{"id":19403,"date":"2025-11-06T10:06:08","date_gmt":"2025-11-06T09:06:08","guid":{"rendered":"https:\/\/www.darda.de\/airtightness"},"modified":"2026-04-24T07:10:03","modified_gmt":"2026-04-24T05:10:03","slug":"airtightness","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/airtightness","title":{"rendered":"Airtightness"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Airtightness is a central topic in deconstruction, interior demolition, and tunnel construction: It determines dust dispersion, air quality, occupational safety, and the controllability of construction site processes in sensitive environments. In areas such as hospitals, laboratories, or occupied buildings as well as underground, reliable airtightness helps limit emissions, direct airflow, and minimize risks. Especially when using hydraulic tools such as concrete demolition shear or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, execution can be planned so that protective enclosures operate reliably and negative-pressure zones remain stable. Robust containment also supports predictable logistics, cleaner handover interfaces, and verifiable compliance with project requirements.<\/p>\n<h2>Definition: What is meant by Airtightness?<\/h2>\n<p>Airtightness is the ability of an envelope, a component, or a temporary protective enclosure to prevent <em>uncontrolled air exchange<\/em>. The aim is to reduce leakage flows through joints, connections, and penetrations to the extent that defined pressure differences and flow directions are maintained. Airtightness differs from water- or oil-tightness and also from gas safety: It is primarily about limiting air movement and thus the ingress or egress of dust, aerosols, and odors. In practice, airtightness of temporary enclosures is checked by visual methods, such as smoke tests, and pressure measurements; in rooms, the air change rate can additionally be assessed. Critical are careful connections, tight penetrations, and a robust build that withstands loads from tool operation and material transport. Typical descriptors include leakage area, differential pressure stability, and the continuity of the air barrier layer, supported by a coherent pressure cascade between adjacent zones.<\/p>\n<h2>Importance of Airtightness in concrete demolition and special demolition<\/h2>\n<p>In selective deconstruction and complex demolition works, airtight protective enclosures limit dust and fiber emissions. They create a controllable environment for dust extraction and negative-pressure maintenance. Hydraulic methods with concrete demolition shear or hydraulic splitter support this: The material-friendly, controlled removal often generates fewer fine, far-traveling particles compared to percussive methods. As a result, negative-pressure zones remain more stable, filter load decreases, and air quality in adjacent areas improves. In tunnels and shafts, good airtightness also enables targeted guidance of fresh air and shielding of work areas during rock excavation or concrete demolition. This reduces cross-contamination pathways, maintains visibility, and helps keep airborne concentrations below project-specific trigger levels.<\/p>\n<h2>Safely planning airtight protective enclosures and negative-pressure control<\/h2>\n<p>Temporary protective enclosures must withstand mechanical loads and remain tight over time. This applies in particular to connections to structural concrete surfaces, joints at ceilings and walls, and penetrations for utility lines and hose bundles. Effective negative-pressure maintenance requires defined low leakage so that exhaust units with pre-filters and HEPA final stages consistently operate within the intended operating range. Reliable power supply, accessible filter change points, and clear routing of material and personnel traffic further stabilize the pressure regime and reduce unplanned openings.<\/p>\n<h3>Key factors for stable airtightness<\/h3>\n<ul>\n<li><strong>Enclosure geometry:<\/strong> The simplest possible, minimally penetrated envelopes reduce leakage paths.<\/li>\n<li><strong>Connections:<\/strong> Tight, load-transferring bonding on sound substrates; carefully roll down folds and overlaps.<\/li>\n<li><strong>Penetrations:<\/strong> Install sleeves, sealing tapes, and zipper doors so that movements of hoses, cables, and carriers do not tear open the seal.<\/li>\n<li><strong>Negative-pressure control:<\/strong> Match air capacity to the enclosure volume and leakage; continuously monitor differential pressure.<\/li>\n<li><strong>Material robustness:<\/strong> Use tear-resistant membranes and reinforce edges and corners to prevent crack initiation under cyclic loads.<\/li>\n<li><strong>Monitoring and alarms:<\/strong> Provide continuous differential pressure indication with threshold alarms to flag performance drifts early.<\/li>\n<\/ul>\n<h2>Tool selection and airtightness: influence of concrete demolition shear and hydraulic splitter<\/h2>\n<p>The choice of removal method affects particle generation, airflow, and thus the requirements for the protective enclosure.<\/p>\n<ul>\n<li><strong>Concrete demolition shear:<\/strong> Crushing and shearing processes usually produce coarser fragments and fewer fine airborne dusts. This facilitates particle control within airtight enclosures, especially in interior demolition.<\/li>\n<li><strong>Hydraulic splitter<\/strong> as well as <em>rock wedge splitter<\/em>: Controlled widening of cracks enables sectional removal with low secondary dust generation; negative-pressure zones remain more manageable.<\/li>\n<li><strong>Combination shears<\/strong> and <strong>multi cutters<\/strong>: In reinforced concrete, the combined cutting\/shearing process reduces rework with percussive tools; this lowers the airborne load inside the enclosure.<\/li>\n<li><strong>Steel shear<\/strong> and <strong>tank cutters:<\/strong> For metal removal, airtight enclosures are important to capture and extract aerosols, fumes, and odors in a targeted manner; tightness protects adjacent areas.<\/li>\n<li><strong>Hydraulic power pack:<\/strong> Hydraulic drives operate without compressed-air streams at the tool head and promote calm air conditions in the enclosure. Hose penetrations must still be routed airtight.<\/li>\n<li><strong>Moisture management:<\/strong> If wetting or misting is used for dust suppression, select tapes and membranes compatible with elevated humidity to avoid adhesion loss at joints.<\/li>\n<\/ul>\n<h2>Fields of application: Airtightness in practice<\/h2>\n<h3>Interior demolition and cutting<\/h3>\n<p>In selective deconstruction within existing buildings, airtight enclosures protect adjacent occupied areas. Concrete demolition shear and combination shears support low-dust removal of slab edges, beams, and wall panels. Zipper doors, airlocks, and differential-pressure-controlled exhaust modules keep particles within the barrier. Clear zoning, floor protection, and interim cleaning sequences reduce resuspension and help maintain a stable pressure cascade across corridors and stairwells.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In sensitive environments, such as ongoing building operations, airtight protective enclosures limit the spread of suspended particulates. Hydraulic splitter enables gentle release of larger components that are then recovered in a controlled manner. Airtightness facilitates source capture of emissions. Where cutting of reinforcement is required, coordinated extraction at the workface and short transport paths within the enclosure further minimize exposure.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Underground, tight enclosures and targeted airflow ensure visibility and breathing air quality. When using rock wedge splitter and concrete demolition shear, work areas can be temporarily separated while the main ventilation controls the flows. This approach aligns with <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a> practices. Low-leakage doors and tight line penetrations are particularly important here. Interfaces to the permanent ventilation must be planned to prevent pressure inversions during shift changes or equipment relocations.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In halls or covered workstations, airtightness minimizes dust release into adjacent zones. Hydraulic splitter contributes to lower-particle removal; capture via local dust extraction points works more efficiently in tight enclosures. Where surfaces are polished post-extraction, maintaining negative pressure and directional airflow prevents fine grinding dust from leaving the process area.<\/p>\n<h3>Special applications<\/h3>\n<p>When working on tanks, shafts, or contaminated sites, airtight enclosures are crucial for process safety. Tank cutters and steel shear require tight, controlled atmospheres; leaks can undermine the entire protection concept. Gas monitoring, spark control, and well-organized access procedures complement airtightness to maintain safe operating conditions in confined spaces.<\/p>\n<h2>Planning and execution: step-by-step to an airtight protective enclosure<\/h2>\n<ol>\n<li><strong>Define the protection objective:<\/strong> Specify the desired pressure differential, air changes, and particle retention. Establish acceptance criteria and target ranges for continuous operation.<\/li>\n<li><strong>Determine enclosure volume and air capacity:<\/strong> Size exhaust units and filter stages to suit the geometry. Consider reserve capacity for door openings, transport activities, and filter loading over time.<\/li>\n<li><strong>Plan the structure:<\/strong> Consider substrates, connections, load transfer, and tensile forces from door traffic and hose movement. Reinforce corners and high-wear zones, and avoid sharp edge contacts.<\/li>\n<li><strong>Coordinate penetrations:<\/strong> Route utility lines, hydraulic hose lines, power supply cables, and dust extraction hoses with planned sealing sleeves. Bundle penetrations where feasible to reduce cumulative leakage.<\/li>\n<li><strong>Execution:<\/strong> Install overlaps, tapes, and sealing profiles professionally; secure edges mechanically. Avoid overstretching tapes and ensure continuous contact pressure along bonds.<\/li>\n<li><strong>Initial test:<\/strong> Smoke test, visual inspection, and differential pressure measurement; rework leaks. Document settings of fans and flow rates for reproducibility.<\/li>\n<li><strong>Operation:<\/strong> Monitor differential pressure, check filter status, regulate traffic flows via airlocks. Schedule cleaning intervals and define response plans for alarm thresholds.<\/li>\n<li><strong>Closeout:<\/strong> Cleanliness and visual inspection, dismantle the enclosure without releasing dust. Remove penetrations in a controlled sequence and seal interim openings until final clearance.<\/li>\n<\/ol>\n<h2>Building materials and details for airtight solutions<\/h2>\n<ul>\n<li><strong>Films and membranes:<\/strong> Mechanically robust, tear-resistant materials of sufficient thickness; double up in impact-prone areas.<\/li>\n<li><strong>Sealing tapes and sleeves:<\/strong> For cables, hoses, and carriers; accommodate movement without opening the seal.<\/li>\n<li><strong>Zipper doors and airlocks:<\/strong> Pressure-stable and tear-out resistant; keep opening times short, plan routing.<\/li>\n<li><strong>Profile frames and bracing:<\/strong> Prevent fluttering and gaps under negative pressure and drafts.<\/li>\n<li><strong>Transitions to rough substrates:<\/strong> Primer or pre-coats increase tape adhesion on mineral surfaces.<\/li>\n<li><strong>Fire and smoke behavior:<\/strong> Select materials with suitable fire performance and low smoke production where required by the use case.<\/li>\n<li><strong>Reinforcements and wear protection:<\/strong> Corner guards, kick plates, and abrasion layers extend service life in high-traffic areas.<\/li>\n<\/ul>\n<h2>Measurement and quality assurance<\/h2>\n<p>Simple, proven procedures are used to check airtightness. A smoke test makes leakage paths visible; manometers show the pressure difference between work and protected areas. Particle measurement tests can demonstrate capture effectiveness. In rooms, methods for determining the air change rate may be used additionally. All measurements should be carefully documented and repeated when the enclosure is modified. Continuous data logging with timestamped records, photos of remediation steps, and defined acceptance thresholds support traceable quality control across the construction phase.<\/p>\n<h2>Occupational safety and environmental aspects<\/h2>\n<p>Airtightness supports the protection of personnel and the surroundings by limiting emissions and defining airflow. Requirements can arise from generally accepted rules of technology and relevant occupational safety regulations. These vary by application and should be reviewed project-specifically. The content here is general in nature and does not replace a binding case-by-case assessment. In addition, proper waste handling of spent filters and collected dust, as well as noise and vibration management, should be aligned with the overall protection concept.<\/p>\n<h2>Typical pitfalls and how to avoid them<\/h2>\n<ul>\n<li><strong>Unplanned penetrations:<\/strong> Subsequent routing without sleeves causes leakage.<\/li>\n<li><strong>Overstretched tapes:<\/strong> Tensile forces at corners and door openings cause gaps; reinforce mechanically.<\/li>\n<li><strong>Unsuitable substrates:<\/strong> Dusty, damp, or highly absorbent surfaces reduce adhesion; plan substrate preparation.<\/li>\n<li><strong>Insufficient air capacity:<\/strong> Undersized exhaust units cannot maintain the pressure differential.<\/li>\n<li><strong>Lack of monitoring:<\/strong> Without differential pressure control, leaks often go unnoticed.<\/li>\n<li><strong>Inadequate reinforcement:<\/strong> Missing bracing at large spans leads to fluttering and seam fatigue under negative pressure.<\/li>\n<li><strong>Moisture exposure:<\/strong> Condensation or wet cutting water at joints degrades adhesion; use compatible products and drip control.<\/li>\n<\/ul>\n<h2>Hydraulic power pack, lines, and airtight penetrations<\/h2>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a> from Darda GmbH supply concrete demolition shear, hydraulic splitter, combination shears, or multi cutters via hose bundles. These lines must be routed airtight through the enclosure. Flexible sleeves or multi-part sealing flanges permit movement during operation without opening leakage paths. With several parallel penetrations, a shared, reinforced technical passage is often tighter and more robust than many individual openings. Thermal loads from drives and hoses can influence airflow balance, so ensure sufficient make-up air and shield heat sources from membranes and tapes.<\/p>\n<h2>Process organization and documentation<\/h2>\n<p>An airtight site enclosure only works in conjunction with orderly workflows. Short door opening times, defined transport routes, intermediate cleaning, and filter replacement plans stabilize pressure conditions. A compact construction record with photos of connections, measurement logs, and approvals facilitates quality assurance and traceability throughout the entire construction phase. Clear responsibilities, handover protocols between shifts, and change management for any modification to the enclosure or penetrations ensure that the achieved airtightness level is maintained until final closeout.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Airtightness is a central topic in deconstruction, interior demolition, and tunnel construction: It determines dust dispersion, air quality, occupational safety, and the controllability of construction site processes in sensitive environments. In areas such as hospitals, laboratories, or occupied buildings as well as underground, reliable airtightness helps limit emissions, direct airflow, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/airtightness\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19403","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Airtightness in Demolition &amp; Tunnel Construction<\/title>\n<meta name=\"description\" content=\"Get airtightness right for construction &amp; demolition \u27a4 cut dust, keep negative pressure stable, protect adjacent areas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/airtightness\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Airtightness in Demolition &amp; Tunnel Construction\" \/>\n<meta property=\"og:description\" content=\"Get airtightness right for construction &amp; demolition \u27a4 cut dust, keep negative pressure stable, protect adjacent areas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/airtightness\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T05:10:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/airtightness\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/airtightness\",\"name\":\"Airtightness in Demolition & Tunnel Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-06T09:06:08+00:00\",\"dateModified\":\"2026-04-24T05:10:03+00:00\",\"description\":\"Get airtightness right for construction & demolition \u27a4 cut dust, keep negative pressure stable, protect adjacent areas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/airtightness#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/airtightness\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/airtightness#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Airtightness\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Airtightness in Demolition & Tunnel Construction","description":"Get airtightness right for construction & demolition \u27a4 cut dust, keep negative pressure stable, protect adjacent areas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/airtightness","og_locale":"en_US","og_type":"article","og_title":"Airtightness in Demolition & Tunnel Construction","og_description":"Get airtightness right for construction & demolition \u27a4 cut dust, keep negative pressure stable, protect adjacent areas.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/airtightness","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-24T05:10:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/airtightness","url":"https:\/\/www.darda.de\/en\/knowledge\/airtightness","name":"Airtightness in Demolition & Tunnel Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-06T09:06:08+00:00","dateModified":"2026-04-24T05:10:03+00:00","description":"Get airtightness right for construction & demolition \u27a4 cut dust, keep negative pressure stable, protect adjacent areas.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/airtightness#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/airtightness"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/airtightness#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Airtightness"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19403"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19403\/revisions"}],"predecessor-version":[{"id":26590,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19403\/revisions\/26590"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}