"url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-2","name":"How are air duct shape and material selected?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Cross-section selection reflects available space, airflow needs, and the required fittings. Material selection considers humidity, chemicals, hygiene, noise control, temperature and fire performance, corrosion resistance, and access for inspection and cleaning.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-3","position":3,"url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-3","name":"Which factors guide air duct sizing and acoustic design?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Sizing is based on required air volume, permissible flow velocity, and pressure loss. Acoustic design combines smooth internal surfaces, suitable cross-sections, moderate deflections, airtight joints, low-turbulence routing, and silencers selected for the relevant frequency spectrum.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-4","position":4,"url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-4","name":"What should be planned before air ducts are dismantled?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Planning starts with reviewing drawings, the fire protection concept, and the services register. Relevant sections should be isolated, materials and internal components identified, and ducts made load-free before sectional dismantling. Access, permits, dust and noise management, temporary closures, and documentation also require coordination.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-5","position":5,"url":"https:\/\/www.darda.de\/en\/knowledge\/air-duct#faq-question-darda-en-b001-19406-5","name":"Which Darda GmbH tools are used when exposing or separating air ducts?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Concrete Crushers from Darda GmbH remove concrete enclosures and enlarge openings, while rock and concrete splitters open massive components. Steel shears, combi-shears, and Multi Cutters separate ducts, flanges, hangers, and sections. Hydraulic Power Units supply these tools.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19406"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19406\/revisions"}],"predecessor-version":[{"id":33134,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19406\/revisions\/33134"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}